A device for transverse moving and beam changing of a trolley support
By using a trolley support transverse beam replacement device, the steel beams are moved and transported laterally using a slide rail and a winch. This solves the safety hazards and construction time requirements of traditional bridge replacement methods, and achieves fast and safe bridge replacement.
Patent Information
- Application Number
- CN202410874592.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-07-02
AI Technical Summary
Traditional bridge replacement methods pose risks of scratches and collisions on electrified railways, involve a large amount of temporary engineering work, and must be completed during railway closures, thus affecting operations.
The trolley support transverse beam replacement device includes a steel plate girder bridge, a construction area under the bridge, a platform between lines, a transverse trolley, and traction equipment. The transverse movement and transfer of steel beams are achieved through slides and winches, avoiding the use of large mechanical equipment.
This enabled the bridge replacement to be completed in the shortest possible time, reducing the impact on railway operations and improving construction safety and efficiency.
Smart Images

Figure CN118621713B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of trolley support technology, and in particular to a trolley support transverse beam changing device. Background Technology
[0002] Traditional railway bridges mostly use under-deck steel structures. However, due to adjustments in railway line alignments and bridge renovations, traditional steel bridges are gradually being replaced by concrete structures. Replacing bridges on operational railway lines has become commonplace.
[0003] Traditional bridge replacement methods include two approaches: one is to use large-tonnage cranes for hoisting and dismantling, and the other is to erect large-area scaffolding to move the steel beams laterally out of track position, with cranes assisting in the hoisting and dismantling. The first approach, under electrified railway conditions, carries the risk of scraping or colliding with the overhead contact lines and supports during steel beam hoisting and dismantling. The second approach requires the erection of numerous temporary scaffolding structures, resulting in a significant amount of temporary engineering work. Both approaches share a common challenge: large-span D-shaped temporary construction beams must be erected simultaneously with the dismantling of the steel beams during railway closures. Summary of the Invention
[0004] The purpose of this invention is to solve the problems existing in the prior art and to propose a trolley support transverse beam changing device.
[0005] To achieve the above objectives, the present invention adopts the following technical solution:
[0006] A trolley support transverse beam replacement device includes a steel plate girder bridge installed between two foundations, with two rails installed on the steel plate girder bridge, and further includes:
[0007] The construction area under the bridge is located on the underside of the steel plate girder bridge, and several first sliding tracks are laid in the construction area under the bridge.
[0008] A track-to-track platform is set between two railway tracks, and several second slide rails are laid on the track-to-track platform;
[0009] A transverse trolley, wherein multiple transverse trolleys are provided and respectively slidably mounted on a first slide rail and a second slide rail; and
[0010] A traction device, which is installed on the ground via ground anchors, is used to traction the lateral movement of the traverse trolley.
[0011] Preferably, the inter-line platform includes a concrete foundation poured on the bridge and a temporary support erected on the concrete foundation using a disc-lock scaffold, on which a working platform assembled from timber or bamboo plywood is laid.
[0012] Preferably, the transverse trolley includes a base plate, a plurality of support pipes fixed on the base plate, a top plate disposed on the top of the support pipes, and a traveling assembly disposed at the bottom of the base plate. A cross brace and an inclined cross brace are disposed between two adjacent support pipes.
[0013] Preferably, the walking assembly includes a first elastic telescopic rod fixed to the bottom of the base plate, and a mounting seat is fixed to the end of the first elastic telescopic rod away from the base plate. The mounting seat is connected to a walking wheel via a first pin.
[0014] Preferably, the walking assembly further includes an ear plate fixed to the bottom of the base plate. The ear plate is rotatably connected to a second elastic telescopic rod via a second pin. A torsion spring for resetting the rotation of the second elastic telescopic rod is sleeved on the second pin. A U-shaped seat is movably connected to the end of the second elastic telescopic rod away from the second elastic telescopic rod. An auxiliary wheel is connected to the U-shaped seat via a rotating shaft. A push rod is fixed to the outer wall of the second elastic telescopic rod. An extrusion slope that abuts against the push rod is provided on the mounting base.
[0015] Preferably, a support plate is fixed on the U-shaped seat, a telescopic plate is fixed on the support plate, a slider is fixed at the end of the telescopic plate away from the support plate, and a groove for sliding the slider is provided at the bottom of the base plate.
