A shunting method applied to an ATS device and the ATS device
By automating train operation through ATS equipment and utilizing different route arrangement modes, the problem of low automation in traditional shunting operations has been solved, enabling safe, efficient, and accurate shunting operations and improving the management efficiency of the depot.
Patent Information
- Application Number
- CN202410529876.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-04-29
AI Technical Summary
Traditional train shunting operations rely on manual labor and have a low degree of automation, making it difficult to guarantee the accuracy and efficiency of shunting operations. In particular, there are problems with insufficient informatization and automation in the management of rolling stock depots.
By using ATS equipment, shunting plans are acquired, routes are arranged using different judgment modes (from far to near or from near to far), train operation is automatically controlled, movement authorization is generated, and automated, accurate and efficient shunting operations are achieved.
It improves the automation level of shunting operations, ensures the safety and efficiency of shunting, enables real-time monitoring of operation progress, reduces manual intervention, and improves the management efficiency and operational safety of the depot.
Smart Images

Figure CN118387167B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of rail transit technology, and in particular to a shunting method and an ATS device. Background Technology
[0002] With the advancement of urbanization in my country, transportation demand has increased dramatically, leading to increasingly severe traffic congestion and placing enormous pressure on urban transportation. Rail transit, with its advantages of large capacity, high speed, safety, and punctuality, has gradually become the backbone of the urban transportation system, playing an increasingly important role in urban economic and social development. However, behind the continuous expansion in scale and the surge in passenger flow, train operation density is constantly increasing, as are the size of depots and the complexity of vehicle management. Consequently, the demand for automated train control in depots is growing.
[0003] In traditional Communication Based Train Control Systems (CBTC), signal tower operators prepare shunting operation plans based on vehicle conditions, track conditions, equipment maintenance schedules, and other factors. Relevant personnel then print out paper shunting operation orders. Outdoor shunting drivers contact station signalmen by telephone to request the designated shunting route. The signalmen then manually process the shunting route according to the outdoor operation requirements. The entire process relies on manual labor, making accuracy and efficiency difficult to guarantee. Summary of the Invention
[0004] The exemplary embodiments of this application provide a shunting method and an ATS device for use in achieving automated, efficient, and accurate shunting operations.
[0005] According to a first aspect of an exemplary embodiment, a shunting method applied to an ATS (Automatic Train Protection) device is provided, comprising:
[0006] Obtain the shunting plan; wherein, the shunting plan includes at least one shunting plan, each shunting plan corresponds to a starting point and an ending point; the ending point corresponding to the previous shunting plan is the starting point corresponding to the next shunting plan; there are multiple routes between the starting point and the ending point corresponding to each shunting plan; the ending point of the previous route is the starting point of the next route;
[0007] If the train is detected to be at the first starting point of the first coupling plan, and if the current mode is the first judgment mode, then when each route corresponding to the first coupling plan meets the route conditions, each route and its set attributes are sent to the interlocking equipment; if the current mode is the second judgment mode, then when any route corresponding to the first coupling plan meets the route conditions, the route and its set attributes are sent to the interlocking equipment, so that the interlocking equipment can generate a movement authorization through the area controller and control the train's operation.
[0008] The first judgment mode is a mode that judges according to the order of the route from the first endpoint to the first starting point of the first hook plan; the second judgment mode is a mode that judges according to the order of the route from the first starting point to the first endpoint of the first hook plan.
[0009] According to a second aspect of an exemplary embodiment, an ATS device is provided, including a processor and a memory;
[0010] The memory is configured to execute:
[0011] Storage and shunting plan;
[0012] The processor is configured to execute:
[0013] Obtain the shunting plan; wherein, the shunting plan includes at least one shunting plan, each shunting plan corresponds to a starting point and an ending point; the ending point corresponding to the previous shunting plan is the starting point corresponding to the next shunting plan; there are multiple routes between the starting point and the ending point corresponding to each shunting plan; the ending point of the previous route is the starting point of the next route;
[0014] If the train is detected to be at the first starting point of the first coupling plan, and if the current mode is the first judgment mode, then when each route corresponding to the first coupling plan meets the route conditions, each route and its set attributes are sent to the interlocking equipment; if the current mode is the second judgment mode, then when any route corresponding to the first coupling plan meets the route conditions, the route and its set attributes are sent to the interlocking equipment, so that the interlocking equipment can generate a movement authorization through the area controller and control the train's operation.
[0015] The first judgment mode is a mode that judges according to the order of the route from the first endpoint to the first starting point of the first hook plan; the second judgment mode is a mode that judges according to the order of the route from the first starting point to the first endpoint of the first hook plan.
[0016] According to a third aspect of an exemplary embodiment, a shunting apparatus for use with an ATS (Automatic Train Protection) system is provided, comprising:
[0017] The data acquisition unit is used to: acquire a shunting plan; wherein the shunting plan includes at least one shunting plan, each shunting plan corresponds to a starting point and an ending point; the ending point corresponding to the previous shunting plan is the starting point corresponding to the next shunting plan; there are multiple routes between the starting point and the ending point corresponding to each shunting plan; the ending point of the previous route is the starting point of the next route.
