Cable channel operation state evaluation system and method in power distribution internet of things scene

By constructing a cable channel operation status assessment system in the context of power distribution IoT, and utilizing equipment sensing and data processing modules for status assessment, the problem of cable channel operation and maintenance relying on manual inspection has been solved. This system enables risk classification and grading of cable channels, thereby improving the safety and reliability of the power grid.

CN118445644BActive Publication Date: 2026-11-24UNIV OF SHANGHAI FOR SCI & TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410476127.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2026-11-24
Estimated Expiration
2044-04-19

AI Technical Summary

Technical Problem

In the current technology, the operation and maintenance of cable channels mainly relies on manual inspections, lacking digital means, which makes it impossible to detect internal problems of cables in a timely manner, affecting operation and maintenance safety and fault repair, resulting in insufficient power grid reliability and security.

Method used

A cable channel operation status assessment system in the power distribution Internet of Things scenario is adopted. The system collects environmental data through the equipment sensing module, performs preprocessing through the data scheduling and processing module, and combines trajectory matrix generation and improved adaptive neural fuzzy inference model to conduct status assessment, determine risk type and level, and realize risk classification and grading of cable channels.

Benefits of technology

It enables digital assessment of the operation and maintenance status of cable channels, reduces operation and maintenance costs, improves power grid safety and reliability, guides operation and maintenance personnel to strengthen targeted inspections, and reduces the risk of failure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118445644B_ABST
    Figure CN118445644B_ABST
Patent Text Reader

Abstract

This invention provides a system and method for assessing the operational status of cable channels in a power distribution Internet of Things (IoT) scenario. The system includes: a device sensing module for collecting environmental data from multiple cable channels; a data scheduling and processing module for sorting all environmental data into a task queue and preprocessing it sequentially to obtain corresponding preprocessed environmental data; a trajectory matrix generation module for generating a trajectory matrix based on the preprocessed environmental data; an assessment module for obtaining the operational status assessment value of the corresponding cable channel based on the trajectory matrix; a risk type judgment module for performing hierarchical clustering of the operational status assessment values ​​for different time periods for each cable channel to obtain the risk type of each cable channel; and a risk level judgment module for obtaining the risk level of the corresponding cable channel based on the operational status assessment value. In summary, this method can classify and grade the operational status of cable channels, thereby reducing the operational costs of cable channels.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of cable channel operation and maintenance technology, specifically to a cable channel operation status assessment system and method in a power distribution Internet of Things (IoT) scenario. Background Technology

[0002] Power cables are the underground arteries for energy transmission in urban power grids. They are usually laid out in cable channels such as tunnels, ducts, and trenches. Their operating status and maintenance level are directly related to the reliable supply of electricity.

[0003] Currently, power supply companies mainly rely on manual inspections for cable maintenance, lacking corresponding digital means and professional technical support. Moreover, they cannot promptly detect problems such as insulation aging, joint damage, partial discharge, and abnormal temperature inside the cables, which adversely affects the safety of maintenance personnel and emergency repairs.

[0004] Therefore, how to reduce the cost of manual operation and maintenance of cable channels and improve the safe operation of the power grid and the level of power reliability has become an urgent problem to be solved. Summary of the Invention

[0005] This invention is made to solve the above-mentioned problems, and aims to provide a system and method for evaluating the operating status of cable channels in a power distribution Internet of Things (IoT) scenario.

[0006] This invention provides a cable channel operation status assessment system in a power distribution Internet of Things (IoT) scenario, used to obtain the operation status assessment results of cable channels. It features the following components: a device sensing module for collecting environmental data from multiple cable channels; a data scheduling and processing module for sorting all environmental data into a task queue and performing preprocessing sequentially to obtain corresponding preprocessed environmental data; a trajectory matrix generation module for performing temporal chaotic analysis and multi-dimensional phase space reconstruction on all preprocessed environmental data corresponding to each cable tunnel to obtain the trajectory matrix corresponding to that cable tunnel; an assessment module containing a trained improved adaptive neural fuzzy inference model for obtaining the corresponding cable channel operation status assessment value based on the trajectory matrix; a risk type judgment module for performing hierarchical clustering on the operation status assessment values ​​of each cable channel at different time periods to obtain the risk type of each cable channel; and a risk level judgment module for obtaining the corresponding risk level of the cable channel based on the operation status assessment value. The operation status assessment result includes both risk type and risk level.