[0016] Preferably, the auxiliary wheel has a plurality of evenly distributed balls arranged in a circular pattern.
[0017] Preferably, the first slide rail and the second slide rail have the same structure. Each set of the first slide rail and the second slide rail includes two slide rails arranged side by side. The slide rails are provided with track grooves for the movement of the traveling wheels. The slide rails are provided with anchoring spiral spikes on the side and elastic fasteners are provided on the anchoring spiral spikes.
[0018] Preferably, the transverse trolley is equipped with a lifting device, which is a 100t short jack.
[0019] Preferably, the traction device is a winch, which is connected to the transverse trolley via a wire rope, and the transverse trolley is provided with a hook hole.
[0020] Compared with the prior art, the present invention provides a trolley support transverse beam changing device, which has the following beneficial effects:
[0021] 1. The trolley support transverse beam replacement device uses a transverse trolley on the first slide to transfer the existing steel beams on the bridge to the outside of the track, and a transverse trolley on the second slide to transfer the temporary beams assembled on the inter-track platform to the inside of the track. This allows the beam entry and exit to be completed at the same blockade point, resulting in fast construction speed, short railway line closure time, and minimizing the impact of construction on the operation of the railway line.
[0022] 2. The trolley support transverse beam changing device uses a winch to transfer the steel beams on the transverse trolley, thus avoiding the use of large mechanical equipment such as cranes during the implementation of the project, avoiding safety hazards to the operating equipment of the railway line, and significantly improving safety compared to the use of large machinery.
[0023] 3. The trolley support transverse beam changing device uses auxiliary wheels that are elastically set on the side of the traveling wheels to buffer and unload the force when the transverse trolley supports the steel beam. The auxiliary wheels are moved to the outside of the transverse trolley to provide more support area for the transverse trolley and improve the stability of the transverse trolley's movement. When the transverse trolley is not supporting the steel beam, the auxiliary wheels retract to the bottom of the transverse trolley, reducing the overall footprint of the transverse trolley and making it easier to store and transport. Attached Figure Description
[0024] Figure 1 This is a schematic diagram of the structure of the present invention;
[0025] Figure 2 This is a schematic diagram of the inter-line platform of the present invention;
[0026] Figure 3 This is a schematic diagram of the transverse trolley of the present invention;
[0027] Figure 4 This is a schematic diagram of the walking component of the present invention when it is not under stress;
[0028] Figure 5 This is a schematic diagram of the walking component of the present invention under stress.
[0029] Figure 6 This is a schematic diagram of the structure of the traction device of the present invention when pulling the transverse trolley;
[0030] Figure 7 This is a flowchart of the construction process of the present invention.
[0031] In the diagram: 1. Railway track; 2. Construction area under the bridge; 3. First sliding track; 4. Track platform; 401. Concrete foundation; 402. Temporary support; 403. Working platform; 5. Second sliding track; 6. Lateral trolley; 601. Base plate; 6011. Slide groove; 6012. Hook hole; 602. Support pipe; 6021. Horizontal brace; 6022. Diagonal brace; 603. Top plate; 7. Traction equipment; 8. First elastic telescopic rod; 801. Mounting base ; 8011, First pin; 802, Traveling wheel; 9, Ear plate; 901, Second pin; 9011, Torsion spring; 902, Second elastic telescopic rod; 9021, Push rod; 10, U-shaped seat; 11, Auxiliary wheel; 111, Ball bearing; 12, Support plate; 121, Telescopic plate; 122, Sliding block; 13, Rail; 131, Track groove; 132, Anchoring spiral spike; 133, Elastic fastener; 14, Lifting equipment; 15, Steel plate girder bridge. Detailed Implementation
[0032] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.
[0033] In the description of this invention, it should be noted that the terms "upper," "lower," "inner," "outer," "top / bottom," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing the invention and for simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0034] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installed," "equipped with," "sleeved / connected," "connected," etc., should be interpreted broadly. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be a connection within two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0035] Example: Refer to Figure 1 , Figure 2 , Figure 3 , Figure 6 and Figure 7 A trolley support transverse beam replacement device includes a steel plate girder bridge 15 installed between two foundations on both sides, with two rails 1 installed on the steel plate girder bridge 15, and further includes:
[0036] Construction area 2 under the bridge is located on the underside of the steel plate girder bridge 15. Several first slides 3 are laid in construction area 2 under the bridge.
