Quickly assembled and disassembled curved arch type suspended operation platform and construction method thereof
By designing a quick-assembly and disassembly curved arch-shaped suspended work platform, the stability and applicability issues of aerial work platforms in bridge construction have been solved. This enables rapid installation and disassembly, reduces safety risks and material costs, and is suitable for different bridge structures and sizes.
Patent Information
- Application Number
- CN202410800189.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-06-20
AI Technical Summary
Existing technologies cannot provide stable and flexible aerial work platforms for bridge construction, and the erection process carries high safety risks. Furthermore, they are not suitable for bridges of different structures and sizes, occupy a large amount of bridge deck space, and affect other construction operations.
Design a quick-assembly and disassembly curved arch-type suspended working platform, including an upper curved arch, a lower curved arch, a working platform, positioning and adjusting wedges, and a ladder. Through the coordinated use of positioning and adjusting wedges and adjusting sleeves, the platform can be quickly installed and disassembled, adapting to different bridge structures and sizes, enhancing stability, and reducing the space occupied on the bridge deck.
The aerial work platform enables rapid installation and dismantling, reducing safety risks during erection and dismantling. It is suitable for different bridge structures and sizes, improving work efficiency, reducing material costs, and enhancing the stability and safety of the platform.
Smart Images

Figure CN118407342B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to a quickly assembled and disassembled arch-shaped suspended work platform and its construction method, belonging to the field of bridge aerial work technology. Background Technology
[0002] During the construction of bridges spanning deep ravines, canyons, or large bodies of water, when the bridge deck construction is not yet complete, if welding is required on the side webs or bottom plates of the bridge's steel box girder, or if decorative finishing or inspection work needs to be carried out on the bridge's webs or bottom plates, a work platform is needed to provide workers with operational space. This work platform must avoid obstructions from the bridge's wing plates and extend below the wing plates to reach the webs or bottom plates to perform the work.
[0003] Because the bridge was not yet fully completed, the bridge deck could not bear a large load. Therefore, the bridge inspection vehicle, which could easily form an aerial work platform when the bridge could bear a load, could not be used. At the same time, because there was water or deep ravines below the bridge, it was also impossible to use a ladder truck to form a work platform under the bridge.
[0004] In this situation, a temporary platform is usually erected on-site using steel pipes and fasteners according to the structure of the bridge deck for the operation. There are several disadvantages to using this method to erect a temporary aerial platform: 1. The safety risks during the erection process are relatively high; 2. The work platforms erected at different work points on the same bridge deck cannot be reused, and are all erected and dismantled only once, which is time-consuming, labor-intensive and material-intensive.
[0005] Through research, several patented technologies and construction methods for aerial work platforms, including side-U-shaped suspended platforms, were identified. However, these side-U-shaped suspended platforms have the following drawbacks: ① The structure is relatively complex, and the platform's stability and balance are weak; ② They are customized for specific projects and cannot be applied to different structural forms or sizes; ③ The side-U-shaped structure occupies a large space for fixing on the bridge deck, significantly interfering with other construction work on the bridge. This patent effectively addresses these shortcomings, hence this patent application for invention. Summary of the Invention
[0006] The purpose of this invention is to provide a quickly assembled and disassembled arch-shaped suspended work platform and its construction method. The structure of this invention is an integral design, which not only avoids interference from the flange plates but also enhances its own stability. The combined use of positioning and adjusting wedges and fixing steel plates allows the work platform to be fixed at the edge of the bridge beam, solving the interference from the protruding structure at the edge of the flange plate, reducing the space occupied on the bridge deck, and not interfering with other work procedures.
[0007] The technical solution of the present invention is as follows: a quick-assembly and disassembly curved arch type suspended work platform, comprising an upper curved arch and a lower curved arch, wherein the front end of the upper curved arch is provided with an inclined fixed steel plate, and the end of the lower curved arch is fixedly connected to a horizontally extending work platform. The end of the upper curved arch and the front end of the lower curved arch are fixedly connected together by connecting members to form a curved arch structure. The platform also includes a positioning and adjusting wedge block for supporting the entire curved arch structure, and a ladder for connecting the upper curved arch and the work platform.
