Double-column pier swivel device and double-column pier swivel construction method
The use of the double-column pier rotation device has solved the problem of road occupation caused by the large distance between the two columns during the construction of double-column piers, realizing a fast and efficient construction process. In addition, the device can be reused, saving costs.
Patent Information
- Application Number
- CN202410680802.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-29
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-05-29
AI Technical Summary
In existing technologies, the spacing between the two columns of double-column bridge piers is too large, causing temporary scaffolding to be erected, which occupies the roadway under the bridge and affects vehicle traffic.
A double-column pier rotation device is adopted, including a sliding beam and a casting formwork main body. By rotating the sliding beam and the casting formwork main body, the double-column pier is structurally supported, achieving balanced rotation of the double-column pier and avoiding the scaffolding from occupying the road.
It enables rapid and efficient construction of double-column piers, reduces the impact on traffic, and the device can be disassembled and reused, saving costs and improving construction efficiency.
Smart Images

Figure CN118390416B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of construction of simply supported beam bridges / continuous beam bridges, specifically to a double-column pier rotation device and a double-column pier rotation construction method. Background Technology
[0002] In recent years, with the increase in urban vehicles, bridges have become wider, and the spacing between the piers supporting the main beams has also increased. For double-column piers and cap beams, the main construction methods involve erecting scaffolding and formwork. However, when the cap beam has a long cantilever, resulting in a large spacing between the two columns, and when the double-column piers span roads, the need for numerous temporary supports obstructs traffic under the bridge, severely impacting vehicle flow. To address this issue, a rotation method can be used to construct the double-column piers and cap beams without disrupting normal traffic flow beneath the beams.
[0003] However, the commonly used pier rotation devices are only applicable to single-column piers, which are commonly used in simply supported beam bridges or continuous beam bridges. Therefore, no construction devices or methods suitable for double-column piers have been found.
[0004] Therefore, improvements are needed in the construction equipment and methods for double-column piers to achieve rapid and efficient construction without disrupting normal traffic. Summary of the Invention
[0005] The purpose of this invention is to provide a double-column pier rotation device and a double-column pier rotation construction method to solve the technical problem that, due to the excessively large spacing between the two columns of the existing double-column piers, when the constructed double-column piers cross the road, a large number of temporary supports need to be erected, which occupy the road space under the bridge and thus affect vehicle traffic.
[0006] To solve the above-mentioned technical problems, the present invention adopts the following technical solution:
[0007] In the first aspect, based on the technical problems solved above, the present invention discloses a double-column pier rotation device for connecting and fixing a double-column pier to the surface of a construction pile foundation, wherein the double-column pier includes a first pier and a second pier.
[0008] The double-column pier rotation device includes a sliding beam and a main casting formwork device;
[0009] The slide beam is rotatably connected to the support device, and the support device is detachably connected to the upper surface of the construction pile foundation.
[0010] The main body of the casting template is rotatably connected to the support device, and the main body of the casting template is fixedly connected to the slide beam. When the slide beam rotates, the main body of the casting template can rotate synchronously with the slide beam.
[0011] The main body of the casting template is symmetrically provided with a first pier casting template and a second pier casting template at both ends, which are used for casting the first pier and the second pier, respectively.
[0012] The working principle of this scheme is as follows: After the construction of the pile foundation is completed, a rotatable sliding beam and a casting formwork main device fixedly connected to the sliding beam are used to provide structural support for the double-column piers. Rotating the sliding beam can rotate the double-column piers to the design position in a balanced manner, so as to avoid the situation where the erected support needs to occupy the road under the bridge and affect vehicle traffic when the distance between the two columns of the double-column piers is large.
[0013] Preferably, the support device includes a base and a vertical support. The base is detachably connected to the upper surface of the construction pile foundation. The vertical support is cylindrical in shape. The bottom of the vertical support is fixed to the top of the base, and the center line of the vertical support coincides with the center line of the base.
