Adjustable pipe auxiliary hoisting device and installation method thereof
By designing an adjustable pipe lifting auxiliary device, utilizing pipe clamp structure, lifting auxiliary structure and high-strength carbon fiber cloth, the problems of poor balance and stress concentration in traditional lifting methods are solved, achieving efficient and safe pipe lifting.
Patent Information
- Application Number
- CN202410633196.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-21
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-05-21
AI Technical Summary
Traditional pipeline hoisting methods suffer from poor balance, stress concentration, and frequent changes in hoisting tools, which affect construction quality, schedule, and safety.
An adjustable pipe lifting auxiliary device is adopted, including a pipe wrench structure, a lifting auxiliary structure, a retractor, and a high-strength carbon fiber cloth. Multiple sets of force-bearing elastic plate assemblies and pressure plate assemblies are suitable for pipes of different sizes and shapes. Combined with a level, it can be accurately positioned and adjusted.
It improved construction quality and safety control, reduced resource input, saved manpower and material resources, improved construction efficiency, reduced stress concentration at pipe ends, and ensured hoisting stability and safety.
Smart Images

Figure CN118373304B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of building construction engineering, specifically an adjustable pipe auxiliary hoisting device and its installation method. Background Technology
[0002] Pipeline hoisting refers to the use of lifting machinery to lift pipelines from the ground or other locations, and then installing them in a designated position through hoisting techniques. Pipeline hoisting is a crucial part of pipeline engineering. It typically requires selecting appropriate lifting machinery and choosing suitable hoisting tools and slings based on the size, weight, and project requirements of the pipeline. The hoisting machinery's hooks or other hoisting tools are connected to the pipeline to accurately position it in the predetermined location, and adjustments are made as needed.
[0003] Traditional pipeline hoisting methods using wire ropes not only suffer from poor balance, but also damage pipe sections, especially at stress concentration points at both ends. Furthermore, the varying pipe sizes and frequent changes in hoisting tools negatively impact construction quality, unit construction period, and safety control. Therefore, a suitable pipeline hoisting device is still lacking. Summary of the Invention
[0004] The purpose of this invention is to provide an adjustable pipe lifting auxiliary device and its installation method to address the aforementioned problems. One objective is to utilize the pipe clamp structure and lifting auxiliary structure specifically described in this invention to protect the pipe itself, especially when the pipe involves concrete, thereby improving construction quality and safety control. Another objective is to make the device suitable for lifting pipes of different sizes and shapes by setting up a convergent device, multiple sets of force-bearing elastic plate assemblies and pressure plate assemblies.
[0005] To achieve the aforementioned technical features, the present invention aims to provide an adjustable pipe-assisted lifting device comprising a pipe clamp structure and a lifting auxiliary structure symmetrically assembled; pipe clamp structures are provided at both ends of the pipe section body, and the pipe clamp structures are clamped at the ends of the pipe section body; the pipe clamp structure is provided with a level, a first pin, a pressure plate assembly, and a force-bearing elastic plate assembly, and a first elastic material layer is provided on the pressure plate of the pressure plate assembly and the force-bearing elastic plate assembly; the lifting auxiliary structure includes slings, connectors, lifting components, a retractor, and high-strength carbon fiber cloth; each sling consists of two slings, with both ends connected to a connector and a first pin.
[0006] The lifting component is provided with three circular through holes, with a second pin installed in each of the two through holes; slings are fixed around both ends of the second pins.
[0007] The connector is provided with four circular through holes, and a third pin is installed according to the actual situation; the two third pins are respectively connected to the pipe clamp structure and the lifting auxiliary structure by means of a sling; the two sets of third pins are at a 45° angle to the sling connection direction.
[0008] The lower part of the lifting auxiliary structure is a high-strength carbon fiber cloth; the connection between the high-strength carbon fiber cloth and the sling is a rigid carbon fiber plate; the carbon fiber plate is connected to the third pin shaft through the sling.
[0009] The slings are equipped with coiling devices at their connections to the carbon fiber plate, pipe clamp structure, connectors, and lifting components; each coiling device consists of a coiling ring and a coiling clamp; and each sling is a set of two.
