A direct-buried hot water pipeline installation tool and a method of using the same

CN118686986BActive Publication Date: 2026-10-20CHINA MCC17 GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410981663.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2026-10-20
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

管道对口安装时,通常采用对口器、对口架子及起重机械配合人工对口等方式,上述对口方式易受到场地条件、气候环境、管材型号等因素制约,致使施工速度慢、作业效率低、质量控制难度大

Benefits of technology

[0045]本发明的架体通过伸缩量组合形成的矩形框架结构,能够根据热力管道的长度和直径进行适应性调整尺寸,适应性强且使用。还设置有绞盘机一和机械爪,在钢丝绳的牵引能够将转动轴在行走件上转动,经齿轮和传动齿轮完成机械爪向内侧夹持热力管道,在夹持热力管道时,需要保证机械爪的高度不会发生改变,即只发生转动且不发生转动,钢丝绳绕接在转动轴上且位于转动轴的下侧,即使在起吊管道后机械爪始终处于夹持状态。当分离时,由于管道在底部支撑作用下不会发生位置改变,外放钢丝绳,机械爪在扭簧作用下复位,和管道分离,然后将机械爪主动上行脱离管道,并将竖向杆和限位块临时固定,回收钢丝绳完成机械爪和管道的分离作业。利用限位板控制竖向杆只能在左右和上下方向上滑动运动,进而控制管道不会因为重心影响发生偏斜,其次能够配合绞盘机二进行轴向对口作业。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118686986B_ABST
    Figure CN118686986B_ABST
Patent Text Reader

Abstract

The application discloses a kind of underground direct-burial hot-force pipeline installation mouth-to-mouth tools and its using method, belong to pipeline laying technical field.Frame body is formed by the rectangular frame structure of telescopic amount combination, can be adaptively adjusted size according to the length and diameter of hot-force pipeline, strong and use adaptability.It is also provided with winch machine one and mechanical claw, can rotate rotating shaft on walking piece under the traction of steel wire rope, complete mechanical claw inward clamping hot-force pipeline by gear and transmission gear, when clamping hot-force pipeline, it is necessary to ensure that the height of mechanical claw does not change, i.e.only rotation occurs and does not occur, steel wire rope is wound on rotating shaft and located at the lower side of rotating shaft, even after lifting pipeline, mechanical claw is always in clamping state.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the technical field of pipeline laying, specifically to a tool for aligning and installing underground direct-buried heating pipelines and its usage method. Background Technology

[0002] With the rapid development of urbanization in my country, centralized heating has gradually become the main way to solve the heating problems of industrial production and residential life, leading to an increasing number of municipal heating pipeline networks. When heating pipelines are laid directly underground, seamless steel pipes, arc-welded or high-frequency-welded steel pipes are used. During the pipeline welding process, the quality of pipe alignment is the primary core link in welding quality control. Pipe alignment installation typically employs alignment tools, alignment frames, and lifting machinery in conjunction with manual alignment. These alignment methods are easily constrained by factors such as site conditions, climate, and pipe material type, resulting in slow construction speed, low work efficiency, and difficulty in quality control. These problems have become common challenges in the alignment installation of underground directly buried heating pipelines, affecting not only the quality control of the pipe alignment process but also the overall project schedule. Summary of the Invention

[0003] This invention addresses the shortcomings of existing tools, devices, and methods for aligning underground direct-buried heating pipelines, and proposes a tool for aligning underground direct-buried heating pipelines and its usage method.

[0004] To solve the above-mentioned technical problems, the inventors, through practice and summarization, derived the technical solution of this invention, which adopts the following technical solution:

[0005] A tool for aligning and installing underground direct-buried heating pipelines, comprising:

[0006] The frame consists of telescopic beam one and telescopic beam two, which are U-shaped structures. The two ends of telescopic beam one and telescopic beam two are spliced ​​together to form a rectangular frame.

[0007] Lifting outriggers are installed at the four corners of the rectangular frame to adjust the height of the frame.

[0008] The gripping assembly has at least two sets along the length of the frame. The gripping assembly includes a winch and a mechanical claw. The winch is installed on the frame and a steel wire rope is installed on the winch. A traveling component is installed on the top of the mechanical claw. The end of the steel wire rope is connected to the traveling component. The traveling component is used to adjust the left and right position of the mechanical claw relative to the frame. The mechanical claw is used for gripping and releasing actions.

