A material pile management system for hydraulic formwork and method thereof

By installing load distribution detection pads on the hydraulic climbing formwork platform, combined with pressure sensors and light-emitting components, material loads can be monitored and managed in real time, solving the problems of platform deformation and safety hazards caused by material stacking, and improving construction safety and efficiency.

CN118728061BActive Publication Date: 2026-11-06CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410772574.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2026-11-06
Estimated Expiration
2044-06-17

AI Technical Summary

Technical Problem

In hydraulic climbing formwork construction, improper material loading can lead to platform deformation and safety hazards. Existing human management methods cannot accurately control the load, resulting in overloading.

Method used

A load distribution detection pad is used to monitor material load in real time through a combination of pressure sensors and light-emitting elements. The load is managed by a controller and load distribution detector, including load calculation, load distribution calculation and status indication, real-time reminders and load distribution location indication.

Benefits of technology

It enables real-time monitoring and management of material loading, avoiding platform deformation and safety hazards, and improving construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728061B_ABST
    Figure CN118728061B_ABST
Patent Text Reader

Abstract

A material loading management system and method for hydraulic climbing formwork, relating to the field of building construction technology, includes a load distribution detection pad, which is composed of a load detection layer, a light-emitting layer, and a transparent surface layer stacked sequentially. Multiple pressure sensors are uniformly arranged within the load detection layer, and light-emitting elements, connected to and corresponding one-to-one with the pressure sensors, are arranged within the light-emitting layer. The pressure sensors and light-emitting elements are communicatively connected to a controller. The controller is communicatively connected to a load distribution detector, which is used to detect the load value and distribution of the material loaded on the load distribution detection pad and manage the loaded material. By acquiring, judging, and managing the load of the loaded material, the problem of platform deformation caused by material loading during hydraulic climbing formwork is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building construction technology, and specifically to a material loading management system and method for hydraulic climbing formwork. Background Technology

[0002] Hydraulic climbing formwork, as a key piece of equipment in modern construction, is widely used in the construction of large structures such as high-rise buildings, large bridges, and silos. Its main feature is the vertical lifting and lowering of the formwork through a hydraulic jacking system, thereby enabling continuous pouring of concrete structures. Hydraulic climbing formwork not only simplifies the construction process and improves efficiency, but also effectively reduces reliance on traditional equipment such as scaffolding and tower cranes, thus lowering construction costs.

[0003] In the actual use of hydraulic climbing formwork, the material stacking platform, as a crucial component supporting construction materials and equipment, directly impacts the smooth progress of the entire construction process due to its stability and safety. However, in actual construction, improper stacking of construction materials (such as reinforcing bars, formwork, and embedded parts), such as concentrating large amounts of materials in a specific area of ​​the stacking platform or stacking them at the platform's edge, can cause the platform to deform because the load on these areas far exceeds the design limits. A deformed platform not only cannot continue to support more materials and equipment but may also lead to safety accidents due to structural instability, thus posing safety hazards to climbing formwork construction.

[0004] Currently, during construction, the stacking of materials is generally controlled through manual management. However, manual management cannot accurately manage the load generated by the stacking of materials, and the stacking load may still exceed the limit stacking load, causing the platform to deform and creating safety hazards. Summary of the Invention

[0005] This invention provides a material loading management system and method for hydraulic climbing formwork, which solves the problem of platform deformation caused by material loading during hydraulic climbing formwork by acquiring, judging and managing the load of the loaded material.

[0006] A material stacking management system for hydraulic climbing formwork includes:

[0007] The load distribution detection pad is composed of a load detection layer, a light-emitting layer and a transparent surface layer stacked in sequence. Multiple pressure sensors are uniformly arranged in the load detection layer, and light-emitting elements are arranged in the light-emitting layer that are connected to the pressure sensors and correspond one-to-one with the number of pressure sensors. The pressure sensors and light-emitting elements are communicatively connected to a controller.

[0008] The controller is communicatively connected to a load distribution detector, which is used to detect the load values ​​and distribution of the materials piled on the load distribution detection pad, and to manage the piled materials.