[0010] The pipe wrench structure includes a first pin, a force-bearing spring plate assembly, a pressure plate assembly, a level, and a pipe wrench wall; The force-bearing elastic plate assembly includes a load-bearing base, springs, spring walls, force-bearing plates, and a first elastic material layer; the force-bearing elastic plate assembly is provided in six groups, and each group includes five spring assemblies; a force-bearing plate is fixed to the top of each of the five spring walls, and a first elastic material layer is fixed to each force-bearing plate.
[0011] The pressure plate assembly includes a fixed shaft, a fixed nut, a pressure plate, a rotating shaft, a rotating connector, and a second elastic material layer; the pressure plate assembly rotates via the rotating shaft and the rotating connector; the pressure plate is telescopically fixed to the pipe wrench wall via the fixed shaft and the fixed nut; there are three sets of pressure plate assemblies, each set of pressure plates is provided with a second elastic material layer; the fixed shaft is provided with a scale.
[0012] The level is detachably mounted inside the rear wall of the pipe clamp; the level can measure the direction, inclination, and tilt parameters of the pipe section body during lifting and installation.
[0013] An adjustable pipe-assisted hoisting device and its installation method include the following steps: Step 1, Geological Survey and Trench Excavation: Conduct a geological survey of the pipeline placement area, obtain engineering geological and hydrogeological data, determine the excavation method for trench excavation, and analyze and determine the installation location of the pipe section body; Step 2: Adjust the length of the lifting slings according to the designed pipe section dimensions, and assemble the pipe wrench structure and lifting auxiliary structure in advance; Step 3: Clamp the pipe wrench structure to the end of the pipe section body for pre-lifting. Adjust the direction of the pressure plate of the pressure plate assembly so that the second elastic material layer is attached to the upper part of the pipe section body. Record the fixed axis scale and observe the level to ensure that the pipe section body remains horizontal. Subsequent pipe sections of the same type will be fixed using this scale without pre-lifting. Step 4: Adjust the tensioner in the lifting auxiliary structure to make the high-strength carbon fiber cloth adhere to the pipe section body, place the sling on both ends of the third pin on the fixed connector, and fix the third pin. Step 5: Hoist the pipe section body to the predetermined installation position in Step 1. Based on the level data, further fine-tune the bottom of the trench, untie the high-strength carbon fiber cloth, place the pipe section body, and remove the pipe wrench structure.
[0014] The present invention has the following beneficial effects: 1. The lifting component of this invention is provided with three circular through holes with a certain distance between them, which can effectively prevent the lifting pipe from rotating during the lifting process and ensure construction safety.
[0015] 2. This invention, through the setting of connectors, especially when encountering concrete pipes, can add slings to connect carbon fiber cloth for auxiliary hoisting. The winding length of the carbon fiber cloth is controlled by the coiler to adapt to pipes of different sizes. In addition, the carbon fiber cloth is lightweight, high-strength, and highly flexible, which improves the stability of hoisting and can effectively ensure construction quality and safety control.
[0016] 3. The present invention, through the setting of the force-bearing elastic plate assembly and the pressure plate assembly, makes the pipe wrench structure applicable to pipes of different shapes and sizes. At the same time, the setting of multiple pressure plate assemblies and force-bearing elastic plate assemblies can effectively increase the contact area between the pipe section and the pipe wrench, reduce the problem of excessive stress at the contact point between the pipe and the pipe wrench, reduce the wear phenomenon before stress concentration at the pipe end, effectively reduce resource input, save manpower and material resources, and improve construction efficiency. Attached Figure Description
[0017] The present invention will be further described below with reference to the accompanying drawings and embodiments.
[0018] Figure 1 This is a schematic diagram of the overall invention.
[0019] Figure 2 This is a front view schematic diagram of the pipe wrench structure of the present invention.
[0020] Figure 3 This is a side view of the pipe wrench structure of the present invention.
[0021] Figure 4 This is a cross-sectional schematic diagram of the pipe wrench structure of the present invention.
[0022] Figure 5 This is a front view schematic diagram of the connector structure of the present invention.
[0023] Figure 6 This is a front view schematic diagram of the lifting component structure of the present invention.
[0024] Figure 7 This is a schematic diagram of the lifting auxiliary structure of the present invention.
[0025] Figure 8 This is a schematic diagram of the sling and retractor of the present invention.