[0007] The cable channel operation status assessment system in the power distribution Internet of Things scenario provided by this invention may also have the following features: the environmental data includes power control data, safety monitoring data, cable body monitoring data, channel environment monitoring data, and fire control data; the power control data includes fan monitoring data, water pump monitoring data, and lighting monitoring data; the safety monitoring data includes water level monitoring data and manhole cover monitoring data; the cable body monitoring data includes grounding circulation current monitoring data, fiber optic temperature measurement monitoring data, and partial discharge monitoring data; the channel environment monitoring data includes video monitoring data, water immersion monitoring data, temperature and humidity monitoring data, and toxic and harmful gas detection data; and the fire control data includes smoke detection data and flame detection data.

[0008] The cable channel operation status assessment system in the power distribution Internet of Things scenario provided by the present invention may also have the following features: in the data scheduling and processing module, task queues are sorted by real-time value density analysis, execution urgency analysis and importance quantification analysis.

[0009] The cable channel operation status assessment system in the power distribution Internet of Things scenario provided by this invention may also have the following feature: wherein the calculation expression for real-time value density analysis is: In the formula For task T i The initial amount of information, For task T i The amount of information processed, C i For task T i The expected processing time, t is the time for task T. i Execution time, For task T i The results of real-time value density analysis.

[0010] The cable channel operation status assessment system in the power distribution Internet of Things scenario provided by this invention may also have the following feature: wherein the calculation expression for performing urgency analysis is: In the formula C i For task T i The expected processing time, t is the time for task T. i Execution time, d i For task T i The absolute deadline for execution, τ i For the current time, For task T i The results of the urgency analysis.

[0011] The cable channel operation status assessment system in the power distribution Internet of Things scenario provided by this invention may also have the following feature: wherein the calculation expression for importance quantification analysis is: In the formula For task T i Importance quantification analysis results For task T i The state at time t is either "processing" or "queuing". For task T i The priority setting value at time t, Z is related to task T. i The number of related tasks, C i For task T i The expected processing time, t is the time for task T. i The execution time.

[0012] The cable channel operation status assessment system in the power distribution IoT scenario provided by this invention may also have the following features: In the data scheduling and processing module, preprocessing includes distorted data processing, missing data processing, and data standardization. Distorted data processing uses a horizontal comparison method to select sample data x. i,j Compared with the average Deviation greater than 3σ i The sample data is used as distorted data for correction, σ i The calculation expression is: In the formula x i,j For the sample data at the j-th time node of the i-th sequence, The average value is denoted by 'n', where 'n' is the number of sample data points and 'x' is the distorted data. i,j The corrected data x is obtained through distortion data processing. i,j The expression for calculating ′ is: x i,j ′=α·(x i,j-1 +x i,j+1 ) / 2+β·x i,j+1 α+β=1, where x i,j-1 For the data at the j-th time node of the i-th sequence corresponding to the previous time node, x i,j+1 For the data corresponding to the j-th time node of the i-th sequence, missing data is handled using a smoothing correction interpolation method, the calculation expression of which is: In the formula x i,j For the data at the j-th time node of the i-th sequence in the interpolation, Δt1 and T1 are the number of nodes at the start and end of the forward acquisition, respectively, and Δt2 and T2 are the number of nodes at the start and end of the backward acquisition, respectively. The data is standardized using Min-Max normalization, the expression of which is: In the formula x i,j For the data at the j-th time node of the i-th sequence in the interpolation, x i min Let x be the minimum value of the data in the i-th sequence.i max It represents the maximum value of the data in the i-th sequence.

[0013] The cable channel operation status evaluation system in the power distribution IoT scenario provided by this invention may also have the following feature: wherein, in the trajectory matrix generation module, the expression of the trajectory matrix is: In the formula, τ represents the time delay, m represents the embedding dimension, and the time delay τ is estimated using the average mutual information method and based on the Shannon entropy measurement of continuous points x. i and x i+τ The nonlinear correlation between them is calculated, and the time delay τ is the time delay when I(τ) reaches its first minimum. The expression for calculating I(τ) is: In the formula p(x i x i+τ (x) is a continuous point i and x i+τ The joint probability density, p(x) i (x) is a continuous point i The independent probability density, p(x) i+τ (x) is a continuous point i+τ The independent probability density and the embedding dimension m are estimated by the pseudo nearest neighbor method.

[0014] The cable channel operation status assessment system in the power distribution Internet of Things scenario provided by this invention may also have the following features: the risk type includes Class I and Class II, the operation status assessment value is a percentage value, and the risk level is divided into three levels: high, medium and low according to the magnitude of the value.