[0014] Multiple limiting blocks are fixed along the outer periphery of the top surface of the vertical support. Each limiting block protrudes radially outward from the outer periphery of the top surface, and the radial extension distance of the protrusion is equal. Each limiting block is used to limit the movement of the slide beam.
[0015] This allows the slide beam to rotate stably and in a balanced manner under the limiting action of each limiting block during rotation, making it less prone to positional deviation and preventing tilting or falling during the rotation process. This ensures more precise positioning when connecting the first and second piers to the construction pile foundation later.
[0016] As one way to enable the slide beam and the main body of the casting template to rotate, the center of the base and the center of the main body of the casting template are rotatably connected by a ball joint, and the main body of the casting template can rotate relative to the base through the ball joint; the slide beam is provided with an outer annular groove on its radial outer periphery, and a traction rope is wound in the outer annular groove. Pulling the traction rope can drive the slide beam to rotate.
[0017] In this scheme, during construction, simply pulling the traction rope is enough to rotate the slide beam, which in turn drives the main body of the casting formwork to rotate, so as to facilitate the connection and fixation of the double column piers and the construction pile foundation.
[0018] As one way to limit the slide beam by the various limiting blocks, the slide beam has an inner annular groove on its radial inner circumference. The groove opening of the inner annular groove faces the radial center of the slide beam. The portion of each limiting block protruding from the outer peripheral edge of the top surface is located within the inner annular groove, so as to realize the limiting function of the slide beam.
[0019] Preferably, the construction pile foundation includes a first pile cap and a second pile cap, with a gap between the first pile cap and the second pile cap; the base is symmetrically and detachably connected to the upper surfaces of the first pile cap and the second pile cap.
[0020] Preferably, a first pad beam and a second pad beam are provided below the vertical support. The first pad beam and the second pad beam are symmetrically and detachably connected to the outer sides of the opposite sides of the first support and the second support. The top of the first pad beam and the second pad beam have a first horizontal plate and a second horizontal plate extending outward horizontally, respectively. The top surface of the first horizontal plate and the second horizontal plate abuts against the bottom surface of the vertical support.
[0021] The first and second pad beams are used to leverage the first and second bearing platforms to better support the upper support device and make the support device more stable when rotating.
[0022] Preferably, the ball joint includes an upper connector and a lower connector. The upper connector is detachably connected to the center of the bottom surface of the casting template body, and the lower connector is detachably connected to the center of the top surface of the base.
[0023] As a arrangement of multiple limiting blocks, a first limiting block, a second limiting block, a third limiting block and a fourth limiting block are respectively fixed along the outer periphery of the top surface of the vertical support;
[0024] The first and second limiting blocks are opposite and symmetrically fixed to the top surface of the vertical support, and the third and fourth limiting blocks are opposite and symmetrically fixed to the top surface of the vertical support; a first line passing through the center points of the first and second limiting blocks passes through the center line of the vertical support, and a second line passing through the center points of the third and fourth limiting blocks also passes through the center line of the vertical support, and the first and second lines are perpendicular to each other on the same plane;
[0025] The first limiting block and the second limiting block are respectively extended upward with a first connecting piece and a second connecting piece. Correspondingly, the third connecting piece and the fourth connecting piece are respectively extended horizontally at the corresponding positions on both sides of the main body of the casting template. The first connecting piece is fixedly connected to the third connecting piece, and the second connecting piece is fixedly connected to the fourth connecting piece, thereby realizing the fixed connection between the main body of the casting template and the slide beam.
[0026] This arrangement allows the limiting blocks to provide more uniform support for the slide beam, which helps the slide beam to rotate more smoothly and minimizes the possibility of positional deviation.
[0027] Preferably, a fifth limiting block and a sixth limiting block are fixed along the outer periphery of the top surface of the vertical support, respectively. The fifth limiting block and the sixth limiting block are symmetrically fixed to the top surface of the vertical support, and the center line of the fifth limiting block and the center line of the sixth limiting block can intersect on the same horizontal plane.
