Full-precast assembly type vertical connecting joint of steel pipe concrete, steel pipe concrete structure with steel pipe row removed and construction method

By using a key-and-anchor connection method combined with grouting material, the problem of high heat damage to concrete during welding in fully prefabricated steel pipe concrete structures was solved, achieving the effects of simplified construction, improved connection reliability, and adaptability to complex environments.

CN118481247BActive Publication Date: 2026-11-24西藏涛扬建筑设计有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410643861.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2026-11-24
Estimated Expiration
2044-05-23

AI Technical Summary

Technical Problem

In fully prefabricated steel pipe concrete structures, welding connections present several challenges, including high heat damage to the concrete inside the steel pipe, complex construction, high quality requirements, difficulty in detecting grouting quality, challenging welding operations, and difficulties in construction in cold regions.

Method used

The method of using key-insertion and anchoring connection is adopted. Through the circumferential key-insertion groove of the upper connecting section and the vertical key-insertion part of the lower connecting section, combined with grouting material, a stable connection between the upper and lower steel pipe concrete is achieved, avoiding welding construction.

Benefits of technology

It solves the problem of high heat damage to concrete during welding, simplifies the construction process, improves ease of operation and connection reliability, adapts to complex environments, reduces labor requirements, and improves production efficiency and construction speed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118481247B_ABST
    Figure CN118481247B_ABST
Patent Text Reader

Abstract

This invention relates to a fully prefabricated steel-concrete composite vertical connection node, a steel-concrete composite structure, and a construction method. The connection node includes: an upper steel-concrete composite section; an upper connecting section, circumferentially contracted at the bottom of the upper steel-concrete composite section and integrally cast with it, the side wall of which has at least one circumferential insertion groove; a lower steel-concrete composite section located below the upper steel-concrete composite section; a lower connecting section, circumferentially expanded at the top of the lower steel-concrete composite section, having a vertical insertion portion between it and the top of the lower steel-concrete composite section, the upper connecting section and at least a portion of the upper steel-concrete composite section being inserted into the vertical insertion portion, a circumferential gap being reserved between the upper connecting section and the lower connecting section, the circumferential gap communicating with the vertical insertion portion, and the side wall of the lower connecting section having multiple insertion holes radially corresponding to the circumferential insertion groove; multiple insertion keys, matching the multiple insertion holes, suitable for insertion and fixing to the circumferential insertion groove through the insertion holes; and grouting material suitable for injection into the circumferential insertion groove and the vertical insertion portion through the circumferential gap. This invention uses a key-and-anchor connection method to transfer internal forces between the upper and lower steel-concrete pipes, eliminating the need for welding. This solves the problem of high heat damage to the precast concrete inside the steel pipe caused by welding, making it easy to operate and saving a lot of labor and improving production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building structure technology, and more particularly to steel-concrete composite structures, specifically to a fully prefabricated steel-concrete composite vertical connection node, a steel-concrete composite structure, and a construction method. Background Technology

[0002] The fully prefabricated steel-tube concrete structure features low material consumption, excellent corrosion and fire resistance, and good ductility, achieving excellent structural load-bearing and seismic performance at a relatively low project cost. It also boasts low resource and energy consumption, environmentally friendly factory production, rapid construction speed, simple connections, convenient construction, lightweight components, and easy transportation, hoisting, and installation. It can be widely used in various residential, office, hotel, and commercial multi-story, high-rise, and super high-rise buildings, making it a high-quality prefabricated industrialized building component.

[0003] In fully prefabricated steel pipe concrete structures, the round steel pipes in the upper and lower components traditionally require welding connections. However, since the concrete inside the steel pipe has already been poured in the factory before welding, the high heat generated by welding on the construction site can easily damage the concrete inside the steel pipe. During construction, it is necessary to strictly control the welding heat to protect the concrete inside the steel pipe. Therefore, the traditional connection method is complex to construct and has high quality requirements.

[0004] In fully prefabricated steel-tube reinforced concrete structures, the circular steel pipes in the upper and lower components are traditionally connected using steel structural joints. However, bolted connections require significant space and high production and installation precision, which is often difficult to achieve. Therefore, welding connections are currently the primary method of connection. However, welding connections still have the following drawbacks:

[0005] 1) Since the concrete inside the steel pipe has been poured before welding, the high heat generated by welding can easily damage the concrete inside the steel pipe. During construction, it is necessary to strictly control the welding heat to protect the concrete inside the steel pipe. Therefore, the traditional connection method is complicated to construct and has high quality requirements.

[0006] 2) After welding, there is usually a small gap between the upper and lower round steel pipes, which needs to be filled with grout. However, the space is sealed after welding, and the grouting quality is not easy to detect.

[0007] 3) Low temperatures in cold regions can affect welding quality and place high demands on construction.

[0008] 4) Welding of round steel pipes requires 360-degree welding, which requires professional technicians. Ordinary welders cannot meet the requirements, which places higher demands on the operators.

[0009] 5) After the upper and lower components of the fully prefabricated steel pipe structure are installed and positioned, temporary fasteners need to be set up as temporary supports during the construction process before welding. After welding, they need to be cut off, making the construction cumbersome. Summary of the Invention

[0010] In view of the shortcomings of existing technologies, this invention proposes a novel fully prefabricated steel-concrete composite connection method, which uses a key-and-anchor connection to transfer internal forces between the upper and lower steel-concrete composite pipes, eliminating the need for welding and thus solving the problem of high heat damage to the prefabricated concrete inside the pipe during welding.