[0015] This invention also provides a method for evaluating the operating status of cable channels using the cable channel operating status evaluation system in a power distribution IoT scenario, characterized by the following steps: Step S1, using a device sensing module to collect environmental data from multiple cable channels; Step S2, using a data scheduling and processing module to sort all environmental data into a task queue and preprocess them sequentially to obtain corresponding preprocessed environmental data; Step S3, using a trajectory matrix generation module to perform temporal chaotic analysis and multi-dimensional phase space reconstruction on all preprocessed environmental data corresponding to each cable tunnel to obtain the trajectory matrix corresponding to that cable tunnel; Step S4, using an evaluation module to obtain the corresponding operating status evaluation value of the cable channel based on the trajectory matrix; Step S5, using a risk type judgment module to perform hierarchical clustering on the operating status evaluation values ​​of each cable channel at different time periods to obtain the risk type of each cable channel; Step S6, using a risk level judgment module to obtain the risk level of the corresponding cable channel based on the operating status evaluation value.

[0016] The role and effect of invention

[0017] According to the cable channel operation status assessment system and method in the power distribution IoT scenario of this invention, on the one hand, an improved adaptive neurofuzzy inference model is obtained through temporal chaotic analysis and multi-dimensional phase space reconstruction to process preprocessed environmental data and obtain operation status assessment values; on the other hand, clustering and numerical analysis are performed based on the operation status assessment values ​​to obtain the risk type and risk level corresponding to each cable channel. Therefore, the cable channel operation status assessment system and method in the power distribution IoT scenario of this invention can classify and grade the operation and maintenance status of cable channels, thereby reducing the operation and maintenance costs of cable channels. Attached Figure Description

[0018] Figure 1 This is a block diagram of the cable channel operation status evaluation system in an embodiment of the present invention;

[0019] Figure 2 This is a flowchart of task queue sorting in an embodiment of the present invention;

[0020] Figure 3 This is a schematic diagram showing the comparison of average task latency for different scheduling methods in this embodiment of the present invention;

[0021] Figure 4 This is a schematic diagram of the kernel density estimation analysis results in an embodiment of the present invention;

[0022] Figure 5 This is a schematic diagram of the distribution of operating status evaluation values ​​of the cable channel in an embodiment of the present invention;

[0023] Figure 6 This is a schematic diagram of the clustering results in an embodiment of the present invention;

[0024] Figure 7 This is a flowchart illustrating the cable channel operation status evaluation method in an embodiment of the present invention. Detailed Implementation

[0025] To make the technical means, creative features, objectives and effects of this invention easy to understand, the following embodiments, in conjunction with the accompanying drawings, specifically illustrate the cable channel operation status evaluation system and method in the power distribution Internet of Things scenario of this invention.

[0026] This embodiment provides a cable channel operation status assessment system in a power distribution Internet of Things (IoT) scenario, used to obtain the operation status assessment results of the cable channel, which include risk type and risk level. In this embodiment, a 1.83-kilometer-long cable channel with a range of approximately 10 meters on both sides in a certain area is used as the object of the cable channel operation status assessment.

[0027] Figure 1This is a block diagram of the cable channel operation status evaluation system in an embodiment of the present invention.

[0028] like Figure 1 As shown, the cable channel operation status assessment system 100 includes an equipment sensing module 10, a data scheduling and processing module 20, a trajectory matrix generation module 30, an assessment module 40, a risk type judgment module 50, a risk level judgment module 60, and a control module 70 that controls the operation of the above modules.

[0029] The device sensing module 10 is used to collect environmental data from multiple cable channels.

[0030] The environmental data includes power control data, safety monitoring data, cable body monitoring data, channel environmental monitoring data, and fire control data.

[0031] The power control data includes fan monitoring data, water pump monitoring data, and lighting monitoring data.

[0032] Safety monitoring data includes water level monitoring data and manhole cover monitoring data.

[0033] The cable body monitoring data includes grounding current monitoring data, fiber optic temperature monitoring data, and partial discharge monitoring data.

[0034] The environmental monitoring data for the passage includes video monitoring data, water immersion monitoring data, temperature and humidity monitoring data, and toxic and harmful gas detection data.

[0035] Fire control data includes smoke detection data and flame detection data.

[0036] In this embodiment, the data collection points for the cable channel operation status assessment are mainly distributed in the cable joint wells. Some wells are equipped with smart well covers, and the number of IoT terminals in the wells is configured according to actual needs.

[0037] The data scheduling and processing module 20 sorts all environmental data into a task queue and preprocesses them sequentially to obtain corresponding preprocessed environmental data. Specifically, the data scheduling and processing module 20 sorts the task queue using real-time value density analysis, execution urgency analysis, and importance quantification analysis. Preprocessing includes distorted data processing, missing data processing, and data standardization.