[0009] Furthermore, the load distribution detector includes an encoding module, a load calculation module, a load location calculation module, and a load status identification module;

[0010] The encoding module is adapted to encode the positions of the light-emitting element and the pressure sensor and write them into the encoding data table;

[0011] The load calculation module is adapted to calculate the load value of the accumulating material based on the data collected by the pressure sensor;

[0012] The loading location calculation module is adapted to calculate the load-sharing amount and loading location of the loaded material when the load value of the loaded material exceeds a threshold.

[0013] The loading status identification module is adapted to identify the loaded material using graphics, colors, and text when the load value of the loaded material exceeds a threshold.

[0014] In addition, graphics, colors, and text are used to identify the load and location of the stacked materials.

[0015] Furthermore, the encoding module includes a coordinate construction unit, a light-emitting element encoding unit, and a pressure sensor encoding unit;

[0016] The coordinate construction unit is used to collect the position data of the light-emitting element and the pressure sensor and construct coordinates;

[0017] The light-emitting element encoding unit is used to encode all the light-emitting elements according to their coordinates;

[0018] The pressure sensor encoding unit is used to encode all the pressure sensors according to their coordinates.

[0019] Furthermore, the load calculation module includes a sensor data acquisition unit and a load calculation unit;

[0020] The sensor data acquisition unit is used to acquire the data collected by the pressure sensor;

[0021] The load calculation unit is used to calculate the load value of the slab material based on the collected data and the pressure sensor encoding.

[0022] Furthermore, the load position calculation module includes a load limit calculation unit, a load distribution calculation unit, and a load distribution position calculation unit;

[0023] The load limit calculation unit is used to calculate the ultimate load value at the current material loading position;

[0024] The load shunting calculation unit is used to determine whether the load value of the current stockpiled material needs to be shunted based on the ultimate load value of the material stockpiling location. If load shunting is required, the unit calculates the amount of load shunting required for the current stockpiled material so that the load value of the current stockpiled material after load shunting is lower than the ultimate load value of the current material stockpiling location.

[0025] The load distribution location calculation unit is used to allocate the load distribution location of materials according to the type of load material when load distribution is required.

[0026] Furthermore, the stacking status identification module includes a judgment unit and an identification unit;

[0027] The judgment unit is used to calculate the ultimate load value at the current material loading position and to determine whether the load value of the loaded material is greater than the ultimate load value.

[0028] The identification unit is used to identify the load when the judgment result is greater than the ultimate load value using the first type of graphics, colors, and text, and to identify the load when the judgment result is less than the ultimate load value using the second type of graphics, colors, and text.

[0029] The identification unit is also used to identify the load and load position of the stacked material using a third type of graphics, color, and text, based on the load amount and load position obtained by the stacking position calculation module.

[0030] Furthermore, the light-emitting element includes a housing and an LED bead disposed inside the housing, and the housing is connected to the pressure sensor.

[0031] Furthermore, the transparent surface layer, the light-emitting layer, and the load detection layer are all elastic.

[0032] Furthermore, the load detection layer has an anti-slip layer underneath.

[0033] Secondly, embodiments of the present invention provide a material loading management method for hydraulic climbing formwork, comprising the following steps:

[0034] Construct a BIM model of the hydraulic climbing formwork and analyze the ultimate load values ​​of each area of ​​the material loading platform of the hydraulic climbing formwork.

[0035] The load distribution detection pad is laid and fixed on the material loading platform, and the position of the load distribution detection pad is mapped to the load distribution detection pad;

[0036] During the material loading process, the load distribution detection pad detects the load value generated by the loaded material and inputs it into the load distribution detector;

[0037] The load distribution detector determines whether the load value of the current material stacking material needs to be distributed based on the ultimate load value of the current material stacking location.

[0038] If load sharing is required, calculate the amount of load sharing required for the current slack material so that the load value of the current slack material after load sharing is lower than the ultimate load value of the current material slack position.

[0039] When load distribution is required, the loading positions of the materials are allocated according to the type of materials being loaded, and the allocated positions are displayed by the load distribution detection pad.

