一种混凝土倒吊式结构施工方法
By using detachable brackets and PTFE side molds in the inverted structure, the problem of insufficient load-bearing capacity of the scaffolding was solved, achieving high-efficiency construction quality and economy. Its promotion has yielded good economic benefits.
CN118422886BActive Publication Date: 2026-07-17SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
- Filing Date
- 2024-04-30
- Publication Date
- 2026-07-17
AI Technical Summary
Technical Problem
Traditional inverted structure construction methods suffer from insufficient load-bearing capacity of the scaffolding, high construction difficulty, lack of economy, and low construction efficiency.
Method used
The structure employs a detachable bracket structure and adjustable PTFE side molds, enabling the inverted structure to be formed through simple manual operation. This reduces the load on the scaffolding, ensures construction quality, and shortens the construction period.
Benefits of technology
It improves construction efficiency, reduces construction costs, and increases the turnover rate of reusable materials, resulting in significant economic and social benefits.
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure CN118422886B_ABST
Abstract
本发明公开了一种混凝土倒吊式结构施工方法,属于建筑施工技术领域,包括如下步骤:步骤一、进行竖向柱墙结构钢筋绑扎,安装预埋件结构;并安装模板;步骤二、搭设倒吊式结构的排架,安装倒吊式梁板结构、暗梁模板并钢筋绑扎;步骤三、对应安装聚四氟乙烯侧模结构;步骤四、对应混凝土浇筑;步骤五、进行吊墙、竖向柱墙结构钢筋绑扎,安装型钢牛腿结构;步骤六、对应安装聚四氟乙烯侧模结构;步骤七、竖向柱墙结构、吊墙的模板安装;搭设上层结构梁板的排架并钢筋绑扎、安装模板;步骤八、对应混凝土浇筑;步骤九、拆除倒吊式结构的排架、模板;步骤十、拆除其余结构;其目的在于解决常规方法排架承载力不足、施工难度大、缺乏经济性的问题。