[0008] In the aforementioned quick-assembly and disassembly arch-type suspended work platform, both the upper and lower arch sections are composed of inner and outer arch members. The inner and outer arch members are composed of parallel left and right side members. The left and right side members are fixedly connected together by longitudinal and vertical arch fixing members. Each of the left and right side members of the upper arch section has a fixing steel plate connected to its head end.
[0009] In the aforementioned quick-assembly and disassembly curved arch type suspended work platform, the inner members of the lower curved arch are all fixedly connected to the work platform via work platform tie rods, and the left and right work platform tie rods are also fixedly connected to the inner members of the curved arch on the same side via tie rod reinforcement rods.
[0010] In the aforementioned arch-shaped suspended work platform that can be quickly assembled and disassembled, the work platform is composed of longitudinally, laterally, and vertically arranged rods that are fixedly connected to each other, and an operating steel plate is fixed on the bottom rods.
[0011] In the aforementioned arch-shaped suspended work platform that can be quickly assembled and disassembled, the surface of the positioning and adjusting wedge block is provided with a fixing steel plate limiting groove.
[0012] In the aforementioned quick-assembly and disassembly arch-type suspended work platform, the connecting component is an arc-shaped adjusting sleeve. There are four adjusting sleeves, and each adjusting sleeve has multiple through holes. The ends of the rods connecting the upper and lower arch sections are all provided with through holes. After the fixing bolt passes through the adjusting sleeve and the through holes of the rods of the upper or lower arch section, the upper or lower arch section is fixedly connected to the adjusting sleeve.
[0013] In the aforementioned quick-assembly and disassembly curved arch type suspended work platform, the connecting component is an arc-shaped adjusting sleeve. There are four adjusting sleeves, and each adjusting sleeve has multiple through holes. The ends of the rods of the upper curved arch are all provided with through holes. After the fixing bolts pass through the adjusting sleeves and the through holes of the rods of the upper curved arch, the upper curved arch is fixedly connected to the adjusting sleeves. The ends of the rods of the lower curved arch are all welded and fixed to the adjusting sleeves, and vice versa.
[0014] In the aforementioned arch-shaped suspended work platform that can be quickly assembled and disassembled, the work platform is equipped with an edge protection frame.
[0015] In the aforementioned arch-shaped suspended work platform that can be quickly assembled and disassembled, the inner side of the ladder is provided with a downward-sloping brace.
[0016] A construction method for a quickly assembled and disassembled arch-shaped suspended work platform involves supporting the upper arch section with a fixed steel plate on the inclined surface of a positioning and adjusting wedge block. The elevation of the upper arch section is adjusted by moving the positioning and adjusting wedge block back and forth, enabling the entire arch structure to cross obstacles of different heights above the wing plate. The connecting components between the upper and lower arch sections are telescopically adjustable, accommodating different lengths of the wing plate and allowing for posture adjustments of the lower arch section and the work platform, ensuring that the work platform remains tilt-free.
[0017] The beneficial effects of the present invention are as follows: Compared with the prior art, the quick-assembly and disassembly curved arch-shaped suspended work platform of the present invention has the following advantages:
[0018] (1) The operating platform of the present invention mainly includes an upper section of curved arch, a lower section of curved arch, an operating platform, a ladder and a positioning and adjusting wedge block. The overall structure is relatively simple, the weight is relatively light, and it can be hung on the steel box girder of the bridge for construction, which perfectly solves the problem that it is impossible to provide an aerial operating platform through bridge inspection vehicle or aerial work platform during bridge construction.
[0019] (2) The operating platform of the present invention does not require temporary erection in the air. During use, the upper and lower curved arch sections are connected together by adjusting the sleeve, and the entire operating platform is fixed by fixing the steel plate. This not only avoids the interference of the bridge wing plate and provides a suspended operating platform for the construction of the bridge belly and bottom plate, but also greatly reduces the safety risks of this platform during erection and dismantling.
