A concrete structure and a method of construction thereof

By using a butt joint mechanism, clamping rods, and locking mechanisms to clamp the embedded steel bars in the concrete structure, ensuring that they are arranged perpendicularly to the butt joint surface, the problems of difficult positioning and deformation misalignment of traditional embedded steel bars are solved, improving construction efficiency and overall stability, and promoting the connection of adjacent concrete structures.

CN118481246BActive Publication Date: 2026-11-24SINOHYDRO BUREAU 8 CO LTD +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410724735.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2026-11-24
Estimated Expiration
2044-06-05

AI Technical Summary

Technical Problem

Traditional pre-embedded steel bars and connectors are difficult to position in concrete structures, have low positioning accuracy, low construction efficiency, and are prone to deformation and misalignment during concrete vibration, affecting the safety and construction period of subsequent structural connections.

Method used

The docking mechanism includes clamping rods, locking mechanisms, embedded steel bars, and connectors. The embedded steel bars are clamped by the sponge of the clamping rods and arranged side by side along the width of the structural steel bar frame. The locking mechanism is used to fix them, ensuring that the embedded steel bars are perpendicular to the docking surface and that the connectors are coplanar with the docking surface.

Benefits of technology

It improves the accuracy and efficiency of construction positioning, enhances overall stability, avoids deformation and misalignment of pre-embedded steel bars during concrete vibration, and promotes smooth connection of adjacent concrete structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118481246B_ABST
    Figure CN118481246B_ABST
Patent Text Reader

Abstract

This invention discloses a concrete structure, including a concrete body, a structural steel reinforcement frame embedded in the concrete body, and multiple docking mechanisms. One side of the concrete body is designated as the docking surface. Each docking mechanism includes two clamping rods, a locking mechanism, multiple embedded steel bars, and multiple connectors. Each clamping rod has a sponge body on one side. The two clamping rods are locked together by the locking mechanism. Each embedded steel bar is clamped between the sponge bodies of the two clamping rods and fixed to the structural steel reinforcement frame. The embedded steel bars are spaced apart along the width of the docking surface and perpendicular to it. The clamping rods are fixed to the structural steel reinforcement frame, and the connectors are connected one-to-one with the embedded steel bars. A construction method for this concrete structure is also disclosed. This concrete structure and its construction method feature good adjustability of the docking mechanism, high positioning accuracy, and good overall stability. It is less prone to deformation and misalignment during concrete vibration, which is beneficial for connecting adjacent concrete structures.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of concrete structure technology, specifically to a concrete structure and its construction method. Background Technology

[0002] In concrete structure construction, it is often necessary to pre-embed reinforcing bars and connectors to facilitate mutual anchoring between adjacent concrete structures being connected simultaneously. Traditionally, pre-embedded reinforcing bars and connectors are typically installed by first welding each individual reinforcing bar to the existing steel reinforcement in the concrete structure, then welding the remaining bars one by one, aligning the later welded bars with the earlier ones. For single pre-embedded reinforcing bars, manually holding both ends for positioning is difficult and inefficient, and the positioning accuracy is low, making it difficult to achieve perpendicularity to the structural surface, resulting in difficulties in aligning connectors between subsequent adjacent concrete structures. For integral pre-embedded reinforcing bars, which need to be arranged side-by-side, the later welded bars are difficult to align with the earlier welded bars, leading to difficult and inefficient positioning. Furthermore, the welded reinforcing bars do not form a unified whole, making them prone to loosening, deformation, and misalignment during concrete pouring and vibration. In summary, this makes it difficult to connect the embedded steel bars and connectors during the later stages of structural construction, requiring the re-installation of steel bars. This compromises the safety of the later structural connections, and also leads to extended construction periods and increased costs. Summary of the Invention

[0003] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a concrete structure and its construction method that has good adjustability of the docking mechanism, high positioning accuracy, good overall stability, is not prone to deformation and misalignment during concrete vibration, and is conducive to the connection of adjacent concrete structures.