[0040] The beneficial effects of the above-described technical solutions provided in the embodiments of the present invention include at least the following:

[0041] 1. After the load distribution detection pad is laid and fixed on the material stacking platform of the existing hydraulic climbing formwork, the load of the stacked material is detected in real time during the material stacking process. When the limit load is exceeded, graphic, color and text can be used to mark and remind to avoid the problem of overloading and avoid platform deformation, which may bring safety hazards to the climbing formwork construction.

[0042] 2. After detecting overload, the load distribution and location can be calculated. The load distribution and location can be marked with graphics, colors and text through the load distribution detection pad, so as to facilitate the management of the material loading process.

[0043] Other features and advantages of the invention will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention. The objects and other advantages of the invention may be realized and obtained by means of the structures particularly pointed out in the written description, claims, and drawings.

[0044] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0045] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings:

[0046] Figure 1 This is a schematic diagram of the material loading management system for hydraulic climbing formwork disclosed in an embodiment of the present invention;

[0047] Figure 2This is a schematic diagram of the structure of a material loading platform with a load distribution detection pad disclosed in an embodiment of the present invention;

[0048] Figure 3 This is a schematic cross-sectional view of the load distribution detection pad disclosed in an embodiment of the present invention;

[0049] Figure 4 This is a schematic flowchart of a material loading management method for hydraulic climbing formwork disclosed in an embodiment of the present invention.

[0050] Figure label:

[0051] 1. Load distribution detection pad; 11. Transparent surface layer; 12. Light-emitting layer; 13. Light-emitting element; 131. Lamp bead; 132. Outer shell; 14. Load detection layer; 15. Pressure sensor; 16. Anti-slip layer; 2. Load distribution detector; 21. Encoding module; 211. Coordinate construction unit; 212. Light-emitting element encoding unit; 213. Pressure sensor encoding unit; 22. Load calculation module; 221. Sensor data acquisition unit; 222. Load calculation unit; 23. Stacking position calculation module; 231. Stacking limit calculation unit; 232. Load distribution calculation unit; 233. Load distribution position calculation unit; 24. Stacking status identification module; 241. Judgment unit; 242. Identification unit; 3. Controller. Detailed Implementation

[0052] Exemplary embodiments of the present disclosure will now be described in more detail with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.

[0053] The following text, in conjunction with the appendix Figures 1-4 The solution of the present invention will be further described.

[0054] Figure 1 A schematic diagram of the material loading management system for hydraulic climbing formwork disclosed in an embodiment of the present invention is shown, including a load distribution detection pad 1, a controller 3, and a load distribution detector 2.

[0055] The controller 3 is communicatively connected to the load distribution detection pad 1 and the load distribution detector 2. The working process is as follows: the load distribution detection pad 1 detects the load of the stacked material and transmits it to the controller 3. The controller 3 transmits the collected load data to the load distribution detector 2 for processing. The load distribution detection pad 1 also serves as a display component. After the load distribution detector 2 analyzes and processes the results and sends them back to the controller 3, the controller controls the content displayed on the load distribution detection pad 1 to facilitate the management of the material stacking process.

[0056] like Figures 2-3 As shown, the load distribution detection pad 1 is laid and fixed on the material stacking platform. It is composed of an elastic load detection layer 14, a light-emitting layer 12 and a transparent surface layer 11 stacked in sequence. Multiple pressure sensors 15 are uniformly arranged in the load detection layer 14, and light-emitting elements 13 are arranged in the light-emitting layer 12 that are connected to the pressure sensors 15 and correspond one-to-one with their quantity.

[0057] The aforementioned transparent surface layer 11 and light-emitting layer 12 can be made of transparent soft PVC, transparent soft silicone, or other materials, and the load detection layer 14 can be made of soft PVC, soft silicone, or other materials.