[0026] In the diagram: 1. Pipe section body; 2. Pipe wrench structure; 3. Lifting auxiliary structure; 4. Connector; 5. Lifting component; 6. Sling; 7. Coiler; 21. First pin; 22. Force-bearing spring plate assembly; 23. Pressure plate assembly; 24. Level; 25. Pipe wrench wall; 31. High-strength carbon fiber cloth; 32. Carbon fiber plate; 41. Connector body; 42. Third pin; 43. Pin; 51. Lifting component body; 52. Second pin; 71. Coil ring; 72. Coil clamp; 221. Load-bearing base; 222. Spring; 223. Spring wall; 224. Force-bearing plate; 225. First elastic material layer; 231. Fixed shaft; 232. Fixed nut; 233. Pressure plate; 234. Rotating shaft; 235. Rotating connector; 236. Second elastic material layer. Detailed Implementation
[0027] The embodiments of the present invention will be further described below with reference to the accompanying drawings.
[0028] Example 1: See Figure 1-8 An adjustable pipe lifting auxiliary device includes a pipe clamp structure 2 and a lifting auxiliary structure 3 symmetrically assembled; both ends of the pipe section body 1 are provided with pipe clamp structures 2, and the pipe clamp structures 2 clamp the ends of the pipe section body 1; the pipe clamp structure 2 is provided with a level 24, a first pin 21, a pressure plate assembly 23 and a force-bearing elastic plate assembly 22, and a first elastic material layer 225 is provided on the pressure plate 233 of the pressure plate assembly 23 and the force-bearing plate 224 of the force-bearing elastic plate assembly 22; the lifting auxiliary structure 3 includes slings 6, connectors 4, lifting components 5, a retractor 7 and high-strength carbon fiber cloth 31; each sling 6 consists of two slings, and both ends are connected to the connectors 4 and the first pin 21. By employing the above-described device of the present invention, and utilizing the pipe wrench structure and lifting auxiliary structure specifically referred to in this invention, the pipe itself is protected, especially when the pipe involves concrete, thereby improving construction quality and safety control. Furthermore, the device is suitable for lifting pipes of different sizes and shapes by using the converging device, multiple sets of force-bearing elastic plate assemblies and pressure plate assemblies.
[0029] Furthermore, the lifting component 5 is provided with three circular through holes, with second pins 52 installed in both ends of the through holes; slings 6 are fixed around both ends of the second pins 52. The lifting component 5 can be used for subsequent lifting operations. In addition, the circular through holes in the lifting component 5, with a certain spacing between them, effectively prevent the lifting pipe from rotating during the lifting process, ensuring construction safety.
[0030] Furthermore, the connector 4 is provided with four circular through holes, and the third pin 43 is installed according to the actual situation; the two third pins 43 are respectively connected to the pipe wrench structure 2 and the lifting auxiliary structure 3 by the sling 6; the two sets of third pins 43 are connected to the sling 6 at a 45° angle.
[0031] Furthermore, the lower part of the lifting auxiliary structure 3 is a high-strength carbon fiber cloth 31; the connection between the high-strength carbon fiber cloth 31 and the sling 6 is a rigid carbon fiber plate 32; the carbon fiber plate 32 is connected to the third pin 43 through the sling 6.
[0032] Furthermore, each of the slings 6 is equipped with a coiler 7 at its connection point with the carbon fiber plate 32, pipe clamp structure 2, connector 4, and lifting component 5. The coiler 7 consists of a coiling ring 71 and a coiling clamp 72. Each sling 6 is installed in pairs. By using the coiler 7 and the high-strength carbon fiber cloth 31, the coiler 7 can be adjusted to control the winding length to adapt to pipes 1 of different sizes. In addition, the high-strength carbon fiber cloth 31 is lightweight, high-strength, and highly flexible, which improves the stability of the hoisting and effectively ensures construction quality and safety control.
[0033] Furthermore, the pipe wrench structure 2 includes a first pin 21, a force-bearing spring plate assembly 22, a pressure plate assembly 23, a level 24, and a pipe wrench wall 25; the force-bearing spring plate assembly 22 includes a load-bearing base 221, a spring 222, a spring wall 223, a force-bearing plate 224, and a first elastic material layer 225; the force-bearing spring plate assembly 22 is provided in six groups, and each group includes five spring assemblies 222; a force-bearing plate 224 is fixed to the top of the five spring walls 223, and a first elastic material layer 225 is fixed on each force-bearing plate 224.