[0004] To solve the above-mentioned technical problems, the present invention adopts the following technical solution: A concrete structure includes a concrete body, a structural steel reinforcement frame embedded in the concrete body, and multiple docking mechanisms. One side of the concrete body is configured as a docking surface for docking with adjacent concrete bodies. Each docking mechanism includes two clamping rods, a locking mechanism, multiple embedded steel bars, and multiple connectors. One side of each of the two clamping rods is provided with a sponge body. The two clamping rods are locked together by the locking mechanism. Each embedded steel bar is clamped between the sponge bodies of the two clamping rods and fixed to the structural steel reinforcement frame. The embedded steel bars are spaced apart along the width direction of the docking surface and perpendicular to the docking surface. Both clamping rods are fixed to the structural steel reinforcement frame. Each connector is connected to the end of each embedded steel bar facing the docking surface and is embedded in the concrete body. The clamping rods of adjacent docking mechanisms are docked side by side along the width direction of the docking surface.

[0005] As a further improvement to the above technical solution: The thickness of the sponge is greater than or equal to the diameter of the pre-embedded reinforcing bar.

[0006] The sponge body is glued to the corresponding clamp rod.

[0007] The locking mechanism includes at least two bolts distributed at both ends of the clamping rods, the bolts passing through the two clamping rods and locking the two clamping rods.

[0008] The connector is threadedly connected to the pre-embedded reinforcing steel bar.

[0009] The outer end face of the connector is coplanar with the mating surface.

[0010] The mating ends of the opposing clamps are respectively provided with interlocking grooves and tenons.

[0011] The embedded steel bars are welded to the structural steel reinforcement frame.

[0012] The clamp is welded to the structural steel reinforcement frame and is attached to the side of the structural steel reinforcement frame facing the mating surface.

[0013] A construction method for a concrete structure includes the following steps: S1. Install the structural steel reinforcement frame; S2. Glue one side of the clamp rod to the sponge body; roll the threads on one end of the pre-embedded steel bar and screw the connector into the rolled thread end of the pre-embedded steel bar; S3. Fabrication of the docking mechanism: Select two clamping rods spaced apart and position their sponge bodies opposite each other. Based on the design spacing of the pre-embedded steel bars, place the corresponding number of pre-embedded steel bars side by side between the sponge bodies of the two clamping rods. Then, lock the two clamping rods using a locking mechanism to clamp the pre-embedded steel bars between the two clamping rods. Fix a connector at the end of each pre-embedded steel bar closest to the two clamping rods to form the docking mechanism. S4. Install the docking mechanism: Place each of the pre-embedded steel bars of the docking mechanism on the structural steel reinforcement frame, and fix both clamps of the docking mechanism to one side of the structural steel reinforcement frame, so that each connector of the docking mechanism is located on the outside of the structural steel reinforcement frame; after positioning the position of the pre-embedded steel bars away from the two clamps relative to the structural steel reinforcement frame, fix the pre-embedded steel bars on the structural steel reinforcement frame, so that each pre-embedded steel bar is arranged side by side along the width direction of the structural steel reinforcement frame, so that the clamps of adjacent docking mechanisms are connected side by side along the width direction of the structural steel reinforcement frame, and so that the outer end face of the fixed connector is flush. S5. Pouring concrete: After the formwork is erected around the structural steel reinforcement frame to form the pouring space for the concrete body, concrete is poured into the pouring space to form the concrete structure. S6. After the concrete has solidified, fold the formwork to form a butt joint on one side of the concrete body, which is used to connect with the adjacent concrete body. Arrange the pre-embedded steel bars at intervals along the width of the butt joint and perpendicular to the butt joint, so that the outer end face of each connector is coplanar with the butt joint.