[0028] Secondly, the present invention also discloses a method for constructing a double-column pier by rotation, utilizing the double-column pier rotation device described above, comprising the following steps:
[0029] S1. Construct a split-type support platform, which includes a first support platform and a second support platform, with a gap between the first support platform and the second support platform. A first reserved part is reserved on the first support platform, and a second reserved part is reserved on the second support platform. Pad blocks are pre-embedded on the side of the split-type support platform to provide structural support for the first pad beam. The pad blocks can enhance the ground rigidity between the split-type support platforms and effectively ensure the operation of the upper device.
[0030] S2. Install the first support beam, the second support beam, and the base between the first and second support platforms respectively;
[0031] S3. Install vertical supports and ball joints on the base;
[0032] S4. Install the slide beam and each limiting block on the top surface of the vertical support, and fix one end of the traction rope in the outer annular groove of the slide beam, while ensuring that each limiting block is located in the inner annular groove of the slide beam.
[0033] S5. Install the main body of the casting template above the slide beam, and connect the main body of the casting template to the slide beam and the ball joint respectively to complete the installation of the double column pier rotation device.
[0034] S6. Cast the first pier and the second pier at both ends of the casting formwork main device of the double-column pier rotation device, and reserve joint steel bars at the bottom of the first pier and the second pier respectively.
[0035] S7. By pulling the traction rope, the slide beam is rotated. When the first pier and the second pier are both rotated to the design position, the joint steel bar reserved at the bottom of the first pier is connected with the first reserved part, and the joint steel bar reserved at the bottom of the second pier is connected with the second reserved part. Then, concrete is poured at the reserved joint.
[0036] S8. Once the concrete at the reserved joint reaches its compressive strength, remove the double-column pier rotation device to complete the rotation construction of the separated pier cap double-column pier.
[0037] The present invention has the following beneficial effects: the double-column pier rotation device of the present invention can be assembled on-site during use. After the double-column pier is rotated to the designed position in a balanced manner and installed, the double-column pier rotation device can be disassembled and reused. The double-column pier rotation construction method of the present invention, by using the double-column pier rotation device, can solve the technical problem that the erected support needs to occupy the road under the bridge due to the large distance between the two columns of the double-column pier, which affects the traffic flow, thus improving work efficiency. After the construction is completed, the double-column pier rotation device can be disassembled and reused. The repeated use of construction facilities saves costs and has the advantages of safety, applicability, economy, speed and efficiency. It can effectively shorten the construction time of double-column piers without affecting normal traffic. Attached Figure Description
[0038] To make the objectives, technical solutions, and advantages of the invention clearer, the invention will now be described in further detail with reference to the accompanying drawings, wherein:
[0039] Figure 1 This is a schematic diagram of the double-column pier rotation device of the present invention.
[0040] Figure 2 This is a schematic diagram of the installation structure of the double-column pier rotation device of the present invention.
[0041] Figure 3 This is a schematic diagram of the slide beam and support device of the present invention.
[0042] Figure 4 This is an exploded view of the slide beam and support device structure of the present invention.
[0043] Figure 5 This is a schematic diagram of the construction pile foundation structure of the present invention.
[0044] Figure 6 This is a schematic diagram of the first and second pad beams of the present invention.
[0045] Figure 7 This is a schematic diagram of the main structure of the casting template of the present invention.
[0046] Explanation of reference numerals in the attached drawings: 101, First pad beam; 102, First horizontal plate; 103, Second pad beam; 104, Second horizontal plate; 105, Insert column; 200, Support device; 201, Base; 202, Vertical support; 203, Ball joint; 300, Slide beam; 301, Outer annular slide groove; 302, Traction rope; 303, First limiting block; 304, Second limiting block; 305, Third limiting block; 306, Fourth limiting block; 307, Fifth limiting block; 308, Sixth limiting block; 309, Inner annular slide groove; 310, First connecting piece; 31 1. Second connecting piece; 312. First perforated plate; 313. Second perforated plate; 400. Main casting formwork device; 401. First pier casting formwork; 402. Second pier casting formwork; 403. Third connecting piece; 404. Fourth connecting piece; 501. First pier cap; 502. Second pier cap; 503. First reserved piece; 504. Second reserved piece; 505. Third perforated plate; 506. Fourth perforated plate; 507. Fifth perforated plate; 508. Sixth perforated plate; 509. Spacer block; 601. First pier; 602. Second pier; 603. Cap beam. Detailed Implementation
[0047] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings.