[0009] Preferably, the telescopic beam includes an L-shaped rod one and an L-shaped rod two;

[0010] One end of the L-shaped rod is provided with a socket two, which is used to receive and fix the connecting rod, and the other end is a socket end;

[0011] The L-shaped rod has a socket at each end, one socket for receiving the connecting rod and the other socket for receiving the socket end.

[0012] The telescopic beam two includes L-shaped rod three and L-shaped rod four. One end of L-shaped rod three and L-shaped rod four are fixedly installed with a socket rod, and the socket rod and socket one / socket two are fixedly inserted.

[0013] The other end of the L-shaped rod three is provided with a socket end two, and the other end of the L-shaped rod four is provided with a socket port three that is compatible with the socket end two.

[0014] Restriction bolts are provided on socket 1, socket 2, and socket 3.

[0015] Preferably, the walking component includes a U-shaped structural plate, with two rotating shafts installed inside the U-shaped structural plate. A torsion spring is provided between the rotating shafts and the U-shaped structural plate, and a gear is installed on the rotating shaft. A mechanical claw is installed at the bottom of the U-shaped structural plate, and a transmission gear that meshes with the gear is installed on the mechanical claw. The rotating shaft, through the cooperation of the gear and the transmission gear, completes the left and right movement of the mechanical claw relative to the frame.

[0016] Preferably, a vertical rod is installed on the U-shaped structural plate, and a limiting plate is installed on the frame. The limiting plate is provided with a rectangular guide hole arranged in the horizontal direction. The top of the vertical rod is movably installed in the rectangular guide hole, and a limiting block is fitted on the vertical rod. The top and bottom of the limiting block are provided with limiting pieces. The two limiting pieces are located on the upper and lower sides of the limiting plate, and the vertical and horizontal positions of the vertical rod relative to the limiting plate are adjustable.

[0017] Preferably, one set of the gripping components is longitudinally slidable relative to the frame, and the corresponding limiting plate and winch are movably mounted on the frame;

[0018] The frame is equipped with a second winch, which has a first traction rope and a second traction rope. The ends of the first traction rope and the second traction rope are installed on corresponding limit plates. The first traction rope is used to pull the limit plate closer to another set of limit plates, and the second traction rope is used to pull the limit plate away from another set of limit plates.

[0019] The mechanical claw of the sliding gripping component holds and fixes the pipe, while the inner wall of the mechanical claw of the fixed gripping component is provided with rollers.

[0020] The two winches, with traction ropes one and two working simultaneously, are used to adjust the spacing of the mechanical claws. The vertical rod and the limit plate control the mechanical claws to maintain a horizontal state during the spacing adjustment process.

[0021] Preferably, the limiting plate includes a plate body one and a plate body two, which are laterally fitted together and whose tops are in the same plane.

[0022] A method for using a tool for aligning and installing underground direct-buried heating pipelines, the steps of which are as follows:

[0023] Step 1: Assemble the frame

[0024] Set up the alignment tool above the two sections of thermal pipes that need to be aligned during installation;

[0025] The socket rod is adapted to the corresponding socket one, the socket end two and the socket three are adapted to each other, and the socket end one and the socket one are adapted to each other.

[0026] Based on the diameter and length of the heating pipe, the expansion beam 1 and expansion beam 2 are fixed to form a frame by the limiting bolts at socket 1, socket 2 and socket 3;

[0027] Two limiting plates are installed on the frame. One limiting plate is fixed to the frame, and the other is slidably installed along the length of the frame. A fixed pulley is installed on the side of the sliding limiting plate away from the fixed limiting plate. A second winch is installed on the frame. The second winch has two winch areas. The rope winding and unwinding directions of the two winch areas are opposite. The second traction rope is connected to the side of the sliding limiting plate away from the fixed limiting plate via the fixed pulley. The first traction rope is directly connected to the side of the sliding limiting plate close to the fixed limiting plate.

[0028] Install limiting blocks in the rectangular guide holes of the two limiting plates, and install limiting pieces at the bottom and top for horizontal guidance;

[0029] A vertical rod is inserted into the limiting block, and the bottom of the vertical rod is fixed to the U-shaped structural plate. A rotating shaft and a gear are installed inside the U-shaped structural plate, and a torsion spring is installed at the rotating node of the rotating shaft.

