Steel structure building prefabricated parapet wall and construction method

By using prefabricated parapet walls for factory processing and on-site assembly, the quality and environmental protection issues in cast-in-place construction have been resolved, achieving an efficient and environmentally friendly construction method that reduces costs and construction time.

CN118481310BActive Publication Date: 2026-11-24SHANDONG ELECTRIC POWER ENG CONSULTING INST CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410673564.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-28
Publication Date
2026-11-24
Estimated Expiration
2044-05-28

AI Technical Summary

Technical Problem

The reinforced concrete parapet walls of existing substation steel structure buildings are constructed using the cast-in-place method, which results in quality problems such as component cracking and honeycomb pitting, increases construction costs and time, and generates construction waste and noise pollution.

Method used

The prefabricated parapet wall is constructed by processing prefabricated walls in a factory and assembling them on site. It is connected by mechanical sleeves using vertical and longitudinal steel bars and parapet wall connecting bars, and then grouted with cement mortar to form an integral structure.

Benefits of technology

It reduced on-site construction waste and noise, saved raw materials, shortened the construction period, avoided quality problems, and reduced construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118481310B_ABST
    Figure CN118481310B_ABST
Patent Text Reader

Abstract

This invention belongs to the field of power facility construction and provides a prefabricated assembled parapet wall for steel structure buildings and its construction method. The prefabricated assembled parapet wall for steel structure buildings includes several prefabricated wall sections, I-beams, vertical reinforcing bars, longitudinal reinforcing bars, and parapet wall connecting bars. The vertical reinforcing bars are fixedly connected to the upper flange of the I-beams. Each prefabricated wall section has corresponding horizontal and vertical reinforcing bar holes. The vertical reinforcing bar holes are matched and connected to the vertical reinforcing bars. The parapet wall connecting bars pass through the horizontal reinforcing bar holes. One end of each longitudinal reinforcing bar is embedded in the prefabricated wall section, and the other end extends out of the prefabricated wall section and is connected and fixed to the distribution bars of the roof slab.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power facility construction, and in particular relates to a prefabricated assembled parapet wall for steel structure buildings and its construction method. Background Technology

[0002] The statements in this section are merely background information related to the present invention and do not necessarily constitute prior art.

[0003] Currently, the reinforced concrete parapet walls of steel structure buildings in substations are mostly constructed using cast-in-place methods. This not only requires the erection of external scaffolding for formwork support, but also easily leads to quality problems such as component cracking and honeycomb-like pitting due to insufficient compaction during pouring and vibration. The construction consumes a lot of energy, increases construction costs, prolongs the construction period, and is prone to safety hazards. In addition, the construction waste and noise generated during construction add to the burden of environmental protection work. Summary of the Invention

[0004] In order to solve at least one of the technical problems existing in the background art, the first aspect of the present invention provides a prefabricated assembled parapet wall for steel structure buildings and a construction method thereof, which can be prefabricated in the factory and transported to the construction site for assembly, thereby reducing the generation of construction waste and noise on site, saving raw materials, shortening the construction period, reducing construction costs, and avoiding quality problems such as cracking and honeycomb surface of cast-in-place concrete.

[0005] To achieve the above objectives, the present invention adopts the following technical solution:

[0006] The first aspect of the present invention provides a prefabricated parapet wall for steel structure buildings.

[0007] A prefabricated assembled parapet wall for steel structure buildings includes: several prefabricated wall bodies, I-beams, vertical reinforcing bars, longitudinal reinforcing bars, and parapet wall connecting bars;

[0008] The vertical reinforcing bars are fixedly connected to the upper flange of the I-beam; each of the precast walls has corresponding horizontal and vertical reinforcing bar holes; the vertical reinforcing bar holes are matched and connected to the vertical reinforcing bars; the parapet wall connecting bars are inserted into the horizontal reinforcing bar holes; one end of the longitudinal reinforcing bar is embedded in the precast wall, and the other end extends out of the precast wall and is connected and fixed to the distribution bars of the roof panel.

[0009] In one implementation, the longitudinal reinforcing bars are connected and fixed to the distribution bars of the roof slab via reinforcing bar sleeves.

[0010] The advantages of the above technical solution are that the rebar sleeve is a mechanical sleeve connection, which has stable and reliable connection quality, high connection strength, faster construction speed than welding, no pollution, and can save steel.

[0011] As one implementation, each of the precast walls has at least one transverse insertion hole.