[0020] (3) The operating platform of the present invention can be quickly installed and disassembled, and can be reused at different work points on the same bridge deck, saving costs and materials and improving working efficiency;
[0021] (4) The operating platform of the present invention can avoid wing plate structures of different sizes and lengths through the adjustment device (including positioning adjustment wedge block and adjustment sleeve) during the installation process, so as to realize the application to bridge construction of different structures and different sizes, and realize the function that can be used in different engineering projects.
[0022] (5) The design of the work platform of the present invention, which connects the curved arch rods as a whole, not only avoids the interference of the flange plate, but also enhances its own stability;
[0023] (6) The use of positioning adjustment wedges and fixed steel plates can fix the working platform at the edge of the bridge beam, which can solve the interference of the protruding structure at the edge of the flange plate, reduce the space occupied on the bridge deck, and not interfere with other work procedures. Attached Figure Description
[0024] Figure 1 This is a schematic diagram of the structure of Embodiment 1 of the present invention;
[0025] Figure 2 This is a schematic diagram of the structure of Embodiment 2 of the present invention;
[0026] Figure 3 This is a schematic diagram of the cross-sectional structure of the upper and lower curved arch sections of the present invention;
[0027] Figure 4 A schematic diagram of the positioning and adjusting wedge block.
[0028] Attached reference numerals: 1-Upper section of curved arch, 2-Lower section of curved arch, 3-Fixed steel plate, 4-Working platform, 5-Positioning and adjusting wedge block, 6-Inner member of curved arch, 7-Outer member of curved arch, 8-Ladder, 9-Diagonal bar, 10-Fixed member of curved arch, 11-Working platform tie rod, 12-Tie rod reinforcement rod, 13-Operating steel plate, 14-Steel plate limiting groove, 15-Adjusting sleeve, 16-Fixed bolt, 17-Edge protection frame. Detailed Implementation
[0029] The present invention will be further described below with reference to the accompanying drawings and embodiments, but this should not be construed as limiting the present invention.
[0030] Embodiment 1 of the present invention: A quick-assembly and disassembly curved arch-shaped suspended work platform, such as... Figure 1 Figures 3 and 4 show an upper curved arch 1 and a lower curved arch 2. The front end of the upper curved arch 1 is welded with an inclined fixed steel plate 3, and the end of the lower curved arch 2 is welded with a horizontally extending working platform 4. The end of the upper curved arch 1 and the front end of the lower curved arch 2 are fixedly connected together by connecting components to form a curved arch structure. The figure also includes a positioning and adjusting wedge block 5 for supporting the entire curved arch structure, and a ladder 8 for connecting the upper curved arch 1 and the working platform 4.
[0031] Before lowering the arch-shaped suspended work platform into use, the upper arch section 1 and the lower arch section 2 are first assembled and connected together on the bridge deck using connecting components. Depending on the specific structure of the construction location, the connecting components can be extended and retracted to accommodate different lengths of the wing plates. This allows for adjustments to the posture of the lower arch section 2 and the work platform 4, ensuring that the work platform 4 has no tilt angle (parallel to the wing plate and perpendicular to the web). After the upper arch section 1 and the lower arch section 2 are adjusted and assembled, they can be fixed to the bridge deck. The inclined design of the upper arch section 1 and the fixing steel plate 3, combined with the positioning and adjusting wedge block 5, allows for adjustment of the arch angle and elevation of the upper arch section 1 by moving the positioning and adjusting wedge block 5 back and forth. This enables the arch members to cross obstacles of different heights above the wing plates. The front end of the fixing steel plate 3 is then fixed to the bridge deck. Finally, a ladder 8 is fixed to the upper arch section 1 to form a passage for personnel to ascend and descend.
[0032] After the construction of one work area is completed, the fixing measures of ladder 8 and fixed steel plate 3 are removed. After the entire device is moved to the bridge deck, the connecting components between the upper section of curved arch 1 and the lower section of curved arch 2 are removed. The platform can then be safely and quickly dismantled and transported to the next work area for rapid installation of the curved arch type suspended work platform.