[0030] The mechanical gripper is rotatably mounted on the U-shaped structural plate and is engaged by transmission gears and gear meshing;

[0031] Four winches are installed on the frame. The wire ropes on the four winches are connected to the corresponding rotating shafts. The two rotating shafts located on the same U-shaped structural plate rotate in opposite directions. Two of the winches are fixedly installed on the frame and correspond to the positions of the fixed limiting plates. The other two winches are slidably installed on the frame and correspond to the positions of the sliding limiting plates. These two winches can be directly installed on the rotating shafts of the sliding limiting plates.

[0032] Install corresponding lifting outriggers at the four corners of the frame. The lifting outriggers are telescopic hydraulic cylinders and have pads at the bottom.

[0033] Step 2: Grab

[0034] Four winches simultaneously release steel wire ropes, and the mechanical claws descend. After the mechanical claws descend to a height where they can clamp the heat pipes, they maintain the height of the top of the vertical rod, and the steel wire ropes are retracted. The mechanical claws are then driven to clamp and fix the heat pipes by the rotating shaft via gears and transmission gears.

[0035] Step 3: Assembly

[0036] By controlling the winding and unwinding actions and the amount of winding and unwinding of the corresponding winch, the axes of the two thermal pipes are aligned.

[0037] By adjusting the direction and rotation amount of winch two, the thermal pipeline is axially adjusted to complete the alignment of the pipeline ports.

[0038] Step 4: Separate tools and pipes

[0039] After the thermal pipeline has been aligned, the pipe ends are welded and supports are installed at the bottom.

[0040] All winches are simultaneously lowered until the mechanical claw separates from the outer ring of the pipe. The mechanical claw is then actively moved to the top of the pipe, and the vertical rod is temporarily fixed relative to the limit block. The steel wire rope is then tightened to complete the separation operation between the pipe and the mechanical claw.

[0041] Move the alignment tool to the next pipe laying location along the pipe laying direction;

[0042] Step 5: Continue laying the heating pipes in the same direction.

[0043] Repeat steps two and three until all heating pipes are laid.

[0044] Compared with the prior art, the present invention has the following beneficial effects:

[0045] The frame of this invention, formed by a combination of telescopic elements to create a rectangular frame structure, can be adaptively adjusted in size according to the length and diameter of the heating pipe, making it highly adaptable and usable. It also includes a winch and a mechanical gripper. The traction of a steel wire rope rotates the rotating shaft on the traveling component. Through gears and transmission gears, the mechanical gripper clamps the heating pipe inwards. During pipe clamping, the height of the mechanical gripper must remain constant; it only rotates without actually moving. The steel wire rope is wound around the rotating shaft and located below it, ensuring the mechanical gripper remains in a clamping state even after the pipe is lifted. Upon separation, since the pipe's position remains unchanged due to the bottom support, the steel wire rope is released, and the mechanical gripper resets under the action of a torsion spring, separating from the pipe. The mechanical gripper then actively moves upwards to detach from the pipe, and the vertical rod and limit block are temporarily fixed. The steel wire rope is then retrieved to complete the separation of the mechanical gripper and the pipe. The limit plate controls the vertical rod to slide only in the left and right and up and down directions, thereby preventing the pipeline from tilting due to the influence of the center of gravity. Secondly, it can be used in conjunction with the winch machine to perform axial alignment operations. Attached Figure Description

[0046] Figure 1 This is a schematic diagram of the overall structure of the present invention;

[0047] Figure 2 This is an internal structural diagram of the walking component of the present invention;

[0048] Figure 3 A schematic diagram of the raising and lowering of the outriggers;

[0049] Figure 4 Diagram showing the structure for adjusting the length of the telescopic extension / retraction.

[0050] Figure 5 This is a diagram of the radial adjustment structure for a thermal pipeline.

[0051] Figure 6 A structural diagram showing the radial and axial adjustments of a thermal pipeline;

[0052] Figure 7 This is a structural diagram of another implementation method;

[0053] Figure 8 for Figure 7 Main structural view of the middle limiting plate;

[0054] Figure 9 for Figure 7 Connection diagram of the middle limit plate and the traveling component. Detailed Implementation

[0055] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.

