An integrated filling false bottom construction and use method for a mine with multiple mine access routes
CN118361283BActive Publication Date: 2024-10-01UNIV OF SCI & TECH BEIJING
-1 Cites -1 Cited by
Patent Information
- Application Number
- CN202410579227.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-11
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-05-11
Smart Images

Figure CN118361283B_ABST
Abstract
The present invention discloses an integrated filling false bottom construction and use method for a mine with multiple mining access routes, and belongs to the field of underground mining technology. An integrated filling false bottom construction for a mine with multiple mining access routes includes a mining tunnel with a drill hole, and also includes: a false bottom construction frame, the false bottom construction frame is arranged in the mining tunnel, and the false bottom construction frame is filled with a filling material using a high ash-sand ratio tailings cementing filling body; a fastening anchor rod, the fastening anchor rod is provided with multiple groups and passes through the false bottom construction frame and is inserted in the drill hole; the present invention uses a customized integral flexible chain link fence to cover the entire mining access section, saving the construction time and cost of the filling retaining wall, greatly reducing the high cost of the filling false bottom construction, and uses the fastening anchor rod to lock the flexible chain link fence on both sides, thereby increasing the strength of the false bottom and ensuring the safety of subsequent construction. The artificial false bottom construction method is convenient and fast, which speeds up the working efficiency of the mine and reduces the labor intensity and preparation cost.