[0034] Furthermore, by setting up the load-bearing base 221, spring 222, spring wall 223, force plate 224 and first elastic material layer 225 in the force-bearing elastic plate assembly 22, the problem that traditional wire rope hoisting and some rigid pipe wrenches not only have poor balance, but also cause damage to pipe section 1, especially at the stress concentration points at both ends of the pipe.
[0035] Furthermore, the pressure plate assembly 23 includes a fixed shaft 231, a fixed nut 232, a pressure plate 233, a rotating shaft 234, a rotating connector 235, and a second elastic material layer 236; the pressure plate assembly 23 rotates via the rotating shaft 234 and the rotating connector 235; the pressure plate 233 is telescopically fixed to the pipe wrench wall 25 via the fixed shaft 231 and the fixed nut 232; there are three sets of pressure plate assemblies 23, and each set of pressure plates 233 is provided with a second elastic material layer 236; the fixed shaft 231 is provided with a scale.
[0036] By setting up a fixed shaft 231, a fixed nut 232, a pressure plate 233, a rotating shaft 234, a rotating connector 235, and a second elastic material layer 236 in the pressure plate assembly 23, rotation is achieved through the rotating shaft 234 and the rotating connector 235. This allows the pipe wrench structure to be applicable to pipes of different shapes and sizes, while increasing the contact area between the pipe section 1 and the top of the inner wall of the pipe wrench structure 2, further reducing stress concentration.
[0037] Furthermore, the level 24 is detachably mounted within the rear wall of the pipe clamp wall 25; the level 24 can measure the direction, inclination, and tilt angle parameters of the pipe section body 1 during lifting and installation, ensuring construction safety.
[0038] Example 2: An adjustable pipe-assisted hoisting device and its installation method include the following steps: Step 1, Geological Survey and Trench Excavation: Conduct a geological survey of the pipeline placement area, obtain engineering geological and hydrogeological data, determine the excavation method for trench excavation, and analyze and determine the installation position of pipe section 1; Step 2: Adjust the length of the lifting sling 6 according to the design dimensions of the pipe section body 1, and assemble the pipe wrench structure 2 and the lifting auxiliary structure 3 in advance; Step 3: Clamp the pipe wrench structure 2 at the end of the pipe section body 1 for pre-lifting. Adjust the direction of the pressure plate 233 of the pressure plate assembly 23 so that the second elastic material layer 236 is attached to the upper part of the pipe section body 1. Record the scale of the fixed axis 231. At the same time, observe the level 24 to ensure that the pipe section body 1 remains horizontal. Subsequent pipe sections 1 will be fixed using this scale without pre-lifting. Step 4: Adjust the retractor 7 in the lifting auxiliary structure 3 so that the high-strength carbon fiber cloth 31 is attached to the pipe section body 1, and place the sling 6 on both ends of the third pin 43 on the fixed connector 4 to fix the third pin 43. Step 5: Hoist the pipe section body 1 to the predetermined installation position in Step 1. Based on the data from the level 24, further fine-tune the bottom of the trench. Untie the high-strength carbon fiber cloth 31, install the pipe section body 1, and remove the pipe wrench structure 2.