[0056] In the description of this invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0057] Examples, such as Figures 1 to 9 As shown, a tool for aligning and installing underground direct-buried heating pipelines includes:

[0058] The frame includes telescopic beam 10 and telescopic beam 20. The telescopic beam 10 and telescopic beam 20 are U-shaped structures. The two ends of the telescopic beam 10 and telescopic beam 20 are spliced ​​together to form a rectangular frame.

[0059] Lifting outriggers 30 are installed at the four corners of the rectangular frame to adjust the height of the frame.

[0060] The gripping assembly 40 has at least two sets along the length of the frame. The gripping assembly 40 includes a winch 41 and a mechanical claw 42. The winch 41 is mounted on the frame and has a steel wire rope. The top of the mechanical claw 42 has a traveling member 43. The end of the steel wire rope is connected to the traveling member 43. The traveling member 43 is used to adjust the left and right position of the mechanical claw 42 relative to the frame. The mechanical claw 42 is used for gripping and releasing actions.

[0061] The telescopic beam 10 includes an L-shaped rod 12 and an L-shaped rod 11.

[0062] One end of the L-shaped rod 11 is provided with a socket 2, which is used to receive and fix the connecting rod, and the other end is a socket end;

[0063] The L-shaped rod 12 has a socket at each end, one socket for receiving the connecting rod and the other socket for receiving the socket end.

[0064] The telescopic beam 20 includes L-shaped rod 3 21 and L-shaped rod 4 22. One end of L-shaped rod 3 21 and L-shaped rod 4 22 is fixedly installed with a socket rod 23, and the socket rod 23 is fixedly inserted into the socket port 1 / socket port 2.

[0065] The other end of the L-shaped rod 21 is provided with a socket end 2, and the other end of the L-shaped rod 22 is provided with a socket port 3 that is compatible with the socket end 2.

[0066] Restriction bolts are provided on socket 1, socket 2, and socket 3.

[0067] The walking component 43 includes a U-shaped structural plate 431, with two rotating shafts 432 installed inside the U-shaped structural plate 431. A torsion spring is provided between the rotating shafts 432 and the U-shaped structural plate 431. A gear 433 is installed on the rotating shafts 432. A mechanical claw 42 is installed at the bottom of the U-shaped structural plate 431, and a transmission gear 422 that meshes with the gear 433 is installed on the mechanical claw 42. The rotating shaft 432, through the cooperation of the gear 433 and the transmission gear 422, completes the left and right movement of the mechanical claw 42 relative to the frame.

[0068] The U-shaped structural plate 431 is equipped with a vertical rod 44, and a limiting plate 45 is installed on the frame. The limiting plate 45 is provided with a rectangular guide hole arranged in the horizontal direction. The top of the vertical rod 44 is movably installed in the rectangular guide hole, and a limiting block 46 is fitted on the vertical rod 44. The top and bottom of the limiting block 46 are provided with limiting pieces 461. The two limiting pieces 461 are located on the upper and lower sides of the limiting plate 45. The vertical and horizontal positions of the vertical rod 44 relative to the limiting plate 45 are adjustable.

[0069] Among them, one group of gripping components 40 is longitudinally slidable relative to the frame, and the corresponding limiting plate 45 and winch 41 are movably mounted on the frame;

[0070] The frame is equipped with a second winch 50, which is provided with a first traction rope 51 and a second traction rope 52. The ends of the first traction rope 51 and the second traction rope 52 are installed on the corresponding limiting plates 45. The first traction rope 51 is used to pull the limiting plate 45 closer to another set of limiting plates 45, and the second traction rope 52 is used to pull the limiting plate 45 away from the other set of limiting plates 45.

[0071] The mechanical claw 42 of the sliding gripping component 40 clamps and fixes the pipe, and the inner wall of the mechanical claw 42 of the fixed gripping component 40 is provided with rollers.

[0072] The winch 2 50, with traction rope 1 51 and traction rope 2 52 working simultaneously, is used to adjust the spacing of the mechanical claw 42. The vertical rod 44 and the limit plate 45 control the mechanical claw 42 to maintain a horizontal state during the spacing adjustment process.

[0073] The limiting plate 45 includes a first plate 451 and a second plate 452. The first plate 451 and the second plate 452 are laterally fitted together and their tops are in the same plane, ensuring that the limiting block 46 can move horizontally without obstruction.