[0033] Both the upper curved arch 1 and the lower curved arch 2 are composed of inner arch members 6 and outer arch members 7. The inner arch members 6 and outer arch members 7 are each composed of parallel left and right side members. The left and right side members are welded and fixed together by longitudinal and vertical curved arch fixing members 10, thus forming the cross-sections of the upper curved arch 1 and the lower curved arch 2. Figure 3 The rectangular frame structure is shown. A fixed steel plate 3 is welded to the ends of both the left and right members of the upper curved arch 1. Specifically, a fixed steel plate 3 connects the inner curved arch member 6 and the outer curved arch member 7 of the left member, and similarly, a fixed steel plate 3 connects the inner curved arch member 6 and the outer curved arch member 7 of the right member, for a total of two fixed steel plates 3. This allows the upper curved arch 1 and the lower curved arch 2 to form a frame structure, increasing their strength and enabling them to withstand certain loads.
[0034] The inner members 6 of the lower curved arch 2 are all fixedly connected to the working platform 4 via diagonally arranged working platform tie rods 11. The left and right working platform tie rods 11 are also fixedly connected to the inner members 6 of the curved arch on the same side via tie rod reinforcement rods 12. Since the working platform 4 is only connected to the end of the lower curved arch 2 on one side, in order to prevent the working platform 4 from deforming under the weight of the construction personnel, the working platform 4 is pulled diagonally upward by the working platform tie rods 11, and the connection between the working platform tie rods 11 and the lower curved arch 2 is strengthened by the tie rod reinforcement rods 12. The working platform 4 is formed by welding and fixing the longitudinal, transverse and vertical members together to form a frame structure, and then the operating steel plate 13 is welded and fixed to the members at the bottom of the frame structure.
[0035] The positioning and adjusting wedge block 5 is provided with a fixed steel plate limiting groove 14. During the installation of the arch-shaped suspended work platform, the fixed steel plate 3 is inserted into the fixed steel plate limiting groove 14 to prevent the entire arch structure from sliding left and right.
[0036] The connecting component is an arc-shaped adjusting sleeve 15. There are four adjusting sleeves 15 (corresponding to the inner member 6 of the left curved arch, the outer member 7 of the left curved arch, the inner member 6 of the right curved arch, and the outer member 7 of the right curved arch, respectively). Each adjusting sleeve 15 has multiple through holes. The ends of the members connecting the upper curved arch 1 and the lower curved arch 2 are all provided with through holes. After the fixing bolt 16 passes through the through holes of the adjusting sleeve 15 and the upper curved arch 1, it fixes the upper curved arch 1 and the adjusting sleeve 15 together. Similarly, after the fixing bolt 16 passes through the through holes of the adjusting sleeve 15 and the lower curved arch 2, it fixes the lower curved arch 2 and the adjusting sleeve 15 together. By adjusting the telescopic length of the upper curved arch 1 and the lower curved arch 2 inside the adjusting sleeve 15 and fixing them with fixing bolts 16, on the one hand, the telescopic length can be adapted to different length dimensions of the wing plate; on the other hand, the posture adjustment of the lower curved arch 2 and the working platform 4 can be realized to ensure that the working platform 4 has no tilt angle (parallel to the wing plate and perpendicular to the web plate).
[0037] The work platform 4 is equipped with an edge protection frame 17 to protect the safety of construction personnel on the work platform 4.
[0038] The inner side of the ladder 18 is provided with a downward-sloping bar 9, which is used to hang the ladder 8 on the arch fixing member 10 on the upper arch 1, thereby fixing the ladder 8.
[0039] A construction method for a quickly assembled and disassembled curved arch type suspended work platform involves supporting the upper curved arch 1 with a fixed steel plate 3 on the inclined surface of a positioning and adjusting wedge block 5. The elevation of the upper curved arch 1 is adjusted by moving the positioning and adjusting wedge block 5 back and forth, enabling the entire curved arch structure to cross obstacles of different heights above the wing plate. The connecting components between the upper curved arch 1 and the lower curved arch 2 are used for telescopic adjustment, which can accommodate different lengths of the wing plate and adjust the posture of the lower curved arch 2 and the work platform 4, ensuring that the work platform 4 has no tilt angle (parallel to the wing plate and perpendicular to the web plate).