[0058] The signal input terminal of the controller 3 is communicatively connected to the signal output terminal of the pressure sensor 15, and the signal output terminal of the controller 3 is communicatively connected to the signal input terminal of the LED bead 131 in the light-emitting component 13. It should be noted that the scheme of the controller 3 controlling the display component composed of LED beads 131 to display different graphics, colors and text adopts existing technology, such as the published utility model patent 201725531U. Therefore, its specific working principle will not be elaborated here.

[0059] The light-emitting element 13 includes a housing 132 and an LED bead 131 disposed inside the housing 132 to protect the LED bead 131 from damage due to compression. At the same time, in order to facilitate the triggering of the pressure sensor 15, the housing 132 is connected to the detection end of the pressure sensor 15. When the transparent surface layer 11 is compressed, the compressive force is transmitted to the pressure sensor 15 through the light-emitting element 13 to realize the detection of the load of the stacked material.

[0060] Both the light-emitting element 13 and the pressure sensor 15 are arranged in a matrix. The number of light-emitting elements 13 and pressure sensors 15 is selected according to actual needs. The number of light-emitting elements 13 and pressure sensors 15 needs to be able to cover the entire detection area.

[0061] like Figure 3 As shown, in order to improve the anti-slip performance of the load distribution detection pad 1, an anti-slip layer 16 is provided below the load detection layer 14 to prevent the load distribution detection pad 1 from slipping during use.

[0062] like Figure 1 As shown, the load distribution detector 2 includes an encoding module 21, a load calculation module 22, a load location calculation module 23, and a load status identification module 24.

[0063] like Figure 1As shown, the encoding module 21 is adapted to encode the positions of the light-emitting element 13 and the pressure sensor 15 and write them into the encoding data table. The encoding module 21 includes a coordinate construction unit 211, a light-emitting element encoding unit 212, and a pressure sensor encoding unit 213.

[0064] The coordinate construction unit 211 is used to collect the position data of the light-emitting element 13 and the pressure sensor 15 and construct coordinates;

[0065] The light-emitting element encoding unit 212 is used to encode all the light-emitting elements 13 according to their coordinates;

[0066] The pressure sensor encoding unit 213 is used to encode all the pressure sensors 15 according to their coordinates.

[0067] After the above-mentioned light-emitting element 13 and pressure sensor 15 are encoded, they are recorded in the encoding data table.

[0068] like Figure 1 As shown, the load calculation module 22 is adapted to calculate the load value of the stacked material based on the data collected by the pressure sensor 15. The load calculation module 22 includes a sensor data acquisition unit 221 and a load calculation unit 222.

[0069] The sensor data acquisition unit 221 is used to acquire data collected by the pressure sensor 15;

[0070] The load calculation unit 222 is used to calculate the load value of the slab material based on the collected data and the encoding of the pressure sensor 15.

[0071] The calculation process includes: acquiring the pressure sensor 15 and obtaining its code from the coding data table; and calculating the load value of the accumulator material based on the data from all the pressure sensors 15.

[0072] like Figure 1 As shown, the load position calculation module 23 is adapted to calculate the load distribution and load distribution position of the load material when the load value of the load material exceeds the threshold. The load position calculation module 23 includes a load limit calculation unit 231, a load distribution calculation unit 232, and a load distribution position calculation unit 233.

[0073] The load limit calculation unit 231 is used to calculate the ultimate load value at the current material loading position.

[0074] Specifically, the load limit calculation unit 231 constructs a BIM model of the hydraulic climbing formwork and calculates the ultimate load values ​​of each area of ​​the material loading platform of the hydraulic climbing formwork through finite element analysis. At the same time, based on the encoding of the pressure sensor 15, the ultimate load value of the current material loading position is obtained.

[0075] The load shunting calculation unit 232 is used to determine whether the load value of the current stockpiled material needs to be shunted based on the ultimate load value of the material stockpiling location. If shunting is required, the unit calculates the amount of load that the current stockpiled material needs to be shunted so that the load value of the current stockpiled material after shunting is lower than the ultimate load value of the current material stockpiling location.

[0076] The load distribution location calculation unit 233 is used to allocate the load distribution location of materials according to the type of load material when load distribution is required.

