A method and system for selecting a site for electric vehicle charging piles considering multi-flow fusion
Through the multi-stream fusion method, combined with core density analysis and multi-objective optimization model, the contradiction between the site selection of electric vehicle charging piles is solved between meeting residents' needs and ensuring grid safety, and the accuracy of site selection and grid stability of charging piles is achieved. .
Patent Information
- Application Number
- CN202411080800.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-08
AI Technical Summary
In cities, it is difficult to select electric vehicle charging piles to meet residents' travel needs and ensure the safe operation of the power grid.
Using a method that considers multi-flow fusion, the regions with the highest travel aggregation are screened through the kernel density analysis method, and a multi-objective optimization model is constructed, combining the carbon emission flow, traffic flow and distribution network energy flow of electric vehicles, establishing a coupling function, and through Solve and sort to determine the most suitable location of charging piles.
It has achieved accurate location selection of electric vehicle charging piles on the basis of ensuring the safe operation of the power grid, meeting residents' travel needs and reducing the impact of electric vehicles on the distribution network during access.
Smart Images

Figure CN118627848B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of site selection for electric vehicle charging piles, and in particular relates to a method and system for site selection for electric vehicle charging piles considering multi-flow fusion. Background Art
[0002] As an important part of grid regulation, the location of electric vehicle charging piles is very important. Giving full play to the location of electric vehicle charging piles can reduce the impact of large-scale electric vehicle access on the distribution network. With the large-scale increase in the use of electric vehicles in cities, the number of charging facilities should also increase rapidly. Accurately grasping the location of electric vehicle charging piles is the basis for meeting the travel needs of urban residents and ensuring the safe operation of the power grid. Summary of the invention
[0003] The present invention provides a method and system for site selection of electric vehicle charging piles considering multi-flow fusion, which are used to solve the technical problem that it is impossible to accurately select the site of electric vehicle charging piles on the basis of urban residents' travel needs and ensuring the safe operation of the power grid.
[0004] In a first aspect, the present invention provides a method for selecting a site for an electric vehicle charging pile considering multi-flow fusion, comprising:
[0005] According to different travel purposes of users, the relationship between residents' travel activities and urban functional areas is analyzed by using kernel density analysis method, and the target area with the highest user travel concentration is screened out;
[0006] A multi-flow fusion model is constructed according to the network characteristic structure of the target area and the coupling relationship between the traffic flow in the target area and the energy flow of the distribution network, and the target area is density-divided according to the multi-flow fusion model to obtain at least one demand domain;
[0007] Constructing a multi-objective optimization model for the at least one demand domain, wherein in a multi-objective optimization model, the objective function is to maximize the carbon emission flow of electric vehicles, traffic flow, and energy flow of the distribution network in a demand domain under preset constraints;
[0008] Solving each multi-objective optimization model to obtain a demand margin value of the at least one demand domain, and sorting the demand margin values of the at least one demand domain from large to small;
[0009] A certain demand domain is selected according to the ranking result of the demand margin value of the at least one demand domain and is used as the final site selection for the electric vehicle charging pile.
[0010] In a second aspect, the present invention provides an electric vehicle charging pile site selection system considering multi-flow fusion, comprising:
[0011] A screening module is configured to analyze the relationship between residents' travel activity patterns and urban functional areas using a kernel density analysis method according to different travel purposes of users, and screen out target areas with the highest travel concentration of users;
[0012] A partitioning module is configured to construct a multi-flow fusion model according to the network characteristic structure of the target area and the coupling relationship between the traffic flow in the target area and the energy flow of the distribution network, and to perform density partitioning on the target area according to the multi-flow fusion model to obtain at least one demand domain;
[0013] A construction module is configured to construct a multi-objective optimization model of the at least one demand domain, wherein in a multi-objective optimization model, the objective function is to maximize the carbon emission flow of electric vehicles, traffic flow, and energy flow of the distribution network in a demand domain under preset constraints;
[0014] a sorting module, configured to solve each multi-objective optimization model to obtain a demand margin value of the at least one demand domain, and sort the demand margin value of the at least one demand domain from large to small;
[0015] The selection module is configured to select a certain demand domain according to the sorting result of the demand margin value of the at least one demand domain, and use it as the final site selection of the electric vehicle charging pile.