[0040] Embodiment 2 of the present invention: A quick-assembly and disassembly curved arch-shaped suspended work platform, such as... Figure 2 Figures 3 and 4 show an upper curved arch 1 and a lower curved arch 2. The front end of the upper curved arch 1 is welded with an inclined fixed steel plate 3, and the end of the lower curved arch 2 is welded with a horizontally extending working platform 4. The end of the upper curved arch 1 and the front end of the lower curved arch 2 are fixedly connected together by connecting components to form a curved arch structure. The figure also includes a positioning and adjusting wedge block 5 for supporting the entire curved arch structure, and a ladder 8 for connecting the upper curved arch 1 and the working platform 4.
[0041] Before lowering the arch-shaped suspended work platform into use, the upper arch section 1 and the lower arch section 2 are first assembled and connected together on the bridge deck using connecting components. Depending on the specific structure of the construction location, the connecting components can be extended and retracted to accommodate different lengths of the wing plates. This allows for adjustments to the posture of the lower arch section 2 and the work platform 4, ensuring that the work platform 4 has no tilt angle (parallel to the wing plate and perpendicular to the web). After the upper arch section 1 and the lower arch section 2 are adjusted and assembled, they can be fixed to the bridge deck. The inclined design of the upper arch section 1 and the fixing steel plate 3, combined with the positioning and adjusting wedge block 5, allows for adjustment of the arch angle and elevation of the upper arch section 1 by moving the positioning and adjusting wedge block 5 back and forth. This enables the arch members to cross obstacles of different heights above the wing plates. The front end of the fixing steel plate 3 is then fixed to the bridge deck. Finally, a ladder 8 is fixed to the upper arch section 1 to form a passage for personnel to ascend and descend.
[0042] After the construction of one work area is completed, the fixing measures of ladder 8 and fixed steel plate 3 are removed. After the entire device is moved to the bridge deck, the connecting components between the upper section of curved arch 1 and the lower section of curved arch 2 are removed. The platform can then be safely and quickly dismantled and transported to the next work area for rapid installation of the curved arch type suspended work platform.
[0043] Both the upper curved arch 1 and the lower curved arch 2 are composed of inner arch members 6 and outer arch members 7. The inner arch members 6 and outer arch members 7 are each composed of parallel left and right side members. The left and right side members are welded and fixed together by longitudinal and vertical curved arch fixing members 10, thus forming the cross-sections of the upper curved arch 1 and the lower curved arch 2. Figure 3 The rectangular frame structure is shown. A fixed steel plate 3 is welded to the ends of both the left and right members of the upper curved arch 1. Specifically, a fixed steel plate 3 connects the inner curved arch member 6 and the outer curved arch member 7 of the left member, and similarly, a fixed steel plate 3 connects the inner curved arch member 6 and the outer curved arch member 7 of the right member, for a total of two fixed steel plates 3. This allows the upper curved arch 1 and the lower curved arch 2 to form a frame structure, increasing their strength and enabling them to withstand certain loads.
[0044] The inner members 6 of the lower curved arch 2 are all fixedly connected to the working platform 4 via diagonally arranged working platform tie rods 11. The left and right working platform tie rods 11 are also fixedly connected to the inner members 6 of the curved arch on the same side via tie rod reinforcement rods 12. Since the working platform 4 is only connected to the end of the lower curved arch 2 on one side, in order to prevent the working platform 4 from deforming under the weight of the construction personnel, the working platform 4 is pulled diagonally upward by the working platform tie rods 11, and the connection between the working platform tie rods 11 and the lower curved arch 2 is strengthened by the tie rod reinforcement rods 12. The working platform 4 is formed by welding and fixing the longitudinal, transverse and vertical members together to form a frame structure, and then the operating steel plate 13 is welded and fixed to the members at the bottom of the frame structure.
