Prefabricated body structure and satellite
By adopting a prefabricated structure made of carbon fiber, and utilizing the double-layer shell stitching connection and installation process hole design, the problems of weight and stability of the satellite's main structure were solved, achieving the requirements of lightweighting and high pointing accuracy for microsatellites.
Patent Information
- Application Number
- CN202410636176.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-22
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-05-22
AI Technical Summary
Existing satellite main structures are heavy, have poor stability, and are difficult to manufacture, making it difficult to meet the requirements of lightweight and high pointing accuracy for microsatellites.
The prefabricated structure made of carbon fiber includes first and second tubular shells and first and second rings, which are connected by stitching to form a double shell. Installation process holes are provided on the rings to achieve lightweighting and facilitate stitching.
It achieves lightweighting and improved stability of satellite structures, reduces manufacturing difficulty, and enhances structural strength and stability, making it suitable for lightweight design of microsatellites.
Smart Images

Figure CN118560717B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of aerospace technology, and in particular to a prefabricated structure and a satellite. Background Technology
[0002] With the development of microelectronics, modern communications, micromechanics, computer technology, energy-absorbing materials, and new energy sources, as well as a deeper understanding of the space environment, the trend towards lightweight satellites is becoming increasingly apparent, and microsatellite technology has become a new field in aerospace science and technology. How to achieve lightweighting on satellites is a problem that urgently needs to be solved in modern microsatellites.
[0003] Existing satellite main structures suffer from problems such as heavy weight, poor stability, and difficulty in manufacturing, which hinders their application. Because satellites endure extreme overload during launch and require extremely high pointing accuracy for their optical payloads, a lightweight and dimensionally stable main structure plays a crucial role in the successful launch of a satellite.
[0004] Therefore, it is necessary to propose a new structural solution to address the above problems. Summary of the Invention
[0005] In view of this, the purpose of this application is to propose a prefabricated structure using carbon fiber material, which can achieve weight reduction while ensuring stability and is easy to sew together.
[0006] To achieve the above objectives, this application provides a prefabricated structure made of carbon fiber material, the prefabricated structure comprising:
[0007] A first tubular shell and a second tubular shell, wherein the second tubular shell is sleeved on the first tubular shell and is coaxially arranged with the first tubular shell;
[0008] The first ring and the second ring are sequentially sleeved on the first tubular shell along the axial direction of the first tubular shell.
[0009] The two ends of the first tubular shell are respectively sewn to the inner ring of the first ring and the inner ring of the second ring. The two ends of the second tubular shell are respectively sewn to the side of the first ring and the side of the second ring. Both the first ring and the second ring are provided with installation process holes.
[0010] The orthographic projection of the installation process hole onto the target plane is located between the orthographic projections of the first tubular shell and the second tubular shell onto the target plane, and the target plane is perpendicular to the axial direction of the first tubular shell.
[0011] In one embodiment, the mounting hole includes an inner arc and an outer arc, the centers of which are both located on the central axis of the first tubular shell, and the length of the outer arc is greater than the length of the inner arc.
[0012] In one embodiment, both the first ring and the second ring are provided with a plurality of mounting process holes spaced apart circumferentially.
[0013] In one embodiment, the mounting hole is shaped like a sector, with an arc transition between adjacent sides of the sector.
[0014] In one embodiment, the prefabricated structure further includes:
[0015] The third ring is fitted onto the first tubular shell and located between the first ring and the second ring. The inner ring of the third ring is sewn to the surface of the second tubular shell. The second tubular shell includes a first pipe segment and a second pipe segment. The two openings of the first pipe segment are sewn to the side of the first ring and the side of the third ring, respectively. The two openings of the second pipe segment are sewn to the side of the second ring and the other side of the third ring, respectively.
[0016] In one embodiment, the first pipe segment and the second pipe segment are provided with weight-reducing holes at intervals along the circumference.
[0017] In one embodiment, the prefabricated structure further includes:
[0018] Multiple first reinforcing plates are spaced apart along the circumference of the first pipe segment. Each first reinforcing plate is rectangular. One long side of the first reinforcing plate is sewn to the outer surface of the first pipe segment, and the two short sides of the first reinforcing plate are sewn to the side of the first tubular shell and the side of the third ring, respectively.