[0011] The technical solution of the present invention is as follows:

[0012] A fully prefabricated steel-concrete composite vertical connection node includes: an upper steel-concrete composite pipe; an upper connecting section, circumferentially contracted at the bottom of the upper steel-concrete composite pipe and integrally cast with it, the side wall of the upper connecting section having at least one circumferential insertion groove; a lower steel-concrete composite pipe, disposed below the upper steel-concrete composite pipe; a lower connecting section, circumferentially expanded at the top of the lower steel-concrete composite pipe, having a vertical insertion portion between it and the top of the lower steel-concrete composite pipe, the upper connecting section and at least a portion of the upper steel-concrete composite pipe being inserted into the vertical insertion portion, a circumferential gap being reserved between it and the lower connecting section, the circumferential gap communicating with the vertical insertion portion, and the side wall of the lower connecting section having multiple insertion holes radially opened corresponding to at least one circumferential insertion groove; multiple insertion keys, matching the multiple insertion holes, suitable for insertion and fixing to the circumferential insertion groove through the insertion holes; and grouting material, suitable for grouting into the circumferential insertion groove and the vertical insertion portion through the circumferential gap.

[0013] In some embodiments, an upper horizontal ring plate is further included, which is circumferentially disposed on the side wall of the upper connecting section, and a certain gap is reserved between the upper horizontal ring plate and the bottom of the upper steel pipe concrete to form the circumferential insertion groove.

[0014] In some embodiments, the depth of the circumferential insertion groove is 10-20 mm.

[0015] In some embodiments, a lower horizontal ring plate is further included, which is circumferentially disposed on top of the lower steel pipe concrete. The inner ring of the lower horizontal ring plate is welded and fixed to the lower steel pipe concrete, and the outer ring is welded and fixed to the lower connecting section.

[0016] In some embodiments, a flow gap exists between the bottom of the upper steel tube concrete and the top of the lower steel tube concrete.

[0017] In some embodiments, the thickness of the lower connecting section is greater than the wall thickness of the lower steel-concrete composite pipe.

[0018] In some embodiments, the upper connecting section and at least a portion of the upper steel pipe concrete inserted into the lower connecting section have a dimension of not less than 100 mm.

[0019] In some embodiments, the insertion depth of the key into the circumferential insertion groove is not less than 10 mm.

[0020] A fully prefabricated assembled steel pipe concrete structure includes: the aforementioned fully prefabricated assembled steel pipe concrete vertical connection node; prefabricated outer reinforced concrete, formed by binding a steel reinforcement skeleton around the outer perimeter of the upper and lower steel pipe concrete and pre-pouring outer concrete; and a horizontal cast-in-place section, formed by cast-in-place concrete in the connection area of ​​the upper and lower steel pipe concrete.

[0021] A construction method for the above-mentioned fully prefabricated steel-pipe concrete structure includes the following steps: S1: Prefabricate the upper and lower steel-pipe concrete structures in a factory, and weld the upper connecting section to the bottom of the upper steel-pipe concrete structure and the lower connecting section to the top of the lower steel-pipe concrete structure; S2: Arrange the upper and lower steel-pipe concrete structures in rows according to the design requirements and at predetermined quantities and spacings, tie reinforcing bars around the upper and lower steel-pipe concrete structures, and pour external concrete to form a steel-pipe concrete structure; 3: Hoist the lower and upper steel pipe concrete sections at the construction site. After the lower steel pipe concrete section is in place, insert the upper connecting section at the bottom of the upper steel pipe concrete section into the vertical insertion part at the top of the lower steel pipe concrete section; S4: Insert multiple insertion keys corresponding to the positions of multiple insertion holes into the circumferential insertion groove; S5: Pour grout into the circumferential insertion groove and the vertical insertion part through the circumferential gap; S6: Tie reinforcing bars in the horizontal connection section of the upper and lower steel pipe concrete sections and pour concrete in place.

[0022] The advantages of this invention compared to the prior art are as follows: This invention proposes a fully prefabricated assembled steel-concrete vertical connection node, which uses a key-and-anchor connection method to transfer internal forces between the upper and lower steel-concrete pipes, eliminating the need for welding construction. This solves the problem of high heat damage to the prefabricated concrete inside the pipe caused by welding, is easy to operate, and can save a lot of labor and improve production efficiency.

[0023] This invention utilizes a key inserted into an annular groove through a keyhole, and grout injected into the annular groove and vertical joint through a circumferential gap to achieve a stable connection between the upper and lower steel-concrete pipes. Through the dual effect of the key and high-strength grout, the internal force transmission and ductility of the connection between the upper and lower steel-concrete pipes can be effectively satisfied, thus achieving a strong connection between weak components.

[0024] Unlike traditional grouting, this invention has a circumferential gap between the upper steel pipe concrete and the lower connecting section. That is, the gap between the upper and lower steel pipe concrete is open and not closed, which makes it easy to ensure the grouting quality and monitor.

[0025] This invention eliminates the need for pre-embedded temporary fixing facilities on precast components. The plug-in key can serve as a temporary support during construction. As a self-supporting technology, it reduces the need for pre-embedded temporary fixing facilities, removal of temporary fixing facilities after installation, and sealing of the surface after removal, thereby reducing workload and increasing construction speed. Attached Figure Description

[0026] To more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings in the following description are merely exemplary, and those skilled in the art can derive other embodiments based on the provided drawings without creative effort.

