Method for traversing a bridge machine over a span

Through the coordinated design of the main truss guide beam and the outriggers, combined with the electrical control system, the bridge erecting machine can safely and reliably traverse across the span, solving the problems of long construction time, high cost and high risk in the existing technology, and improving construction efficiency and safety.

CN118581806BActive Publication Date: 2026-11-24NINGBO HONGZI CONSTR ENG CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410642265.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2026-11-24
Estimated Expiration
2044-05-23

AI Technical Summary

Technical Problem

In existing bridge construction, the method of lateral movement of bridge erecting machines across the bridge span has problems such as long construction time, high cost, large workload, and high safety risks.

Method used

The bridge erecting machine structure consists of a main truss guide beam, front temporary support legs, front support legs, middle support legs, rear support legs, and a turntable. The movement of the truss and turntable is controlled by an electrical control system to achieve safe and reliable lateral movement of the bridge erecting machine. This includes multiple steps of support leg adjustment and angle rotation to ensure that the bridge erecting machine can move laterally between 0° and 45°.

Benefits of technology

It shortens the lateral movement time of the bridge erecting machine, reduces costs, improves construction efficiency, reduces safety risks, simplifies operation procedures, and reduces site requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118581806B_ABST
    Figure CN118581806B_ABST
Patent Text Reader

Abstract

This invention discloses a bridge construction device, aiming to provide a safe, reliable, short-time, and low-cost method for the lateral movement of a bridge erecting machine. The key technical points are that the main structure of the bridge erecting machine is a multi-segment truss connecting beam, which is easy to assemble and disassemble, convenient for transfer to the construction site, and allows for one-time lateral movement. It also has high wind resistance, ensuring safe operation. Compared with traditional bridge erecting machine lateral movement operations, it consumes less time, requires less cost, and has higher lateral movement efficiency. Furthermore, the above-mentioned lateral movement scheme improves the efficiency of beam erection. Compared with traditional lateral movement methods, it eliminates the need to hoist the bridge erecting machine off the bridge, reducing the number of equipment disassemblies and reassemblies, lowering safety management risks, and reducing site requirements. It avoids the problems of foundation reinforcement due to insufficient bearing capacity and occupying limited space, reducing project costs, simplifying the operation procedure, and significantly improving work efficiency. This invention is applicable to the field of bridge construction technology.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a bridge construction device, and more specifically, to a method for the lateral movement of a bridge erecting machine. Background Technology

[0002] To accommodate greater pedestrian and vehicular traffic and prevent congestion, modern bridges typically consist of two spans. During construction, after the bridge erecting machine completes the erection of one span, it needs to be moved to the other. Traditional methods for moving the bridge erecting machine usually include the following three approaches:

[0003] Option 1 involves moving the bridge erecting machine forward along the existing bridge to the abutment behind the subgrade, then disassembling, turning around, and moving it laterally. However, this option is greatly affected by the site conditions, requires a long starting abutment roadbed, and takes a long time, thus impacting the bridge construction period.

[0004] Option 2 involves dismantling the entire bridge erecting machine and using cranes and transport vehicles to transfer its various parts to another cast-in-place bridge deck for reassembly. However, this option is complicated and expensive.

[0005] Option 3 involves driving foundation piles into the water in the central isolation zone and setting up two steel platforms on which Bailey bridge beams are erected. These Bailey bridge beams serve as transition support points for the bridge erecting machine to move laterally across the span. This option involves a large amount of work and a high degree of difficulty, with complicated procedures and additional related costs. Furthermore, the platform construction takes a long time, which will delay the construction period. After the platform is built, the foundation bearing capacity needs to be tested. Additionally, there are safety risks when the bridge erecting machine moves laterally across the span. Summary of the Invention

[0006] In view of the shortcomings of the existing technology, the purpose of this invention is to provide a safe, reliable, short-time, and low-cost method for the lateral movement of a bridge erecting machine.