[0018] The data processing unit is used to: detect that the train is located at the first starting point of the first coupling plan; if the current condition is the first judgment mode, then when each route corresponding to the first coupling plan meets the route conditions, send each route and the set route attributes to the interlocking equipment; if the current condition is the second judgment mode, then when any route corresponding to the first coupling plan meets the route conditions, send the route and the set attributes to the interlocking equipment; so that the interlocking equipment generates a movement authorization through the area controller and controls the train operation.
[0019] The first judgment mode is a mode that judges according to the order of the route from the first endpoint to the first starting point of the first hook plan; the second judgment mode is a mode that judges according to the order of the route from the first starting point to the first endpoint of the first hook plan.
[0020] According to a fourth aspect of an exemplary embodiment, a computer storage medium is provided, which stores computer program instructions that, when executed on a computer, cause the computer to perform a shunting method applied to an ATS device as described in the first aspect.
[0021] In this embodiment, after obtaining the shunting plan, different methods are used to arrange routes for each shunting plan based on the current judgment mode. The first judgment mode is to judge routes in order from the first endpoint to the first starting point of the first shunting plan, i.e., from farthest to nearest. In this mode, if a train is detected at the first starting point of the first shunting plan, and each route corresponding to the first shunting plan meets the route conditions, each route and its set attributes are sent to the interlocking equipment. The second judgment mode is to judge routes in order from the first starting point to the first endpoint of the first shunting plan, i.e., from nearest to farthest. In this mode, if a train is detected at the first starting point of the first shunting plan, and any route corresponding to the first shunting plan meets the route conditions, the route and its set attributes are sent to the interlocking equipment. Thus, the interlocking equipment generates movement authorization through the area controller and controls train operation. Arranging routes from farthest to nearest avoids situations where a train has already started but the next route is not yet open, ensuring shunting safety; arranging routes from nearest to farthest improves shunting efficiency. Furthermore, arranging routes on a route-by-route basis improves shunting accuracy. In summary, the embodiments of this application can achieve automated, efficient, accurate, and safe shunting. Attached Figure Description
[0022] To more clearly illustrate the technical solutions in the embodiments of this application, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0023] Figure 1 An exemplary schematic diagram of a path arrangement provided in an embodiment of this application is shown;
[0024] Figure 2 An exemplary schematic diagram of a shunting operation process provided in an embodiment of this application is shown;
[0025] Figure 3 An exemplary illustration shows an application scenario diagram of a shunting method for ATS equipment provided in an embodiment of this application;
[0026] Figure 4 An exemplary flowchart illustrates a shunting method for ATS equipment provided in an embodiment of this application;
[0027] Figure 5 An exemplary illustration shows a schematic diagram of automatically issuing shunting orders according to a shunting plan, provided in an embodiment of this application;
[0028] Figure 6 An exemplary schematic diagram of an automatic shunting route planning method provided in an embodiment of this application is shown;
[0029] Figure 7 An exemplary flowchart illustrates a complete shunting method applied to ATS equipment provided in an embodiment of this application;
[0030] Figure 8 An exemplary illustration shows a shunting operation state transition diagram provided in an embodiment of this application;
[0031] Figure 9 An exemplary schematic diagram of a shunting device applied to an ATS equipment provided in an embodiment of this application is shown;
[0032] Figure 10 An exemplary schematic diagram of an ATS device provided in an embodiment of this application is shown. Detailed Implementation
[0033] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings.
[0034] For ease of understanding, the terms used in the embodiments of this application are explained below:
[0035] (1) A shunting plan is a component of a station operation plan. It is a specific action plan that specifies how trains are dismantled, assembled, retrieved, and detached during shunting operations. Depending on the content of the shunting operation, there are dismantling shunting operation plans, marshalling shunting operation plans, retrieval and delivery shunting operation plans, and intermediate station detachment and coupling shunting operation plans. In the embodiments of this application, a shunting plan refers to a shunting method that moves a train from one track to another without detaching trains during the transfer. In each shunting plan, the shunting route is planned in advance.
[0036] In this embodiment of the application, the shunting plan includes at least one shunting plan, each shunting plan corresponding to a starting point (starting track) and an ending point (destination track); the ending point corresponding to the previous shunting plan is the starting point corresponding to the next shunting plan; there are multiple routes between the starting point and the ending point corresponding to each shunting plan; the ending point of the previous route is the starting point of the next route; there is a route between two adjacent signals, and each route includes multiple sections.
[0037] Figure 1 This is a schematic diagram of one approach arrangement in an embodiment of this application. Figure 1 The example uses two hook plans, where the positions of destination track 1, signal light 3, and starting track 2 coincide; and the positions of destination track 2, signal light 6, and starting track 3 coincide. Figure 1 This is just an example and does not constitute a specific limitation.