[0048] It should be noted that similar reference numerals and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures. In the description of this invention, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the figures, or the orientation or positional relationship commonly used when the product is in use. They are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the invention. Furthermore, the terms "first," "second," and "third," etc., are only used to distinguish descriptions and should not be construed as indicating or implying relative importance. In addition, the terms "horizontal," "vertical," etc., do not indicate that the component is required to be absolutely horizontal or suspended, but can be slightly tilted. For example, "horizontal" simply means that its direction is more horizontal than "vertical," and does not mean that the structure must be completely horizontal, but can be slightly tilted. In the description of this invention, it should also be noted that, unless otherwise explicitly specified and limited, the terms "set," "install," "connect," and "link" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0049] This invention can be applied to the construction of double-column pier rotation, solving the technical problem that, due to the excessively large spacing between the two columns in the existing double-column piers, when the constructed double-column piers cross the road, a large number of temporary supports need to be erected, which occupy the road under the bridge and thus affect vehicle traffic.
[0050] Firstly, please refer to Figure 1 and Figure 2Based on the aforementioned technical problems, this invention discloses a double-column pier rotation device for fixing a double-column pier to the surface of a construction pile foundation. The double-column pier includes a first pier 601 and a second pier 602. The double-column pier rotation device includes a sliding beam 300 and a casting template main body device 400. The sliding beam 300 is rotatably connected to a support device 200, which is detachably connected to the upper surface of the construction pile foundation. The casting template main body device 400 is rotatably connected to the support device 200 and fixedly connected to the sliding beam 300. When the sliding beam 300 rotates, the casting template main body device 400 can rotate synchronously with the sliding beam 300. The casting template main body device 400 has a first pier casting template 401 and a second pier casting template 402 symmetrically arranged at both ends, respectively used for casting the first pier 601 and the second pier 602.
[0051] The working principle of this scheme is as follows: After the construction of the pile foundation is completed, a rotatable sliding beam 300 and a casting formwork main device 400 fixedly connected to the sliding beam 300 are used to provide structural support for the double column piers. Rotating the sliding beam 300 can rotate the double column piers to the design position in a balanced manner, so as to avoid the situation where the erected support needs to occupy the road under the bridge and affect vehicle traffic when the distance between the two columns of the double column piers is large.
[0052] The double-column pier rotation device using this solution has the following technical advantages: the double-column pier rotation device can be assembled on-site during use. After the double-column pier is rotated to the designed position in a balanced manner and installed, the double-column pier rotation device can be disassembled and reused. It has the advantages of safety, applicability, economy, speed and efficiency, which can effectively shorten the construction time of double-column piers without affecting normal traffic.
[0053] For preference, please refer to Figure 3 The support device 200 includes a base 201 and a vertical support 202. The base 201 is detachably connected to the upper surface of the construction pile foundation. The vertical support 202 is cylindrical in shape. The bottom of the vertical support 202 is fixed to the top of the base 201, and the center line of the vertical support 202 coincides with the center line of the base 201. Multiple limiting blocks are fixed along the outer periphery of the top surface of the vertical support 202. Each limiting block protrudes radially outward from the outer periphery of the top surface, and the radial extension distance of the protrusion is equal. Each limiting block is used to limit the sliding beam 300.
[0054] This allows the slide beam 300 to rotate stably and in a balanced manner under the limiting action of each limiting block during rotation, making it less prone to positional deviation and avoiding tilting or falling during rotation. This ensures more precise positioning when connecting the first pier 601 and the second pier 602 to the construction pile foundation later.