[0007] To achieve the above objectives, the present invention provides the following technical solution: a method for lateral movement of a bridge erecting machine, comprising a main truss guide beam, a front temporary support leg, a front support leg, a middle support leg, a rear support leg, and a turntable disposed below the main truss guide beam, wherein a lateral movement track is also provided on the main truss guide beam, and two gantry cars are disposed on the lateral movement track; an electrical control system is also provided inside the main truss guide beam, and the electrical control system is configured to control the movement of the gantry cars and the rotation of the turntable;

[0008] The method for lateral movement of the bridge erecting machine further includes the following steps: S1, controlling the bridge erecting machine to move backward so that the outriggers and temporary outriggers on the bridge erecting machine are in a safe state under stress;

[0009] S2. Remove the fixing screws around the front outrigger, middle outrigger, and turntable to allow the central shaft of the bridge erecting machine to rotate along the set control angle.

[0010] S3. Retract the front temporary support leg and the rear support leg to suspend the bridge erecting machine in the air, the middle support leg and the front support leg are under force, the guide beam rear support leg moves backward, when the guide beam rear support leg begins to move backward and cantilever, move the two gantry cranes in opposite directions along the guide beam track to the middle support leg and the front support leg to balance the load relationship between the rear support leg and the cantilever of the main truss.

[0011] S4. Continue to control the front outrigger and the middle outrigger to move in opposite directions, so that the bridge erecting machine rotates from 0°-15° to 30°. At the same time, the tail end of the guide beam and the rear outrigger swing to the space of the central isolation zone and leave the current beam surface.

[0012] S5. In the opposite manner to the previous outrigger crossing, the rear outrigger is moved from the central isolation zone space to a direction away from the current beam surface until it reaches the target beam surface. The rear outrigger is supported by the hydraulic device and the front temporary outrigger, rear outrigger and middle outrigger are also supported.

[0013] S6. Move the front outrigger backward along the guide beam to apply force to the outrigger;

[0014] S7. Retract the middle outrigger and move it closer to the rear outrigger along the guide beam;

[0015] S8. Continue to move the guide beam's subsequent support leg toward the target span of the bridge, so that the rear right support leg is close to the pedestrian guardrail on the target span of the bridge, and support the rear support leg, so that the rear support leg, the front temporary support leg, and the middle support leg are all under force at the same time.

[0016] S9. Retract the front outrigger to make it suspended in the air, move the front outrigger along the guide beam past the width, and stop when it approaches the middle outrigger after crossing the central isolation zone.

[0017] S10. After the bridge erecting machine has moved to the target span of the bridge, the rear outriggers are moved by means of fine-tuning the angle of the bridge erecting machine body.

[0018] S11. Retract the middle support leg to make it suspended in the air, and move the middle support leg along the guide beam to the rear support leg so that the rear support leg is under force.

[0019] S12. Retract the rear outrigger and the front temporary outrigger, and move the front outrigger and the middle outrigger away from each other along their respective track beams. Through the movable turntable of the front outrigger, the middle outrigger, and the gantry crane, restore the bridge erecting machine body from a 20° angle to a 0° angle overall upright position.

[0020] S13. Reinstall and tighten the disassembled front outrigger, middle outrigger, and the fixing screws around the turntable to restore the relative fixed relationship between the guide beam and the turntable. Insert the safety bolt of the front outrigger and extend the steel support of the front temporary outrigger.

[0021] S14. Retract the rear outriggers, move the guide beam toward the direction of the beam to be erected, and stop it in mid-air;

[0022] S15. Repeat the traditional beam erection and relocation operation, with the front outriggers straddling the top cap beams at both ends of the beam to bear the force, and the rear outriggers bearing the force on the cast-in-place beam surface, forming a safe beam feeding state in which the front, middle and rear outriggers bear the force simultaneously.

[0023] The present invention is further configured such that, in step S1, the two gantry cranes on the bridge erecting machine are respectively positioned between the middle support leg and the front support leg, and are biased towards the front support leg.

[0024] The present invention is further configured such that: in step S7, the guide beam and the central isolation strip of the bridge are at a 30° angle, the two gantry cranes on the bridge erecting machine are respectively set on the guide beams of the middle support leg and the front support leg, and the bridge erecting machine is supported by 14 sleepers.