[0038] (2) Train impoundment: In the context of subways, "train impoundment" refers to an emergency measure in which the train dispatcher stops the train at the station and prohibits it from being dispatched when there are sudden emergencies such as operational adjustments, section blockages, or train rescue.
[0039] (3) Rail shoes. Rail shoes are one of the tools used in railway shunting operations to prevent slippage. They are used to prevent slippage on rail surfaces of various sizes and are divided into ordinary rail shoes and self-locking rail shoes. The locking claws are opened with a special key and installed on dedicated lines or arrival / departure lines to prevent vehicles from slipping. Without the special key, people cannot take the rail shoes, which serve as both anti-theft and safety measures to prevent slippage.
[0040] The Automatic Train Supervision (ATS) system is an important subsystem of the Automatic Train Control (ATC) system. It works in conjunction with other subsystems such as interlocking, Automatic Train Operation (ATO), or Automatic Train Protection (ATP) systems to set routes for train operations based on the train timetable, automatically adjust train operations, direct train operations, implement train operation management, and complete the train operation command for an urban rail line.
[0041] With the development of rail transit, subway depots, as a crucial component of subway operations, play a vital role in improving operational efficiency, reducing operating costs, and enhancing customer experience through their automation levels. Specifically, taking subway trains as an example, after a subway train's operation ends, it needs to return to the depot for rest and maintenance. The depot is the location within the urban rail transit system for the operation, management, parking, and maintenance of vehicles. Besides its parking function, the depot is also a site for major overhauls of urban rail transit vehicles. Subway vehicle maintenance is primarily carried out within the maintenance depot; therefore, as a support base for subway vehicle commissioning and operation, the depot undertakes the tasks of commissioning, inspection, operation, and comprehensive maintenance and upkeep of all equipment and facilities along the entire line.
[0042] In traditional CBTC systems, depots are typically managed manually, with the ATS system only monitoring but not controlling trains within the depot. Depot entry and exit operations are primarily handled by dispatch workstations or depot / section dispatcher workstations, resulting in a high degree of automation. However, shunting operations are mainly conducted through local control workstations under local manual control, leading to a low degree of automation. Furthermore, conflicts between depot construction and shunting operations, as well as abnormal situations such as depot power outages and shunting operation conflicts, cannot be predicted in advance, and shunting progress cannot be monitored in real time. The low level of informatization and automation in traditional control methods significantly impacts depot efficiency. Traditional vehicle management methods can no longer meet the needs of localized subway operations, thus placing higher demands on the informatization, automation, and efficiency of shunting operations. Therefore, there is an urgent need to introduce a comprehensive shunting operation management solution to improve management efficiency and operational safety.
[0043] Figure 2 This is a schematic diagram of a shunting operation process in related technologies. Figure 2 It should include at least the following steps:
[0044] S201: Signalman prepares shunting plan.
[0045] S202: Print paper shunting operation order.
[0046] S203: The driver requests permission to arrange a shunting route.
[0047] S204: Signalmen manually handle shunting routes.
[0048] S205: The driver begins shunting operations.
[0049] pass Figure 2 It can be seen that the shunting operation process in the relevant technologies relies too much on manual intervention, has a low degree of automation, and is inefficient.
[0050] Therefore, this application provides a shunting method applied to ATS equipment, including a complete shunting operation scheme such as compiling a shunting plan, automatically controlling the shunting operation process, automatically planning the shunting route, and checking for conflicting operating conditions. By adopting the shunting amplification method in this application embodiment, the informatization and automation level of shunting operations can be improved; by optimizing the shunting route, the efficiency of shunting operations can be improved; and by checking for conflicting operating conditions, the safety of shunting operations can be improved.
[0051] After introducing the design concept of the embodiments of this application, the following is a brief introduction to the application scenarios to which the technical solutions of the embodiments of this application can be applied. It should be noted that the application scenarios described below are only for illustrating the embodiments of this application and are not intended to limit the scope. In specific implementation, the technical solutions provided by the embodiments of this application can be flexibly applied according to actual needs.
[0052] ATS equipment can be categorized by location into control center ATS equipment, mainline station ATS equipment (including centralized and non-centralized equipment stations), depot ATS equipment, and parking lot ATS equipment. Each ATS equipment communicates with other equipment via a communication network. This application embodiment can be applied to depot or parking lot scenarios; therefore, the ATS equipment in this application embodiment is depot ATS equipment or parking lot ATS equipment.