[0055] Specifically, each of the limiting blocks is made of steel, and each limiting block is fixed to the top surface of the vertical support 202 by welding.
[0056] As one embodiment of the rotatable sliding beam 300 and casting formwork main device 400, please refer to [link to relevant documentation]. Figure 3 and Figure 4 The center of the base 201 and the center of the casting template main body device 400 are rotatably connected by a ball joint 203, and the casting template main body device 400 can rotate relative to the base 201 through the ball joint 203; the outer circumference of the slide beam 300 is provided with an outer annular groove 301, and a traction rope 302 is wound inside the outer annular groove 301. Pulling the traction rope 302 can drive the slide beam 300 to rotate.
[0057] In this scheme, during construction, simply pulling the traction rope 302 is enough to rotate the slide beam 300, which in turn drives the main casting formwork device 400 to rotate, so as to facilitate the connection and fixation of the double column pier and the construction pile foundation.
[0058] For details, please refer to Figure 4 One way to achieve the detachable connection of the base 201 to the upper surface of the construction pile foundation is to pre-embed a first hole plate 312 on the upper surface of the construction pile foundation. The first hole plate 312 has an array of through holes. Correspondingly, a second hole plate 313 is fixed to the edge of the base 201. Correspondingly, the second hole plate 313 has a corresponding array of through holes. Bolts are installed in each of the corresponding array of through holes of the first hole plate 312 and the second hole plate 313. After the construction is completed, each bolt is removed to achieve the detachable connection of the base 201.
[0059] Preferably, the ball joint 203 includes an upper connector and a lower connector. The upper connector is detachably connected to the center of the bottom surface of the casting template main body device 400, and the lower connector is detachably connected to the center of the top surface of the base 201.
[0060] Specifically, the upper and lower connecting parts of the ball joint 203 are detachably connected to the bottom center of the casting template main body device 400 and the top center of the base 201 by bolts.
[0061] As one implementation method for limiting the slide beam 300 by the various limiting blocks, please refer to [link to relevant documentation]. Figure 3 and Figure 4 The slide beam 300 has an inner annular groove 309 on its radial inner circumference. The groove opening of the inner annular groove 309 faces the radial center of the slide beam 300. The portion of each limiting block protruding from the outer peripheral edge of the top surface is located within the inner annular groove 309 to achieve the limiting function of the slide beam 300.
[0062] For the arrangement of multiple limit blocks, please refer to [link / reference]. Figure 3 and Figure 4 A first limiting block 303, a second limiting block 304, a third limiting block 305 and a fourth limiting block 306 are respectively fixed along the outer periphery of the top surface of the vertical support 202;
[0063] The first limiting block 303 and the second limiting block 304 are opposite and symmetrically fixed to the top surface of the vertical support 202, and the third limiting block 305 and the fourth limiting block 306 are opposite and symmetrically fixed to the top surface of the vertical support 202; the first line connecting the center points of the first limiting block 303 and the second limiting block 304 passes through the center line of the vertical support 202, and the second line connecting the center points of the third limiting block 305 and the fourth limiting block 306 also passes through the center line of the vertical support 202, and the first and second lines are perpendicular to each other on the same plane;
[0064] The first limiting block 303 and the second limiting block 304 also have a first connecting member 310 and a second connecting member 311 extending upwards, respectively. (See also...) Figure 7 The casting template main body device 400 has a third connector 403 and a fourth connector 404 extending horizontally from corresponding positions on both sides. The first connector 310 is fixedly connected to the third connector 403, and the second connector 311 is fixedly connected to the fourth connector 404, thereby realizing the fixed connection between the casting template main body device 400 and the slide beam 300.
[0065] This arrangement allows the limiting blocks to provide more uniform positioning of the slide beam 300, which helps the slide beam 300 to rotate more smoothly and minimizes the possibility of positional deviation.