[0038] The calculation expression for real-time value density analysis is as follows:

[0039]

[0040] In the formula For task T i The initial amount of information, For task T i The amount of information processed, Ci For task T i The expected processing time, t is the time for task T. i Execution time, For task T i The real-time value density analysis results are used. In this embodiment, a larger value in the real-time value density analysis result indicates that more value is processed per unit time, and the corresponding task is then placed at the front of the task queue.

[0041] The calculation expression for performing urgency analysis is:

[0042]

[0043] In the formula C i For task T i The expected processing time, t is the time for task T. i Execution time, d i For task T i The absolute deadline for execution, τ i For the current time, For task T i The execution urgency analysis results are used. In this embodiment, a larger execution urgency analysis result indicates a larger proportion of spare time that requires resource consumption, and the corresponding task will be scheduled at the beginning of the task queue.

[0044] The calculation expression for importance quantification analysis is:

[0045]

[0046]

[0047]

[0048] In the formula For task T i Importance quantification analysis results For task T i At time t, the state is either processing or queued, with 1 indicating processing and 0 indicating queued. The state changes as the processing progresses. For task T i The priority setting value at time t, Z is related to task T. i The number of related tasks, C i For task T i The expected processing time, t is the time for task T. i The execution time. In this embodiment, the order is recorded as follows: 2 and 3.

[0049] Figure 2This is a flowchart of task queue sorting in an embodiment of the present invention.

[0050] like Figure 2 As shown, all the environmental data that needs to be processed constitutes the task set {T}. i}, and set the initial task sequence to L0, determine whether i is greater than 0 and less than or equal to Z, if so, then calculate task T. i The real-time value density analysis results, i.e., the real-time value density R of the task. Ti If not, then the process ends. Next, determine the real-time value density R of the task. Ti If the threshold value is greater than or equal to a preset threshold of 1, then execute task T. i And end; otherwise, based on the task's real-time value density R. Ti Task T i Insert task sequence L0, update it to task sequence L1, and calculate task T. i The results of the execution urgency analysis, i.e., the task urgency analysis α Ti Then, analyze the urgency of the task (α). Ti If the value is greater than or equal to a preset threshold of 2, then execute task T. i And end; otherwise, based on the task's real-time value density R. Ti Task T i Insert it into task sequence L1, updating it to task sequence L2. Then, determine task T. i corresponding If the value is equal to the preset value, then execute task T. i If not, then calculate task T. i The results of the importance quantification analysis, i.e., the task importance quantification I Ti And quantify I based on task importance. Ti Task T i Add it to task sequence L2, update it to task sequence L3, and finally execute task sequence L3 and end.

[0051] In this embodiment, the task queue sorting method adopted by the data scheduling and processing module 20, namely the real-time dynamic scheduling method, is referred to as Method 1, and it is compared with the first-in-first-out order scheduling method, namely Method 2, and the fixed priority scheduling method, namely Method 3.

[0052] Figure 3 This is a schematic diagram showing the comparison of average task latency results for different scheduling methods in this embodiment of the present invention.

[0053] like Figure 3As shown, the horizontal axis represents the amount of tasks (in %), and the vertical axis represents the average task latency (in milliseconds). It can be seen that with the increase of terminal devices and task volume, the real-time dynamic scheduling method has the lowest average latency, achieving a low latency effect and improving the overall efficiency of task processing.

[0054] Distortion data processing uses a horizontal comparison method to select sample data x. i,j Compared with the average Deviation greater than 3σ i The sample data is used as distorted data for correction, σ i The calculation expression is:

[0055]

[0056]

[0057] In the formula x i,j For the sample data at the j-th time node of the i-th sequence, is the average value, and n is the number of sample data.

[0058] Distorted data x i,j The corrected data x is obtained through distortion data processing. i,j The expression for calculating ′ is:

[0059] x i,j ′=α·(x i,j-1 +x i,j+1 ) / 2+β·x i,j+1 ,

[0060] α+β=1,

[0061] In the formula x i,j-1 For the data at the j-th time node of the i-th sequence corresponding to the previous time node, x i,j+1 This refers to the data of the next time node corresponding to the j-th time node of the i-th sequence.

[0062] Missing data is handled using a smoothing correction interpolation method, the calculation expression of which is:

[0063]

[0064] In the formula x i,j Let be the data of the i-th sequence at the j-th time node in the interpolation, where Δt1 and T1 are the number of nodes at the start and end of the forward acquisition, respectively, and Δt2 and T2 are the number of nodes at the start and end of the backward acquisition, respectively.