[0077] It should be noted that in this embodiment, the meaning of load reduction is to reduce the currently loaded material, the load reduction amount is defined as the amount to be reduced, and the load reduction location is defined as the location where the reduced material is placed.

[0078] When distributing stacked materials, prioritize the allocation of similar types of materials according to the principle of proximity to facilitate their use.

[0079] The load position calculation unit 233 calculates the position based on the code of the light-emitting element 13 in the coding data table, and then outputs the code of the light-emitting element 13 for marking.

[0080] like Figure 1 As shown, the load status identification module 24 is adapted to identify the loaded material using graphics, colors, and text when the load value of the loaded material exceeds a threshold, and to identify the load amount and load location of the loaded material using graphics, colors, and text. The load status identification module 24 includes a judgment unit 241 and an identification unit 242.

[0081] The judgment unit 241 is used to calculate the ultimate load value at the current material loading position and to determine whether the load value of the loaded material is greater than the ultimate load value.

[0082] The process by which the judgment unit 241 obtains the ultimate load value at the current material loading position is to extract the value from the calculation result of the load limit calculation unit 231 and determine whether the load value of the loaded material is greater than the ultimate load value by comparing the values.

[0083] The marking unit 242 is used to mark the result when it is greater than the ultimate load value using the first type of graphics, color and text, and to mark the result when it is less than the ultimate load value using the second type of graphics, color and text.

[0084] The identification unit 242 is also used to identify the load and load position of the stacked material using a third type of graphics, color and text, based on the load amount and load position obtained by the stacking position calculation module 23.

[0085] The types and styles of the graphics, colors, and text labels of the first to third types mentioned above can be set to be the same or different.

[0086] In one example, when the result is greater than the ultimate load value, a frame that can wrap around the surcharge material is used to mark it, and further prompts are made by using red or flashing.

[0087] In the example above, text can also be used outside the frame to display the load of the currently loaded material and the ultimate load value of the material loading location.

[0088] In one example, when the result is greater than the ultimate load value, a green frame that can wrap around the load material is used to mark it.

[0089] In the example above, text can also be used outside the frame to display the load of the currently loaded material and the ultimate load value of the material loading location.

[0090] In one example, a yellow or flashing border is used, with text and graphics used around or inside the border to indicate the load capacity and load location.

[0091] The marking unit 242 controls the lamp beads 131 in the corresponding light-emitting element 13 to work through the controller 3 according to the code of the light-emitting element 13 used for marking.

[0092] A material loading management method for hydraulic climbing formwork includes the following steps:

[0093] S1. Construct a BIM model of the hydraulic climbing formwork and analyze the ultimate load values ​​of each area of ​​the material loading platform of the hydraulic climbing formwork.

[0094] S2, Lay a fixed load distribution detection pad 1 on the material loading platform and map the position of the load distribution detection pad 1 to the load distribution detection pad 1;

[0095] S3, During the material loading process, the load distribution detection pad 1 detects the load value generated by the loaded material and inputs it into the load distribution detector 2;

[0096] S4, Load distribution detector 2 determines whether the load value of the current material stacking material needs to be distributed based on the ultimate load value of the current material stacking location.

[0097] S5. If load sharing is required, calculate the amount of load sharing required for the current slack material so that the load value of the current slack material after load sharing is lower than the ultimate load value of the current material slack position.

[0098] S6, when load distribution is required, the loading position of the material is allocated according to the type of the material being loaded, and the allocated position is displayed by the load distribution detection pad 1.

[0099] This invention provides a material loading management system and method for hydraulic climbing formwork. After laying and fixing the load distribution detection pad 1 on the existing hydraulic climbing formwork material loading platform, the load is monitored in real time during material loading. When the load exceeds the limit, it can be marked with graphics, colors, and text to avoid overloading. After detecting overloading, the load distribution amount and location can be calculated, and the load distribution location and amount can be marked with graphics, colors, and text on the load distribution detection pad 1. This facilitates the management of the material loading process, avoids overloading, and prevents platform deformation that could pose safety hazards during climbing formwork construction.