[0053] refer to Figure 3 This diagram illustrates an application scenario of a shunting method using ATS equipment. Taking a depot as an example, the depot's ATS equipment mainly includes: redundant ATS station machines, dispatch workstations, depot / depot dispatcher workstations, redundant local control workstations, reversing units, ATS display workstations, station maintenance workstations, network equipment, and necessary auxiliary equipment. It should be noted that... Figure 3 Only a portion is shown, not the entirety. Outbound and inbound operations are primarily implemented through dispatch workstations or yard / section dispatcher workstations, exhibiting a high degree of automation. However, shunting operations are mainly implemented through local control workstations, which, in related technologies, are achieved under local manual control, resulting in a low degree of automation.
[0054] To further illustrate the technical solutions provided in the embodiments of this application, a detailed description is provided below in conjunction with the accompanying drawings and specific implementation methods. Although the embodiments of this application provide method operation steps as shown in the following embodiments or drawings, the method may include more or fewer operation steps based on conventional or non-inventive methods. In steps where there is no logically necessary causal relationship, the execution order of these steps is not limited to the execution order provided in the embodiments of this application.
[0055] The following is combined with Figure 3 The application scenarios shown are for reference. Figure 4 The flowchart shown illustrates a shunting method applied to ATS equipment, and explains the technical solution provided in the embodiments of this application.
[0056] S401: Obtain shunting plan.
[0057] S402: Train detected at the first starting point of the first hook plan.
[0058] S403: If the current mode is the first judgment mode, when each path corresponding to the first hook plan meets the path conditions, each path and the set path attributes are sent to the interlocking device.
[0059] S404: If the current judgment mode is the second judgment mode, when any route corresponding to the first hook plan meets the route conditions, the route and the set attributes will be sent to the interlocking device.
[0060] S405: Enables interlocking equipment to generate movement authorization via the area controller and control train operation;
[0061] The first judgment mode is a mode that judges according to the order of the route from the first endpoint to the first starting point of the first hook plan; the second judgment mode is a mode that judges according to the order of the route from the first starting point to the first endpoint of the first hook plan.
[0062] In this embodiment, after obtaining the shunting plan, different methods are used to arrange routes for each shunting plan based on the current judgment mode. The first judgment mode is to judge routes in order from the first endpoint to the first starting point of the first shunting plan, i.e., from farthest to nearest. In this mode, if a train is detected at the first starting point of the first shunting plan, and each route corresponding to the first shunting plan meets the route conditions, each route and its set attributes are sent to the interlocking equipment. The second judgment mode is to judge routes in order from the first starting point to the first endpoint of the first shunting plan, i.e., from nearest to farthest. In this mode, if a train is detected at the first starting point of the first shunting plan, and any route corresponding to the first shunting plan meets the route conditions, the route and its set attributes are sent to the interlocking equipment. Thus, the interlocking equipment generates movement authorization through the area controller and controls train operation. Arranging routes from farthest to nearest avoids situations where a train has already started but the next route is not yet open, ensuring shunting safety; arranging routes from nearest to farthest improves shunting efficiency. Furthermore, arranging routes on a route-by-route basis improves shunting accuracy. In summary, the embodiments of this application can achieve automated, efficient, accurate, and safe shunting.
[0063] Regarding S401, obtaining the shunting plan allows us to determine which shunting plans are included in the plan, and the starting and ending points of each plan. The starting point of a shunting plan can be the starting track, and the ending point can be the destination track. Table 1 is an information table of a shunting plan provided in an embodiment of this application. The shunting plan may also include the depot number (used to uniquely identify the depot or parking lot), the plan date, the shunting plan number, the plan issuance time, and the type of traction train (electric train traction or engineering vehicle traction). Furthermore, taking a single shunting plan as an example, the shunting plan also includes the starting track number, the destination track number, the train number (shunting may involve coupling and uncoupling, and multiple trains may be shunted), and the status of the shunting plan. The status of the shunting plan includes route not yet processed, route open, route in progress, and route used up. Initially, the status of each shunting plan is route not yet processed.
[0064] Table 1. Information table of a shunting plan provided in the embodiments of this application.
[0065]
[0066]
[0067] Figure 5 This is a schematic diagram illustrating the automatic issuance of shunting orders based on a shunting plan, provided as an embodiment of this application. Figure 5 It should include at least the following steps:
[0068] S501: The parking section prepares a shunting plan.
[0069] S502: Determine whether a train has been found based on the time the shunting plan is issued. If so, proceed with S503; otherwise, end the process.
[0070] The timing of issuing the shunting plan can be preset.
[0071] S503: Carry out shunting operations according to the shunting plan and execute the shunting plan.
[0072] This application embodiment can support the preparation of shunting plans and automatically issue shunting operation orders according to the shunting plan issuance time, which greatly improves the informatization level of shunting operations.
[0073] Next, we will take any one of the shunting plans as an example to illustrate the shunting process. The first shunting plan will be used as an example.
[0074] Regarding S402-S404, if the train is located at the first starting point of the first coupling plan, it means that the first coupling plan can be started. At this time, the route can be arranged according to different modes, including a first judgment mode and a second judgment mode. The first judgment mode is a mode that judges according to the route sequence in the direction from the first endpoint to the first starting point of the first coupling plan; the second judgment mode is a mode that judges according to the route sequence in the direction from the first starting point to the first endpoint of the first coupling plan.