[0027] The structures, proportions, sizes, etc. illustrated in this specification are only for the purpose of assisting those skilled in the art in understanding and reading the content disclosed herein, and are not intended to limit the conditions under which the present invention can be implemented. Therefore, they have no substantial technical significance. Any modifications to the structure, changes in the proportions, or adjustments to the size, without affecting the effects and objectives that the present invention can produce, should still fall within the scope of the technical content disclosed in the present invention.

[0028] Figure 1 This is a schematic diagram of the overall structure of a fully prefabricated steel-concrete composite vertical connection node according to some embodiments of the present invention;

[0029] Figure 2 This is a schematic diagram showing the exploded state of a fully prefabricated steel-concrete composite vertical connection node according to some embodiments of the present invention.

[0030] Figure 3 for Figure 1 Schematic diagram of section 1-1;

[0031] Figure 4 for Figure 1 Schematic diagram of section 2-2;

[0032] Figure 5 This is a schematic diagram of the upper connecting segment in some embodiments of the present invention;

[0033] Figure 6 This is a schematic planar diagram of the lower connecting segment according to some embodiments of the present invention;

[0034] Figure 7 This is a plan view of a fully prefabricated assembled steel pipe concrete structure according to some embodiments of the present invention;

[0035] Figure 8 This is a schematic elevation view of a fully prefabricated assembled steel pipe concrete structure according to some embodiments of the present invention.

[0036] Marked in the image:

[0037] 100 - Vertical connection node; 1 - Upper steel pipe concrete; 101 - Upper steel pipe; 2 - Upper connection section; 201 - Circumferential insertion groove; 3 - Lower steel pipe concrete; 301 - Lower steel pipe; 4 - Lower connection section; 401 - Vertical insertion part; 402 - Circumferential gap; 403 - Insertion hole; 5 - Insertion key; 6 - Grouting material; 7 - Upper horizontal ring plate; 8 - Lower horizontal ring plate; 9 - Flow gap; 10 - Horizontal cast-in-place section; 11 - Reinforcing steel cage; 12 - External concrete; 1a - Upper row of steel pipe concrete; 3a - Lower row of steel pipe concrete.

[0038] The same or corresponding marks in the diagram indicate the same or corresponding parts. Detailed Implementation

[0039] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings. Here, the illustrative embodiments and descriptions of the present invention are used to explain the present invention, but are not intended to limit the present invention.

[0040] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0041] It should be understood that the terms "comprising / including," "consisting of," or any other variations are intended to cover non-exclusive inclusion, such that a product, apparatus, process, or method that comprises a list of elements includes not only those elements but may also include, where necessary, other elements not expressly listed, or elements inherent to such a product, apparatus, process, or method. Without further limitation, an element defined by the phrases "comprising / including," "consisting of," does not exclude the presence of additional identical elements in the product, apparatus, process, or method that includes said element.

[0042] It should also be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device, component or structure referred to must have a specific orientation, be constructed or operated in a specific orientation, and should not be construed as a limitation of the present invention.

[0043] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified.

[0044] Existing steel-concrete composite pipe connections generally employ welding, which presents several problems: high welding difficulty, difficulty in guaranteeing welding quality, and the high heat generated during welding can easily damage the precast concrete inside the steel pipe. Based on these issues, this invention proposes a novel steel-concrete composite pipe connection method that uses a key-insertion connection combined with anchoring to transfer internal forces between the upper and lower steel-concrete composite pipes, eliminating the need for welding and thus solving the problem of high heat damage to the precast concrete inside the steel pipe caused by welding.

[0045] The implementation of the present invention will be described in detail below with reference to preferred embodiments.

[0046] like Figures 1 to 6 As shown, the present invention proposes a fully prefabricated assembled steel-concrete composite vertical connection node 100, including an upper steel-concrete composite 1 and a lower steel-concrete composite 3. The upper steel-concrete composite 1 has an upper connecting section 2 at its bottom and a lower connecting section 4 at its top. The upper steel-concrete composite 1 and the lower steel-concrete composite 3 are connected and anchored by the upper connecting section 2 and at least part of the upper steel-concrete composite 1 inserted into the lower connecting section 4 by the insertion key 5, and further fixed by the injection of grout 6.

[0047] This connection method ensures the effective transfer of internal forces at the nodes, avoiding the risks of stress concentration and fracture. Simultaneously, the ductile design of the nodes allows the structure to deform to a certain extent when subjected to external forces, thereby absorbing more energy and improving overall seismic performance.

[0048] Specifically, the upper steel-tube concrete structure 1 comprises an upper steel tube 101, which is filled with concrete to form a complete load-bearing structure. The upper steel-tube concrete structure 1 is a precast steel-tube concrete structure. It is manufactured in a factory according to specific designs and specifications. The manufacturing process includes steel tube preparation, concrete pouring and curing, and subsequent joint treatment. This method of manufacturing results in a high degree of uniformity and consistency in the upper steel-tube concrete structure 1, ensuring its stability and reliability during use.

[0049] The upper connecting section 2 is circumferentially contracted at the bottom of the upper steel pipe concrete 1 and is cast integrally with the upper steel pipe concrete 1.

[0050] It should be understood that circumferential shrinkage here refers to the overall shrinkage or reduction around the outer wall of the upper steel pipe concrete 1 along the central axis. Integral casting means that the upper connecting section 2 and the upper steel pipe 101 are poured with concrete simultaneously, which ensures that the connection between them is tight and seamless.