[0016] In a third aspect, an electronic device is provided, comprising: at least one processor, and a memory communicatively connected to the at least one processor, wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can perform the steps of the electric vehicle charging pile site selection method considering multi-stream fusion according to any embodiment of the present invention.
[0017] In a fourth aspect, the present invention further provides a computer-readable storage medium having a computer program stored thereon, wherein when the program instructions are executed by a processor, the processor executes the steps of the method for site selection of electric vehicle charging piles considering multi-stream fusion according to any embodiment of the present invention.
[0018] The electric vehicle charging pile site selection method and system considering multi-flow fusion of the present application, according to the different travel purposes of users, uses the kernel density analysis method to analyze the relationship between the travel activity patterns of residents and the urban functional areas, and screens out areas with high user travel concentration, and then establishes a multi-objective optimization model based on the carbon emission flow of electric vehicles in different demand areas, traffic flow and energy flow in the distribution network as the objective function, integrates the models of carbon flow, traffic flow and energy flow in the distribution network, constructs a coupling function, and solves the maximum value of the coupling function; solves the multi-objective model through an analytical method, and sorts them according to the size of the coupling function. The larger the coupling function, the more suitable it is for the site selection of electric vehicles, thereby solving the problem of not being able to accurately select the site for electric vehicle charging piles based on the travel needs of urban residents and ensuring the safe operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0020] Figure 1 A flowchart of a method for selecting a charging pile site for an electric vehicle considering multi-flow fusion provided by an embodiment of the present invention;
[0021] Figure 2 A structural block diagram of an electric vehicle charging pile site selection system considering multi-stream fusion provided by an embodiment of the present invention;
[0022] Figure 3 It is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] See also Figure 1 , which shows a flow chart of a method for selecting a site for an electric vehicle charging pile considering multi-flow fusion in the present application.
[0025] like Figure 1 As shown in FIG, the electric vehicle charging pile site selection method considering multi-flow fusion specifically includes the following steps:
[0026] Step S101, according to different travel purposes of users, the relationship between residents' travel activity patterns and urban functional areas is analyzed using the kernel density analysis method to screen out the target area with the highest user travel concentration.
[0027] In this step, the road network data of the target city is obtained, and the POI data of the Amap of different urban areas are selected according to the division of different urban areas in the city. The Amap POI data includes the number, name, category, and longitude and latitude;
[0028] Analyze the travel patterns of users, divide the travel purposes of users into four categories, use the kernel density analysis method to analyze the relationship between the travel activity patterns of residents and urban functional areas, and obtain the kernel density estimation function of different travel purposes. The expression for calculating the kernel density estimation function of different travel purposes is:
[0029] ,
[0030] In the formula, is the frequency density of different travel purposes, n is the number of types of travel purposes, is the weight of the jth travel purpose, is the shortest distance between the travel destination and the POI data, is the travel destination j and the city center The distance is the path distance attenuation threshold, i.e., bandwidth;
[0031] According to the size of the user travel frequency density, the target area with the highest user travel concentration is screened out. The expression for determining the target area with the highest user travel concentration is:
[0032] ,
[0033] In the formula, is the frequency density of users’ travel in the target area, is a spatial weight matrix. If the distance between the i-th and j-th units is within the set distance d, the element in the spatial weight matrix is 1, otherwise it is 0. The frequency density of the jth type of travel purpose.
[0034] It should be noted that the expression for calculating the path distance attenuation threshold is:
[0035] ,
[0036] In the formula, is the standard distance between the average center of a POI point and all points, is the median distance between the average center of a POI point and all points. is the total number of POIs;
[0037] ,
[0038] In the formula, , are the horizontal and vertical coordinates of the i-th POI point, , are the horizontal and vertical coordinates of the average center point of the POI points respectively.