[0019] Multiple second reinforcing plates are spaced apart along the circumference of the second pipe segment. The second reinforcing plates are rectangular. One long side of the second reinforcing plate is sewn to the outer surface of the second pipe segment, and the two short sides of the second reinforcing plate are sewn to the side of the second tubular shell and the other side of the third ring, respectively.
[0020] In one embodiment, the second ring is provided with a plurality of reinforcing plate groups on the side near the first ring, and each reinforcing plate group includes two third reinforcing plates arranged at a predetermined angle.
[0021] In one embodiment, the first ring and the second ring are provided with a plurality of mounting holes spaced apart along the circumference, and the orthographic projection of the mounting holes on the target plane is located outside the ring formed by the orthographic projection of the second tubular housing on the target plane.
[0022] Based on the same inventive concept, this application also provides a satellite that uses the aforementioned prefabricated structure as its main structure.
[0023] As can be seen from the above, the prefabricated structure provided in this application consists of a first tubular shell and a second tubular shell forming a double shell. The double shell is connected by a first ring and a second ring, which can effectively ensure the structural strength and stability. At the same time, the tubular shell is conducive to weight reduction. The installation process holes are provided on the first ring and the second ring, which not only effectively achieves lightweighting but also facilitates the stitching of carbon fibers on the surface of the prefabricated structure, reducing the difficulty of prefabricated structure preparation. Attached Figure Description
[0024] To more clearly illustrate the technical solutions in this application or related technologies, the drawings used in the description of the embodiments or related technologies will be briefly introduced below. Obviously, the drawings described below are only embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0025] Figure 1 This is a schematic diagram of the overall structure of the prefabricated structure in one embodiment of this application;
[0026] Figure 2 This is a top view of a prefabricated structure in one embodiment of this application;
[0027] Figure 3 for Figure 2 Sectional view along FF;
[0028] Figure 4 This is a projection diagram of one embodiment of this application.
[0029] Figure Labels
[0030] 100. Precast structure; 1. First tubular shell; 11. First annulus; 2. Second tubular shell; 21. First pipe section; 22. Second pipe section; 23. Second annulus; 3. First ring; 4. Second ring; 5. Installation process hole; 51. Inner arc; 52. Outer arc; 6. Third ring; 7. Weight reduction hole; 81. First reinforcing plate; 82. Second reinforcing plate; 83. Third reinforcing plate; 9. Assembly hole. Detailed Implementation
[0031] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with specific embodiments and the accompanying drawings.
[0032] It should be noted that, unless otherwise defined, the technical or scientific terms used in the embodiments of this application should have the ordinary meaning understood by one of ordinary skill in the art to which this application pertains. The terms "first," "second," and similar terms used in the embodiments of this application do not indicate any order, quantity, or importance, but are merely used to distinguish different components. Terms such as "comprising" or "including" mean that the element or object preceding the word encompasses the elements or objects listed after the word and their equivalents, without excluding other elements or objects. Terms such as "connected" or "linked" are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. Terms such as "upper," "lower," "left," and "right" are only used to indicate relative positional relationships; when the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0033] Reference Figure 1-4 As shown, one embodiment of this application provides a prefabricated structure 100 made of carbon fiber material. The prefabricated structure 100 includes a first tubular shell 1, a second tubular shell 2, a first ring 3, and a second ring 4.
[0034] The second tubular shell 2 is sleeved on the first tubular shell 1 and is coaxially arranged with the first tubular shell 1; the first ring 3 and the second ring 4 are sequentially sleeved on the first tubular shell 1 along the axial direction (X direction in the figure); the two ends of the first tubular shell 1 are respectively sewn to the inner ring of the first ring 3 and the inner ring of the second ring 4, and the two ends of the second tubular shell 2 are respectively sewn to the side of the first ring 3 and the side of the second ring 4. The first ring 3 and the second ring 4 are both provided with installation process holes 5.
[0035] The orthographic projection of the installation process hole 5 onto the target plane is located between the orthographic projections of the first tubular shell 1 and the second tubular shell 2 onto the target plane, and the target plane is perpendicular to the axial direction of the first tubular shell 1.
[0036] The prefabricated structure 100 provided in this application consists of a first tubular shell 1 and a second tubular shell 2 forming a double shell. The double shell is connected by a first ring 3 and a second ring 4, which can effectively ensure the structural strength and stability. At the same time, the tubular shell is conducive to weight reduction. The installation process holes 5 are provided on the first ring 3 and the second ring 4, which not only effectively achieves lightweighting, but also facilitates the stitching of carbon fibers on the surface of the prefabricated structure 100, reducing the difficulty of manufacturing the prefabricated structure 100.