[0051] The cross-sectional shape of the upper connecting section 2 is the same as that of the upper steel pipe 101. It is generally circular. Specifically, the upper connecting section 2 is an inwardly tapering circular steel pipe at the bottom of the upper steel pipe concrete 1.

[0052] The upper connecting section 2 is welded and fixed to the upper steel pipe 101 on the upper steel pipe concrete 1, for example, by welding and fixing it to the bottom of the upper steel pipe 101 through a connecting plate.

[0053] The purpose of the upper connecting section 2 in this invention is mainly to facilitate the insertion of the upper steel pipe concrete 1 into the lower steel pipe concrete 3 and form a circumferential insertion groove 201, thereby improving positioning accuracy and enhancing structural stability.

[0054] In this invention, the side wall of the upper connecting section 2 is provided with at least one circumferential insertion groove 201, so as to connect and fix the upper steel pipe concrete 1 and the lower steel pipe concrete 3 by inserting the insertion key 5.

[0055] In some embodiments, the radius of the upper connecting section 2 is 10-20mm smaller than the radius of the upper steel pipe concrete 1, meaning the depth of the circumferential insertion groove 201 is generally controlled at 10-20mm. It's easy to understand that the key 5 needs to be inserted into the circumferential insertion groove 201 to a certain depth to achieve the interlocking function. The wall thickness of the lower connecting section 4 is generally 8-10mm, meaning the external support of the key 5 is approximately 10mm. Therefore, the key 5 inside the circumferential insertion groove 201 should not be less than 10mm. However, it cannot be too long either; otherwise, the deeper the groove, the smaller the diameter of the upper connecting section 2, making concrete pouring inconvenient. Furthermore, the longer the support, the greater the thickness of the ring plate. To ensure connection rigidity, the depth of the circumferential insertion groove 201 is chosen to be 10-20mm.

[0056] In this invention, the circumferential insertion groove 201 can be provided with one, two, or more grooves along the height direction of the upper connecting section 2. The specific number is mainly determined based on the load-bearing requirements, structural stability requirements, and construction conditions of the steel pipe. This invention does not impose any limitations.

[0057] In some embodiments, the connection node further includes an upper horizontal ring plate 7, see [link to previous document]. Figure 5 The upper horizontal ring plate 7 is circumferentially disposed on the side wall of the upper connecting section 2. The inner ring of the upper horizontal ring plate 7 is welded and fixed to the side wall of the upper connecting section 2.

[0058] See Figure 2 A certain gap is reserved between the top surface of the upper horizontal ring plate 7 and the bottom of the upper steel pipe concrete 1 to form the above-mentioned circumferential insertion groove 201.

[0059] It is easy to understand that the number of upper horizontal ring plates 7 is determined by the number of circumferential insertion slots 201 required by the structural design, and the present invention does not make specific limitations.

[0060] See Figure 1 , Figure 2 The lower steel-concrete composite tube 3 comprises a lower steel tube 301, which is filled with concrete to form a complete load-bearing structure. The lower steel-concrete composite tube 3 is positioned below the upper steel-concrete composite tube 1. The lower steel-concrete composite tube 3 and the upper steel-concrete composite tube 1 have the same shape and structure, and are both precast steel-concrete composite tubes. Because the upper and lower steel-concrete composite tubes have the same shape and structure, and are both precast, they are consistent in terms of materials, manufacturing processes, and mechanical properties, thus ensuring the standardization and reliability of the entire steel-concrete composite tube structure.

[0061] In some embodiments, see Figure 2 There is a flow gap 9 between the top of the lower steel-concrete pipe 3 and the bottom of the upper steel-concrete pipe 1. The flow gap 9 provides a channel for the flow of grout 6, and also allows the upper steel-concrete pipe 1 and the lower steel-concrete pipe 3 to have a certain relative displacement space when the temperature changes, thereby reducing the impact of thermal stress on the connection part, and providing tolerance space for the installation of precast components.

[0062] The lower connecting section 4 is circumferentially enlarged and installed on top of the lower steel-concrete tube 3, and is welded and fixed to the top of the lower steel-concrete tube 3. It should be understood that the circumferential enlargement here refers to the overall enlargement or expansion around the outer wall of the lower steel-concrete tube 3 along the central axis.

[0063] In some embodiments, the radius of the lower connecting section 4 is approximately 10 mm larger than the radius of the lower steel-concrete pipe 3. In this invention, the radii of the upper and lower steel-concrete pipes are the same. Since the upper steel-concrete pipe 1 requires sufficient space to insert into the lower connecting section 4, and there is a certain error in on-site installation, the reserved space is designed so that the radius of the lower connecting section 4 is larger than the radius of the lower steel-concrete pipe 3, so as to have sufficient tolerance.

[0064] The cross-sectional shape of the lower connecting section 4 is the same as that of the lower steel pipe 301. It is generally circular. Specifically, the lower connecting section 4 is an outwardly expanding circular steel pipe at the top of the lower steel pipe concrete 3.

[0065] The lower connecting section 4 is welded and fixed to the lower steel pipe 301 on the lower steel pipe concrete 3, for example, by welding and fixing it to the top of the lower steel pipe 301 through a connecting plate.

[0066] A vertical insertion part 401 is formed between the top of the lower connecting section 4 and the lower steel-concrete composite 3, for vertically inserting the upper steel-concrete composite 1 and the upper connecting section 2. See also Figure 2 The entire length of the upper connecting section 2 and the bottom part of the upper steel pipe concrete 1 are inserted into the vertical insertion part 401.