[0012] The advantage of the above technical solution is that it allows the parapet wall connecting bars to pass through the precast wall, enabling horizontal connection and fixation between any two adjacent precast walls.

[0013] In one embodiment, the prefabricated wall is a Z-shaped prefabricated wall.

[0014] The advantage of the above technical solution is that by utilizing the continuous stress of the Z-shaped prefabricated wall, the connection of the prefabricated wall is more reliable.

[0015] In one embodiment, the Z-shaped prefabricated wall has a centrally symmetrical structure and is provided with at least two transverse reinforcing bar holes in a centrally symmetrical manner.

[0016] The advantage of the above technical solution is that it can improve the reliability and stability of the entire precast wall connection.

[0017] In one implementation, the diameter of the transverse insertion hole is larger than the diameter of the parapet wall connecting bar.

[0018] The advantage of the above technical solution is that it ensures that the parapet wall connecting bars pass through the transverse insertion bar holes.

[0019] In one embodiment, the diameter of the vertical insertion hole is larger than the diameter of the vertical reinforcing bar.

[0020] The advantage of the above technical solution is that it ensures that the vertical reinforcing bars pass through the vertical bar insertion holes.

[0021] In one embodiment, the vertical reinforcing bars are welded and fixedly connected to the upper flange of the I-beam.

[0022] In one implementation, one end of the longitudinal steel bar extending out of the precast wall is fixed to the steel bar sleeve by a threaded connection.

[0023] The advantages of the above technical solution are that, since the connection between the longitudinal steel bar and the steel bar sleeve may be in a narrow space, the use of threaded connection method facilitates the connection between the longitudinal steel bar and the steel bar sleeve, and can also ensure the firmness and convenience of the connection.

[0024] As one implementation method, the length of the vertical reinforcing bars is the height of the parapet wall minus the thickness of the protective layer.

[0025] A second aspect of the present invention provides a construction method for a prefabricated parapet wall in a steel structure building.

[0026] A construction method for a prefabricated parapet wall in a steel structure building includes:

[0027] The vertical reinforcing bars are fixedly connected to the upper flange of the I-beam;

[0028] The vertical reinforcing bar holes of the precast wall are inserted into the corresponding vertical reinforcing bars, so that the precast walls can be spliced ​​together.

[0029] The parapet wall connecting bars are inserted into the horizontal bar holes to fix the spliced ​​precast wall.

[0030] One end of the longitudinal steel bar extending from the precast wall is connected and fixed to the distribution bar of the roof panel. After the steel bars of the roof panel are tied, concrete is poured to complete the assembly.

[0031] The beneficial effects of this invention are:

[0032] The prefabricated parapet wall of this invention is prefabricated in a factory and transported to the construction site. After being hoisted onto the upper flange of the I-beam of the steel structure building, the prefabricated parapet wall and the I-beam are assembled by interlocking. The I-beam requires pre-welded reinforcing bars, and the prefabricated parapet wall requires pre-drilled holes for inserting reinforcing bars. After assembly, cement mortar is poured through the interlocking holes. Finally, the bent anchoring section of the longitudinal reinforcement of the parapet wall is connected to the reinforcing bars tied to the roof panel using a reinforcing bar sleeve before the concrete of the roof panel is poured, assembling it into a whole. This reduces the generation of construction waste and noise on site, saves raw materials, shortens the construction period, reduces construction costs, and avoids quality problems such as cracking and honeycomb surface of cast-in-place concrete.

[0033] Advantages of additional aspects of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description

[0034] The accompanying drawings, which form part of this invention, are used to provide a further understanding of the invention. The illustrative embodiments of the invention and their descriptions are used to explain the invention and do not constitute an improper limitation of the invention.

[0035] Figure 1 This is a three-dimensional structural diagram of a prefabricated parapet wall in a steel structure building according to an embodiment of the present invention;

[0036] Figure 2 This is a top view of a prefabricated parapet wall of a steel structure building according to an embodiment of the present invention;

[0037] Figure 3 This is a schematic diagram of the three-dimensional structure of the I-beam according to an embodiment of the present invention;

[0038] Figure 4 This is a top view of an I-beam according to an embodiment of the present invention;

[0039] Figure 5 This is a schematic diagram of the assembly of a prefabricated parapet wall in a steel structure building according to an embodiment of the present invention.