[0039] Step S102, constructing a multi-flow fusion model according to the network characteristic structure of the target area and the coupling relationship between the traffic flow in the target area and the energy flow of the distribution network, and density-dividing the target area according to the multi-flow fusion model to obtain at least one demand domain.
[0040] Step S103, constructing a multi-objective optimization model for the at least one demand domain, wherein the objective function of a multi-objective optimization model is to maximize the carbon emission flow of electric vehicles, traffic flow and distribution network energy flow in a demand domain under preset constraints.
[0041] In this step, the electric vehicle carbon emission flow is the energy when the electric vehicle travels to the charging station, including the road congestion level and driving speed as well as the power consumption;
[0042] Among them, the expression for calculating the carbon emission flow of electric vehicles is:
[0043] ,
[0044] In the formula, is the daily carbon emissions generated by electric vehicles, is the number of electric vehicles that generate charging demand at node u in the road network within one day, is the straight-line distance from the location u where charging demand occurs to the nearest charging station, is the road non-linearity coefficient, is the driving speed, is the carbon emission factor for electricity production, is the road congestion coefficient, For power consumption;
[0045] The traffic flow is the number of traffic entities passing a certain point on the road, including travel speed and traffic density;
[0046] ,
[0047] In the formula, For traffic flow, is the traffic density, is the driving speed;
[0048] The expression for calculating the driving speed is:
[0049] ,
[0050] In the formula, For smooth travel speed, is the blocking density;
[0051] The expression of the energy flow of the distribution network is:
[0052] ,
[0053] In the formula, is the i-th line loss per unit time, , , are the basic active load of the end node of line i, the active load of electric vehicles, and the actual output value of distributed photovoltaics, , , They are the basic reactive load of the end node of line i, the reactive power of the connected charging station, and the reactive power of the distributed photovoltaic output. is the voltage value of the node at the end of line i, is the resistance value of line i;
[0054] ,
[0055] In the formula, is the power of the ith line, is the output power of photovoltaic power generation.
[0056] It should be noted that the planning of charging stations also requires constraints, specifically:
[0057] Carbon emission constraints:
[0058] ,
[0059] In the formula, for the carbon emissions of electric vehicles; This is the maximum carbon emission of electric vehicles.
[0060] Constraints on the number of vehicles on the road:
[0061] ,
[0062] In the formula, An upper limit on the number of electric vehicles;
[0063] Photovoltaic power generation constraints:
[0064] ,
[0065] In the formula, is the lower limit of the adjustable power at node i, is the upper limit of the adjustable power at node i.
[0066] Branch capacity constraints:
[0067] ,
[0068] In the formula, is the active power flow of branch i; The upper limit of the trend; is the total number of branches in the distribution system.
[0069] By coupling the energy flow, traffic flow and carbon flow of the distribution network, the coupling function is established:
[0070] .
[0071] Step S104, solving each multi-objective optimization model to obtain the demand margin value of the at least one demand domain, and sorting the demand margin values of the at least one demand domain from large to small.
[0072] In this step, a station construction plan 0-1 matrix is obtained based on the candidate areas of the charging station. The value of the station construction location is 1, and the value of the location without station construction is set to 0. The total number of station construction plans is:
[0073] ,
[0074] In the formula, is the total number of site building plans, is the total number of candidate stations, is the number of charging stations available in the candidate area;
[0075] Based on the principle that users rationally choose the nearest charging station when their vehicles need to be charged, the charging areas are divided and it is determined whether each area meets the preset constraints.