[0067] In this invention, considering the importance of tensile force transmission and the crucial role of the upper and lower steel pipes in the steel-concrete composite vertical member, it is recommended that the lengths of the upper steel-concrete composite 1 and the upper connecting section 2 inserted into the lower connecting section 4 be sufficient to meet the anchorage length for tensile force transmission, and that the overall length of the upper steel-concrete composite 1 and the upper connecting section 2 inserted into the lower connecting section be no less than 100mm. This specific length needs to be determined through calculation, taking into account factors such as the steel pipe diameter, thickness, strength, and grout strength. The length should meet the anchorage requirements for the transmission of internal forces within the upper steel pipe, ensuring a sufficiently robust connection between the steel pipes to effectively resist external forces and reduce the risk of structural damage or failure due to weak connections. When the structure encounters extreme loads, if the internal force of the steel pipe exceeds the transmission capacity of the grout, the insertion key 5 will work together with the grout to transmit the internal force and provide sufficient ductility to the connection node.

[0068] In this invention, the outer side of the portion of the upper steel-concrete pipe 1 and the upper connecting section 2 inserted into the lower connecting section 4 should be roughened, and the inner wall of the lower connecting section 4 should be roughened, thereby increasing the friction of the side wall and enabling better transmission of internal force between the upper and lower steel-concrete pipes.

[0069] See also Figure 2 A circumferential gap 402 is pre-reserved between the lower connecting section 4 and the side wall of the upper steel pipe concrete 1. The top of the circumferential gap 402 is open and communicates with the vertical insertion part 401. The presence of the circumferential gap 402 allows the grout 6 to flow fully and penetrate into every corner of the steel pipe connection, avoiding uneven pouring or voids caused by insufficient space. At the same time, this design also helps to expel air and excess grout during the pouring process, ensuring that the grout can completely fill the gaps and preventing quality problems caused by air retention or accumulation of excess grout.

[0070] The side wall of the lower connecting section 4 is radially provided with multiple insertion holes 403 at the position corresponding to the circumferential insertion groove 201, so as to insert the insertion key 5 to anchor the upper steel pipe concrete 1 and the lower steel pipe concrete 3.

[0071] In some embodiments, the height of the insertion hole 403 is comparable to the height of the circumferential insertion groove 201, which ensures that the insertion key 5 can fully enter the circumferential insertion groove 201 when inserted, forming a stable and tight connection.

[0072] In this invention, the cooperation between the insertion hole 403 and the circumferential insertion groove 201 makes the connection between the upper and lower steel pipe concrete more tight. The circumferential insertion groove 201 provides circumferential positioning for the insertion key 5. Since the circumferential insertion groove 201 is circumferentially continuous, after the insertion key 5 is inserted into the insertion hole 403, it can easily be inserted into the circumferential insertion groove 201, ensuring ease of construction and installation. This dual positioning mechanism makes the installation of the upper and lower steel pipe concrete more precise, convenient, and reliable.

[0073] It is easy to understand that one or more insertion holes 403 can be vertically arranged along the lower connecting section 4. The number of insertion holes 403 corresponds to the number of circumferential insertion grooves 201, and each circumferential insertion groove 201 is provided with multiple insertion holes 403. See also Figure 4 The present invention preferably has 8 insertion holes 403.

[0074] The specific number of insertion holes 403 corresponding to each circumferential insertion slot 201 needs to be determined by comprehensively considering multiple factors such as actual engineering requirements, the specifications and dimensions of the steel pipe, the stress condition of the connection section, and ease of construction. This invention does not impose specific limitations.

[0075] In some embodiments, the thickness of the lower connecting section 4 is greater than the wall thickness of the lower steel-concrete composite 3, that is, greater than the wall thickness of the lower steel pipe 301. Since the insertion hole 403 needs to be opened on the lower connecting section 4, the cross-section is significantly weakened. Therefore, it is necessary to increase the wall thickness to ensure that the load-bearing capacity of the lower connecting section 4 is not less than that of the lower steel-concrete composite 3.

[0076] In some embodiments, the connection node further includes a lower horizontal ring plate 8, see [link to relevant documentation]. Figure 6 The lower horizontal ring plate 8 is circumferentially set on top of the lower steel pipe concrete 3 to facilitate connection to the lower connecting section 4. Preferably, the inner ring of the lower horizontal ring plate 8 is welded and fixed to the lower steel pipe concrete 3, and the outer ring of the lower horizontal ring plate 8 is welded and fixed to the lower connecting section 4.

[0077] See Figure 1 , Figure 2 , Figure 4 Multiple key-connectors 5 are provided, and each key-connector 5 matches the key-connector hole 403. They are suitable for being inserted and fixed into the circumferential key-connector groove 201 through the key-connector hole 403 when connecting the upper steel pipe concrete 1 and the lower steel pipe concrete 3. The number of key-connectors 5 and their strength requirements dictate that their shear bearing capacity is not lower than the tensile bearing capacity of the round steel pipe.

[0078] In some embodiments, the key 5 is a pin or a long strip-shaped insert. Pins are also known as clips, inserts, or retainers in industrial applications; their main function is to fix the position of two shafts so that they work together. Basic materials for pins include carbon steel, stainless steel, and brass, and their dimensions are selected according to the bearing diameter and length.

[0079] The height of the key 5 is slightly less than the height of the circumferential insertion slot 201 or the insertion hole 403, so as to facilitate insertion into the circumferential insertion slot 201 through the insertion hole 403. For example, the height of the key 5 is 1-2 mm lower than the height of the circumferential insertion slot 201 or the insertion hole 403. Alternatively, the key 5 is interference-fitted with the circumferential insertion slot 201 or the insertion hole 403.