[0066] For preference, please refer to Figure 3 and Figure 4 A fifth limiting block 307 and a sixth limiting block 308 are fixed along the outer periphery of the top surface of the vertical support 202, respectively. The fifth limiting block 307 and the sixth limiting block 308 are symmetrically fixed to the top surface of the vertical support 202, and the center line of the fifth limiting block 307 and the center line of the sixth limiting block 308 can intersect on the same horizontal plane.
[0067] For preference, please refer to Figure 2 and Figure 5 The construction pile foundation includes a first pile cap 501 and a second pile cap 502, with a gap between the first pile cap 501 and the second pile cap 502; the base 201 is symmetrically and detachably connected to the upper surfaces of the first pile cap 501 and the second pile cap 502.
[0068] For details, please refer to Figure 5 The construction pile foundation is provided with a first reserved part 503 and a second reserved part 504 that correspond to the positions of the first pier casting template 401 and the second pier casting template 402. After the first pier 601 and the second pier 602 are cast, the slide beam 300 is rotated to the position where the first pier 601 corresponds to the first reserved part 503 and the second pier 602 corresponds to the second reserved part 504, and the first pier 601 and the second pier 602 are connected and fixed to the construction pile foundation.
[0069] For preference, please refer to Figure 2 and Figure 6 Below the vertical support 202, a first pad beam 101 and a second pad beam 103 are also provided. The first pad beam 101 and the second pad beam 103 are symmetrically and detachably connected to the outer sides of the opposite sides of the first support 501 and the second support 502. The top of the first pad beam 101 and the second pad beam 103 respectively have a first horizontal plate 102 and a second horizontal plate 104 extending outward horizontally. The top surfaces of the first horizontal plate 102 and the second horizontal plate abut against the bottom surface of the vertical support 202.
[0070] The first pad beam 101 and the second pad beam 103 are used to leverage the first support platform 501 and the second support platform 502 to better support the upper support device 200 and make the support device 200 more stable when rotating.
[0071] For details, please refer to Figure 3 and Figure 6 The bottom surface of the vertical support 202 has multiple through holes. Correspondingly, the first horizontal plate 102 and the second horizontal plate 104 each have multiple vertically extending posts 105. Each post 105 corresponds to a different through hole. When the first horizontal plate 102 and the second horizontal plate 104 abut against the bottom surface of the vertical support 202, each post 105 passes through a different through hole, making the installation of the vertical support 202 more stable.
[0072] For details, please refer to Figure 6In one embodiment, the first pad beam 101 and the second pad beam 103 are symmetrically and detachably connected to the upper surfaces of the first support platform 501 and the second support platform 502, respectively. A third hole plate 505 and a fourth hole plate 506 are pre-embedded on the outer side of the first support platform 501 and the second support platform 502 on the same side. The third hole plate 505 and the fourth hole plate 506 are provided with array through holes. The two ends of the first pad beam 101 are also provided with array through holes corresponding to the array through holes of the third hole plate 505 and the fourth hole plate 506, and bolts are installed in each of the corresponding array through holes.
[0073] Similarly, a fifth hole plate 507 and a sixth hole plate 508 are pre-embedded on the outer side of the other side of the first base plate 501 and the second base plate 502. The fifth hole plate 507 and the sixth hole plate 508 are also provided with array through holes. The two ends of the second pad beam 103 are also provided with array through holes corresponding to the array through holes of the fifth hole plate 507 and the sixth hole plate 508, and bolts are installed in each of the corresponding array through holes.
[0074] After construction is completed, the bolts can be removed to achieve a detachable connection between the first pad beam 101 and the second pad beam 103.
[0075] For details, please refer to Figure 7 The main body of the casting template 400 is made of welded steel structure. The first pier casting template 401 and the second pier casting template 402 are respectively made of steel plates enclosed and welded. The size and shape of the steel plates enclosed match the designed external dimensions of the first pier 601 and the second pier 602.
[0076] For details, please refer to Figure 2 The top of the first pier 601 and the second pier 602 are also fixed with cap beams 603 for structural support of the bridge deck.