[0025] The present invention is further configured such that, in step S8, the two gantry cranes on the bridge erecting machine are positioned between the rear support leg and the middle support leg.

[0026] The present invention is further configured such that: in step S9, the rear support leg, the middle support leg and the front temporary support leg of the bridge erecting machine are simultaneously subjected to force, and the two gantry cranes on the bridge erecting machine are set on the guide beam between the rear support leg and the middle support leg and close to the rear support leg, and the bridge erecting machine is supported by 18 sleepers.

[0027] The present invention is further configured such that: in step S10, the method for fine-tuning the body angle of the bridge erecting machine includes the following steps: S101, retracting the rear outriggers and the front temporary outriggers;

[0028] S102. Control the front outrigger and the middle outrigger to move away from each other in opposite directions, so that the bridge erecting machine rotates from a 30° angle to a 20° angle, gradually straightening the bridge erecting machine body, and the guide beam and the track beam of the front and middle outriggers gradually change into a rectangle.

[0029] The present invention is further configured such that: in step S11, the two gantry cranes on the bridge erecting machine are positioned between the rear support leg and the middle support leg, and the bridge erecting machine is supported by 14 sleepers.

[0030] The present invention is further configured such that, in step S14, the two gantry cranes on the bridge erecting machine are positioned between the front support leg and the middle support leg.

[0031] The present invention is further configured such that: in step S15, the two gantry cranes on the bridge erecting machine are positioned between the middle support leg and the rear support leg, and the lower end of the front support leg of the bridge erecting machine is supported by at least 14 sleepers and steel supports, and the lower end of the middle support leg is supported by at least 22 supports.

[0032] By adopting the above technical solution, the main structure of the bridge erecting machine is a multi-segment truss connecting beam, which is easy to disassemble and assemble, convenient to transfer to the construction site, and can move laterally in one step. It has a large wind resistance and can ensure safe operation. Furthermore, through the turntable function of the bridge erecting machine, the machine can be controlled to move laterally between 0° and 45°, which is safe and reliable. Compared with the traditional bridge erecting machine's transverse operation, it takes less time, requires less cost, and has high lateral movement efficiency.

[0033] Furthermore, to improve the overall balance and stability of the bridge erecting machine during lateral movement, the position of the gantry on the main truss guide beam is changed in each step to balance the load relationship of the guide beam. Also, since some outriggers are retracted during the lateral movement of the bridge erecting machine, the remaining outriggers cannot bear their own weight. In order to distribute the load of the bridge erecting machine during its movement, sleepers and steel supports are placed under the track beam at the lower end of the bridge erecting machine. This can distribute the load of the bridge erecting machine and the feeding beam after the outriggers are retracted, thus improving the safety of the bridge erecting machine during lateral movement.

[0034] Meanwhile, in step S10, when the bridge erecting machine has fully crossed to the target span of the bridge, due to the influence of the bridge deck width and the outer sidewalk guardrail structure, it is impossible to extend the rear outriggers further backward under the premise of a plane angle ≥30°. It is necessary to take the method of making transitional fine adjustments to the angle of the bridge erecting machine body to gradually straighten the bridge erecting machine body.

[0035] Furthermore, the above-mentioned bridge erecting machine lateral movement method improves the efficiency of bridge erection. Compared with the traditional method, the bridge erecting machine is no longer hoisted off the bridge, reducing the number of times the equipment is disassembled and assembled, lowering the risk of safety management. At the same time, it has low site requirements, avoiding the problems of foundation reinforcement due to insufficient foundation bearing capacity and occupying limited space, reducing project costs, simplifying the operation procedure, and greatly improving work efficiency. Attached Figure Description

[0036] Figure 1 This is the first part of a flowchart illustrating a method for lateral movement of a bridge erecting machine according to an embodiment of the present invention.

