A construction method for accurately positioned recyclable steel pipe piles

CN118563780BActive Publication Date: 2025-02-21CHINA CONSTR EIGHTH BUREAU DEV & CONSTR CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411059654.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2025-02-21
Estimated Expiration
2044-08-05

Smart Images

  • Figure CN118563780B_ABST
    Figure CN118563780B_ABST
Patent Text Reader

Abstract

The present invention provides a precisely positioned recyclable steel pipe pile construction method, which belongs to the technical field of recyclable steel pipe pile construction, and comprises: accurately measuring and laying out a construction area to determine the position and elevation of the steel pipe pile; leveling the site with advanced machinery and installing a stable and horizontal drilling rig; correcting the verticality of the drill rod with two theodolites to ensure that the deviation is less than 0.5%; drilling a hole with a skip-drilling process, checking the verticality every 2 meters and correcting it; cleaning the sediment and accumulated water at the bottom of the hole with compressed air; installing the steel pipe pile and connecting it with the upper and lower connectors of the pipe shoe; connecting the steel pipe pile with the steel crown beam with U-bolts, and using mud wall protection between the pile and the waist beam; backfilling and compacting the fertilizer trough, and backfilling and compacting in layers after removing the waist beam; using pile pulling equipment to recover the steel pipe pile, and backfilling the pile hole with sand; the construction method provided by the present invention solves the technical problem that the existing recyclable steel pipe pile construction method has low positioning accuracy.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Design construction method of flexible compound fabricated recoverable rectangular working well supporting structure

    CN109056746A

  • Method and device for detecting construction quality of rotary excavating pile foundation

    CN117514127A