[0074] A method for using a tool for aligning and installing underground direct-buried heating pipelines, the steps of which are as follows:

[0075] Step 1: Assemble the frame

[0076] Set up the alignment tool above the two sections of thermal pipes that need to be aligned during installation;

[0077] The socket rod 23 is adapted to the corresponding socket one, the socket end two and the socket three are adapted to each other, and the socket end one and the socket one are adapted to each other.

[0078] Based on the diameter and length of the heating pipe, the expansion beam 10 and expansion beam 20 are fixed to form a frame by the limiting bolts at socket 1, socket 2 and socket 3;

[0079] Two limiting plates 45 are installed on the frame. One limiting plate 45 is fixed on the frame, and the other is slidably installed along the length of the frame. A fixed pulley 4311 is installed on the side of the sliding limiting plate 45 away from the fixed limiting plate 45. A second winch 50 is installed on the frame. The second winch 50 has two winch areas. The rope winding and unwinding directions of the two winch areas are opposite. One set of winch areas winds up the rope, and the other set performs synchronous rope unwinding operations. The second traction rope 52 is connected to the side of the sliding limiting plate 45 away from the fixed limiting plate 45 via the fixed pulley 4311. The first traction rope 51 is directly connected to the side of the sliding limiting plate 45 close to the fixed limiting plate 45.

[0080] Limiting blocks 46 are installed in the rectangular guide holes of the two limiting plates 45, and limiting pieces 461 are installed at the bottom and top for horizontal guidance;

[0081] A vertical rod 44 is inserted into the limiting block 46, and the bottom of the vertical rod 44 is fixed to the U-shaped structure plate. A rotating shaft 432 and a gear 433 are installed in the U-shaped structure plate, and a torsion spring is installed at the rotation node of the rotating shaft 432.

[0082] The mechanical claw 42 is rotatably mounted on the U-shaped structure plate and is engaged by the transmission gears 422 and 433.

[0083] Four winches 41 are installed on the frame. The wire ropes on the four winches 41 are connected to the corresponding rotating shafts 432. The two rotating shafts 432 located on the same U-shaped structural plate rotate in opposite directions. Two of the winches 41 are fixedly installed on the frame and correspond to the fixed limiting plate 45. The other two winches 41 are slidably installed on the frame and correspond to the sliding limiting plate 45. These two winches 41 can be directly installed on the rotating shafts 432 of the sliding limiting plate.

[0084] Install corresponding lifting outriggers 30 at the four corners of the frame. The lifting outriggers 30 are telescopic hydraulic cylinders and have pads at the bottom.

[0085] Step 2: Grab

[0086] Four winches 41 simultaneously release steel wire ropes, and mechanical claws 42 descend. After the mechanical claws 42 descend to a height that can clamp the heat pipe, the height of the top of the vertical rod is maintained, and the steel wire rope is retracted. The mechanical claws 42 are driven by the rotating shaft 432, which, through the gear 433 and the transmission gear 422, clamps and fixes the heat pipe.

[0087] Step 3: Assembly

[0088] By controlling the winding and unwinding actions and the amount of winding and unwinding of the corresponding winch 41, the axes of the two thermal pipes are aligned.

[0089] By adjusting the direction and rotation amount of the winch 250, the thermal pipeline is axially adjusted to complete the alignment of the pipeline ports.

[0090] Step 4: Separate tools and pipes

[0091] After the thermal pipeline has been aligned, the pipe ends are welded and supports are installed at the bottom.

[0092] All winches 41 are simultaneously extended until the mechanical claw 42 separates from the outer ring of the pipe, the mechanical claw 42 is actively moved to the top of the pipe, and the vertical rod 44 is temporarily fixed relative to the limiting block 431, thereby completing the separation operation between the pipe and the mechanical claw 42.

[0093] Move the alignment tool to the next pipe laying location along the pipe laying direction;

[0094] Step 5: Continue laying the heating pipes in the same direction.

[0095] Repeat steps two and three until all heating pipes are laid.

[0096] The above description is merely a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. The substitutions may be replacements of some structures, devices, or method steps, or they may be complete technical solutions. Equivalent substitutions or modifications made to the technical solutions and inventive concepts of the present invention should all be covered within the scope of protection of the present invention.