[0076] Count the users’ travel goals and divide travel strategies according to different destinations: the first category is work, the second category is shopping, the third category is leisure and entertainment, and the fourth category is dining;
[0077] Count the weights of users' travel goals at different time periods and analyze the main travel purposes at each time period;
[0078] According to the main travel purpose in each time period, record the number of vehicles served under different travel strategies in the target area, the mileage of the vehicles before charging, and the remaining power of the vehicles, and count the traffic flow and charging times in each time period to facilitate the subsequent calculation of the power loss and carbon emissions of electric vehicles after the charging load is connected to the distribution system;
[0079] According to the vehicle information arriving at the demand domain and the distribution network system information, the grid line nodes and traffic roads in the demand domain are optimized to meet the goals of minimizing the carbon flow of electric vehicles, maximizing the traffic flow, and maximizing the energy flow of the distribution network;
[0080] Combined with electric vehicle charging information, road traffic information, and power distribution system information, the power loss of electric vehicles after they are connected to the distribution network, the number of electric vehicles on the main roads, and carbon emissions are calculated in five-minute steps;
[0081] The coupling function is calculated based on the nodes with the shortest charging distance for electric vehicles, the lowest carbon emissions, the largest number of vehicles, the largest traffic flow, and the highest power supply energy of the distribution network transmission lines. The larger the coupling function, the greater the demand margin value.
[0082] Step S105: selecting a certain demand domain according to the ranking result of the demand margin value of the at least one demand domain, and using it as the final site selection for the electric vehicle charging pile.
[0083] In summary, the method of the present application uses the kernel density analysis method to analyze the relationship between the travel activity patterns of residents and urban functional areas according to the different travel purposes of users, screens out areas with high user travel concentration, and then establishes a multi-objective optimization model based on the carbon emission flow, traffic flow and energy flow in the distribution network of electric vehicles in different demand areas as the objective function, integrates the models of carbon flow, traffic flow and energy flow in the distribution network, constructs a coupling function, and solves the maximum value of the coupling function; solves the multi-objective model through an analytical method, and sorts them according to the size of the coupling function. The larger the coupling function, the more suitable it is for the site selection of electric vehicles, thereby solving the problem of not being able to accurately select the site for electric vehicle charging piles based on the travel needs of urban residents and ensuring the safe operation of the power grid.
[0084] See also Figure 2 , which shows a structural block diagram of an electric vehicle charging pile site selection system considering multi-stream fusion in the present application.
[0085] like Figure 2 As shown, the electric vehicle charging pile site selection system 200 includes a screening module 210 , a division module 220 , a construction module 230 , a sorting module 240 and a selection module 250 .
[0086] Among them, the screening module 210 is configured to analyze the relationship between the residents' travel activity patterns and the urban functional areas by using the kernel density analysis method according to the different travel purposes of the users, and screen out the target area with the highest user travel concentration; the division module 220 is configured to construct a multi-flow fusion model according to the network characteristic structure of the target area and the coupling relationship between the traffic flow and the distribution network energy flow in the target area, and density divide the target area according to the multi-flow fusion model to obtain at least one demand domain; the construction module 230 is configured to construct a multi-objective optimization model for the at least one demand domain, wherein the objective function in a multi-objective optimization model is to maximize the carbon emission flow, traffic flow and distribution network energy flow of electric vehicles in a demand domain under preset constraints; the sorting module 240 is configured to solve each multi-objective optimization model to obtain the demand margin value of the at least one demand domain, and sort the demand margin values of the at least one demand domain from large to small; the selection module 250 is configured to select a certain demand domain according to the sorting result of the demand margin value of the at least one demand domain, and use it as the final site selection of the electric vehicle charging pile.
[0087] It should be understood that Figure 2 Modules and references documented in Figure 1 Therefore, the operations and features described above for the method and the corresponding technical effects are also applicable to Figure 2 The modules in it will not be described in detail here.