[0037] The inter-rail platform 4 is set between two rails 1, and several second slides 5 are laid on the inter-rail platform 4.
[0038] A transverse trolley 6, of which multiple trolleys 6 are provided, and are respectively slidably mounted on the first slide rail 3 and the second slide rail 5; and
[0039] The traction device 7 is installed on the ground via ground anchors and is used to traction the transverse trolley 6 to move laterally.
[0040] Furthermore, the inter-line platform 4 includes a concrete foundation 401 poured on the bridge and a temporary support 402 erected on the concrete foundation 401 by means of a disc-lock scaffold. A working platform 403 assembled from timber or bamboo plywood is laid on the temporary support 402.
[0041] Furthermore, the first slide rail 3 and the second slide rail 5 have the same structure. Each set of the first slide rail 3 and the second slide rail 5 includes two slide rails 13 arranged side by side. The slide rails 13 are provided with track grooves 131 for the movement of the traveling wheel 802. Anchoring spiral rail spikes 132 are provided on the side of the slide rails 13, and elastic fasteners 133 are provided on the anchoring spiral rail spikes 132.
[0042] Furthermore, the transverse trolley 6 is equipped with a lifting device 14, which is a 100t short jack.
[0043] Furthermore, the traction device 7 is a winch, which is connected to the transverse trolley 6 via a wire rope. The transverse trolley 6 is provided with a hook hole 6012.
[0044] Specifically, in the construction area 2 under the bridge, the original ground is compacted and concrete is poured. A first sliding track 3 is set up on it, and ground anchors are set at the traction end to place traction equipment 7, such as a winch. A transverse trolley 6 is assembled on the first sliding track 3, and a steel pipe support is assembled on the upper part of the transverse trolley 6. At the same time, the site between the two rail lines 1 is leveled and compacted to ensure that the site elevation is consistent within the range of the support erection. A concrete foundation 401 is poured, and a temporary support 402 is erected using a disc-lock scaffold. The top is covered with timber and bamboo plywood as a working platform 403 for assembling the steel temporary beams between the lines. A second slide rail 5 is set on the line platform 4. Both the first slide rail 3 and the second slide rail 5 are set with two steel rails 13 side by side. The elastic fasteners 133 and the anchoring spiral rail spikes 132 are used to fix the slide rails and prevent displacement. In order to ensure that the temporary beam is moved to the line position, the existing steel beams of the steel plate girder bridge 15 need to be removed at the same time as the existing steel beams are removed. The 14m rails 1 on both sides of the steel plate girder bridge 15 are removed. After the closure order is issued, the rails are cut with a rail saw. The existing rails 1 on both sides of the steel plate girder bridge 15 are removed by manual labor and loaders. The existing steel plate girder bridge 15 is removed by the lifting equipment 14 on the side of the lateral moving trolley 6. The steel beams, each weighing 40 tons, were lifted using four 100-ton short jacks, ensuring sufficient safety. It was noted that solid wooden planks were placed between the existing steel beams and the top support of the transverse trolley 6. Then, a hand-operated hoist was used to secure the existing steel beams to the trolley support, and a winch was used simultaneously to pull the beams laterally out of track 1. During the beam movement, each set of slides was monitored by designated personnel who reported the trolley's position every 30cm, observed the movement between the trolley and the slide, and promptly reported and corrected any deviations until the entire steel beam was moved to the correct position. Outside the main line, the steel beams were lowered and dismantled using the construction plan of the adjacent operating line. Then, the temporary beams on the platform 4 between the lines were moved laterally to the center of the line by a winch. The temporary steel beams were placed on the support piles, and jacks were used to lift the temporary steel beams at the support piles. Auxiliary facilities such as slides, pulley blocks, winch wire ropes, and temporary beam supports were removed. The rails were placed on the temporary beam supports, and the rails on both sides of the temporary steel beams were connected. The bolts of the temporary beams after they were moved in were inspected and tightened. The geometric dimensions of the line were checked and adjusted. The line was opened after all the geometric dimensions of the line were adjusted to meet the specifications. This application uses the transverse trolley 6 on the first slide rail 3 to transfer the existing steel beams on the bridge to the outside of the track, and the transverse trolley 6 on the second slide rail 5 to transfer the temporary beams assembled on the inter-track platform 4 to the track. This allows the entry and exit of the beams to be completed at the same blockade point, resulting in fast construction speed and short railway line closure time, minimizing the impact of construction on the operation of the railway line. By using a winch to transfer the steel beams on the transverse trolley 6, the use of large mechanical equipment such as cranes is avoided during the implementation of the project, thus avoiding safety hazards to the operating equipment of the railway line and significantly improving safety compared to the use of large machinery.