[0037] Figure 2 This is the second part of the flowchart of a method for lateral movement of a bridge erecting machine according to an embodiment of the present invention;

[0038] Figure 3 This is the third part of the flowchart of a method for lateral movement of a bridge erecting machine according to an embodiment of the present invention;

[0039] Figure 4 This is a simplified structural diagram of a bridge erecting machine according to an embodiment of the lateral movement method of a bridge erecting machine of the present invention;

[0040] The attached diagram is labeled as follows: 1. Main truss guide beam; 2. Front temporary support leg; 3. Front support leg; 4. Middle support leg; 5. Rear support leg; 6. Turntable; 7. Transverse track; 8. Gantry crane; 9. Electrical control system. Detailed Implementation

[0041] Reference Figures 1 to 4 The following is a further description of an embodiment of the lateral movement method for a bridge erecting machine according to the present invention.

[0042] For ease of explanation, spatial relative terms such as “up,” “down,” “left,” and “right” are used in the embodiments to describe the relationship of one element or feature shown in the figures relative to another element or feature. It should be understood that, in addition to the orientations shown in the figures, spatial terms are intended to include different orientations of the device in use or operation. For example, if the device in the figures is inverted, an element described as being “down” of other elements or features would be positioned “up” of those other elements or features. Therefore, the exemplary term “down” can encompass both up and down orientations. The device may be positioned in other ways (rotated 90 degrees or in other orientations), and the spatial relative descriptions used herein will be interpreted accordingly.

[0043] Moreover, relational terms such as “first” and “second” are used merely to distinguish one component from another that has the same name, without necessarily requiring or implying any such actual relationship or order between the components.

[0044] For ease of understanding, in the following embodiments, the bridge erection machine erects a bridge with a length of 378m. The first to third spans are cast-in-place prestressed concrete continuous beam bridges with six lanes in both directions and a single span width of 20.5m, including a 5m wide central median and a 2.4m wide cantilever on both outer flanges. The fourth span is a 3*30m span simply supported variable continuous beam bridge, designed with 42 precast small box girders, with a maximum load of 123t on the side beams and a cantilever width of 0.645m on the side beams. The bridge is approximately 9.6m above the water surface.

[0045] The bridge erecting machine of the present invention includes a main truss guide beam 1, a front temporary support leg 2, a front support leg 3, a middle support leg 4, a rear support leg 5 and a turntable 6 disposed below the main truss guide beam 1, a transverse track 7 is also provided on the main truss guide beam 1, two gantry cars 8 are provided on the transverse track 7, and an electrical control system 9 is also provided inside the main truss guide beam 1. The electrical control system 9 is configured to control the movement of the gantry cars 8 and the rotation of the turntable 6.

[0046] When a bridge erecting machine completes the erection of one small box girder and needs to move to erect another girder, there are three options for the traditional technological implementation plan:

[0047] Option 1: The bridge erecting machine continues to move forward along the existing bridge to the back of abutment A10. At this point, the back of the abutment has not yet been backfilled, the height difference is 2.8m, there is no support surface, and it is impossible to disassemble, turn around, and move laterally to another span. Alternatively, the bridge erecting machine can slowly retreat along the existing bridge using its walking function to the starting point of the road at abutment A0, and then move laterally to the other span of the bridge to be erected to carry out the beam erection work. However, the objective limitations at this point are: the length of the roadbed at the starting abutment is limited (only 15m), the temporary access road to the bridge has a steep slope of 40%, the walking time is long, the site conditions for lateral movement are not available, and the above option requires at least 7 days, with labor costs of 7 days * 5 people * 500 yuan / person = 17,500 yuan. Furthermore, there is no available site, so this option cannot be implemented.

[0048] Option 2: Dismantle the bridge erecting machine and transfer it to another cast-in-place bridge deck using an 80t wheeled crane and transport vehicles for reassembly and testing. This procedure is complicated. In addition, if the dismantling and reassembly operation takes 3 days, the cost of the 80t crane + flatbed truck will be 23,500 yuan, the labor cost will be 7,500 yuan, and the cost of re-testing the bridge erecting machine after installation will be 10,000 yuan, for a total cost of 41,000 yuan. This is expensive and complicated.