[0080] In some embodiments, the insertion depth of the key 5 into the circumferential insertion groove 201 is not less than 10 mm, ensuring the stability and safety of the steel pipe concrete connection, improving the reliability and durability of the connection, and taking into account the ease of operation and precision requirements during construction.

[0081] In this invention, the matching of multiple plug keys 5 with plug holes 403 enhances the stability and reliability of the connection. By increasing the number of plug keys 5, the steel-concrete composite pipe can be fixed at multiple locations, forming multi-point support. This multi-point fixing method effectively disperses the force, reduces the possibility of stress concentration, and thus improves the overall structural stability and load-bearing capacity.

[0082] Furthermore, multiple interlocking points help resist external forces. At the steel-concrete composite joint, external forces (such as wind loads, seismic forces, etc.) may cause relative displacement of the steel-concrete composite. The even distribution of multiple interlocking keys 5 can provide resistance in different directions, preventing displacement or torsion of the steel-concrete composite and ensuring the stability and safety of the connection.

[0083] Furthermore, the use of multiple interlocking keys 5 improves the uniformity and integrity of the connection. By inserting interlocking keys at different locations, it ensures a more uniform stress distribution at the steel-concrete composite joint, reducing the risk of localized damage due to uneven stress. Simultaneously, multi-point fixing also helps enhance the overall integrity of the steel-concrete composite joint, making the entire structure more robust and stable.

[0084] This invention employs a matching design of multiple plug-in keys and plug-in holes, making the construction process more convenient and efficient. Construction personnel can flexibly select the number and location of the plug-in keys as needed to adapt to different construction conditions and requirements. At the same time, this design also helps improve the accuracy and quality of construction, ensuring the stability and reliability of the steel-concrete joint.

[0085] During construction and installation, this invention eliminates the need for pre-embedded temporary fixing facilities on prefabricated components. The plug-in key can serve as a temporary support during construction. As a self-supporting technology, it reduces the need for pre-embedded temporary fixing facilities, post-installation removal of temporary fixing facilities, and post-removal surface sealing, thereby reducing workload and increasing construction speed.

[0086] See Figure 2The grout 6 is suitable for being injected into the circumferential insertion groove 201 and the vertical insertion part 401 through the circumferential gap 402. The injection of the grout 6 through the circumferential gap 402 eliminates the need for complex operations or additional filling work by construction personnel. This not only reduces construction time and cost but also lowers the operational difficulty, making the entire construction process simpler and more efficient.

[0087] The presence of the circumferential void 402 allows the grout 6 to flow naturally under gravity and enter the circumferential insertion groove 201 and the vertical insertion part 401 through this channel. This ensures that all voids at the steel-concrete joint are fully filled, avoiding structural weakening or safety hazards caused by insufficient filling.

[0088] After filling the gaps, the grout 6 forms a solid whole, tightly connecting the upper steel-concrete pipe 1 and the lower steel-concrete pipe 3 together. This connection method not only increases the contact area but also improves the rigidity and durability of the connection through the curing effect of the grout.

[0089] The grouting material 6 in this invention is a high-strength grouting material, formulated with high-strength materials as aggregates, cement as a binder, and supplemented with substances that promote high fluidity, micro-expansion, and anti-segregation. It is ready for use after adding a certain amount of water and stirring evenly at the construction site. The high-strength grouting material features good self-flowability, rapid hardening, high early strength, no shrinkage, micro-expansion, non-toxicity, non-aging, no pollution to water and the surrounding environment, and good self-tightening and rust prevention. Furthermore, it also boasts advantages such as reliable quality, low cost, short construction period, and ease of use.

[0090] In some embodiments, in order to ensure the grouting quality of high-strength grouting material, a monitoring device, such as a pinhole camera, can be installed in the vertical insertion part 401 to record the entire process and monitor the grouting quality.

[0091] In this invention, the connection between the upper and lower steel-concrete pipes should be able to effectively transmit tensile, compressive, shear, and bending moment forces. Based on high-strength grouting, the transmission of compressive and shear forces is effectively guaranteed, and most importantly, tensile force transmission is achieved. This invention uses the plug-in key 5 and the grouting material 6 as a combined force-transmitting element. Through the double-layer action of the plug-in key 5 and the grouting material 6, the internal force transmission and ductility of the connection between the upper and lower steel-concrete pipes are effectively satisfied, thus achieving a strong connection between weak components.

[0092] This invention eliminates welding because, on the one hand, the high heat of welding would damage the precast concrete inside the steel pipe, and this damage is difficult to detect and assess; on the other hand, the area for welding the upper and lower steel pipe concrete is relatively narrow, and welding the upper and lower steel pipe concrete 360 ​​degrees along their entire length is very difficult, requiring a high level of technical skill from the construction personnel. This not only easily leads to safety hazards but also causes defects such as slow construction speed and extended construction period.

[0093] This invention employs a key-and-anchor connection method to transfer internal forces between the upper and lower steel-concrete pipes, eliminating the need for welding and thus adapting to different environments. In extremely cold regions, the low temperatures compromise welding quality, making construction impossible. Similarly, welding is significantly affected during humid and rainy seasons. In remote, sparsely populated high-altitude areas, even small-scale projects (such as rural housing) require highly skilled welders, obviously increasing costs. This invention eliminates welding, making it more adaptable to different environments and less restrictive.