[0045] Reference Figure 3 , Figure 4 and Figure 5 As a preferred technical solution of the present invention, the transverse trolley 6 includes a base plate 601, a plurality of support pipes 602 fixed on the base plate 601, a top plate 603 disposed on the top of the support pipes 602, and a traveling assembly disposed on the bottom of the base plate 601. A transverse support rod 6021 and an inclined cross support rod 6022 are provided between two adjacent support pipes 602.
[0046] Furthermore, the walking assembly includes a first elastic telescopic rod 8 fixed to the bottom of the base plate 601. A mounting base 801 is fixed to one end of the first elastic telescopic rod 8 away from the base plate 601. The mounting base 801 is connected to a walking wheel 802 via a first pin 8011.
[0047] Specifically, a support pipe 602, a horizontal brace 6021, and a diagonal brace 6022 are provided between the base plate 601 and the top plate 603 to enhance the structural strength of the transverse trolley 6 and enable it to stably support the transfer of the steel beam. Additionally, a traveling wheel 802 is provided on the base plate 601, allowing the traveling wheel 802 to move within a sliding range, thus enabling the transverse trolley 6 to move smoothly. At the same time, the traveling wheel 802 is connected to the base plate 601 through the first elastic telescopic rod 8, which allows the transverse trolley 6 to initially buffer and unload the force when supporting the steel beam.
[0048] Reference Figure 3 , Figure 4 and Figure 5 As a preferred technical solution of the present invention, the walking assembly further includes an ear plate 9 fixedly disposed at the bottom of the base plate 601. The ear plate 9 is rotatably connected to a second elastic telescopic rod 902 via a second pin 901. A torsion spring 9011 for resetting the rotation of the second elastic telescopic rod 902 is sleeved on the second pin 901. A U-shaped seat 10 is movably connected to one end of the second elastic telescopic rod 902 away from the second elastic telescopic rod 902. An auxiliary wheel 11 is connected to the U-shaped seat 10 via a rotating shaft. A push rod 9021 is fixedly disposed on the outer wall of the second elastic telescopic rod 902. A pressing inclined surface is provided on the mounting base 801 to movably abut against the push rod 9021.
[0049] Specifically, auxiliary wheels 11 are elastically installed on the side of the traveling wheels 802. This buffers and relieves the force when the traverse trolley 6 moves downward under the support of the steel beam. The downward-moving traverse trolley 6 presses down on the second elastic telescopic rod 902, causing the push rod 9021 on the outside of the second elastic telescopic rod 902 to exert a force on the pressing slope on the mounting base 801. The push rod 9021 receives a reaction force and causes the second elastic telescopic rod 902 to rotate relative to the second pin 901. This causes the second elastic telescopic rod 902 to drive the auxiliary wheels 11 to move to the outside of the traverse trolley 6, providing more support area for the traverse trolley 6 and improving the stability of the traverse trolley 6's movement. When the traverse trolley 6 is not supporting the steel beam, the auxiliary wheels 11 retract to the bottom of the traverse trolley 6, reducing the overall footprint of the traverse trolley 6 and making it easier to store and transport.
[0050] Reference Figure 3 , Figure 4 and Figure 5 As a preferred technical solution of the present invention, a support plate 12 is fixed on the U-shaped seat 10, a telescopic plate 121 is fixed on the support plate 12, a slider 122 is fixed at the end of the telescopic plate 121 away from the support plate 12, and a groove 6011 for sliding the slider 122 is opened at the bottom of the base plate 601.
[0051] Specifically, by providing a telescopic plate 121 between the U-shaped seat 10 and the base plate 601, the slider 122 at the end of the telescopic plate 121 automatically slides in the groove 6011 as the U-shaped seat 10 moves, so that the telescopic plate 121 limits the U-shaped seat 10, thereby preventing the auxiliary wheel 11 in the U-shaped seat 10 from rotating synchronously with the second elastic telescopic rod 902, avoiding the auxiliary wheel 11 from being tilted, which would reduce the contact area between the auxiliary wheel 11 and the ground, and keeping the auxiliary wheel 11 always vertically placed with respect to the ground, thereby providing more support area for the movement of the transverse trolley 6 and improving the stability of the movement of the transverse trolley 6.