[0014] Compared with the prior art, the advantages of the present invention are as follows: The concrete structure of this invention, on the one hand, in the overall scheme of this concrete structure, for each docking mechanism, one end of each pre-embedded steel bar is first clamped and fixed to the structural steel reinforcement frame by two clamping rods, and then the other end is positioned and fixed. Compared with the existing manual welding of each bar one by one, the construction positioning is easier and more efficient. Moreover, since one end of each pre-embedded steel bar is clamped by the sponge of the two clamping rods, it has a certain amount of adjustment. Before the other end is fixed, the relative position of the pre-embedded steel bar can be adjusted by swinging and / or slightly moving, so that each pre-embedded steel bar can be arranged side by side along the width direction of the structural steel reinforcement frame (the same as the width direction of the docking surface) and perpendicular to the docking surface formed by subsequent pouring. That is, during the installation process, the adjustability is good and it is easy to accurately position. On the other hand, the pre-embedded steel bars are clamped by two clamping rods and then positioned and fixed, which not only facilitates the side-by-side installation of each pre-embedded steel bar, but also improves the integrity of each pre-embedded steel bar of each docking mechanism. Under the action of clamping by two clamping rods, each pre-embedded steel bar is not easy to deform or misalign during concrete vibration. In summary, this concrete structure features a well-adjustable docking mechanism with high positioning accuracy and good overall stability. It is not prone to deformation or misalignment during concrete vibration, which is beneficial for connecting adjacent concrete structures through the docking mechanism.

[0015] The construction method for concrete structures of the present invention has two advantages. First, for each docking mechanism, one end of each pre-embedded steel bar is first clamped and fixed to the structural steel reinforcement frame by two clamping rods, and then the other end is positioned and fixed. Compared with the existing method of manually welding each bar one by one, the construction positioning is easier and more efficient. Moreover, since one end of each pre-embedded steel bar is clamped by the sponge of the two clamping rods, it has a certain amount of adjustment. Before the other end is fixed, the relative position of the pre-embedded steel bars can be adjusted by swinging and / or slightly moving, so that each pre-embedded steel bar can be arranged side by side along the width direction of the structural steel reinforcement frame (the same as the width direction of the docking surface) and perpendicular to the docking surface formed by subsequent pouring. That is, during the installation process, the adjustability is good and it is easy to accurately position. Second, the pre-embedded steel bars are clamped by two clamping rods and then positioned and fixed, which not only facilitates the side-by-side installation of each pre-embedded steel bar, but also improves the integrity of each pre-embedded steel bar in each docking mechanism. Under the action of clamping by two clamping rods, each pre-embedded steel bar is not easy to deform or misalign during concrete vibration. Attached Figure Description

[0016] Figure 1 This is a side view of the concrete structure of the present invention.

[0017] Figure 2This is a schematic diagram of the main cross-section of the concrete structure of the present invention.

[0018] Figure 3 This is a three-dimensional structural diagram of the clamping rod of the concrete structure of the present invention.

[0019] The labels in the diagram represent: 1. Concrete body; 2. Structural steel reinforcement frame; 3. Connecting mechanism; 31. Clamping rod; 32. Locking mechanism; 321. Bolt; 33. Embedded steel reinforcement; 34. Connector; 4. Connecting surface; 5. Sponge body; 6. Groove; 7. Tenon. Detailed Implementation

[0020] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0021] In the description of this invention, it should be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0022] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified.

[0023] In this invention, unless otherwise explicitly specified and limited, the terms "assembly," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0024] Example 1: Figures 1 to 3An embodiment of the concrete structure of the present invention is shown. The concrete structure of this embodiment includes a concrete body 1, a structural steel reinforcement frame 2 embedded in the concrete body 1, and multiple docking mechanisms 3. One side of the concrete body 1 is provided as a docking surface 4 for docking with adjacent concrete bodies 1. The docking mechanism 3 includes two clamping rods 31, a locking mechanism 32, multiple embedded steel bars 33, and multiple connectors 34. One side of each of the two clamping rods 31 is provided with a sponge body 5. The two clamping rods 31 are locked together by the locking mechanism 32. Each embedded steel bar 33 is clamped between the sponge bodies 5 of the two clamping rods 31 and fixed on the structural steel reinforcement frame 2. The embedded steel bars 33 are arranged at intervals along the width direction of the docking surface 4 and are perpendicular to the docking surface 4. The two clamping rods 31 are fixed on the structural steel reinforcement frame 2. Each connector 34 is connected to the end of each embedded steel bar 33 facing the docking surface 4 and is embedded in the concrete body 1. The clamping rods 31 of adjacent docking mechanisms 3 are docked side by side along the width direction of the docking surface 4.