[0065] Data standardization is performed using Min-Max normalization, and its expression is:

[0066]

[0067] In the formula x i,j For the data at the j-th time node of the i-th sequence in the interpolation, x imin Let x be the minimum value of the data in the i-th sequence. imax It represents the maximum value of the data in the i-th sequence.

[0068] Figure 4 This is a schematic diagram of the kernel density estimation analysis results in an embodiment of the present invention.

[0069] like Figure 4 As shown, the preprocessed environmental data includes ambient temperature, ambient humidity, joint temperature, sump water level, CO concentration, and H2S concentration. Temperature and humidity monitoring data includes ambient temperature and humidity; water immersion monitoring data includes sump water level; and toxic and harmful gas detection data includes CO concentration and H2S concentration. (a) is a schematic diagram of the kernel density estimation analysis results for ambient temperature, with the horizontal axis representing temperature (°C) and the vertical axis representing probability density; (b) is a schematic diagram of the kernel density estimation analysis results for ambient humidity, with the horizontal axis representing ambient humidity (%) and the vertical axis representing probability density; (c) is a schematic diagram of the kernel density estimation analysis results for joint temperature, with the horizontal axis representing joint temperature (°C) and the vertical axis representing probability density; (d) is a schematic diagram of the kernel density estimation analysis results for sump water level, with the horizontal axis representing joint temperature (°C) and the vertical axis representing probability density; (e) is a schematic diagram of the kernel density estimation analysis results for CO concentration, with the horizontal axis representing CO concentration (*10). -4 (%), with the vertical axis representing probability density; (f) is a schematic diagram of the nuclear density estimation analysis results for H2S concentration, with the horizontal axis representing H2S concentration in units of *10. -5 (%), with the vertical axis representing probability density. The values ​​corresponding to the peak positions in each graph are recorded as the steady-state typical values ​​of the variable. These values ​​are then compared with the safety thresholds set according to existing standards to obtain the exceedance indicators, thereby obtaining the hazard ranking corresponding to the variable, as shown in the table below:

[0070] variable Steady-state typical values Safety threshold Exceeding limits Hidden danger ranking Ambient temperature (°C) 25.4 60 0.58 6 Ambient humidity (%) 52.6 60 0.12 1 Connector temperature (°C) 31.8 60 0.47 3 Water level in the collection well (cm) 11.4 25 0.54 5 CO concentration * 10⁻⁴ (%) 5.2 10 0.48 4 H2S concentration * 10⁻⁵ (%) 18 30 0.40 2

[0071] The first column in the table above lists the variables corresponding to each preprocessed environmental data. Columns two through five list the steady-state typical values, safety thresholds, exceedance indicators, and hazard rankings for each variable, respectively. The smaller the exceedance indicator and the lower the corresponding hazard ranking, the greater the hazard severity. Therefore, the hazard ranking from highest to lowest is: ambient humidity > H2S concentration > joint temperature > CO concentration > ambient temperature. This hazard ranking can guide maintenance personnel to strengthen targeted inspections.

[0072] The calculation expression for the over-limit indicator is as follows:

[0073]

[0074] In the formula x tp,j Let j be the steady-state typical value. P is the safety threshold corresponding to variable j. j Let j be the limit-breaking indicator corresponding to variable j.

[0075] The trajectory matrix generation module 30 is used to perform temporal chaotic analysis and multi-dimensional phase space reconstruction on all preprocessed environmental data corresponding to each cable tunnel to obtain the trajectory matrix corresponding to the cable tunnel. In this embodiment, a 6-dimensional phase space is constructed based on ambient temperature, ambient humidity, joint temperature, sump water level, CO concentration, and H2S concentration.

[0076] The trajectory matrix is ​​expressed as follows:

[0077]

[0078] In the formula, τ is the time delay and m is the embedding dimension.

[0079] The time delay τ is estimated using the average mutual information method and based on the Shannon entropy measurement of continuous points x. i and x i+τ The nonlinear correlation between them is calculated, and the time delay τ is the time delay when I(τ) reaches its first minimum. The expression for calculating I(τ) is:

[0080]

[0081] In the formula p(x i x i+τ (x) is a continuous point i and x i+τ The joint probability density, p(x) i (x) is a continuous point i The independent probability density, p(x) i+τ (x) is a continuous point i+τ The independent probability density.

[0082] The embedding dimension m is estimated using the pseudo nearest neighbor method, which involves searching for the nearest neighbors of each point in a given dimension m, checking whether these points are still nearest neighbors in a higher dimension m+1, and repeating this process in higher dimensions until the percentage of the FNN becomes zero or small enough.