[0040] Among them, 1 is precast wall, 2 is I-beam, 2-1 is upper flange, 3 is vertical reinforcement, 4 is weld, 5 is vertical reinforcement hole, 6 is horizontal reinforcement hole, 7 is longitudinal reinforcement bent anchoring section, 7-1 is longitudinal reinforcement, 8 is reinforcement sleeve, 9 is parapet wall connecting reinforcement, 10 is distribution reinforcement, and 11 is roof panel. Detailed Implementation

[0041] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0042] It should be noted that the following detailed description is illustrative and intended to provide further explanation of the invention. Unless otherwise specified, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains.

[0043] It should be noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the scope of exemplary embodiments according to the invention. As used herein, the singular form is intended to include the plural form as well, unless the context clearly indicates otherwise. Furthermore, it should be understood that when the terms "comprising" and / or "including" are used in this specification, they indicate the presence of features, steps, operations, devices, components, and / or combinations thereof.

[0044] In this invention, terms such as "upper," "lower," "left," "right," "front," "back," "vertical," "horizontal," "side," and "bottom" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. These terms are used only to facilitate the description of the structural relationships of the various components or elements of this invention and do not specifically refer to any component or element in this invention. They should not be construed as limiting the invention.

[0045] In this invention, terms such as "fixed connection," "connected," and "linked" should be interpreted broadly, indicating a fixed connection, an integral connection, or a detachable connection; a direct connection or an indirect connection through an intermediate medium. Those skilled in the art can determine the specific meaning of these terms in this invention based on the specific circumstances, and they should not be construed as limitations on the invention.

[0046] according to Figure 1 and Figure 2 As shown, an embodiment of the present invention provides a prefabricated parapet wall for a steel structure building, comprising: several prefabricated wall sections 1, I-beams 2, vertical reinforcing bars 3, longitudinal reinforcing bars 7-1, and parapet wall connecting bars 9; the vertical reinforcing bars 3 are fixedly connected to the upper flange 2-1 of the I-beams 2, as shown in the figure. Figure 3 and Figure 4As shown; each of the precast wall 1 has a corresponding horizontal bar insertion hole 6 and a vertical bar insertion hole 5; the vertical bar insertion hole 5 is matched and connected to the vertical bar 3; the parapet wall connecting bar 9 passes through the horizontal bar insertion hole 6; one end of the longitudinal bar 7-1 is embedded in the precast wall 1, and the other end extends out of the precast wall 1 and is connected and fixed to the distribution bar 10 of the roof panel 11.

[0047] according to Figure 5 In this embodiment, the longitudinal steel bar 7-1 (i.e., the longitudinal steel bar bending anchorage section 7) is connected and fixed to the distribution bar 10 of the roof panel 11 through the steel bar sleeve 8.

[0048] The rebar sleeve in this embodiment is a mechanical sleeve connection, which has stable and reliable connection quality, high connection strength, faster construction speed than welding, no pollution, and can save steel.

[0049] Specifically, one end of the longitudinal reinforcing bar extending from the precast wall is fixed to the reinforcing bar sleeve via a threaded connection. Since the connection between the longitudinal reinforcing bar and the reinforcing bar sleeve may be in a confined space, this threaded connection method facilitates the connection between the longitudinal reinforcing bar and the reinforcing bar sleeve, while also ensuring the strength and speed of the connection.

[0050] It should be noted that in other embodiments, the longitudinal steel bars can be connected to the distribution bars of the roof slab by means of tying or welding.

[0051] In the specific implementation process, each of the precast wall 1 has at least one transverse insertion hole 6. This allows the parapet wall connecting bars to pass through the precast wall, enabling transverse connection and fixation between any two adjacent precast walls.

[0052] In one or more embodiments, the precast wall 1 is a Z-shaped precast wall. The Z-shaped precast wall has a centrally symmetrical structure and at least two transverse reinforcing bar holes are centrally symmetrically arranged. The continuous stress distribution of the Z-shaped precast wall makes the connection of the precast wall more reliable.

[0053] Specifically, the diameter of the transverse insertion hole 6 is larger than the diameter of the parapet wall connecting bar. This ensures that the parapet wall connecting bar passes through the transverse insertion hole.

[0054] Specifically, the diameter of the vertical insertion hole is larger than the diameter of the vertical reinforcing bar. This ensures that the vertical reinforcing bar passes through the vertical insertion hole.

[0055] The vertical reinforcing bar 3 is welded and fixedly connected to the upper flange 2 of the I-beam; the length of the vertical reinforcing bar 3 is the height of the parapet wall minus the thickness of the protective layer.