[0025] The fabrication process of this concrete structure is as follows: First, install the structural steel reinforcement frame 2; Second, glue one side of the clamping rod 31 to the sponge body 5; thread one end of the embedded steel bar 33 and screw the connector 34 into the threaded end of the embedded steel bar 33; Third, select two clamping rods 31 spaced apart with their sponge bodies 5 facing each other. Based on the designed spacing of the embedded steel bars 33, place the corresponding number of embedded steel bars 33 side-by-side between the sponge bodies 5 of the two clamping rods 31; then lock the two clamping rods 31 using the locking mechanism 32, clamping the embedded steel bars 33 between the sponge bodies 5 of the two clamping rods 31; fix the connector 34 to the end of each embedded steel bar 33 near the two clamping rods 31 to form the docking mechanism 3; Fourth, place each embedded steel bar 33 of the docking mechanism 3 on the structural steel reinforcement frame 2, and fix both clamping rods 31 of the docking mechanism 3 to the structural steel reinforcement frame 2. On one side of the frame 2, the connectors 34 of the docking mechanism 3 are located outside the structural steel frame 2; after positioning the embedded steel bars 33 at the position away from the two clamps 31 relative to the structural steel frame 2, the embedded steel bars 33 are fixed on the structural steel frame 2, so that each embedded steel bar 33 is arranged side by side along the width direction of the structural steel frame 2, so that the clamps 31 of the adjacent docking mechanism 3 are docked side by side along the width direction of the structural steel frame 2, and the outer end faces of the fixed connectors 34 are flush; in the fifth step, after the formwork is erected around the structural steel frame 2 to form the pouring space of the concrete body 1, concrete is poured into the pouring space to form a concrete structure; in the sixth step, after the concrete has solidified, the formwork is folded down so that one side of the concrete body 1 forms a docking surface 4 for docking with the adjacent concrete body 1, so that each embedded steel bar 33 is arranged at intervals along the width direction of the docking surface 4 and perpendicular to the docking surface 4, so that the outer end faces of each connector 34 are coplanar with the docking surface 4.

[0026] On the one hand, in the overall scheme of this concrete structure, for each connecting mechanism 3, one end of each pre-embedded steel bar 33 is first clamped and fixed to the structural steel bar frame 2 by two clamping rods 31, and then the other end is positioned and fixed. Compared with the existing manual welding of each bar one by one, the construction positioning is easier and more efficient. Moreover, since one end of each pre-embedded steel bar 33 is clamped by the sponge body 5 of the two clamping rods 31, it has a certain amount of adjustment. Before the other end is fixed, the relative position of the pre-embedded steel bar 33 can be adjusted by swinging and / or slightly moving, so that each pre-embedded steel bar 33 can be positioned. The steel reinforcement frame 2 can be arranged side-by-side along its width (the same as the width of the butt joint surface 4) and perpendicular to the butt joint surface 4 formed by subsequent pouring. This ensures good adjustability and accurate positioning during installation. Furthermore, each embedded steel bar 33 is clamped by two clamping rods 31 before being positioned and fixed. This facilitates the side-by-side installation of the embedded steel bars 33 and improves the overall integrity of each butt joint mechanism 3. Under the clamping action of the two clamping rods 31, the embedded steel bars 33 are less prone to deformation and misalignment during concrete vibration. In summary, this concrete structure features good adjustability, high positioning accuracy, and good overall stability. It is less prone to deformation and misalignment during concrete vibration, which is beneficial for connecting adjacent concrete structures through the butt joint mechanism 3.