[0052] Reference Figure 3 , Figure 4 and Figure 5 As a preferred technical solution of the present invention, the auxiliary wheel 11 is provided with a plurality of evenly distributed balls 111 arranged in a circular pattern.
[0053] Specifically, by setting ball bearings 111 on the auxiliary wheel 11, the U-shaped seat 10 drives the auxiliary wheel 11 to move perpendicular to the slide rail, so that the ball bearings 111 contact the ground, thereby improving the smoothness of the longitudinal movement of the auxiliary wheel 11 and reducing the wear of the auxiliary wheel 11 during longitudinal movement.
[0054] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.
Claims
1. A trolley support transverse beam replacement device, comprising a steel plate girder bridge (15) disposed between two foundations, wherein two rails (1) are disposed on the steel plate girder bridge (15), characterized in that, Also includes: The construction area under the bridge (2) is located on the underside of the steel plate girder bridge (15), and several first slides (3) are laid in the construction area under the bridge (2). The inter-line platform (4) is set between two rails (1), and several second slides (5) are laid on the inter-line platform (4). A transverse trolley (6), wherein multiple transverse trolleys (6) are provided and are respectively slidably mounted on the first slide rail (3) and the second slide rail (5); and The traction device (7) is installed on the ground by ground anchors and is used to traction the transverse trolley (6) to move laterally; The transverse trolley (6) includes a base plate (601), a plurality of support pipes (602) fixed on the base plate (601), a top plate (603) set on the top of the support pipes (602), and a traveling assembly set on the bottom of the base plate (601). A cross brace (6021) and an inclined cross brace (6022) are provided between two adjacent support pipes (602). The walking assembly includes a first elastic telescopic rod (8) fixed to the bottom of the base plate (601). A mounting base (801) is fixed to one end of the first elastic telescopic rod (8) away from the base plate (601). The mounting base (801) is connected to a walking wheel (802) through a first pin (8011). The walking assembly also includes an ear plate (9) fixed to the bottom of the base plate (601). The ear plate (9) is rotatably connected to a second elastic telescopic rod (902) via a second pin (901). A torsion spring (9011) for resetting the rotation of the second elastic telescopic rod (902) is sleeved on the second pin (901). A U-shaped seat (10) is movably connected to one end of the second elastic telescopic rod (902) away from the second elastic telescopic rod (902). An auxiliary wheel (11) is connected to the U-shaped seat (10) via a rotating shaft. A push rod (9021) is fixed to the outer wall of the second elastic telescopic rod (902). A pressing slope that abuts against the push rod (9021) is provided on the mounting base (801). A support plate (12) is fixed on the U-shaped seat (10), a telescopic plate (121) is fixed on the support plate (12), a slider (122) is fixed on one end of the telescopic plate (121) away from the support plate (12), and a groove (6011) for sliding the slider (122) is opened at the bottom of the base plate (601).
2. The trolley support transverse beam changing device according to claim 1, characterized in that, The line platform (4) includes a concrete foundation (401) poured on the bridge and a temporary support (402) erected on the concrete foundation (401) by a disc-lock scaffold. The temporary support (402) is covered with a working platform (403) assembled from timber or bamboo plywood.
3. The trolley support transverse beam changing device according to claim 1, characterized in that, The auxiliary wheel (11) is provided with a number of evenly distributed balls (111) in a circular pattern.
4. The trolley support transverse beam changing device according to claim 3, characterized in that, The first slide (3) and the second slide (5) have the same structure. Each set of the first slide (3) and the second slide (5) includes two slide rails (13) arranged side by side. The slide rails (13) are provided with track grooves (131) for the movement of the walking wheels (802). Anchoring spiral spikes (132) are provided on the side of the slide rails (13). Elastic fasteners (133) are provided on the anchoring spiral spikes (132).
5. The trolley support transverse beam changing device according to claim 1, characterized in that, The transverse trolley (6) is equipped with a lifting device (14), which is a 100t short jack.
6. The trolley support transverse shift beam changing device according to claim 5, characterized in that, The traction device (7) is a winch, which is connected to the transverse trolley (6) by a wire rope. The transverse trolley (6) is provided with a hook hole (6012).