An intelligent optimization method for smooth blasting holes in tunnels in layered rock mass

CN118586178BActive Publication Date: 2025-02-07SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD +1
2 Cites 0 Cited by

Patent Information

Application Number
CN202410682397.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2025-02-07
Estimated Expiration
2044-05-29

Smart Images

  • Figure CN118586178B_ABST
    Figure CN118586178B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of underground engineering, and in particular to an intelligent optimization method for smooth blasting blastholes in a tunnel in a layered rock mass. Firstly, according to the surrounding rock grade, blastholes on a tunnel face are arranged according to a conventional method. Then, the angle between the bedding plane of the tunnel face and a tunnel design contour line is identified by computer image recognition technology and an algorithm, and a maximum angle area where the bedding plane has little influence on the smooth blasting, a minimum angle area where the bedding plane has little influence on the smooth blasting, and a most unfavorable position where the bedding plane has little influence on the smooth blasting effect are obtained. Then, according to the calculation results, the blastholes are offset optimized to obtain optimized blasthole positions. Through the above optimization steps, the influence of the bedding plane on the blasting effect of surrounding holes during blasting is effectively reduced, thereby improving the excavation effect of the layered rock mass tunnel blasting, reducing the overconsumption of initial support shotcrete, and saving the tunnel construction cost.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Ultra-under-excavation control energy-collecting hydraulic smooth blasting construction method for slate tunnel

    CN111322077A

  • Grouting range optimization method applied to jointed rock mass tunnel excavation process

    CN113781441A