[0037] Specifically, the first tubular shell 1, the second tubular shell 2, the first ring 3, and the second ring 4 are all made of carbon fiber material and are connected by stitching at the joints. (Refer to...) Figure 4 As shown, the orthographic projection of the first tubular shell 1 onto the target plane is the first ring 11, and the orthographic projection of the second tubular shell 2 onto the target plane is the second ring 23. The first ring 11 is located inside the second ring 23. The orthographic projection of the mounting process hole 5 onto the target plane is located between the first ring 11 and the second ring 23, facilitating the stitching of the connections between the first tubular shell 1 and the first ring 3, the first tubular shell 1 and the second ring 4, the second tubular shell 2 and the first ring 3, and the second tubular shell 2 and the second ring 4 through the mounting process hole 5. Figure 4 For the sake of simplicity, the thickness of the first tubular shell 1 and the second tubular shell 2 is ignored.
[0038] Please refer to Figure 2 As shown, in one embodiment, the mounting hole 5 includes an inner arc 51 and an outer arc 52, the centers of which are both located on the central axis of the first tubular housing 1. The length of the outer arc 52 is greater than the length of the inner arc 51. Compared with a circular hole of equal area, the mounting hole 5 of this shape has greater structural strength and a stronger ability to withstand radial pressure and tension from the first ring 3 and the second ring 4. It can also make full use of the space on the first ring 3 and the second ring 4. Therefore, while ensuring structural strength, the mounting hole 5 of this shape can be larger to make the first ring 3 and the second ring 4 lighter.
[0039] Furthermore, both the first ring 3 and the second ring 4 are provided with multiple installation process holes 5 spaced apart circumferentially. The spaced arrangement of multiple installation process holes 5 helps to reduce the impact of excavation on structural strength, ensuring structural strength and stability. Preferably, the multiple installation process holes 5 are equally spaced along the first ring 3 and the second ring 4 to further ensure structural strength and stability. The number of installation process holes 5 on the first ring 3 can be 4, 6, 8, etc., and the number of installation process holes 5 on the second ring 4 can be 4, 6, 8, etc., without specific limitation.
[0040] Please continue to refer to Figure 2 As shown, in one embodiment, the mounting process hole 5 is shaped like a fan segment, and the adjacent sides of the fan segment are transitioned by an arc angle, which is beneficial to improving the structural strength and stability.
[0041] Please continue to refer to Figure 1 As shown, in one embodiment, a plurality of mounting holes 9 are provided circumferentially spaced on the first ring 3 and the second ring 4, and the orthographic projection of the mounting holes 9 onto the target plane is located outside the ring formed by the orthographic projection of the second tubular housing 2 onto the target plane. Specifically, refer to... Figure 4 As shown, the orthographic projection of the second tubular housing 2 onto the target plane is a second annulus 23. The orthographic projection of the assembly hole 9 onto the target plane is located outside the second annulus 23 formed by the orthographic projection of the second tubular housing 2 onto the target plane, facilitating the fixing of the prefabricated structure 100 onto other components. The assembly hole 9 can also be located at the position of other components. Preferably, the orthographic projections of the assembly hole 9 on the first ring 3 and the assembly hole 9 on the second ring 4 onto the target plane completely overlap, further facilitating assembly. Preferably, the assembly hole 9 is a bolt hole.
[0042] Furthermore, multiple mounting holes 9 are equally spaced circumferentially on the first ring 3 and equally spaced circumferentially on the second ring 4, further ensuring structural strength and stability. Specifically, the number of mounting holes 9 on the first ring 3 can be 4, 6, 8, etc., and the number of mounting holes 9 on the second ring 4 can be 4, 6, 8, etc., without any specific limitation.
[0043] Please continue to refer to Figure 1 As shown, in one embodiment, the prefabricated structure 100 further includes: a third ring 6, which is sleeved on the first tubular shell 1 and located between the first ring 3 and the second ring 4. The inner ring of the third ring 6 is stitched to the surface of the second tubular shell 2. The second tubular shell 2 includes a first pipe segment 21 and a second pipe segment 22. The two openings of the first pipe segment 21 are stitched to the side of the first ring 3 and the side of the third ring 6, respectively. The two openings of the second pipe segment 22 are stitched to the side of the second ring 4 and the other side of the third ring 6, respectively.