[0088] In some other embodiments, the embodiments of the present invention further provide a computer-readable storage medium having a computer program stored thereon, wherein when the program instructions are executed by a processor, the processor is caused to execute the electric vehicle charging pile site selection method considering multi-stream fusion in any of the above method embodiments;
[0089] As an implementation mode, the computer-readable storage medium of the present invention stores computer-executable instructions, and the computer-executable instructions are configured as follows:
[0090] According to different travel purposes of users, the relationship between residents' travel activities and urban functional areas is analyzed by using kernel density analysis method, and the target area with the highest user travel concentration is screened out;
[0091] A multi-flow fusion model is constructed according to the network characteristic structure of the target area and the coupling relationship between the traffic flow in the target area and the energy flow of the distribution network, and the target area is density-divided according to the multi-flow fusion model to obtain at least one demand domain;
[0092] Constructing a multi-objective optimization model for the at least one demand domain, wherein in a multi-objective optimization model, the objective function is to maximize the carbon emission flow of electric vehicles, traffic flow, and energy flow of the distribution network in a demand domain under preset constraints;
[0093] Solving each multi-objective optimization model to obtain a demand margin value of the at least one demand domain, and sorting the demand margin values of the at least one demand domain from large to small;
[0094] A certain demand domain is selected according to the ranking result of the demand margin value of the at least one demand domain and is used as the final site selection for the electric vehicle charging pile.
[0095] The computer-readable storage medium may include a program storage area and a data storage area, wherein the program storage area may store an operating system and an application required by at least one function; the data storage area may store data created according to the use of the electric vehicle charging pile site selection system considering multi-stream fusion, etc. In addition, the computer-readable storage medium may include a high-speed random access memory, and may also include a memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the computer-readable storage medium may optionally include a memory remotely arranged relative to the processor, and these remote memories may be connected to the electric vehicle charging pile site selection system considering multi-stream fusion via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0096] Figure 3 is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention, such as Figure 3 As shown, the device includes: a processor 310 and a memory 320. The electronic device may also include: an input device 330 and an output device 340. The processor 310, the memory 320, the input device 330 and the output device 340 may be connected via a bus or other means. Figure 3 The example of the bus connection is taken. The memory 320 is the computer-readable storage medium mentioned above. The processor 310 executes various functional applications and data processing of the server by running the non-volatile software programs, instructions and modules stored in the memory 320, that is, the method for selecting a site for an electric vehicle charging pile considering multi-stream fusion in the above method embodiment is implemented. The input device 330 can receive input digital or character information, and generate key signal input related to user settings and function control of the electric vehicle charging pile site selection system considering multi-stream fusion. The output device 340 may include display devices such as display screens.
[0097] The electronic device can execute the method provided by the embodiment of the present invention, and has the functional modules and beneficial effects corresponding to the execution method. For technical details not described in detail in this embodiment, please refer to the method provided by the embodiment of the present invention.
[0098] As an implementation mode, the electronic device is applied to an electric vehicle charging pile site selection system considering multi-stream fusion, and is used for a client, and includes: at least one processor; and a memory connected to the at least one processor in communication; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can:
[0099] According to different travel purposes of users, the relationship between residents' travel activities and urban functional areas is analyzed by using kernel density analysis method, and the target area with the highest user travel concentration is screened out;
[0100] A multi-flow fusion model is constructed according to the network characteristic structure of the target area and the coupling relationship between the traffic flow in the target area and the energy flow of the distribution network, and the target area is density-divided according to the multi-flow fusion model to obtain at least one demand domain;
[0101] Constructing a multi-objective optimization model for the at least one demand domain, wherein in a multi-objective optimization model, the objective function is to maximize the carbon emission flow of electric vehicles, traffic flow, and energy flow of the distribution network in a demand domain under preset constraints;
[0102] Solving each multi-objective optimization model to obtain a demand margin value of the at least one demand domain, and sorting the demand margin values of the at least one demand domain from large to small;
[0103] A certain demand domain is selected according to the ranking result of the demand margin value of the at least one demand domain and is used as the final site selection for the electric vehicle charging pile.
[0104] Through the description of the above implementation modes, those skilled in the art can clearly understand that each implementation mode can be implemented by means of software plus a necessary general hardware platform, or of course by hardware. Based on such an understanding, the above technical solution can essentially or in other words be embodied in the form of a software product that contributes to the prior art. The computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a magnetic disk, an optical disk, etc., and includes a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods of each embodiment or some parts of the embodiment.