Claims

1. A tool for aligning and installing underground direct-buried heating pipelines, characterized in that, include: The frame includes telescopic beam one (10) and telescopic beam two (20). The telescopic beam one (10) and telescopic beam two (20) are U-shaped structures. The two ends of the telescopic beam one (10) and telescopic beam two (20) are spliced ​​together to form a rectangular frame. Lifting outriggers (30) are installed at the four corners of the rectangular frame to adjust the height of the frame. The gripping assembly (40) has at least two sets along the length of the frame. The gripping assembly (40) includes a winch (41) and a mechanical claw (42). The winch (41) is installed on the frame and a wire rope is provided on the winch (41). A traveling component (43) is provided on the top of the mechanical claw (42). The end of the wire rope is connected to the traveling component (43). The traveling component (43) is used to adjust the left and right position of the mechanical claw (42) relative to the frame. The mechanical claw (42) is used for gripping and releasing actions. The walking component (43) includes a U-shaped structure plate (431), two rotating shafts (432) are installed inside the U-shaped structure plate (431), and a torsion spring is provided between the rotating shafts (432) and the U-shaped structure plate (431) for the mechanical claw to reset and separate from the pipe under the action of the torsion spring. A gear (433) is installed on the rotating shaft (432), and the mechanical claw (42) is installed at the bottom of the U-shaped structure plate (431). A transmission gear (422) that meshes with the gear (433) is installed on the mechanical claw (42). The rotating shaft (432) completes the opening and closing of the mechanical claw (42) through the cooperation of the gear (433) and the transmission gear (422). A vertical rod (44) is installed on the U-shaped structural plate (431), and a limit plate (45) is installed on the frame. The limit plate (45) is provided with a rectangular guide hole arranged in the horizontal direction. The top of the vertical rod (44) is movably installed in the rectangular guide hole, and a limit block (46) is fitted on the vertical rod (44). The top and bottom of the limit block (46) are provided with limit pieces (461). The two limit pieces (461) are located on the upper and lower sides of the limit plate (45). The vertical and horizontal positions of the vertical rod (44) relative to the limit plate (45) are adjustable. One of the gripping components (40) is longitudinally slidable relative to the frame, and the corresponding limiting plate (45) and winch (41) are movably mounted on the frame; Four winches (41) are installed on the frame. The wire ropes on the four winches (41) are connected to the corresponding rotating shafts (432). The two rotating shafts (432) located on the same U-shaped structure plate rotate in opposite directions. Two of the winches (41) are fixedly installed on the frame and correspond to the fixed limiting plate (45). The other two winches (41) are slidably installed on the frame and correspond to the sliding limiting plate (45). The other two winches (41) are directly installed on the rotating shaft (432) of the sliding limiting plate. Four winches simultaneously release steel wire ropes, and the mechanical claws (42) descend. By controlling the winding and unwinding actions and the amount of winding and unwinding of the corresponding winch (41), the axes of the two thermal pipes are aligned.

2. The matching tool for installing underground direct-buried heating pipelines according to claim 1, characterized in that, The telescopic beam one (10) includes L-shaped rod one (12) and L-shaped rod two (11); One end of the L-shaped rod (11) is provided with a socket (2), which is used to hold and fix the socket rod (23), and the other end is the socket end; The two ends of the L-shaped rod (12) are respectively provided with a socket, one socket is used to receive the socket rod (23), and the other socket is used to receive the socket end. The telescopic beam two (20) includes L-shaped rod three (21) and L-shaped rod four (22). One end of L-shaped rod three (21) and L-shaped rod four (22) is fixedly installed with a socket rod (23), and the socket rod (23) is fixedly inserted into the socket one / socket two. The other end of the L-shaped rod three (21) is provided with a socket end two, and the other end of the L-shaped rod four (22) is provided with a socket three that is compatible with the socket end two; Restricting bolts are installed on socket 1, socket 2, and socket 3 to connect telescopic beam 1 and telescopic beam 2 into a frame.

3. The matching tool for installing underground direct-buried heating pipelines according to claim 2, characterized in that, The frame is equipped with a second winch (50), and the second winch (50) is provided with a first traction rope (51) and a second traction rope (52). The ends of the first traction rope (51) and the second traction rope (52) are installed on the corresponding limit plates (45). The first traction rope (51) is used to pull the limit plate (45) closer to another set of limit plates (45), and the second traction rope (52) is used to pull the limit plate (45) away from another set of limit plates (45). The mechanical claw (42) of the sliding gripping component (40) clamps the fixed pipe, and the inner wall of the mechanical claw (42) of the fixed gripping component (40) is provided with rollers; The winch (50) with traction ropes (51 and 52) working simultaneously is used to adjust the spacing of the mechanical claw (42). The vertical rod (44) and the limit plate (45) control the mechanical claw (42) to maintain a horizontal state during the spacing adjustment process.