[0044] When the distance between the first ring 3 and the second ring 4 is relatively large, the strength requirement for the connection structure between the first ring 3 and the second ring 4 is relatively high, while the third ring 6 is beneficial to increasing the strength and stability of the prefabricated structure 100.
[0045] In one embodiment, the first pipe segment 21 and the second pipe segment 22 are provided with weight-reducing holes 7 at circumferential intervals. The weight-reducing holes 7 can effectively reduce the weight of the prefabricated structure 100. Preferably, the weight-reducing holes 7 are rectangular holes, which helps to ensure better resistance to axial pressure and tension from the second tubular shell 2. At the same time, the weight-reducing holes 7 also facilitate the fixing of the prefabricated structure 100 to other components.
[0046] In one embodiment, the third ring 6 is provided with a plurality of mounting holes 9 along its circumference, which are used to cooperate with the mounting holes 9 on the first ring 3 and the second ring 4 to fix the prefabricated structure 100 onto other components. Preferably, the mounting holes 9 on the first ring 3, the second ring 4, and the third ring 6 have completely overlapping orthographic projections on the target plane, which facilitates assembly.
[0047] Please continue to refer to Figure 1As shown, in one embodiment, the prefabricated structure 100 further includes a plurality of first reinforcing plates 81, which are spaced apart circumferentially along the first pipe segment 21. Each first reinforcing plate 81 is rectangular, with one long side stitched to the outer surface of the first pipe segment 21, and the two short sides stitched to the side surfaces of the first tubular shell 1 and the third ring 6, respectively. The first reinforcing plates 81 help increase the structural strength and stability of the prefabricated structure 100. Furthermore, the first reinforcing plates 81 are positioned between adjacent weight-reducing holes 7, allowing for weight reduction while maintaining structural strength.
[0048] Please continue to refer to Figure 1 As shown, in one embodiment, the prefabricated structure 100 further includes a plurality of second reinforcing plates 82, which are spaced apart circumferentially along the second pipe segment 22. Each second reinforcing plate 82 is rectangular, with one long side stitched to the outer surface of the second pipe segment 22, and the two short sides stitched to the side of the second tubular shell 2 and the other side of the third ring 6, respectively. The second reinforcing plates 82 help increase the structural strength and stability of the prefabricated structure 100. Furthermore, the second reinforcing plates 82 are positioned between adjacent weight-reducing holes 7, allowing for weight reduction while maintaining structural strength.
[0049] Please continue to refer to Figure 1 As shown, in one embodiment, the second ring 4 has multiple reinforcing plate groups on its side near the first ring 3, and each reinforcing plate group includes two third reinforcing plates 83 arranged at a predetermined angle. The second ring 4 can serve as the bottom structure of the prefabricated structure 100, and the third reinforcing plates 83 help improve the structural strength and stability of the second ring 4.
[0050] Furthermore, in each reinforcing plate group, two third reinforcing plates 83 surround a mounting hole 9 on the second ring 4. The number of reinforcing plate groups on the second ring 4 is the same as the number of mounting holes 9 on the second ring 4, which can reduce the adverse effects of the mounting holes 9 on the structural strength and stability. The predetermined angle between the two third reinforcing plates 83 in each reinforcing plate group is 50, 60, 70 degrees, etc., and is not specifically limited.
[0051] Another embodiment of this application discloses a satellite that uses the prefabricated structure 100 in the above embodiment as its main structure.
[0052] The satellite provided in this application embodiment has a prefabricated structure 100, which consists of a first tubular shell 1 and a second tubular shell 2 forming a double shell. The double shell is connected by a first ring 3 and a second ring 4, which can effectively ensure structural strength and stability. At the same time, the tubular shell is conducive to weight reduction. The installation process holes 5 are provided on the first ring 3 and the second ring 4, which not only effectively achieves weight reduction, but also facilitates the stitching of carbon fibers on the surface of the prefabricated structure 100, reduces the manufacturing difficulty of the prefabricated structure 100, and thus helps to reduce the weight of the satellite, ensure the structural strength and stability of the satellite, and reduce the satellite launch cost.