[0083] In this embodiment, the temporal chaos analysis, i.e., the chaos analysis of time series, uses the maximum Lyapunov exponent to examine the numerical characteristics of the average exponential divergence of adjacent trajectories in the phase space. Its expression is:

[0084]

[0085] In the formula, n approaches infinity, xn λ is the value of the nth iteration, and λ is the Lyapunov exponent.

[0086] The evaluation module 40 contains a pre-trained improved adaptive neural fuzzy inference model, used to obtain the corresponding operational status evaluation value of the cable channel based on the trajectory matrix. The operational status evaluation value is a percentage-based score.

[0087] In this embodiment, the improved adaptive neurofuzzy inference model is obtained by reconstructing the phase space of the adaptive neurofuzzy inference model and training it using the existing training set. To avoid getting trapped in local minima during the training process, a hybrid learning algorithm combining least squares and gradient descent is used.

[0088] The adaptive neurofuzzy reasoning model consists of an input layer, a membership layer, a rule layer, a decision layer, and an output layer.

[0089] The input layer consists of adaptive nodes. Membership functions are used to fuzzy input features x and y to obtain the membership degrees within the interval. The output is as follows:

[0090] θ i 1 (t)=μ Ai (x),

[0091]

[0092] In the formula, x is the input of node i, Ai is the correlation variable, and μ Ai (x) is the membership function of the input variable x, c i and σ i The parameters set for the Gaussian function.

[0093] The membership layer consists of fixed nodes, denoted by Π. The trigger strength ωi of each rule is obtained by multiplying the membership degrees of each feature, and the output is as follows:

[0094] θ i 2 =ω i =μ Ai (x)×μ Bi (y),

[0095] In the formula μ Bi (y) is the membership function of the input variable y.

[0096] The rule layer uses N for classification, and normalizes the trigger strength of each rule obtained from the previous layer to represent the probability of using the rule throughout the inference process, as shown in the following formula:

[0097]

[0098] In the formula, This is the normalized trigger strength.

[0099] The decision layer consists of adaptive nodes, and the output of each node is simply the product of the normalized trigger strength and a first-order polynomial, as shown below:

[0100]

[0101] In the formula {p i ,q i ,r i} represents the set of parameters for this node, i.e., the consequent parameters.

[0102] The output layer has fixed nodes. The results of each rule are weighted and averaged to obtain the final output of the model, as shown in the following formula:

[0103]

[0104] In this embodiment, the performance of the improved adaptive neurofuzzy inference model (i.e., the improved ANFIS) and the original adaptive neurofuzzy inference model (i.e., the original ANFIS) is compared on existing data. The results of their MAE, MAPE, R2, and average training time are shown in the table below:

[0105] MAE MAPE R2 Average training time (s) Improved ANFIS 0.0072 2.4653 0.9967 2.46 Original ANFIS 0.0294 9.4732 0.8919 2.25

[0106] The first column of the table above shows the various models, and the second to fifth columns show the MAE, MAPE, R2, and average training time results for each model, respectively. This demonstrates that the improved ANFIS significantly enhances classification accuracy with only a small additional training time.

[0107] Figure 5 This is a schematic diagram of the distribution of operating status evaluation values ​​of the cable channel in an embodiment of the present invention.

[0108] like Figure 5 As shown, the horizontal axis represents the percentage-based operational status assessment value, and the vertical axis represents the number of cable channels. It can be seen that the operational status assessment values ​​of most cable channels are concentrated in the range of [50, 70], accounting for 69.23%, indicating that most cable channels are in normal operating condition. The number of samples with scores above 70 is the smallest, indicating that only a few cable channels are in good operating condition. A small number of channels have scores below 50, indicating that a small number of cable channels are in poor operating condition and should be prioritized for inclusion in the maintenance plan.

[0109] The risk type determination module 50 is used to perform hierarchical clustering of the operational status assessment values ​​for different time periods corresponding to each cable channel to obtain the risk type of each cable channel. The risk types include Class I and Class II. In this embodiment, different operation and maintenance strategies are adopted for different risk types.

[0110] Figure 6 This is a schematic diagram of the clustering results in an embodiment of the present invention.

[0111] like Figure 6 As shown, the dashed lines are labeled lines. The left and right sides of the dashed lines represent the cable channels corresponding to the two risk types obtained from clustering, respectively. The vertical axis in the figure represents the distance between clusters.

[0112] The risk level assessment module 60 is used to determine the risk level of the corresponding cable channel based on the operational status assessment value. The risk level is divided into three levels: high, medium, and low, based on the numerical value. In this embodiment, a value less than 50 is set to high; a value greater than or equal to 50 but less than or equal to 70 is set to medium; and a value greater than 70 is set to low. In this embodiment, for high-level risks, increased maintenance efforts are implemented; for low-level risks, routine work arrangements are maintained.