[0094] See Figure 7 , Figure 8 The present invention also proposes a fully prefabricated assembled steel pipe concrete structure, which includes the aforementioned fully prefabricated assembled steel pipe concrete vertical connection node 100, prefabricated outer reinforced concrete, and horizontal cast-in-place section 10. The prefabricated outer reinforced concrete is formed by pre-pouring outer concrete 12 after binding a steel reinforcement skeleton 11 around the outer perimeter of the upper steel pipe concrete 1 and the lower steel pipe concrete 3. The horizontal cast-in-place section 10 is formed by cast-in-place concrete in the connection area between the upper steel pipe concrete 1 and the lower steel pipe concrete 3.

[0095] The fully prefabricated assembled steel-concrete composite vertical connection node of the present invention is used to fabricate fully prefabricated assembled steel-concrete composite structures. See [link to related document]. Figure 8 Specifically, this includes: arranging upper steel pipe concrete 1s with upper connecting sections 2 in a predetermined quantity and spacing at the factory, binding reinforcing bars around them, and pouring external concrete 12 to precast the upper row of steel pipe concrete 1a; and arranging lower steel pipe concrete 3s with lower connecting sections 4 in the same quantity and spacing, binding reinforcing bars around them, and pouring external concrete 12 to precast the lower row of steel pipe concrete 3a. Then, at the construction site, the precast upper row of steel pipe concrete 1a and lower row of steel pipe concrete 3a are installed in a predetermined manner, and concrete is poured in the horizontal cast-in-place section 10 to form the steel pipe concrete structure. The specific installation method will be described in detail in the construction method steps below.

[0096] Fully prefabricated steel-pipe concrete structures are excellent prefabricated structural components. All components and parts are standardized in design, factory-produced, assembled in construction, and managed with information technology. They also facilitate integrated decoration and intelligent applications. This transforms traditional construction site laborers into industrial workers, significantly saving labor, reducing labor intensity, increasing production efficiency, accelerating construction speed, improving project quality, and extending the building's lifespan.

[0097] The present invention places the horizontal cast-in-place section of the fully prefabricated steel pipe concrete structure at the connection position of the upper and lower steel pipe concrete, which is a conventional operation in the field and will not be described in detail here.

[0098] See also Figure 8The present invention also proposes a construction method for the above-mentioned fully prefabricated assembled steel pipe concrete structure, comprising the following steps:

[0099] S1: The upper steel pipe concrete 1 and the lower steel pipe concrete 3 are prefabricated in the factory, and the upper connecting section 2 is welded to the bottom of the upper steel pipe concrete 1 and the lower connecting section 4 is welded to the top of the lower steel pipe concrete 3.

[0100] Specifically, this includes reserving a circumferential insertion groove 201 at a specific position in the upper connecting section 2, and forming a vertical insertion part 401 and a insertion hole 403 at a specific position inside the lower connecting section 4.

[0101] S2: According to the design requirements, the upper steel pipe concrete 1 and the lower steel pipe concrete 3 are arranged in a row with a predetermined number and spacing. For example, in the figure, 3 upper steel pipe concrete 1 and 3 lower steel pipe concrete 3 are arranged in a row. Then, steel bars are tied around the upper steel pipe concrete 1 and the lower steel pipe concrete 3 and the outer concrete 12 is poured to form the upper row of steel pipe concrete 1a and the lower row of steel pipe concrete 3a.

[0102] S3: The lower steel pipe concrete 3a and the upper steel pipe concrete 1a are hoisted at the construction site. After the lower steel pipe concrete 3a is installed in place, the upper connecting section 2 at the bottom of the upper steel pipe concrete 1a is inserted into the vertical insertion part 401 at the top of the lower steel pipe concrete 3a.

[0103] S4: Insert the multiple plug keys 5 into the circumferential plug slots 201 at the positions of the multiple plug holes 403 corresponding to the positions of the multiple plug keys 5;

[0104] S5: Grout 6 is injected into the circumferential insertion groove 201 and the vertical insertion part 401 through the circumferential gap 402;

[0105] S6: Tie reinforcing bars in the horizontal connection section between the upper row of steel pipe concrete 1a and the lower row of steel pipe concrete 3a, and then pour concrete in place.

[0106] It is easy to understand that in S4, steel wedges are also needed to adjust the verticality of the upper steel pipe concrete 1a. After the verticality adjustment is completed, the temporary fixation is completed, and the hoisting equipment can be moved away.

[0107] This construction method has the following advantages:

[0108] High precision: Because the splice sections of the upper and lower steel-concrete pipes are prefabricated in the factory, including the circumferential splice grooves, vertical splice parts, and splice holes, precise machining is used to ensure dimensional accuracy and consistency. This high-precision prefabrication simplifies on-site installation and improves the precision and reliability of the connection.

[0109] High safety: The tight fit between the key and the socket, as well as the circumferential socket groove, and the filling of the circumferential socket groove and the vertical socket section with grout, form a robust and stable connection structure. This connection method can effectively resist external forces, reduce the risk of structural loosening or detachment, and improve the overall structural safety.

[0110] Reduced on-site welding workload: Traditional steel pipe concrete structure connection methods often require extensive on-site welding, which not only increases construction difficulty and cost but may also affect the overall performance of the structure due to unstable welding quality. However, with this plug-in anchoring connection method, most welding work is completed in the factory, requiring only simple plugging and grouting operations on-site, significantly reducing on-site welding workload and improving construction efficiency.