[0056] A construction method for a prefabricated parapet wall in a steel structure building according to an embodiment of the present invention specifically includes the following steps:

[0057] Step 1: Secure the vertical reinforcing bars to the upper flange of the I-beam;

[0058] Step 2: Insert the vertical reinforcing bar holes of the precast wall into the corresponding vertical reinforcing bars to make the precast walls splice together.

[0059] Step 3: Insert the parapet wall connecting bars into the horizontal bar holes to fix the spliced ​​precast wall;

[0060] Step 4: Connect and fix one end of the longitudinal steel bar extending from the precast wall to the distribution bar of the roof panel. After the steel bars of the roof panel are tied, pour concrete to complete the assembly.

[0061] The prefabricated parapet wall of this invention is prefabricated in a factory and transported to the construction site. After being hoisted onto the upper flange of the I-beam of the steel structure building, the prefabricated parapet wall and the I-beam are assembled by interlocking. The I-beam requires pre-welded reinforcing bars, and the prefabricated parapet wall requires pre-drilled holes for inserting reinforcing bars. After assembly, cement mortar is poured through the interlocking holes. Finally, the bent anchoring section of the longitudinal reinforcement of the parapet wall is connected to the reinforcing bars tied to the roof panel using a reinforcing bar sleeve before the roof panel concrete is poured, assembling it into a whole. This reduces the generation of construction waste and noise on site, saves raw materials, shortens the construction period, reduces construction costs, and avoids quality problems such as cracking and honeycomb surface of the cast-in-place concrete.

[0062] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A construction method for a prefabricated parapet wall in a steel structure building, characterized in that, include: The vertical reinforcing bars are fixedly connected to the upper flange of the I-beam; The vertical reinforcing bar holes of the precast wall are inserted into the corresponding vertical reinforcing bars, so that the precast walls can be spliced ​​together. The parapet wall connecting bars are inserted into the horizontal bar holes to fix the spliced ​​precast wall. One end of the longitudinal steel bar extending from the precast wall is connected and fixed to the distribution bar of the roof panel. After the steel bars of the roof panel are tied, concrete is poured to complete the assembly. The aforementioned prefabricated assembled parapet wall for steel structure buildings includes: several prefabricated wall bodies, I-beams, vertical reinforcing bars, longitudinal reinforcing bars, and parapet wall connecting bars; The vertical reinforcing bars are fixedly connected to the upper flange of the I-beam; each of the precast walls has corresponding horizontal and vertical reinforcing bar holes; the vertical reinforcing bar holes are matched and connected to the vertical reinforcing bars; the parapet wall connecting bars are inserted into the horizontal reinforcing bar holes; one end of the longitudinal reinforcing bar is embedded in the precast wall, and the other end extends out of the precast wall and is connected and fixed to the distribution bars of the roof panel.

2. The construction method for prefabricated assembled parapet walls in steel structure buildings as described in claim 1, characterized in that, The longitudinal reinforcing bars are connected and fixed to the distribution bars of the roof slab through reinforcing bar sleeves.

3. The construction method for prefabricated assembled parapet walls in steel structure buildings as described in claim 1, characterized in that, Each of the precast walls has at least one horizontal insertion hole.

4. The construction method for prefabricated assembled parapet walls in steel structure buildings as described in claim 1, characterized in that, The precast wall is a Z-shaped precast wall.

5. The construction method for prefabricated assembled parapet walls in steel structure buildings as described in claim 4, characterized in that, The Z-shaped prefabricated wall has a centrally symmetrical structure and at least two transverse reinforcing bar holes are provided centrally symmetrically.

6. The construction method for prefabricated assembled parapet walls in steel structure buildings as described in claim 1, characterized in that, The diameter of the transverse insertion hole is larger than the diameter of the parapet wall connecting bar.

7. The construction method for prefabricated assembled parapet walls in steel structure buildings as described in claim 1, characterized in that, The diameter of the vertical insertion hole is larger than the diameter of the vertical reinforcing bar.

8. The construction method for prefabricated assembled parapet walls in steel structure buildings as described in claim 1, characterized in that, The vertical reinforcing bars are welded and fixedly connected to the upper flange of the I-beam; Alternatively, one end of the longitudinal steel bar extending out of the precast wall may be fixed to the steel bar sleeve via a threaded connection.

9. The construction method for prefabricated assembled parapet walls in steel structure buildings as described in claim 1, characterized in that, The length of the vertical reinforcing bars is the height of the parapet wall minus the thickness of the protective layer.

Citation Information

Patent Citations

  • Cantilever type prefabricated parapet wall connecting structure

    CN114809470A