[0113] The control module 70 stores the control program that controls the operation of each module.

[0114] The following describes the process of evaluating the operating status of a cable channel using the cable channel operating status evaluation system 100, with reference to the accompanying drawings.

[0115] Figure 7 This is a flowchart illustrating the cable channel operation status evaluation method in an embodiment of the present invention.

[0116] like Figure 7 As shown, the method for assessing the operational status of cable channels includes the following steps:

[0117] Step S1: Use the device sensing module 10 to collect environmental data from multiple cable channels.

[0118] Step S2: The data scheduling and processing module 20 sorts all environmental data into a task queue and preprocesses them sequentially to obtain the corresponding preprocessed environmental data.

[0119] Step S3: The trajectory matrix generation module 30 is used to perform temporal chaotic analysis and multi-dimensional phase space reconstruction on all preprocessed environmental data corresponding to each cable tunnel to obtain the trajectory matrix corresponding to the cable tunnel.

[0120] Step S4: The evaluation module 40 obtains the corresponding operating status evaluation value of the cable channel based on the trajectory matrix.

[0121] Step S5: The risk type judgment module 50 performs hierarchical clustering on the operating status assessment values ​​of each cable channel at different time periods to obtain the risk type of each cable channel.

[0122] Step S6: The risk level judgment module 60 uses the operating status assessment value to obtain the risk level of the corresponding cable channel.

[0123] The role and effect of the embodiments

[0124] According to the cable channel operation status assessment system and method in the power distribution IoT scenario involved in this embodiment, on the one hand, an improved adaptive neurofuzzy inference model is obtained through temporal chaotic analysis and multi-dimensional phase space reconstruction to process preprocessed environmental data and obtain operation status assessment values; on the other hand, clustering and numerical analysis are performed based on the operation status assessment values ​​to obtain the risk type and risk level corresponding to each cable channel. In summary, this method can classify and grade the operation and maintenance status of cable channels, thereby reducing the operation and maintenance costs of cable channels.

[0125] In addition, by preprocessing environmental data to calculate the limit-breaking indicators, the degree of hidden danger of each variable in each cable channel is ranked according to the limit-breaking indicators, thereby guiding maintenance personnel to strengthen the inspection of high-risk problems in a targeted manner.

[0126] Those skilled in the art should understand that this invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of the invention. Various changes and modifications can be made to this invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the invention as claimed. The scope of protection of this invention is defined by the appended claims and their equivalents.

Claims

1. A cable channel operation status assessment system in a power distribution Internet of Things (IoT) scenario, used to obtain the operation status assessment results of the cable channel, characterized in that, include: The device sensing module is used to collect environmental data from multiple cable channels; The data scheduling and processing module is used to sort all the environmental data into a task queue and preprocess them sequentially to obtain the corresponding preprocessed environmental data. The trajectory matrix generation module is used to perform temporal chaotic analysis and multi-dimensional phase space reconstruction on all the preprocessed environmental data corresponding to each cable channel to obtain the trajectory matrix corresponding to the cable channel. The evaluation module includes a trained improved adaptive neural fuzzy inference model, which is used to obtain the corresponding operating status evaluation value of the cable channel based on the trajectory matrix. The risk type determination module is used to perform hierarchical clustering on the operating status evaluation values ​​of each cable channel at different time periods to obtain the risk type of each cable channel; The risk level assessment module is used to determine the risk level of the corresponding cable channel based on the operational status assessment value. The operational status assessment results include the risk type and the risk level. In the data scheduling and processing module, the task queue is sorted through real-time value density analysis, execution urgency analysis, and importance quantification analysis. In the trajectory matrix generation module, the expression for the trajectory matrix is: , In the formula For time delay, For the embedding dimension, Delay Estimation was performed using the average mutual information method, and continuous points were measured based on Shannon entropy. and The nonlinear correlation between them was calculated and obtained. The delay when the first minimum value is reached is taken as the delay. , The calculation expression is: , In the formula For continuous points and The joint probability density, For continuous points independent probability density, For continuous points independent probability density, The embedding dimension m is estimated using a pseudo-nearest neighbor method, which involves searching for the nearest neighbors of each point in a given dimension m, checking if these points are still nearest neighbors in a higher dimension m+1, and repeating this process in higher dimensions until the percentage of the FNN becomes zero or sufficiently small. The aforementioned temporal chaos analysis, or time series chaos analysis, uses the maximum Lyapunov exponent to examine the numerical characteristics of the average exponential divergence of adjacent trajectories in phase space. Its expression is: , In the formula, n approaches infinity, x_n is the value of the nth iteration, and λ is the Lyapunov exponent. The improved adaptive neurofuzzy inference model is obtained by reconstructing the phase space of the adaptive neurofuzzy inference model and training it using an existing training set. In order to avoid getting trapped in local minima during the training process, a hybrid learning algorithm combining least squares and gradient descent is adopted. The adaptive neurofuzzy inference model includes an input layer, a membership layer, a rule layer, a decision layer, and an output layer.