[0075] See Figure 1 The first judgment mode is from farthest to nearest. That is, it first judges whether route 3 meets the route conditions, then whether route 2 meets the route conditions, and then whether route 1 meets the route conditions. When all the route conditions are met, each route and its set route attributes are sent to the interlocking equipment. Here, the route sent refers to the start and end points of the route, and the set route attributes refer to any of the following: train route priority, shunting route priority, or a mixture of train route and shunting route. The set route attributes are set according to user requirements. Among them, the train route priority attribute indicates a higher train speed; the shunting route priority attribute indicates a lower train speed.
[0076] In this mode, if route 3 meets the route conditions, signal light 3 turns green, but the train is still at point A and remains stationary after signal light 3 turns green. If route 2 meets the route conditions, signal light 2 turns green, but the train is still at point A and remains stationary after signal light 2 turns green. If route 2 meets the route conditions, signal light 1 turns green, but the train is still at point A. After signal light 1 turns green, these three routes and their set attributes are sent to the interlocking equipment. The interlocking equipment generates movement authorization through the area controller and controls the train's operation. In this way, the train completes one route planning cycle. This arrangement of routes from far to near avoids situations where a train has already started but the next route does not yet meet the opening conditions.
[0077] The second judgment mode is a near-to-far approach. That is, it first judges whether route 1 meets the route conditions, then judges whether route 2 meets the route conditions, and then judges whether route 1 meets the route conditions again. After judging the route conditions of any route, the route and the set route attributes can be sent to the interlocking device.
[0078] In this mode, if route 1 meets the route conditions, signal light 1 turns green, and route 1 and its set attributes are sent to the interlocking equipment. The interlocking equipment generates a movement authorization through the area controller and controls the train to pass through the location of signal light 1. If route 2 meets the route conditions, signal light 2 turns green, and route 2 and its set attributes are sent to the interlocking equipment. The interlocking equipment generates a movement authorization through the area controller and controls the train to pass through the location of signal light 2. If route 3 meets the route conditions, signal light 3 turns green, and route 3 and its set attributes are sent to the interlocking equipment. The interlocking equipment generates a movement authorization through the area controller and controls the train to pass through the location of signal light 3. In this way, the train completes one shunting plan. This method, proceeding from near to far, can improve shunting efficiency.
[0079] In this embodiment, routes are automatically arranged according to the shunting plan, thereby improving the automation level of shunting operations.
[0080] This application embodiment supports differentiated needs for cities and lines, such as train route priority, from far to near, and from near to far. It can be flexibly configured, improving system applicability and facilitating engineering implementation.
[0081] Figure 6 This is a schematic diagram illustrating an automatic shunting route planning method provided in an embodiment of this application. Figure 6 It should include at least the following steps:
[0082] S601: Match the destination of the planned trip.
[0083] S602: If train route priority is given, then train route combinations will be searched first.
[0084] S603: If shunting route priority is given, then shunting route combinations will be searched first.
[0085] S604: If the train route and shunting route are mixed, then perform a mixed search of the train route and shunting route.
[0086] S605: Get the list of routes to be sorted.
[0087] S606: Sort the list of routes to be arranged according to the route determination mode.
[0088] S607: Issue route arrangement commands in sequence.
[0089] In this embodiment of the application, issuing the route arrangement command means that after the route meets the route conditions, the signal light ahead of the route turns green under the control of the interlocking controller and the area controller, and the train starts running after receiving the movement authorization.
[0090] Optionally, the route conditions include some or all of the following conditions, which can be used to determine whether any route meets the route conditions:
[0091] Condition 1: The section where the train is located and the sections it passes through are under power supply.
[0092] The train's location can be determined based on its position within the designated section. The train's position is related to the judgment mode. For example, if the current judgment mode is first, the train remains stationary at position A, and its position is the first starting point of the first route plan. If the current judgment mode is second, the train operates as each route condition is met, and its position is the starting point of the current route. For instance, when judging route 2, the train's position is where signal light 1 is located.
[0093] Because there is a correspondence between location and section, the section where the train is located can be determined when the train's location is known. The sections traversed are all sections included in the current route. This condition ensures that both the section where the train is located and the sections traversed are powered.
[0094] Condition 2: The section where the train is located and the section it passes through are not under construction.
[0095] When construction is underway in certain sections, it can affect shunting operations. Therefore, this condition ensures that the section where the train is located and the sections it passes through are free from construction.
[0096] Condition 3: The train is not impounded.
[0097] When a train is impounded, it is prohibited from running. Therefore, this condition ensures that the train is not impounded.
[0098] Condition 4: The train is in a state where the brake shoes are not installed.
[0099] Trains are prohibited from operating when they are in a state where they are set to be hit by metal scraps. Therefore, this condition ensures that the train is in a state where there are no metal scraps.