[0045] The positioning and adjusting wedge block 5 is provided with a fixed steel plate limiting groove 14. During the installation of the arch-shaped suspended work platform, the fixed steel plate 3 is inserted into the fixed steel plate limiting groove 14 to prevent the entire arch structure from sliding left and right.
[0046] The connecting component is an arc-shaped adjusting sleeve 15. Four adjusting sleeves 15 are provided (corresponding to the inner member 6 of the left curved arch, the outer member 7 of the left curved arch, the inner member 6 of the right curved arch, and the outer member 7 of the right curved arch, respectively). Each adjusting sleeve 15 has multiple through holes. The ends of the members of the upper curved arch 1 are all provided with through holes. After the fixing bolts 16 pass through the adjusting sleeves 15 and the through holes of the members of the upper curved arch 1, the upper curved arch 1 is fixedly connected to the adjusting sleeves 15. The heads of the members of the lower curved arch 2 are all welded and fixed to the other end of the adjusting sleeves 15. By adjusting the extension and retraction length of the upper curved arch 1 inside the adjusting sleeves 15 and fixing it with the fixing bolts 16, it can adapt to different length dimensions of the wing plate through extension and retraction; it can also achieve posture adjustment of the lower curved arch 2 and the working platform 4, ensuring that the working platform 4 has no tilt angle (parallel to the wing plate and perpendicular to the web plate).
[0047] Alternatively, the lower section of the curved arch 2 can be fixedly connected to the adjusting sleeve 15 by fixing bolts 16, while the upper section of the curved arch 1 can be fixedly connected to the adjusting sleeve 15 by welding.
[0048] The work platform 4 is equipped with an edge protection frame 17 to improve safety protection performance.
[0049] The inner side of the ladder 8 is provided with a downward-sloping bar 9. During the installation of the ladder 8, the bar 9 can be directly hung on the arch fixing member 10 on the upper section of the arch 1 to fix the ladder 8.
[0050] A construction method for a quickly assembled and disassembled curved arch type suspended work platform involves supporting the fixed steel plate 3 on the upper curved arch 1 on the inclined surface of the positioning and adjusting wedge block 5. The elevation of the upper curved arch 1 is adjusted by moving the positioning and adjusting wedge block 5 back and forth, enabling the entire curved arch structure to cross obstacles of different heights above the wing plate. The connecting components between the upper curved arch 1 and the lower curved arch 2 are used for telescopic adjustment, which can adapt to different length dimensions of the wing plate and adjust the posture of the lower curved arch 2 and the work platform 4, ensuring that the work platform 4 has no tilt angle (parallel to the wing plate and perpendicular to the web plate).
[0051] The two embodiments differ in that in Embodiment 1, both the upper curved arch 1 and the lower curved arch 2 are fixedly connected to the adjusting sleeve 15 by fixing bolts 16, while in Embodiment 2, only the upper curved arch 1 or the lower curved arch 2 is fixedly connected to the adjusting sleeve 15 by fixing bolts 16. Comparatively, Embodiment 1 has a larger adjustment range and a longer extension length; while the structure of Embodiment 2 allows for faster assembly.
Claims
1. A quick-assembly and disassembly arched suspended work platform, characterized in that: It includes an upper curved arch (1) and a lower curved arch (2), wherein the front end of the upper curved arch (1) is provided with an inclined fixed steel plate (3), and the end of the lower curved arch (2) is fixedly connected with a horizontally extended working platform (4). The end of the upper curved arch (1) and the front end of the lower curved arch (2) are fixedly connected together by connecting members to form a curved arch structure. It also includes a positioning and adjusting wedge block (5) for supporting the entire curved arch structure, and a ladder (8) for connecting the upper curved arch (1) and the working platform. The expansion and contraction adjustment is carried out through the connecting components between the upper curved arch (1) and the lower curved arch (2), which can adapt to different length dimensions of the wing plate on the one hand, and realize the posture adjustment of the lower curved arch (2) and the working platform (4) on the other hand. The positioning adjustment wedge block (5) is provided with a fixed steel plate limiting groove (14). During the installation of the curved arch type suspended work platform, the fixed steel plate (3) is inserted into the fixed steel plate limiting groove (14) to prevent the entire curved arch structure from sliding left and right.