[0049] Option 3: Utilize the central median strip, drive pile foundations in the water, and construct two steel platforms. Erect Bailey bridges on these platforms as transitional support points for the bridge erecting machine's lateral movement. The platforms should be approximately 9.6m high, 0.9m wide, and 9.8m long. The top surface should not only support the central median strip for 5m, but also extend to the bottom surface of the flanges (2.4m x 2m = 4.8m) to support the cantilever beams. This option involves a large scale and high difficulty, complex procedures, high costs, and potential delays. It requires testing the bearing capacity of the support foundations and poses safety risks during lateral movement. A rough calculation suggests the project will take 30 days and cost 23,000 yuan. The project is time-consuming, complex, expensive, and carries safety risks.

[0050] The method for lateral movement of the bridge erecting machine in this application specifically includes the following steps: S1, controlling the bridge erecting machine to move backward so that the outriggers and temporary outriggers on the bridge erecting machine are in a safe state under stress.

[0051] S2. Remove the fixing screws around the front outrigger, middle outrigger, and turntable to allow the central shaft of the bridge erecting machine to rotate along the set control angle.

[0052] S3. Retract the front temporary support leg and the rear support leg to suspend the bridge erecting machine in the air, the middle support leg and the front support leg are under force, the guide beam rear support leg moves backward, when the guide beam rear support leg begins to move backward and cantilever, move the two gantry cranes in opposite directions along the guide beam track to the middle support leg and the front support leg to balance the load relationship between the rear support leg and the cantilever of the main truss.

[0053] S4. Continue to control the front outrigger and the middle outrigger to move in opposite directions, so that the bridge erecting machine rotates from 0°-15° to 30°. At the same time, the tail end of the guide beam and the rear outrigger swing to the space of the central isolation zone and leave the current beam surface.

[0054] S5. In the opposite manner to the previous outrigger crossing, the rear outrigger is moved from the central isolation zone space to a direction away from the current beam surface until it reaches the target beam surface. The rear outrigger is supported by the hydraulic device and the front temporary outrigger, rear outrigger and middle outrigger are also supported.

[0055] S6. Move the front outrigger backward along the guide beam to apply force to the outrigger;

[0056] S7. Retract the middle outrigger and move it closer to the rear outrigger along the guide beam;

[0057] S8. Continue to move the guide beam's subsequent support leg toward the target span of the bridge, so that the rear right support leg is close to the pedestrian guardrail on the target span of the bridge, and support the rear support leg, so that the rear support leg, the front temporary support leg, and the middle support leg are all under force at the same time.

[0058] S9. Retract the front outrigger to make it suspended in the air, move the front outrigger along the guide beam past the width, and stop when it approaches the middle outrigger after crossing the central isolation zone.

[0059] S10. After the bridge erecting machine has moved to the target span of the bridge, the rear outriggers are moved by means of fine-tuning the angle of the bridge erecting machine body.

[0060] S11. Retract the middle support leg to make it suspended in the air, and move the middle support leg along the guide beam to the rear support leg so that the rear support leg is under force.

[0061] S12. Retract the rear outrigger and the front temporary outrigger, and move the front outrigger and the middle outrigger away from each other along their respective track beams. Through the movable turntable of the front outrigger, the middle outrigger, and the gantry crane, restore the bridge erecting machine body from a 20° angle to a 0° angle overall upright position.

[0062] S13. Reinstall and tighten the disassembled front outrigger, middle outrigger, and the fixing screws around the turntable to restore the relative fixed relationship between the guide beam and the turntable. Insert the safety bolt of the front outrigger and extend the steel support of the front temporary outrigger.

[0063] S14. Retract the rear outriggers, move the guide beam toward the direction of the beam to be erected, and stop it in mid-air;

[0064] S15. Repeat the traditional beam erection and relocation operation, with the front outriggers straddling the top cap beams at both ends of the beam to bear the force, and the rear outriggers bearing the force on the cast-in-place beam surface, forming a safe beam feeding state in which the front, middle and rear outriggers bear the force simultaneously.