[0053] It should be noted that some embodiments of this application have been described above. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps described in the claims can be performed in a different order than that shown in the above embodiments and still achieve the desired result. In addition, the processes depicted in the drawings do not necessarily require the specific order or sequential order shown to achieve the desired result.
[0054] Those skilled in the art should understand that the discussion of any of the above embodiments is merely exemplary and is not intended to imply that the scope of this application (including the claims) is limited to these examples; within the framework of this application, the technical features of the above embodiments or different embodiments can also be combined, the steps can be implemented in any order, and there are many other variations of different aspects of the embodiments of this application as described above, which are not provided in the details for the sake of brevity.
[0055] The embodiments of this application are intended to cover all such substitutions, modifications, and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the embodiments of this application should be included within the protection scope of this application.
Claims
1. A preform structure, characterized by, The preform structure comprises a carbon fiber material, and the preform structure comprises: a first tubular shell and a second tubular shell, the second tubular shell being sleeved on the first tubular shell and arranged coaxially with the first tubular shell; a first circular ring and a second circular ring, the first circular ring and the second circular ring being sequentially sleeved on the first tubular shell along the axial direction of the first tubular shell; two ends of the first tubular shell are respectively sutured with the inner ring of the first circular ring and the inner ring of the second circular ring, and two ends of the second tubular shell are respectively sutured with the side surface of the first circular ring and the side surface of the second circular ring, and mounting process holes are arranged on the first circular ring and the second circular ring; wherein the normal projection of the mounting process hole on a target plane is located between the normal projections of the first tubular shell and the second tubular shell on the target plane, and the target plane is perpendicular to the axial direction of the first tubular shell.
2. The preform structure of claim 1, wherein, The mounting process hole comprises an inner arc and an outer arc, the centers of the inner arc and the outer arc are located on the central axis of the first tubular shell, and the length of the outer arc is greater than the length of the inner arc.
3. The preform structure of claim 1 or 2, wherein, The first circular ring and the second circular ring are both provided with a plurality of mounting process holes at intervals along the circumferential direction.
4. The preform structure of claim 2, wherein, The mounting process hole is in the shape of a sector, and the adjacent sides of the sector are transitioned by arc angles.
5. The preform structure of claim 1, wherein, The preform structure further comprises: a third circular ring, the third circular ring being sleeved on the first tubular shell and located between the first circular ring and the second circular ring, the inner ring of the third circular ring being sutured with the surface of the second tubular shell, the second tubular shell comprising a first pipe segment and a second pipe segment, two ends of the first pipe segment being respectively sutured with the side surface of the first circular ring and the side surface of the third circular ring, and two ends of the second pipe segment being respectively sutured with the side surface of the second circular ring and the other side surface of the third circular ring.
6. The preform structure of claim 5, wherein, The first pipe segment and the second pipe segment are provided with weight-reducing holes at intervals along the circumferential direction.
7. The preform structure of claim 5, wherein, The preform structure further comprises: a plurality of first reinforcing sheets arranged at intervals along the circumferential direction of the first pipe segment, the first reinforcing sheets being rectangular, one long side of the first reinforcing sheets being sutured with the outer surface of the first pipe segment, and two short sides of the first reinforcing sheets being respectively sutured with the side surface of the first tubular shell and the side surface of the third circular ring; a plurality of second reinforcing sheets arranged at intervals along the circumferential direction of the second pipe segment, the second reinforcing sheets being rectangular, one long side of the second reinforcing sheets being sutured with the outer surface of the second pipe segment, and two short sides of the second reinforcing sheets being respectively sutured with the side surface of the second tubular shell and the other side surface of the third circular ring.
8. The preform structure of claim 1, wherein, The side surface of the second circular ring close to the first circular ring is provided with a plurality of reinforcing sheet groups, each reinforcing sheet group comprising two third reinforcing sheets arranged at a predetermined angle.
9. The preform structure of claim 1, wherein, A plurality of assembly holes are arranged at intervals along the circumferential direction on the first circular ring and the second circular ring, and the normal projection of the assembly hole on the target plane is located outside the annulus formed by the normal projection of the second tubular shell on the target plane.
10. A satellite, characterized by The preform structure as claimed in any one of claims 1-9 is used as a main body structure.
Citation Information
Patent Citations
Method for forming structural component for airframe of aircraft or spacecraft and structural component
CN110481814A
Prefabricated body with spar supporting frame
CN111453004A