[0111] Adaptable to complex construction environments: In complex construction environments, such as working at heights or in confined spaces, traditional welding connection methods may be severely limited. This plug-in anchoring connection method, however, requires no complex welding equipment; only simple tools and operating space are needed to complete the connection, making it more suitable for various complex construction environments.

[0112] In summary, this method not only improves construction efficiency and connection accuracy, but also enhances the safety and stability of the structure, while reducing on-site welding workload, adapting to complex construction environments, and facilitating future maintenance.

[0113] The various embodiments of the present invention have been described above. These descriptions are exemplary and not exhaustive, nor are they limited to the disclosed embodiments. Many modifications and variations will be apparent to those skilled in the art without departing from the scope and spirit of the described embodiments. The terminology used herein is chosen to best explain the principles, practical application, or technical improvements to the embodiments in the market, or to enable others skilled in the art to understand the embodiments disclosed herein.

[0114] While several specific implementation details are included in the foregoing discussion, these should not be construed as limiting the scope of the invention. Certain features described in the context of individual embodiments may also be implemented in combination in a single implementation. Conversely, various features described in the context of a single implementation may also be implemented individually or in any suitable sub-combination in multiple implementations.

Claims

1. A fully prefabricated steel-concrete composite vertical connection node, characterized in that, include: Concrete pipe with steel pipe; The upper connecting section is circumferentially contracted at the bottom of the upper steel pipe concrete and is integrally cast with the upper steel pipe concrete. The side wall of the upper connecting section is provided with at least one circumferential insertion groove. The lower steel-concrete composite structure is located below the upper steel-concrete composite structure. The lower connecting section is circumferentially enlarged and disposed at the top of the lower steel pipe concrete, and has a vertical insertion part between it and the top of the lower steel pipe concrete. The upper connecting section and at least part of the upper steel pipe concrete are inserted into the vertical insertion part, and a circumferential gap is reserved between them and the lower connecting section. The circumferential gap communicates with the vertical insertion part, and the side wall of the lower connecting section has a plurality of insertion holes radially opened corresponding to at least one circumferential insertion groove. Multiple key connectors are provided, which match the multiple key connectors, and are suitable for being inserted and fixed to the circumferential key connector through the key connectors; Grouting material is suitable for being injected into the circumferential insertion groove and the vertical insertion part through the circumferential gap.

2. The fully prefabricated steel-concrete composite vertical connection node according to claim 1, characterized in that, It also includes an upper horizontal ring plate, which is circumferentially disposed on the side wall of the upper connecting section. A certain gap is reserved between the upper horizontal ring plate and the bottom of the upper steel pipe concrete to form the circumferential insertion groove.

3. The fully prefabricated steel-concrete composite vertical connection node according to claim 1, characterized in that, The depth of the circumferential insertion groove is 10-20mm.

4. The fully prefabricated steel-concrete composite vertical connection node according to claim 1, characterized in that, It also includes a lower horizontal ring plate, which is circumferentially disposed on top of the lower steel pipe concrete. The inner ring of the lower horizontal ring plate is welded and fixed to the lower steel pipe concrete, and the outer ring is welded and fixed to the lower connecting section.

5. The fully prefabricated steel-concrete composite vertical connection node according to claim 1, characterized in that, There is a flow gap between the bottom of the upper steel pipe concrete and the top of the lower steel pipe concrete.

6. The fully prefabricated steel-concrete composite vertical connection node according to claim 1, characterized in that, The thickness of the lower connecting section is greater than the wall thickness of the lower steel-concrete pipe.

7. The fully prefabricated steel-concrete composite vertical connection node according to claim 1, characterized in that, The upper connecting section and at least a portion of the upper steel pipe concrete inserted into the lower connecting section have a dimension of not less than 100 mm.

8. The fully prefabricated steel-concrete composite vertical connection node according to claim 1, characterized in that, The insertion depth of the key into the circumferential insertion slot is not less than 10 mm.

9. A fully prefabricated assembled steel pipe concrete structure, characterized in that, include: The fully prefabricated steel-concrete composite vertical connection node according to any one of claims 1 to 8; The precast outer reinforced concrete is formed by binding a steel reinforcement cage around the outer perimeter of the upper and lower steel pipe concrete and pre-pouring the outer concrete. The horizontal cast-in-place section is formed by casting concrete in the connection zone between the upper and lower steel tube concrete.

10. A construction method for a fully prefabricated assembled steel pipe concrete structure according to claim 9, characterized in that, Includes the following steps: S1: The upper steel pipe concrete and the lower steel pipe concrete are prefabricated in the factory, and the upper connecting section is welded to the bottom of the upper steel pipe concrete and the lower connecting section is welded to the top of the lower steel pipe concrete. S2: According to the design requirements, upper steel pipe concrete and lower steel pipe concrete are arranged in rows with a predetermined number and spacing. Reinforcing bars are tied around the upper steel pipe concrete and lower steel pipe concrete and external concrete is poured to form upper and lower steel pipe concrete. S3: The lower and upper steel pipe concrete sections are hoisted at the construction site. After the lower steel pipe concrete is installed in place, the upper connecting section at the bottom of the upper steel pipe concrete is inserted into the vertical insertion part at the top of the lower steel pipe concrete. S4: Insert the multiple plug keys corresponding to the positions of the multiple plug holes into the circumferential plug groove; S5: The grout is injected into the circumferential insertion groove and the vertical insertion part through the circumferential gap; S6: Tie reinforcing bars in the horizontal connection section between the upper and lower steel pipe concrete sections, and then pour concrete in place.