4. The matching tool for installing underground direct-buried heating pipelines according to claim 3, characterized in that, The limiting plate (45) includes a plate body one (451) and a plate body two (452), which are laterally fitted together and whose tops are in the same plane.

5. The method of using the matching tool for installing underground direct-buried heating pipelines according to claim 4, characterized in that, The steps are as follows: Step 1: Assemble the frame Set up the alignment tool above the two sections of thermal pipes that need to be aligned during installation; The socket rod (23) is adapted to the corresponding socket one, the socket end two and the socket three are adapted to each other, and the socket end one and the socket one are adapted to each other. Based on the diameter and length of the heat pipe, the expansion beam 1 (10) and expansion beam 2 (20) are fixed to form a frame by the limiting bolts at socket 1, socket 2 and socket 3; Two limiting plates (45) are installed on the frame. One limiting plate (45) is fixed on the frame, and the other is slidably installed along the length of the frame. A fixed pulley (4311) is installed on the side of the sliding limiting plate (45) away from the fixed limiting plate (45). A second winch (50) is installed on the frame. The second winch (50) has two winch areas. The winding and unwinding directions of the two winch areas are opposite. The second traction rope (52) is connected to the side of the sliding limiting plate (45) away from the fixed limiting plate (45) via the fixed pulley (4311). The first traction rope (51) is directly connected to the side of the sliding limiting plate (45) close to the fixed limiting plate (45). Install limiting blocks (46) in the rectangular guide holes of the two limiting plates (45), and install limiting pieces (461) at the bottom and top for horizontal guidance; A vertical rod (44) is inserted into the limiting block (46), and the bottom of the vertical rod (44) is fixed on the U-shaped structure plate. A rotating shaft (432) and a gear (433) are installed in the U-shaped structure plate. A torsion spring is installed at the rotation node of the rotating shaft (432). The mechanical claw (42) is rotatably mounted on the U-shaped structure plate and meshed with the transmission gear (422) and gear (433); Four winches (41) are installed on the frame. The wire ropes on the four winches (41) are connected to the corresponding rotating shafts (432). The two rotating shafts (432) located on the same U-shaped structure plate rotate in opposite directions. Two of the winches (41) are fixedly installed on the frame and correspond to the fixed limiting plate (45). The other two winches (41) are slidably installed on the frame and correspond to the sliding limiting plate (45). The other two winches (41) are directly installed on the rotating shaft (432) of the sliding limiting plate. Install corresponding lifting outriggers (30) at the four corners of the frame. The lifting outriggers (30) are telescopic cylinders and have pads at the bottom. Step 2: Grab Four winches (41) simultaneously release steel wire ropes, and mechanical claws (42) descend. After the mechanical claws (42) descend to a height that can clamp the heat pipe, the height of the top of the vertical rod is maintained, the steel wire rope is retracted, and the mechanical claws (42) are driven by the rotating shaft (432) through the gear (433) and the transmission gear (422) to clamp and fix the heat pipe. Step 3: Assembly By controlling the winding and unwinding actions and the amount of winding and unwinding of the corresponding winch (41), the axes of the two thermal pipes are aligned. By adjusting the direction and rotation amount of winch two (50), the thermal pipeline is axially adjusted to complete the alignment operation of the pipeline port; Step 4: Separate tools and pipes After the thermal pipeline has been aligned, the pipe ends are welded and supports are installed at the bottom. All winches (41) are simultaneously extended until the mechanical claw (42) separates from the outer ring of the pipe. The mechanical claw (42) is actively moved to the top of the pipe. The vertical rod (44) is temporarily fixed relative to the limiting block (46). The steel wire rope is tightened to complete the separation operation between the pipe and the mechanical claw (42). Move the alignment tool to the next pipe laying location along the pipe laying direction; Step 5: Continue laying the heating pipes in the same direction. Repeat steps two and three until all the heating pipes are laid.

Citation Information

Patent Citations

  • Flexible clamp for pipe fitting welding and adjusting method thereof

    CN102000935A

  • Pipeline laying device for municipal construction road construction

    CN113620181A