[0100] In both of the above modes, the first hook plan is considered complete when each path corresponding to the first hook plan meets the path conditions.
[0101] If the first shunting plan is the first of at least one shunting plan, the method further includes detecting whether the train is at the starting point of the first shunting plan if the current time is a preset time before the planned start time of the shunting plan. For example, if the planned start time is 14:00 and the preset time is 5 minutes, the detection of whether the train is at the starting point of the first shunting plan can start from 13:55, which can fully ensure the accuracy of the execution of the first shunting plan. If the first shunting plan is not the last shunting plan in the shunting plan, the next shunting plan after the first shunting plan is completed will continue to be executed.
[0102] In this embodiment of the application, when the shunting plan includes multiple shunting plans, the shunting operation can be completed in the order of the shunting plans.
[0103] Figure 7 A flowchart illustrating a complete shunting method applied to ATS equipment is provided as an embodiment of this application. Figure 7 It should include at least the following steps:
[0104] S701: Automatically match destinations based on the plan.
[0105] S702: Automatically create permutation path tasks.
[0106] S703: Check whether there is a power outage in the section where the train is located and the sections it passes through. If not, proceed to S704; if yes, proceed to S710.
[0107] S704: Check whether there is construction on the section where the train is located and the sections it passes through. If not, proceed to S705; if so, proceed to S710.
[0108] S705: Check if the train has been detained by the depot. If not, proceed to S706; if so, proceed to S710.
[0109] S706: Check if the train is equipped with a safety rail. If not, proceed to S707; if yes, proceed to S710.
[0110] S707: Issue route arrangement command.
[0111] S708: The train has arrived at the destination of the planned route.
[0112] S709: Determine if the current checkbox is the last checkbox. If so, end; otherwise, return to execute S701.
[0113] S710: Notifies the dispatcher of job conflicts.
[0114] In this embodiment, when arranging routes, the system checks for conflicts between operational conditions such as construction, power supply, track maintenance, and train impoundment based on the planned shunting route in the shunting plan, and automatically arranges routes for the trains, improving the safety of shunting operations. If operational conflicts exist, a prompt message can be generated and displayed to the dispatcher.
[0115] In addition, to provide real-time feedback on shunting operation status, the ATS equipment can obtain the execution status of the shunting plan through interlocking devices. The execution status includes the current target route, the target route's status, and the open status of signals within the target route (whether they have switched to green). The target route's status includes the route application status (whether it has been processed) and the route usage status (whether it is in use). The execution status of the shunting plan is then sent to terminal equipment. This terminal equipment can be a display device installed in the section or a handheld device used by maintenance personnel. This allows maintenance personnel to promptly monitor the progress of shunting operations.
[0116] Furthermore, for the implementation of shunting operations, the object-oriented state machine design pattern can be used to implement the shunting operation function. Using a state machine to manage the shunting operation process improves the maintainability and scalability of the software. Based on different stages of the shunting operation, shunting operations are handled according to initial state, destination setting state, route usage completion state, and ending state. The conditions for state transitions and train control under specific states are identified, including updates to control commands during state transitions and updates to control commands during the duration of a state. Table 2 provides an explanation of shunting operation state transitions according to an embodiment of this application.
[0117] Table 2. A shunting operation status transition table provided in the embodiments of this application.
[0118]
[0119] Figure 8 This application provides a shunting operation state transition diagram, which is achieved through... Figure 8 This demonstrates the process of completing a shunting operation.
[0120] The embodiments of this application can be used in the train control system of actual projects, and train control is carried out throughout the entire operation life cycle, which greatly improves the accuracy of train control; it supports customized depot / equipment fault handling / track anomaly handling functions, and has significant advantages in engineering implementation.
[0121] like Figure 9 As shown, based on the same inventive concept, this application provides a shunting device for ATS equipment, including a data acquisition unit 91 and a data processing unit 92.
[0122] The data acquisition unit 91 is used to: acquire a shunting plan; wherein the shunting plan includes at least one shunting plan, each shunting plan corresponds to a starting point and an ending point; the ending point corresponding to the previous shunting plan is the starting point corresponding to the next shunting plan; there are multiple routes between the starting point and the ending point corresponding to each shunting plan; the ending point of the previous route is the starting point of the next route.
[0123] The data processing unit 92 is configured to: detect that the train is located at the first starting point of the first coupling plan; if the current condition is the first judgment mode, then when each route corresponding to the first coupling plan meets the route conditions, send each route and the set route attributes to the interlocking equipment; if the current condition is the second judgment mode, then when any route corresponding to the first coupling plan meets the route conditions, send the route and the set attributes to the interlocking equipment; so that the interlocking equipment generates a movement authorization through the area controller and controls the train operation.
[0124] The first judgment mode is a mode that judges according to the order of the route from the first endpoint to the first starting point of the first hook plan; the second judgment mode is a mode that judges according to the order of the route from the first starting point to the first endpoint of the first hook plan.