[0027] Furthermore, in this embodiment, the thickness of the sponge 5 is greater than or equal to the diameter of the embedded steel bars 33. This provides both good clamping force for each embedded steel bar 33 and good adjustability for each embedded steel bar 33.

[0028] Furthermore, in this embodiment, the sponge 5 is adhesively attached to the corresponding clamping rod 31. The sponge 5 is fixed to the clamping rod 31 to prevent displacement during the clamping of the reinforcing bar.

[0029] Furthermore, in this embodiment, the locking mechanism 32 includes at least two bolts 321 distributed at both ends of the clamping rods 31. The bolts 321 pass through the two clamping rods 31 and lock the two clamping rods 31. The two clamping rods 31 of the locking mechanism 32 are locked by bolts 321, which is simple in structure and convenient in operation. Specifically, as shown... Figure 3 As shown, the clamping rod 31 has through holes at both ends, and the bolt 321 is inserted into the through holes.

[0030] Furthermore, in this embodiment, the connector 34 is threadedly connected to the embedded reinforcing bar 33. The connection end between the embedded reinforcing bar 33 and the connector 34 is provided with an external thread, and the connector 34 is connected to the external thread. In this way, by screwing the connector 34, the alignment of each connector 34 can be easily adjusted, further improving the overall positioning accuracy.

[0031] Furthermore, in this embodiment, as Figure 2 As shown, the outer end face of connector 34 is coplanar with the mating surface 4.

[0032] Furthermore, in this embodiment, the mating ends of the opposing clamping rods 31 are respectively provided with interlocking grooves 6 and tenons 7. The mating ends of the clamping rods 31 of adjacent mating mechanisms 3 are connected by the interlocking of the grooves 6 and tenons 7, so that the clamping rods 31 are better engaged, thereby improving the alignment accuracy and positioning accuracy of each mating mechanism 3. Preferably, the groove 6 is square, 10mm wide and 10mm deep; the tenon 7 is square, 10mm wide and 10mm deep.

[0033] Furthermore, in this embodiment, the pre-embedded reinforcing bar 33 is welded to the structural reinforcing bar frame 2. This welding connection improves the bonding strength.

[0034] Furthermore, in this embodiment, the clamp 31 is welded to the structural steel reinforcement frame 2 and abuts against the side of the structural steel reinforcement frame 2 facing the mating surface 4. The clamp 31 and the structural steel reinforcement frame 2 are connected by welding to improve the bonding strength. Specifically, the clamp 31 has a square cross-section, extending along the width direction of the mating surface 4 (e.g., ...). Figure 1 Extends (in the left-right direction as shown). Clamp 31 has a cross-sectional width of 30mm, a height of 20mm, and a wall thickness of 3mm. Clamp 31 is 750mm long.

[0035] Preferably, the connector 34 is screwed into the pre-embedded steel bar 33 to a depth of half the height of the connector 34, the inside of the connector 34 is coated with grease, and a cap is installed on the surface.