[0065] By adopting the above technical solution, the main structure of the bridge erecting machine is a multi-segment truss connecting beam, which is easy to disassemble and assemble, convenient to transfer to the construction site, and can be moved laterally in one step. It has a large wind resistance and can ensure safe operation. Furthermore, through the turntable function of the bridge erecting machine, the machine can be controlled to move laterally between 0° and 45°, which is safe and reliable. At the same time, it was roughly measured that when the above solution is adopted, the time spent on the bridge erecting machine to move laterally across the width is 2 days. Compared with the traditional bridge erecting machine operation, the time spent is shorter, the cost is lower, and the efficiency of lateral movement is higher.

[0066] Furthermore, in order to improve the overall balance and stability of the bridge erecting machine during the lateral movement, the position of the gantry on the main truss guide beam is changed in each step to balance the load relationship of the guide beam. Also, since some outriggers are in a retracted state during the lateral movement of the bridge erecting machine, the remaining outriggers of the bridge erecting machine cannot bear their own weight. In order to distribute the load of the bridge erecting machine during the movement, sleepers and steel supports are placed under the track beam at the lower end of the bridge erecting machine. This can distribute the load of the bridge erecting machine and the feeding beam after the outriggers are retracted, thus improving the safety of the bridge erecting machine during the lateral movement.

[0067] In step S1, the front temporary support leg of the bridge erecting machine is 28m away from the front support leg and is located 23m away from the No. 9 erected beam segment. The two gantry cranes on the bridge erecting machine are respectively set between the middle support leg and the front support leg, and are biased towards the front support leg.

[0068] In step S7, the front outrigger of the bridge erecting machine is about 24m away from the middle outrigger. The two outriggers are under the force on the east and west bridge decks. The guide beam is at a 30° angle to the central isolation zone of the two bridge decks. At the same time, the middle outrigger is retracted. The load capacity of the bridge erecting machine is insufficient. Therefore, the two gantry cranes on the bridge erecting machine are respectively set on the guide beams of the middle outrigger and the front outrigger, and the bridge erecting machine is supported by 14 sleepers.

[0069] In step S8, the rear right outrigger of the bridge erecting machine approaches the pedestrian guardrail of the cast-in-place box girder on the east side (i.e., the target side) and stops 2.5m away from the edge of the cantilever beam of the flange plate. The two gantry cranes on the bridge erecting machine are positioned between the rear outrigger and the middle outrigger.

[0070] In step S9, the front outrigger of the bridge erecting machine moves backward along the guide beam, crosses the central isolation zone, and approaches the middle outrigger at a distance of about 2m before stopping to bear the load. At this time, the rear outrigger, the middle outrigger, and the front temporary outrigger are all under load. The load capacity of the front outrigger is insufficient, so 18 sleepers need to be placed under the track beam of the front outrigger to distribute the load of the bridge erecting machine. At the same time, the two gantry cranes on the bridge erecting machine are set on the guide beam between the rear outrigger and the middle outrigger, close to the rear outrigger.

[0071] In step S11, after the middle support leg is retracted and suspended in the air, the middle support leg is moved about 5m along the guide beam to the rear support leg and then stopped to bear the load. At this time, the load capacity of the middle support leg is insufficient, so 14 sleepers need to be placed under the track beam of the middle support leg to distribute the load of the bridge machine. At the same time, the two gantry cranes on the bridge erecting machine are set between the rear support leg and the middle support leg.

[0072] In step S14, the rear outrigger is retracted, the rear end of the bridge erecting machine is suspended in the air, and the two gantry cranes on the bridge erecting machine are set between the front outrigger and the middle outrigger to prevent the rear end of the bridge erecting machine from falling. At this time, the front temporary outrigger is 26m away from the front outrigger, the front outrigger is 19m away from the middle outrigger, and the middle outrigger is 15m away from the rear outrigger, which is a safe state.