[0125] In an optional implementation, if the first hook plan is the first of at least one hook plan, the data processing unit 92 is further configured to:
[0126] If the current time is a preset time before the planned start time of the shunting plan, then check whether the train is at the starting point of the first shunting plan.
[0127] In an optional implementation, if the shunting plan includes multiple shunting plans, and the first shunting plan is not the last of the shunting plans, then the data processing unit 92 is further configured to:
[0128] After the first hook plan is completed, the next hook plan will be executed.
[0129] In an optional implementation, the data processing unit 92 is further configured to:
[0130] The first hook plan is considered complete when each path in the first hook plan meets the path conditions.
[0131] In an optional implementation, the data processing unit 92 is further configured to:
[0132] The execution status of the shunting plan is obtained through interlocking equipment; the execution status includes the current target route, the status of the target route, and the open status of the signals in the target route; the status of the target route includes the route processing status and the route usage status;
[0133] The execution status of the shunting plan is sent to the terminal device.
[0134] In one alternative implementation, the route conditions include some or all of the following conditions:
[0135] The section where the train is located and the sections it passes through are under power supply.
[0136] The section where the train is located and the section it passes through are currently not under construction.
[0137] The train is not impounded.
[0138] The train is in a state where the brake shoes are not installed;
[0139] The route segments refer to the various segments included in the current route.
[0140] In an optional implementation, the data processing unit 92 is further configured to:
[0141] Determine the section where the train is located based on its position;
[0142] If the current judgment mode is the first judgment mode, the train's position is the first starting point of the first hook plan; if the current judgment mode is the second judgment mode, the train's position is the starting point of the current route.
[0143] In one alternative implementation, the route attributes are set to include train route priority, shunting route priority, and any one of a combination of train route and shunting route.
[0144] Since this device is the same as the device in the method of this application embodiment, and the principle of the device in solving the problem is similar to that of the method, the implementation of the device can be referred to the implementation of the method, and the repeated parts will not be described again.
[0145] like Figure 10 As shown, based on the same inventive concept, this application provides an ATS device, including a processor 101 and a memory 102.
[0146] Memory 102 is configured to perform:
[0147] Storage and shunting plan;
[0148] Processor 101 is configured to execute:
[0149] Obtain the shunting plan; wherein, the shunting plan includes at least one shunting plan, each shunting plan corresponds to a starting point and an ending point; the ending point corresponding to the previous shunting plan is the starting point corresponding to the next shunting plan; there are multiple routes between the starting point and the ending point corresponding to each shunting plan; the ending point of the previous route is the starting point of the next route;
[0150] If the train is detected to be at the first starting point of the first coupling plan, and if the current mode is the first judgment mode, then when each route corresponding to the first coupling plan meets the route conditions, each route and its set attributes are sent to the interlocking equipment; if the current mode is the second judgment mode, then when any route corresponding to the first coupling plan meets the route conditions, the route and its set attributes are sent to the interlocking equipment, so that the interlocking equipment can generate a movement authorization through the area controller and control the train's operation.
[0151] The first judgment mode is a mode that judges according to the order of the route from the first endpoint to the first starting point of the first hook plan; the second judgment mode is a mode that judges according to the order of the route from the first starting point to the first endpoint of the first hook plan.
[0152] In an alternative implementation, if the first hook plan is the first of at least one hook plan, the processor 101 is further configured to:
[0153] If the current time is a preset time before the planned start time of the shunting plan, then check whether the train is at the starting point of the first shunting plan.
[0154] In an optional implementation, if the shunting plan includes multiple shunting plans, and the first shunting plan is not the last of the shunting plans, then the processor 101 is further configured to:
[0155] After the first hook plan is completed, the next hook plan will be executed.
[0156] In an alternative implementation, the processor 101 is further configured to:
[0157] The first hook plan is considered complete when each path in the first hook plan meets the path conditions.
[0158] In an alternative implementation, the processor 101 is further configured to:
[0159] The execution status of the shunting plan is obtained through interlocking equipment; the execution status includes the current target route, the status of the target route, and the open status of the signals in the target route; the status of the target route includes the route processing status and the route usage status;
[0160] The execution status of the shunting plan is sent to the terminal device.
[0161] In one alternative implementation, the route conditions include some or all of the following conditions:
[0162] The section where the train is located and the sections it passes through are under power supply.
[0163] The section where the train is located and the section it passes through are currently not under construction.
[0164] The train is not impounded.
[0165] The train is in a state where the brake shoes are not installed;
[0166] The route segments refer to the various segments included in the current route.
[0167] In an alternative implementation, the processor 101 is further configured to:
[0168] Determine the section where the train is located based on its position;
[0169] If the current judgment mode is the first judgment mode, the train's position is the first starting point of the first hook plan; if the current judgment mode is the second judgment mode, the train's position is the starting point of the current route.