[0105] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A site selection method for electric vehicle charging piles considering multi-flow fusion, It is characterized in that include: According to different travel purposes of users, the relationship between residents' travel activities and urban functional areas is analyzed by using kernel density analysis method, and the target area with the highest user travel concentration is screened out; A multi-flow fusion model is constructed according to the network characteristic structure of the target area and the coupling relationship between the traffic flow in the target area and the energy flow of the distribution network, and the target area is density-divided according to the multi-flow fusion model to obtain at least one demand domain; Constructing a multi-objective optimization model for the at least one demand domain, wherein a multi-objective optimization model takes the carbon emission flow of electric vehicles, traffic flow and energy flow of distribution network in a demand domain under preset constraints as the objective function, wherein the carbon emission flow of electric vehicles is the energy when the electric vehicle travels to the charging station, including the degree of road congestion, driving speed and power consumption; Among them, the expression for calculating the carbon emission flow of electric vehicles is: , In the formula, is the daily carbon emissions generated by electric vehicles, is the number of electric vehicles that generate charging demand at node u in the road network within one day, is the straight-line distance from the location u where charging demand occurs to the nearest charging station, is the road non-linearity coefficient, is the driving speed, is the carbon emission factor for electricity production, is the road congestion coefficient, For power consumption; The traffic flow is the number of traffic entities passing a certain point on the road, including travel speed and traffic density; , In the formula, For traffic flow, is the traffic density, is the driving speed; The expression for calculating the driving speed is: , In the formula, For smooth travel speed, is the blocking density; The expression of the energy flow of the distribution network is: , In the formula, is the i-th line loss per unit time, , , are the basic active load of the end node of line i, the active load of electric vehicles, and the actual output value of distributed photovoltaics, , , They are the basic reactive load of the end node of line i, the reactive power of the connected charging station, and the reactive power of the distributed photovoltaic output. is the voltage value of the node at the end of line i, is the resistance value of line i; , In the formula, is the power of the ith line, is the output power of photovoltaic power generation; For the planning of charging stations, constraints are also required, specifically: Carbon emission constraints: , In the formula, for the carbon emissions of electric vehicles; is the maximum carbon emission of electric vehicles; Constraints on the number of vehicles on the road: , In the formula, An upper limit on the number of electric vehicles; Photovoltaic power generation constraints: , In the formula, is the lower limit of the adjustable power at node i, is the upper limit of the adjustable power at node i; Branch capacity constraints: , In the formula, is the active power flow of branch i; The upper limit of the trend; is the total number of branches in the distribution system; By coupling the energy flow, traffic flow and carbon flow of the distribution network, the coupling function is established: ; Solving each multi-objective optimization model to obtain the demand margin value of the at least one demand domain, and sorting the demand margin value of the at least one demand domain from large to small, wherein solving each multi-objective optimization model to obtain the demand margin value of the at least one demand domain, and sorting the demand margin value of the at least one demand domain from large to small includes: According to the candidate areas of charging stations, we get the station construction plan 0-1 matrix, where the station construction location value is 1, and the location value without station construction is set to 0. The total number of station construction plans is: , In the formula, is the total number of site building plans, is the total number of candidate stations, is the number of charging stations available in the candidate area; Based on the principle that users rationally choose the nearest charging station when their vehicles need to be charged, the charging areas are divided and it is determined whether each area meets the preset constraints. Count the users’ travel goals and divide travel strategies according to different destinations: the first category is work, the second category is shopping, the third category is leisure and entertainment, and the fourth category is dining; Count the weights of users' travel goals at different time periods and analyze the main travel purposes at each time period; According to the main travel purpose in each time period, record the number of vehicles served under different travel strategies in the target area, the mileage of the vehicles before charging, and the remaining power of the vehicles, and count the traffic flow and charging times in each time period to facilitate the subsequent calculation of the power loss and carbon emissions of electric vehicles after the charging load is connected to the distribution system; According to the vehicle information arriving at the demand domain and the distribution network system information, the grid line nodes and traffic roads in the demand domain are optimized to meet the goals of minimizing the carbon flow of electric vehicles, maximizing the traffic flow, and maximizing the energy flow of the distribution network; Combined with electric vehicle charging information, road traffic information, and power distribution system information, the power loss of electric vehicles after they are connected to the distribution network, the number of electric vehicles on the main roads, and carbon emissions are calculated in five-minute steps; The coupling function is calculated based on the conditions of the shortest charging distance for electric vehicles, the smallest carbon emissions, the largest number of vehicles, the largest traffic flow, and the node with the highest power supply energy of the distribution network transmission line. The larger the coupling function, the larger the demand margin value; A certain demand domain is selected according to the ranking result of the demand margin value of the at least one demand domain and is used as the final site selection for the electric vehicle charging pile.