[0073] In step S15, the front outrigger is stressed on the top cover beam of the P8 pier at both ends of the bridge to be erected, and the front outrigger track beam is supported by at least 14 sleepers and steel supports to distribute the load of the bridge crane and the beam feeding. The middle outrigger is stressed on the solid cross-section of the cross beam at the end of the P7 pier of the cast-in-place box girder, and the middle outrigger track beam is supported by at least 22 sleepers to distribute the load of the bridge crane and the beam feeding. The rear outrigger is stressed on the cast-in-place beam surface 19m away from the middle outrigger. The middle outrigger is 32m away from the front outrigger. The front temporary outrigger is cantilevered outside the P8 pier and 9m away from the front outrigger. The two gantry cranes on the bridge crane are set between the middle outrigger and the rear outrigger, forming a safe beam feeding state in which the front, middle and rear outriggers are stressed at the same time.

[0074] Meanwhile, in step S10, the method for fine-tuning the angle of the bridge erecting machine includes the following steps: S101, retracting the rear outriggers and the front temporary outriggers;

[0075] S102. Control the front outrigger and the middle outrigger to move away from each other in opposite directions, so that the bridge erecting machine rotates from a 30° angle to a 20° angle, gradually straightening the bridge erecting machine body, and the guide beam and the track beam of the front and middle outriggers gradually change into a rectangle.

[0076] When the bridge erecting machine has fully crossed to the target span of the bridge, due to the influence of the bridge deck width and the outer sidewalk guardrail structure, it is impossible to extend the rear outriggers further backward under the premise of a plane angle of ≥30°. It is necessary to take the method of making transitional fine adjustments to the angle of the bridge erecting machine body to gradually straighten the bridge erecting machine body and facilitate the subsequent work of the bridge erecting machine.

[0077] The above-mentioned bridge erecting machine lateral movement method improves the efficiency of bridge erection. Compared with the traditional method, it eliminates the need to hoist the bridge erecting machine off the bridge, reducing the number of times the equipment is disassembled and reassembled, lowering the risk of safety management. At the same time, it has low site requirements, avoiding the problems of foundation reinforcement due to insufficient bearing capacity and occupying limited space, reducing project costs, simplifying the operation procedure, and greatly improving work efficiency. This method has promotional significance and broad prospects.

[0078] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any ordinary changes and substitutions made by those skilled in the art within the scope of the technical solution of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for traversing a bridge machine across a span, the method comprising: The bridge erecting machine comprises a main truss guide beam (1), a front temporary support leg (2), a front support leg (3), a middle support leg (4), a rear support leg (5) and a rotating disc (6) arranged below the main truss guide beam (1), wherein the main truss guide beam (1) is further provided with a transverse moving track (7), the transverse moving track (7) is provided with two truss trolleys (8), and the main truss guide beam (1) is further provided with an electrical control system (9) configured to control the movement of the truss trolleys (8) and the rotation of the rotating disc (6). The transverse moving method of the bridge erecting machine further comprises the following steps: S1, controlling the bridge erecting machine to move backward so that the support legs and the temporary support legs on the bridge erecting machine are in a safe force state; S2, disassembling the fixing screws around the front support leg, the middle support leg and the rotating disc so that the central shaft of the bridge erecting machine can rotate along a set control angle; S3, folding the front temporary support leg and the rear support leg to make the bridge erecting machine suspended, the middle support leg and the front support leg are stressed, the guide beam moves backward with the rear support leg, and when the guide beam starts to move backward and cantilevers, the two truss trolleys are moved to the middle support leg and the front support leg in opposite directions along the guide beam track to balance the load relationship between the rear support leg and the main truss beam cantilever; S4, continuously controlling the front support leg and the middle support leg to move in opposite directions so that the bridge erecting machine rotates from 0°-15° to 30°, and meanwhile, the tail end of the guide beam and the rear support leg swing to the central separation belt space and leave the current beam surface; S5, moving the rear support leg from the central separation belt space to the direction away from the current beam surface in the opposite form of the front support leg cantilever until reaching the target beam surface, and supporting the rear support leg by the rear support leg hydraulic device, and supporting the front temporary support leg, the rear support leg and the middle support leg to bear stress; S6, moving the front support leg along the guide beam to bear stress; S7, folding the middle support leg and moving the middle support leg along the guide beam to the rear support leg; S8, continuously moving the guide beam along with the rear support leg to the target beam surface so that the rear right support leg approaches the sidewalk guardrail of the target beam surface, and the rear support leg is supported to make the rear support leg, the front temporary support leg and the middle support leg bear stress at the same time; S9, folding the front support leg to make it suspended, moving the front support leg along the guide beam to cross the central separation belt to approach the middle support leg and then stop to bear stress; S10, after the bridge erecting machine is completely moved to the target beam surface, moving the rear support leg by the bridge erecting machine body angle transition fine adjustment method; S11, folding the middle support leg to make it suspended, and moving the middle support leg along the guide beam to bear stress; S12, folding the rear support leg and the front temporary support leg, moving the front support leg and the middle support leg in the direction away from each other along the respective track beam, and making the bridge erecting machine body recover to the 0° angle overall normal position state from the 20° intersection angle by the movable rotating disc of the front support leg, the middle support leg and the truss trolley; S13, reassembling and tightening the disassembled fixing screws around the front support leg, the middle support leg and the rotating disc to recover the relative fixing relationship between the guide beam and the rotating disc, inserting the front support leg safety insurance steel bolt, and simultaneously lengthening the front temporary support leg steel support pier; S14, folding the rear support leg, moving the guide beam to the direction of the beam to be erected and stopping to be suspended. ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ S15. Repeat the traditional beam erection and relocation operation, with the front outriggers straddling the top cap beams at both ends of the beam to bear the force, and the rear outriggers bearing the force on the cast-in-place beam surface, forming a safe beam feeding state in which the front, middle and rear outriggers bear the force simultaneously.