[0100] It should be understood that the specific order or hierarchy of steps in the disclosed process is an example of an exemplary method. Based on design preferences, it should be understood that the specific order or hierarchy of steps in the process may be rearranged without departing from the scope of this disclosure. The appended method claims provide elements of various steps in an exemplary order and are not intended to limit the scope to the specific order or hierarchy described.

[0101] In the detailed description above, various features are combined together in a single embodiment to simplify this disclosure. This approach to disclosure should not be construed as reflecting an intention that embodiments of the claimed subject matter require more features than are explicitly stated in each claim. Rather, as reflected in the appended claims, the invention is presented with fewer features than all of the features in a single disclosed embodiment. Therefore, the appended claims are hereby explicitly incorporated into the detailed description, with each claim representing a separate preferred embodiment of the invention.

[0102] Those skilled in the art will also understand that the various illustrative logic blocks, modules, circuits, and algorithm steps described in conjunction with the embodiments herein can be implemented as electronic hardware, computer software, or a combination thereof. To clearly illustrate the interchangeability between hardware and software, the various illustrative components, blocks, modules, circuits, and steps described above are generally described in terms of their functionality. Whether such functionality is implemented as hardware or software depends on the specific application and the design constraints imposed on the overall system. Those skilled in the art can implement the described functionality in alternative ways for each specific application; however, such implementation decisions should not be construed as departing from the scope of this disclosure.

[0103] The steps of the methods or algorithms described in conjunction with the embodiments herein can be directly embodied in hardware, software modules executed by a processor, or a combination thereof. The software modules can reside in RAM memory, flash memory, ROM memory, EPROM memory, EEPROM memory, registers, hard disks, removable disks, CD-ROMs, or any other form of storage medium well known in the art. An exemplary storage medium is connected to the processor, enabling the processor to read information from and write information to the storage medium. Of course, the storage medium can also be a component of the processor. The processor and storage medium can reside in an ASIC. The ASIC can reside in a user terminal. Alternatively, the processor and storage medium can exist as discrete components in the user terminal.

[0104] For software implementation, the techniques described in this application can be implemented using modules (e.g., procedures, functions, etc.) that perform the functions described in this application. This software code can be stored in memory units and executed by a processor. The memory units can be implemented within the processor or outside the processor; in the latter case, they are communicatively coupled to the processor via various means, as is well known in the art.

[0105] The foregoing description includes examples of one or more embodiments. It is certainly impossible to describe all possible combinations of components or methods in order to describe the above embodiments, but those skilled in the art will recognize that the various embodiments can be further combined and arranged. Therefore, the embodiments described herein are intended to cover all such changes, modifications, and variations that fall within the scope of the appended claims. Furthermore, the term "comprising" as used in the specification or claims is interpreted in a manner similar to the term "including," as interpreted when used as a conjunction in the claims. Additionally, the use of any term "or" in the specification of the claims is intended to mean "non-exclusive or."

Claims

1. A material loading management system for hydraulic climbing formwork, characterized in that, include: The load distribution detection pad is composed of a load detection layer, a light-emitting layer and a transparent surface layer stacked in sequence. Multiple pressure sensors are uniformly arranged in the load detection layer, and light-emitting elements are arranged in the light-emitting layer that are connected to the pressure sensors and correspond one-to-one with the number of pressure sensors. The pressure sensors and light-emitting elements are communicatively connected to a controller. The controller is communicatively connected to a load distribution detector, which is used to detect the load values ​​and distribution of the materials piled on the load distribution detection pad, and to manage the piled materials. The load distribution detector includes an encoding module, a load calculation module, a load position calculation module, and a load status identification module; the encoding module is adapted to encode the positions of the light-emitting element and the pressure sensor and write them into an encoding data table; The load calculation module is adapted to calculate the load value of the stacked material based on the data collected by the pressure sensor; the stacking position calculation module is adapted to calculate the load distribution and location of the stacked material when the load value of the stacked material exceeds a threshold; the stacking status identification module is adapted to identify the stacked material using graphics, colors, and text when the load value of the stacked material exceeds a threshold; and to identify the load distribution and location of the stacked material using graphics, colors, and text.