[0036] Example 2: The construction method for the concrete structure in Example 1 includes the following steps: S1. Install structural steel reinforcement frame 2; S2. Glue the sponge 5 to one side of the clamp 31; roll the thread on one end of the pre-embedded steel bar 33 and screw the connector 34 into the rolled thread end of the pre-embedded steel bar 33. S3. Fabrication of docking mechanism 3: Select two clamping rods 31 and arrange them at intervals with the sponge bodies 5 of the two clamping rods 31 facing each other. According to the design spacing of the pre-embedded steel bars 33, place the corresponding number of pre-embedded steel bars 33 side by side between the sponge bodies 5 of the two clamping rods 31. Then, lock the two clamping rods 31 with the locking mechanism 32, so that the pre-embedded steel bars 33 between the two clamping rods 31 are clamped between the sponge bodies 5 of the two clamping rods 31. Fix the connector 34 at the end of each pre-embedded steel bar 33 near the two clamping rods 31 to form docking mechanism 3. S4. Install the docking mechanism 3: Place each of the pre-embedded steel bars 33 of the docking mechanism 3 on the structural steel reinforcement frame 2, and fix both clamps 31 of the docking mechanism 3 on one side of the structural steel reinforcement frame 2, so that each connector 34 of the docking mechanism 3 is located on the outside of the structural steel reinforcement frame 2; after positioning the position of the pre-embedded steel bars 33 away from the two clamps 31 relative to the structural steel reinforcement frame 2, fix the pre-embedded steel bars 33 on the structural steel reinforcement frame 2, so that each pre-embedded steel bar 33 is arranged side by side along the width direction of the structural steel reinforcement frame 2, so that the clamps 31 of the adjacent docking mechanisms 3 are connected side by side along the width direction of the structural steel reinforcement frame 2, and so that the outer end face of the fixed connector 34 is flush. S5. Pouring concrete: After the concrete body 1 is formed by erecting formwork around the structural steel reinforcement frame 2, concrete is poured into the pouring space to form a concrete structure. S6. After the concrete has solidified, the formwork is folded to form a butt joint 4 on one side of the concrete body 1, which is used to connect with the adjacent concrete body 1. The pre-embedded steel bars 33 are arranged at intervals along the width direction of the butt joint 4 and perpendicular to the butt joint 4, so that the outer end face of each connector 34 is coplanar with the butt joint 4.

[0037] The construction method of this concrete structure, on the one hand, for each connecting mechanism 3, one end of each pre-embedded steel bar 33 is first clamped and fixed to the structural steel bar frame 2 by two clamping rods 31, and then the other end is positioned and fixed. Compared with the existing method of manually welding each bar one by one, the construction positioning is easier and more efficient; and since one end of each pre-embedded steel bar 33 is clamped by the sponge body 5 of the two clamping rods 31, it has a certain amount of adjustment. Before fixing the other end, the relative position of the pre-embedded steel bar 33 can be adjusted by swinging and / or slightly moving, so that each pre-embedded steel bar 33 can be... The pre-embedded steel bars 33 are arranged side by side along the width direction of the structural steel reinforcement frame 2 (which is the same as the width direction of the butt joint surface 4) and perpendicular to the butt joint surface 4 formed by subsequent pouring. This means that they are easy to adjust and accurately position during installation. On the other hand, each pre-embedded steel bar 33 is first clamped by two clamping rods 31 and then positioned and fixed. This not only facilitates the side-by-side installation of each pre-embedded steel bar 33, but also improves the overall integrity of each pre-embedded steel bar 33 in each butt joint mechanism 3. Under the clamping action of the two clamping rods 31, each pre-embedded steel bar 33 is not prone to deformation or misalignment during concrete vibration.

[0038] Furthermore, in this embodiment, the construction method for the concrete structure also includes the following steps: S7: Chisel open the connector 34 and clamp 31 from the mating surface 4, loosen the locking mechanism 32, and remove the clamp 31; S8: Screw the external steel bars that need to be connected into the connector 34, and then pour the external structural concrete.

[0039] While the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the invention. Any person skilled in the art can make many possible variations and modifications to the technical solutions of the present invention, or modify them into equivalent embodiments, without departing from the scope of the present invention. Therefore, any simple modifications, equivalent changes, and modifications made to the above embodiments based on the technical essence of the present invention, without departing from the scope of the present invention, should fall within the protection scope of the present invention.

Claims

1. A concrete structure, characterized in that: The system includes a concrete body (1), a structural steel reinforcement frame (2) embedded in the concrete body (1), and multiple docking mechanisms (3). One side of the concrete body (1) is provided as a docking surface (4) for docking with adjacent concrete bodies (1). The docking mechanism (3) includes two clamping rods (31), a locking mechanism (32), multiple embedded steel bars (33), and multiple connectors (34). One side of each of the two clamping rods (31) is provided with a sponge body (5). The two clamping rods (31) are locked together by the locking mechanism (32). Each of the embedded steel bars... (33) are all clamped between the sponge body (5) of the two clamping rods (31) and fixed on the structural steel frame (2). The pre-embedded steel bars (33) are arranged at intervals along the width direction of the docking surface (4) and perpendicular to the docking surface (4). The two clamping rods (31) are fixed on the structural steel frame (2). The connectors (34) are connected one-to-one with the end of each pre-embedded steel bar (33) facing the docking surface (4) and are pre-embedded in the concrete body (1). The clamping rods (31) of the adjacent docking mechanisms (3) are docked side by side along the width direction of the docking surface (4).