2. The quick-assembly and disassembly curved arch-shaped suspended work platform according to claim 1, characterized in that: The upper section of the curved arch (1) and the lower section of the curved arch (2) are both composed of inner arch members (6) and outer arch members (7). The inner arch members (6) and the outer arch members (7) are both composed of parallel left and right side members. The left and right side members are fixedly connected together by longitudinal and vertical curved arch fixing members (10). The left and right side members of the upper section of the curved arch (1) are each connected to a fixing steel plate (3) at the head end of the left and right side members.
3. The quick-assembly and disassembly curved arch-shaped suspended work platform according to claim 2, characterized in that: The inner members (6) of the lower section of the curved arch (2) are all fixedly connected to the working platform (4) via the working platform tie rod (11). The left and right working platform tie rods (11) are also fixedly connected to the inner members (6) of the same side of the curved arch via tie rod reinforcement rod (12).
4. The quick-assembly and disassembly curved arch-shaped suspended work platform according to claim 1, characterized in that: The work platform (4) is formed by connecting the longitudinal, transverse and vertical rods, and the bottom rods are fixed with an operating steel plate (13).
5. The quick-assembly and disassembly curved arch-shaped suspended work platform according to claim 2, characterized in that: The connecting component is an arc-shaped adjusting sleeve (15). There are 4 adjusting sleeves (15), and each adjusting sleeve (15) has multiple through holes. The ends of the rods connecting the upper section of the curved arch (1) and the lower section of the curved arch (2) are provided with through holes. After the fixing bolt (16) passes through the adjusting sleeve (15) and the through holes of the rods of the upper section of the curved arch (1) or the lower section of the curved arch (2), the upper section of the curved arch (1) or the lower section of the curved arch (2) is fixedly connected to the adjusting sleeve (15).
6. The quick-assembly and disassembly curved arch-shaped suspended work platform according to claim 2, characterized in that: The connecting component is an arc-shaped adjusting sleeve (15). There are 4 adjusting sleeves (15), and each adjusting sleeve (15) has multiple through holes. The ends of the rods of the upper section of the curved arch (1) are provided with through holes. After the fixing bolt (16) passes through the adjusting sleeve (15) and the through holes of the rods of the upper section of the curved arch (1), the upper section of the curved arch (1) is fixedly connected to the adjusting sleeve (15). The ends of the rods of the lower section of the curved arch (2) are welded and fixed to the adjusting sleeve (15).
7. The quick-assembly and disassembly curved arch-shaped suspended work platform according to claim 1, characterized in that: The work platform (4) is equipped with an edge protection frame (17).
8. The quick-assembly and disassembly curved arch-shaped suspended work platform according to claim 1, characterized in that: The ladder (8) has a downward-sloping bar (9) on its inner side.
9. A construction method for a quickly assembled and disassembled curved arch-shaped suspended work platform as described in any one of claims 1-8, characterized in that: By supporting the upper curved arch (1) with the fixed steel plate (3) on the inclined surface of the positioning adjustment wedge block (5), the elevation of the upper curved arch (1) is adjusted by moving the position of the positioning adjustment wedge block (5) back and forth, so as to realize the function of the entire curved arch structure crossing obstacles of different heights above the wing plate; by adjusting the extension and retraction of the connecting components between the upper curved arch (1) and the lower curved arch (2), it can adapt to different length dimensions of the wing plate on the one hand, and realize the posture adjustment of the lower curved arch (2) and the working platform (4) on the other hand, so as to ensure that the working platform (4) has no tilt angle.
Citation Information
Patent Citations
Hanger articulated bridge inspection vehicle
CN102635066A
Hanging bracket hinging-type single-track bridge overhaul vehicle
CN108103929A