一种水力发电机组多分支绕组接地故障快速定位的方法

By disconnecting the faulty phase of the hydroelectric generator set, installing fiber optic current transformers to measure the current and calculate the voltage, the grounding fault of multiple branch windings can be quickly and accurately located, solving the problem of difficult grounding fault location in hydroelectric generator sets and improving maintenance efficiency and safety.

CN118425767BActive Publication Date: 2026-07-17CHINA THREE GORGES PROJECTS DEV CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA THREE GORGES PROJECTS DEV CO LTD
Filing Date
2024-04-28
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Grounding faults in multiple branch windings of hydroelectric generator sets are difficult to locate quickly, resulting in long downtime, high costs, and low efficiency for maintenance, which affects energy supply and grid security.

Method used

By disconnecting the soft connection of the faulty phase, installing a fiber optic current transformer to measure the current value, setting the voltage at both ends of the branch using a variable frequency AC power supply, and calculating the location of the faulty conductor, rapid and accurate positioning can be achieved.

Benefits of technology

It eliminates the need to remove external insulation, significantly reducing the workload of unit dismantling, quickly locating grounding fault points, improving maintenance efficiency, reducing economic losses, and enhancing energy supply and power system security.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118425767B_ABST
    Figure CN118425767B_ABST
Patent Text Reader

Abstract

一种水力发电机组多分支绕组接地故障快速定位的方法,包括:Step1、断开故障相出口和中性点的软连接;Step2、测量各分支端部电流稳定电流值;Step3、判断下述公式是否成立:isn=ien;Step4、如果公式不成立,则确定该分支出现接地故障,进入Step5;Step5、在故障分支始端和末端均外接交流变频电源,并设定相同的输出电压;Step6、记录故障分支稳定始端电流值Isgc1记录故障分支稳定末端电流值Iegc1;Step7、计算故障分支中故障线棒位置GC;Step8、则从故障分支末端起,第GC根线棒则为故障线棒。无需破坏外部绝缘、大量减少机组定转子部件拆除工作量,实现快速精准定位接地故障点,极大提升了机组停机检修效率,大大减少了经济损失,进一步加强了能源保供和电力系统安全保障能力。
Need to check novelty before this filing date? Find Prior Art