Claims
1. An adjustable pipe-assisted hoisting device, characterized in that, It includes a pipe wrench structure (2) and a lifting auxiliary structure (3) assembled symmetrically; both ends of the pipe section body (1) are provided with pipe wrench structures (2), and the pipe wrench structures (2) are clamped at the ends of the pipe section body (1); the lifting auxiliary structure (3) includes slings (6), connectors (4), lifting components (5), a coiler (7) and high-strength carbon fiber cloth (31); the slings (6) are all two, and both ends are connected to the connectors (4) and the first pin (21); the pipe wrench structure (2) includes the first pin (21), a force-bearing spring plate assembly (22), a pressure plate assembly (23), a level (24) and a pipe wrench wall (25); The force-bearing spring plate assembly (22) includes a load-bearing base (221), a spring (222), a spring wall (223), a force-bearing plate (224), and a first elastic material layer (225); the force-bearing spring plate assembly (22) is provided in six groups, and each group includes five spring (222) assemblies; a force-bearing plate (224) is fixed on the top of each of the five spring walls (223), and a first elastic material layer (225) is fixed on each force-bearing plate (224); The pressure plate assembly (23) includes a fixed shaft (231), a fixed nut (232), a pressure plate (233), a rotating shaft (234), a rotating connector (235), and a second elastic material layer (236). The pressure plate assembly (23) rotates through the rotating shaft (234) and the rotating connector (235). The pressure plate (233) is telescopically fixed to the pipe wrench wall (25) through the fixed shaft (231) and the fixed nut (232). There are three sets of pressure plate assemblies (23), and each set of pressure plates (233) is provided with a second elastic material layer (236). The fixed shaft (231) is provided with a scale.
2. The adjustable pipe-assisted hoisting device according to claim 1, characterized in that: The lifting component (5) is provided with three circular through holes, and a second pin (52) is installed in the through holes at both ends; the two ends of the second pin (52) are fixed with slings (6).
3. The adjustable pipe-assisted hoisting device according to claim 2, characterized in that: The connector (4) is provided with four circular through holes for mounting the third pin (43); the two third pins (43) are respectively connected to the pipe clamp structure (2) and the lifting auxiliary structure (3) by the sling (6); the two sets of third pins (43) are connected to the sling (6) at a 45° angle.
4. The adjustable pipe-assisted hoisting device according to claim 3, characterized in that: The lower part of the lifting auxiliary structure (3) is a high-strength carbon fiber cloth (31); the connection between the high-strength carbon fiber cloth (31) and the sling (6) is a rigid carbon fiber plate (32); the carbon fiber plate (32) is connected to the third pin (43) through the sling (6).
5. The adjustable pipe-assisted hoisting device according to claim 4, characterized in that: The slings (6) are all equipped with a coiler (7) at the connection points with the carbon fiber plate (32), the pipe wrench structure (2), the connector (4), and the lifting component (5); the coiler (7) consists of a coiling ring (71) and a coiling clamp (72); the slings (6) are all in pairs.
6. The adjustable pipe-assisted hoisting device according to claim 5, characterized in that: The level (24) is detachably installed in the rear wall of the pipe clamp (25); the level (24) can measure the direction, inclination and tilt parameters of the pipe section body (1) during lifting and installation.
7. A method for pipe-assisted hoisting installation, characterized in that, The method is implemented using the pipeline auxiliary hoisting device as described in claim 6, and includes the following steps: Step 1, Geological exploration and trench excavation: Conduct geological exploration of the pipeline placement area, obtain engineering geological and hydrogeological data, determine the excavation method for trench excavation, and analyze and determine the installation position of the pipe section body (1); Step 2: Adjust the length of the lifting sling (6) according to the design pipe section body (1) size, and assemble the pipe wrench structure (2) and lifting auxiliary structure (3) in advance. Step 3: Clamp the pipe wrench structure (2) at the end of the pipe section body (1) for pre-lifting. Adjust the direction of the pressure plate (233) of the pressure plate assembly (23) so that the second elastic material layer (236) is attached to the upper part of the pipe section body (1). Record the scale of the fixed axis (231) and observe the level (24) to ensure that the pipe section body (1) remains horizontal. Subsequent pipe sections (1) will be fixed using this scale without pre-lifting. Step 4: Adjust the tensioner (7) in the lifting auxiliary structure (3) so that the high-strength carbon fiber cloth (31) fits against the pipe section body (1), and place the sling (6) on both ends of the third pin (43) on the fixed connector (4) to fix the third pin (43). Step 5: Hoist the pipe section body (1) to the predetermined installation position in Step 1. Based on the data of the level (24), the bottom of the trench can be further fine-tuned. Untie the high-strength carbon fiber cloth (31), place the pipe section body (1), and remove the pipe wrench structure (2).
Citation Information
Patent Citations
Auxiliary hoisting device for circular reinforced concrete pipe joint
CN116768037A
Novel nimble hoist and mount of cement pipe material supporting device
CN205953338U
Lifting device for tubular pile production and processing
CN214879572U