2. The method of claim 1, wherein, In step S1, the two gantry cranes on the bridge erecting machine are respectively positioned between the middle support leg and the front support leg, and are biased towards the front support leg.

3. The method of claim 1, wherein, In step S7, the guide beam and the central isolation zone of the bridge are at a 30° angle. The two gantry cranes on the bridge erecting machine are respectively set on the guide beams of the middle support leg and the front support leg, and the bridge erecting machine is supported by sleepers.

4. The method of claim 1, wherein, In step S8, the two gantry cranes on the bridge erecting machine are positioned between the rear support leg and the middle support leg.

5. The method of claim 1, wherein, In step S9, the rear support leg, middle support leg and front temporary support leg of the bridge erecting machine are subjected to force simultaneously, and the two gantry cranes on the bridge erecting machine are set on the guide beam between the rear support leg and the middle support leg and close to the rear support leg, and the bridge erecting machine is supported by sleepers.

6. The method of claim 1, wherein, In step S10, the method for fine-tuning the angle of the bridge erecting machine includes the following steps: S101, retracting the rear outriggers and the front temporary outriggers; S102. Control the front outrigger and the middle outrigger to move away from each other in opposite directions, so that the bridge erecting machine rotates from a 30° angle to a 20° angle, gradually straightening the bridge erecting machine body, and the guide beam and the track beam of the front and middle outriggers gradually change into a rectangle.

7. The method of claim 1, wherein, In step S11, the two gantry cranes on the bridge erecting machine are positioned between the rear support leg and the middle support leg, and sleepers are placed under the bridge erecting machine.

8. The method of claim 1, wherein, In step S14, the two gantry cranes on the bridge erecting machine are positioned between the front outrigger and the middle outrigger.

9. The method of claim 1, wherein, In step S15, the two gantry cranes on the bridge erecting machine are positioned between the middle support leg and the rear support leg, and the lower end of the front support leg of the bridge erecting machine is padded with sleepers and steel supports, while the lower end of the middle support leg is padded with sleepers.

Citation Information

Patent Citations

  • Traversing luffing method of large-sized bridge erecting machine

    CN108532463A

  • Small-radius curve large-gradient narrow ramp bridge girder erection machine and construction method

    CN115807387A