2. A material loading management system for hydraulic climbing formwork as described in claim 1, characterized in that, The encoding module includes a coordinate construction unit, a light-emitting element encoding unit, and a pressure sensor encoding unit; The coordinate construction unit is used to collect the position data of the light-emitting element and the pressure sensor and construct coordinates; The light-emitting element encoding unit is used to encode all the light-emitting elements according to their coordinates; The pressure sensor encoding unit is used to encode all the pressure sensors according to their coordinates.

3. A material loading management system for hydraulic climbing formwork as described in claim 1, characterized in that, The load calculation module includes a sensor data acquisition unit and a load calculation unit; The sensor data acquisition unit is used to acquire the data collected by the pressure sensor; The load calculation unit is used to calculate the load value of the slab material based on the collected data and the pressure sensor encoding.

4. A material loading management system for hydraulic climbing formwork as described in claim 1, characterized in that, The load position calculation module includes a load limit calculation unit, a load distribution calculation unit, and a load distribution position calculation unit. The load limit calculation unit is used to calculate the ultimate load value at the current material loading position; The load shunting calculation unit is used to determine whether the load value of the current stockpiled material needs to be shunted based on the ultimate load value of the material stockpiling location. If load shunting is required, the unit calculates the amount of load shunting required for the current stockpiled material so that the load value of the current stockpiled material after load shunting is lower than the ultimate load value of the current material stockpiling location. The load distribution location calculation unit is used to allocate the load distribution location of materials according to the type of load material when load distribution is required.

5. A material loading management system for hydraulic climbing formwork as described in claim 1, characterized in that, The stacking status identification module includes a judgment unit and an identification unit; The judgment unit is used to calculate the ultimate load value at the current material loading position and to determine whether the load value of the loaded material is greater than the ultimate load value. The identification unit is used to identify the load when the judgment result is greater than the ultimate load value using the first type of graphics, colors, and text, and to identify the load when the judgment result is less than the ultimate load value using the second type of graphics, colors, and text. The identification unit is also used to identify the load and load position of the stacked material using a third type of graphics, color, and text, based on the load amount and load position obtained by the stacking position calculation module.

6. A material loading management system for hydraulic climbing formwork as described in any one of claims 1 to 5, characterized in that, The light-emitting element includes a housing and LED beads disposed inside the housing, and the housing is connected to the pressure sensor.

7. A material loading management system for hydraulic climbing formwork as described in claim 6, characterized in that, The transparent surface layer, the light-emitting layer, and the load detection layer are all elastic.

8. A material loading management system for hydraulic climbing formwork as described in claim 7, characterized in that, The load detection layer has an anti-slip layer underneath.

9. A material stacking management method for hydraulic climbing formwork, employing a material stacking management system for hydraulic climbing formwork as described in any one of claims 1 to 5, characterized in that, Includes the following steps: Construct a BIM model of the hydraulic climbing formwork and analyze the ultimate load values ​​of each area of ​​the material loading platform of the hydraulic climbing formwork. The load distribution detection pad is laid and fixed on the material loading platform, and the position of the load distribution detection pad is mapped to the load distribution detection pad; During the material loading process, the load distribution detection pad detects the load value generated by the loaded material and inputs it into the load distribution detector; The load distribution detector determines whether the load value of the current material stacking material needs to be distributed based on the ultimate load value of the current material stacking location. If load sharing is required, calculate the amount of load sharing required for the current slack material so that the load value of the current slack material after load sharing is lower than the ultimate load value of the current material slack position. When load distribution is required, the loading positions of the materials are allocated according to the type of materials being loaded, and the allocated positions are displayed by the load distribution detection pad.

Citation Information

Patent Citations

  • Natural gourd lamp box

    CN201725531U

  • Overload early warning device of hydraulic creeping formwork platform

    CN214246594U

  • Load bearing raised flooring system panel with integrated load excess indicator

    US20220098878A1

  • Load distribution measurement system, information processing device and information processing method

    WO2013187002A1