[0077] Specifically, both the first reserved part 503 and the second reserved part 504 are reserved steel bars.
[0078] Secondly, the present invention also discloses a method for constructing a double-column pier by rotation, utilizing the double-column pier rotation device described above, comprising the following steps:
[0079] S1. Construct a split-type support platform, which includes a first support platform 501 and a second support platform 502, with a gap between the first support platform 501 and the second support platform 502. A first reserved part 503 is reserved on the first support platform 501, and a second reserved part 504 is reserved on the second support platform 502; Please refer to Figure 2A pad 509 is pre-embedded on the side of the split-type foundation to provide structural support for the first pad beam 101. The pad 509 can enhance the ground rigidity between the split-type foundations and effectively ensure the operation of the upper device.
[0080] S2. The double-column pier rotation device is symmetrically installed on the upper surfaces of the first pier 501 and the second pier 502. First, the first pad beam 101, the second pad beam 103 and the base 201 are installed between the first pier 501 and the second pier 502 respectively.
[0081] S3. Install the vertical support 202 and the ball joint 203 on the base 201;
[0082] S4. Install the slide beam 300 and each limiting block on the top surface of the vertical support 202, and fix one end of the traction rope 302 in the outer annular groove 301 of the slide beam 300, while ensuring that each limiting block is located in the inner annular groove 309 of the slide beam 300.
[0083] S5. Install the casting template main body device 400 above the slide beam 300, and connect the casting template main body device 400 to the slide beam 300 and the ball joint 203 respectively to complete the installation of the double column pier rotation device.
[0084] S6. Cast the first pier 601 and the second pier 602 at both ends of the casting template main device 400 of the double-column pier rotation device, and reserve joint steel bars at the bottom of the first pier 601 and the second pier 602 respectively.
[0085] S7. By pulling the traction rope 302, the slide beam 300 is rotated. When the first pier 601 and the second pier 602 are both rotated to the design position, the joint steel bar reserved at the bottom of the first pier 601 is connected to the first reserved part 503, and the joint steel bar reserved at the bottom of the second pier 602 is connected to the second reserved part 504. Then, concrete is poured at the reserved joint.
[0086] S8. Once the concrete at the reserved joint reaches its compressive strength, remove the double-column pier rotation device to complete the rotation construction of the separated pier cap double-column pier.
[0087] The double-column pier rotation construction method of this scheme has the following technical advantages: By using a double-column pier rotation device, this method can solve the technical problem that the large spacing between the two columns of the double-column pier requires the erected supports to occupy the road under the bridge, affecting vehicle traffic. This improves work efficiency. After construction is completed, the double-column pier rotation device can be disassembled and reused. The repeated use of construction facilities saves costs and has the advantages of safety, applicability, economy, speed, and efficiency. It can effectively shorten the construction time of double-column piers without affecting normal traffic.
[0088] Specifically, in step S6, the first pier 601 and the second pier 602 are poured in the first pier pouring template 401 and the second pier pouring template 402 of the pouring template main device 400, respectively.
[0089] It is understood that the present invention has been described through some embodiments, and those skilled in the art will recognize that various changes or equivalent substitutions can be made to these features and embodiments without departing from the spirit and scope of the invention. Under the teachings of the present invention, modifications can be made to these features and embodiments to adapt to specific situations and materials without departing from the spirit and scope of the invention. The embodiments described in this invention are only a part of the embodiments of the invention, not all of them. The components of the embodiments of the invention described and shown in the accompanying drawings can generally be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. Therefore, the invention is not limited to the specific embodiments disclosed herein, and all other embodiments obtained by those skilled in the art based on the embodiments of the invention without inventive effort are within the scope of protection of the present invention.