2. According to the method for selecting a site for an electric vehicle charging pile considering multi-flow fusion according to claim 1, It is characterized in that According to the different travel purposes of users, the relationship between residents' travel activity patterns and urban functional areas is analyzed by using the kernel density analysis method, and the target areas with the highest user travel concentration are screened out, including: Obtain the road network data of the target city, and select the Amap POI data of different urban areas according to the division of different urban areas in the city, wherein the Amap POI data includes the number, name, category, and longitude and latitude; Analyze the travel patterns of users, divide the travel purposes of users into four categories, use the kernel density analysis method to analyze the relationship between the travel activity patterns of residents and urban functional areas, and obtain the kernel density estimation function of different travel purposes. The expression for calculating the kernel density estimation function of different travel purposes is: , In the formula, is the frequency density of different travel purposes, n is the number of types of travel purposes, is the weight of the jth travel purpose, is the shortest distance between the travel destination and the POI data, is the distance between the trip destination j and the city center, is the path distance attenuation threshold, i.e., bandwidth; According to the size of the user travel frequency density, the target area with the highest user travel concentration is screened out. The expression for determining the target area with the highest user travel concentration is: , In the formula, is the frequency density of users’ travel in the target area, is a spatial weight matrix. If the distance between the i-th and j-th units is within the set distance d, the element in the spatial weight matrix is 1, otherwise it is 0. The frequency density of the jth type of travel purpose.
3. According to the method for selecting a site for an electric vehicle charging pile considering multi-flow fusion according to claim 2, It is characterized in that in, The expression for calculating the path distance attenuation threshold is: , In the formula, is the standard distance between the average center of a POI point and all points, is the median distance between the average center of a POI point and all points. is the total number of POIs; , In the formula, , are the horizontal and vertical coordinates of the i-th POI point, , are the horizontal and vertical coordinates of the average center point of the POI points respectively.
4. An electric vehicle charging pile site selection system considering multi-flow fusion according to any of the methods described in claims 1-3, It is characterized in that include: A screening module is configured to analyze the relationship between residents' travel activity patterns and urban functional areas using a kernel density analysis method according to different travel purposes of users, and screen out target areas with the highest travel concentration of users; A partitioning module is configured to construct a multi-flow fusion model according to the network characteristic structure of the target area and the coupling relationship between the traffic flow in the target area and the energy flow of the distribution network, and to perform density partitioning on the target area according to the multi-flow fusion model to obtain at least one demand domain; A construction module is configured to construct a multi-objective optimization model of the at least one demand domain, wherein a multi-objective optimization model takes the carbon emission flow of electric vehicles, traffic flow and energy flow of distribution network in a demand domain under preset constraints as objective functions; a sorting module, configured to solve each multi-objective optimization model to obtain a demand margin value of the at least one demand domain, and sort the demand margin value of the at least one demand domain from large to small; The selection module is configured to select a certain demand domain according to the sorting result of the demand margin value of the at least one demand domain, and use it as the final site selection of the electric vehicle charging pile.
5. An electronic device, It is characterized in that include: At least one processor, and a memory communicatively connected to the at least one processor, wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to execute the method described in any one of claims 1 to 3.
6. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the program is executed by a processor, the method according to any one of claims 1 to 3 is implemented.