[0170] In one alternative implementation, the route attributes are set to include train route priority, shunting route priority, and any one of a combination of train route and shunting route.
[0171] This application also provides a computer storage medium storing computer program instructions. When the instructions are executed on the computer, the computer performs the steps of the above-described shunting method applied to the ATS equipment.
[0172] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0173] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to this application. It should be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.
[0174] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.
[0175] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.
[0176] Obviously, those skilled in the art can make various modifications and variations to this application without departing from the scope of this application. Therefore, if such modifications and variations fall within the scope of the claims of this application and their equivalents, this application also intends to include such modifications and variations.
Claims
1. A shunting method applied to ATS equipment, characterized in that, include: Obtain a shunting plan; wherein the shunting plan includes at least one shunting plan, each shunting plan corresponds to a starting point and an ending point; the ending point corresponding to the previous shunting plan is the starting point corresponding to the next shunting plan; there are multiple routes between the starting point and the ending point corresponding to each shunting plan; the ending point of the previous route is the starting point of the next route; If the train is detected to be at the first starting point of the first coupling plan, and if the current mode is the first judgment mode, then when each route corresponding to the first coupling plan meets the route conditions, each route and the set route attributes are sent to the interlocking equipment; if the current mode is the second judgment mode, then when any route corresponding to the first coupling plan meets the route conditions, the route and the set route attributes are sent to the interlocking equipment; so that the interlocking equipment generates a movement authorization through the area controller and controls the train operation. The first judgment mode is a mode in which the judgment is made according to the order of the route from the first endpoint to the first starting point of the first hooking plan; the second judgment mode is a mode in which the judgment is made according to the order of the route from the first starting point to the first endpoint of the first hooking plan.
2. The method according to claim 1, characterized in that, If the first hook plan is the first of the at least one hook plan, then the method further includes: If the current time is a preset time before the planned start time of the shunting plan, then it is detected whether the train is located at the starting point of the first shunting plan.
3. The method according to claim 1, characterized in that, If the shunting plan includes multiple shunting plans, and the first shunting plan is not the last of the shunting plans, then the method further includes: After the first hook plan is completed, the next hook plan will be executed.
4. The method according to claim 3, characterized in that, The method further includes: When each path corresponding to the first hook plan satisfies the path condition, the first hook plan is determined to be completed.
5. The method according to claim 1, characterized in that, The method further includes: The execution status of the shunting plan is obtained through the interlocking equipment; wherein, the execution status includes the current target route, the status of the target route, and the open status of the signals in the target route; the status of the target route includes the route processing status and the route usage status; The execution status of the shunting plan is sent to the terminal device.
6. The method according to claim 1, characterized in that, The route conditions include some or all of the following conditions: The section where the train is located and the sections it passes through are under power supply. The section where the train is located and the section it passes through are currently not under construction. The train was not impounded. The train was in a state where the brake shoes were not installed; The route segments refer to the various segments included in the current route.
7. The method according to claim 6, characterized in that, The method further includes: The section where the train is located is determined based on the train's position; Wherein, if the current judgment mode is the first judgment mode, the position of the train is the first starting point of the first hook plan; if the current judgment mode is the second judgment mode, the position of the train is the starting point of the current route.
8. The method according to any one of claims 1 to 7, characterized in that, The route setting attributes include train route priority, shunting route priority, and any combination of train route and shunting route.
9. An ATS device, characterized in that, Including processor and memory; The memory is configured to execute: Storage and shunting plan; The processor is configured to execute: Obtain a shunting plan; wherein the shunting plan includes at least one shunting plan, each shunting plan corresponds to a starting point and an ending point; the ending point corresponding to the previous shunting plan is the starting point corresponding to the next shunting plan; there are multiple routes between the starting point and the ending point corresponding to each shunting plan; the ending point of the previous route is the starting point of the next route; If the train is detected to be at the first starting point of the first coupling plan, and if the current mode is the first judgment mode, then when each route corresponding to the first coupling plan meets the route conditions, each route and the set route attributes are sent to the interlocking equipment; if the current mode is the second judgment mode, then when any route corresponding to the first coupling plan meets the route conditions, the route and the set route attributes are sent to the interlocking equipment; so that the interlocking equipment generates a movement authorization through the area controller and controls the train operation. The first judgment mode is a mode in which the judgment is made according to the order of the route from the first endpoint to the first starting point of the first hooking plan; the second judgment mode is a mode in which the judgment is made according to the order of the route from the first starting point to the first endpoint of the first hooking plan.
10. The ATS device according to claim 9, characterized in that, If the first hook plan is the first of the at least one hook plan, then the processor is further configured to: If the current time is a preset time before the planned start time of the shunting plan, then it is detected whether the train is located at the starting point of the first shunting plan.
Citation Information
Patent Citations
Automatic shunting route handling method
CN112572549A
Controlling means of station train driving operation
CN206265072U