Claims
1. A method for constructing a double-column pier by rotation, implemented using a double-column pier rotation device, the double-column pier rotation device being used to connect and fix the double-column pier to the surface of the construction pile foundation, the double-column pier including a first pier and a second pier, the double-column pier rotation device including a sliding beam and a casting template main body device; the sliding beam is rotatably connected to a support device, the support device being detachably connected to the upper surface of the construction pile foundation; the casting template main body device is rotatably connected to the support device, the casting template main body device being fixedly connected to the sliding beam, the casting template main body device being able to rotate synchronously with the sliding beam when the sliding beam rotates; the casting template main body device is symmetrically provided with a first pier casting template and a second pier casting template at both ends, respectively used for casting the first pier and the second pier; The support device includes a base and a vertical support. The base is detachably connected to the upper surface of the construction pile foundation. The vertical support is cylindrical in shape. The bottom of the vertical support is fixed to the top of the base, and the center line of the vertical support coincides with the center line of the base. Multiple limiting blocks are fixed along the outer periphery of the top surface of the vertical support. Each limiting block protrudes radially outward from the outer periphery of the top surface, and the radial extension distance of the protrusion is equal. Each limiting block is used to limit the movement of the slide beam. The center of the base and the center of the main body of the casting template are rotatably connected by a ball joint, and the main body of the casting template can rotate relative to the base through the ball joint; an outer annular groove is provided on the radial outer periphery of the slide beam, and a traction rope is wound in the outer annular groove. Pulling the traction rope can drive the slide beam to rotate. The inner radial circumference of the slide beam has an inner annular groove, the opening of the inner annular groove faces the radial center of the slide beam, and the portion of each limiting block protruding from the outer peripheral edge of the top surface is located within the inner annular groove. The construction pile foundation includes a first pile cap and a second pile cap, with a gap between the first pile cap and the second pile cap; the base is symmetrically and detachably connected to the upper surfaces of the first pile cap and the second pile cap. Below the vertical support, there are also a first pad beam and a second pad beam. The first pad beam and the second pad beam are symmetrically and detachably connected to the outer sides of the opposite sides of the first support and the second support. The top of the first pad beam and the second pad beam have a first horizontal plate and a second horizontal plate extending outward horizontally, respectively. The top surface of the first horizontal plate and the second horizontal plate abuts against the bottom surface of the vertical support. Its features are, The construction method includes the following steps: S1. Construct a split-type support platform, which includes a first support platform and a second support platform, with a gap between the first support platform and the second support platform. A first reserved part is reserved on the first support platform, and a second reserved part is reserved on the second support platform. Embed pad blocks on the side of the split-type support platform to provide structural support for the first pad beam. S2. Install the first support beam, the second support beam, and the base between the first and second support platforms, respectively. S3. Install vertical supports and ball joints on the base; S4. Install the slide beam and each limiting block on the top surface of the vertical support, and fix one end of the traction rope in the outer annular groove of the slide beam, while ensuring that each limiting block is located in the inner annular groove of the slide beam. S5. Install the main body of the casting template above the slide beam, and connect the main body of the casting template to the slide beam and the ball joint respectively to complete the installation of the double column pier rotation device. S6. Cast the first pier and the second pier at both ends of the casting formwork main device of the double-column pier rotation device, and reserve joint steel bars at the bottom of the first pier and the second pier respectively. S7. By pulling the traction rope, the slide beam is rotated. When the first pier and the second pier are both rotated to the design position, the joint steel bar reserved at the bottom of the first pier is connected with the first reserved part, and the joint steel bar reserved at the bottom of the second pier is connected with the second reserved part. Then, concrete is poured at the reserved joint. S8. Once the concrete at the reserved joint reaches its compressive strength, remove the double-column pier rotation device to complete the rotation construction of the separated pier cap double-column pier.
2. The method for constructing a double-column pier by rotation according to claim 1, characterized in that, The ball joint includes an upper connector and a lower connector. The upper connector is detachably connected to the center of the bottom surface of the main body of the casting template, and the lower connector is detachably connected to the center of the top surface of the base.
Citation Information
Patent Citations
Railway long-span rotator T-shaped bridge construction method
CN103046476A
Pier bottom swivel construction method and system for double-thin-walled pier
CN108487079A