2. The concrete structure according to claim 1, characterized in that: The thickness of the sponge (5) is greater than or equal to the diameter of the pre-embedded steel bar (33).

3. The concrete structure according to claim 2, characterized in that: The sponge (5) is glued to the corresponding clamp (31).

4. The concrete structure according to claim 2, characterized in that: The locking mechanism (32) includes at least two bolts (321) distributed at both ends of the clamping rods (31), the bolts (321) passing through the two clamping rods (31) and locking the two clamping rods (31).

5. The concrete structure according to claim 1, characterized in that: The connector (34) is threadedly connected to the pre-embedded steel bar (33).

6. The concrete structure according to claim 1, characterized in that: The outer end face of the connector (34) is coplanar with the mating surface (4).

7. The concrete structure according to claim 1, characterized in that: The mating ends of the opposing clamps (31) are respectively provided with interlocking grooves (6) and tenons (7).

8. The concrete structure according to claim 1, characterized in that: The pre-embedded steel bars (33) are welded to the structural steel reinforcement frame (2).

9. The concrete structure according to claim 1, characterized in that: The clamp (31) is welded to the structural steel frame (2) and attached to the side of the structural steel frame (2) facing the mating surface (4).

10. A construction method for a concrete structure, characterized in that, Includes the following steps: S1. Install the structural steel reinforcement frame (2); S2. Glue the sponge (5) to one side of the clamp (31); roll the thread on one end of the pre-embedded steel bar (33) and screw the connector (34) into the rolled end of the pre-embedded steel bar (33); S3. Making the docking mechanism (3): Select two clamping rods (31) and arrange them at intervals, with the sponge bodies (5) of the two clamping rods (31) facing each other. According to the design spacing of the pre-embedded steel bars (33), place the corresponding number of pre-embedded steel bars (33) side by side between the sponge bodies (5) of the two clamping rods (31); then lock the two clamping rods (31) with the locking mechanism (32) so that the pre-embedded steel bars (33) between the two clamping rods (31) are clamped between the sponge bodies (5) of the two clamping rods (31); fix the connector (34) at the end of each pre-embedded steel bar (33) near the two clamping rods (31) to make the docking mechanism (3). S4. Install the docking mechanism (3): Place each of the pre-embedded steel bars (33) of the docking mechanism (3) on the structural steel frame (2), and fix the two clamps (31) of the docking mechanism (3) on one side of the structural steel frame (2), so that each connector (34) of the docking mechanism (3) is located on the outside of the structural steel frame (2); after positioning the position of the pre-embedded steel bar (33) away from the two clamps (31) relative to the structural steel frame (2), fix the pre-embedded steel bar (33) on the structural steel frame (2), so that each pre-embedded steel bar (33) is arranged side by side along the width direction of the structural steel frame (2), so that the clamps (31) of the adjacent docking mechanism (3) are connected side by side along the width direction of the structural steel frame (2), so that the outer end face of the fixed connector (34) is flush. S5. Pouring concrete: After the concrete body (1) is formed by erecting a formwork around the structural steel frame (2), concrete is poured into the pouring space to form a concrete structure. S6. After the concrete has solidified, the formwork is folded so that one side of the concrete body (1) forms a butt joint (4) for connecting with the adjacent concrete body (1). The pre-embedded steel bars (33) are arranged at intervals along the width direction of the butt joint (4) and perpendicular to the butt joint (4), so that the outer end face of each connector (34) is coplanar with the butt joint (4).

Citation Information

Patent Citations

  • Die-cast concrete embedded steel bar connector and construction process

    CN109610737A

  • Reserved steel bar protection structure of cover-digging main body

    CN210946887U