2. The cable channel operation status assessment system in the power distribution Internet of Things scenario according to claim 1, characterized in that: in, The environmental data includes power control data, safety monitoring data, cable body monitoring data, channel environmental monitoring data, and fire control data. The power control data includes fan monitoring data, water pump monitoring data, and lighting monitoring data. The safety monitoring data includes water level monitoring data and manhole cover monitoring data. The cable body monitoring data includes grounding current monitoring data, fiber optic temperature monitoring data, and partial discharge monitoring data. The environmental monitoring data for the passage includes video monitoring data, water immersion monitoring data, temperature and humidity monitoring data, and toxic and harmful gas detection data. The fire control data includes smoke detection data and flame detection data.

3. The cable channel operation status assessment system in the power distribution Internet of Things scenario according to claim 1, characterized in that: in, The calculation expression for the real-time value density analysis is as follows: , In the formula For the task The initial amount of information, For the task The amount of information already processed For the task Expected processing time For the task Execution time, For the task The results of real-time value density analysis.

4. The cable channel operation status assessment system in the power distribution Internet of Things scenario according to claim 1, characterized in that: in, The calculation expression for the urgency analysis is as follows: , In the formula For the task Expected processing time For the task Execution time, For the task The absolute deadline for execution. For the current time, For the task The results of the urgency analysis.

5. The cable channel operation status assessment system in the power distribution Internet of Things scenario according to claim 1, characterized in that: in, The calculation expression for the importance quantification analysis is as follows: , , , In the formula For the task Importance quantification analysis results For the task exist The status at any given time, which is either processing or queuing. For the task exist The priority setting value at any given moment. In order to complete the mission The number of related tasks For the task Expected processing time For the task The execution time.

6. The cable channel operation status assessment system in the power distribution Internet of Things scenario according to claim 1, characterized in that: in, In the data scheduling and processing module, the preprocessing includes distorted data processing, missing data processing, and data standardization. The distortion data processing employs a horizontal comparison method to filter sample data. Compared with the average Deviation greater than The sample data was used to correct the distorted data. The calculation expression is: , , In the formula For the first The sequence number is... Sample data at each time point, This is the average value. The number of sample data. Distorted data Corrected data obtained through distortion data processing The calculation expression is: , , In the formula For the first The sequence number is... Each time point corresponds to the data of the previous time point. For the first The sequence number is... Each time point corresponds to the data of the next time point. The missing data processing uses a smoothing correction method for interpolation, and its calculation expression is as follows: , In the formula For the interpolation of the first The sequence number is... Data at each time point and These represent the number of nodes at the start and end of the forward data collection, respectively. and These represent the number of nodes at the start and end of the backward data collection, respectively. The data is standardized using Min-Max normalization, and its expression is: , In the formula For the interpolation of the first The sequence number is... Data at each time point For the first The minimum value of data in a sequence. For the first The maximum value of data in a sequence.

7. The cable channel operation status assessment system in the power distribution Internet of Things scenario according to claim 1, characterized in that: in, The risk types include Class I and Class II. The operational status evaluation value is a percentage-based score. The risk level is divided into three levels: high, medium, and low, based on the magnitude of the value.

8. A method for evaluating the operating status of cable channels using the cable channel operating status evaluation system in a power distribution Internet of Things scenario as described in any one of claims 1-7, characterized in that, Includes the following steps: Step S1: Use the device sensing module to collect environmental data from multiple cable channels; Step S2: The data scheduling and processing module sorts all the environmental data into a task queue and preprocesses them sequentially to obtain the corresponding preprocessed environmental data. Step S3: The trajectory matrix generation module is used to perform temporal chaotic analysis and multi-dimensional phase space reconstruction on all the preprocessed environmental data corresponding to each cable channel to obtain the trajectory matrix corresponding to the cable channel. Step S4: The evaluation module obtains the corresponding operating status evaluation value of the cable channel based on the trajectory matrix; Step S5: The risk type judgment module is used to perform hierarchical clustering on the operating status evaluation values ​​of each cable channel at different time periods to obtain the risk type of each cable channel. Step S6: The risk level judgment module uses the operating status assessment value to obtain the corresponding risk level of the cable channel.