Coating equipment
By introducing a moving mechanism and a jet mechanism into the coating equipment, the sheet material receives the precursor multiple times and is isolated by inert gas, which solves the problem of time-consuming filling and cleaning of the precursor in the reaction chamber, and improves the coating efficiency and safety.
Patent Information
- Application Number
- CN202410782357.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-10-11
AI Technical Summary
In the production process of photovoltaic and semiconductor products, the precursor filling and cleaning process in the reaction chamber of the coating equipment takes a long time, resulting in poor coating efficiency for sheet materials.
A coating equipment is designed, including a reaction chamber, a preheating chamber and a jet mechanism. The sheet material is moved at the corresponding position of the jet mechanism through the moving mechanism, thereby receiving the first precursor and the second precursor multiple times, and passing the inert gas through it. Isolated to form a multi-layer atomic film.
It improves the efficiency of sheet material coating processing, reduces the contact between precursors and inert gases in the reaction chamber, and enhances processing safety and stability.
Smart Images

Figure CN118756115A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of automation, and in particular to a coating device. Background Art
[0002] In the process of photovoltaic and semiconductor product production, sheet materials need to be deposited by atomic layer deposition (ALD) through coating equipment to form a multi-layer atomic film on the sheet material. During the ALD process, two precursors need to be introduced into the reaction chamber of the coating equipment in sequence and filled with the precursors. In addition, inert gas needs to be introduced into the reaction chamber in the interval between the introduction of one precursor and the introduction of another precursor to clean the precursors in the reaction chamber that are not involved in the formation of the atomic film. Each time the gas is introduced into the reaction chamber and filled with gas, a lot of time is consumed, resulting in poor efficiency in the processing of sheet materials. Summary of the invention
[0003] In view of the above, it is necessary to provide a coating device to solve the above defects.
[0004] An embodiment of the present application provides a coating device for coating a sheet material, the coating device comprising: a reaction chamber for accommodating the sheet material; a preheating chamber, the preheating chamber being connected to the reaction chamber, the preheating chamber being used to accommodate the sheet material, the preheating chamber being provided with a preheating element, the preheating element being used to heat the sheet material in the preheating chamber; an injection mechanism, the injection mechanism being connected to the reaction chamber, the injection mechanism being provided with a first injection slot, a second injection slot and a third injection slot, the third injection slot being located between the first injection slot and the second injection slot, the first injection slot being used to spray a first precursor into the reaction chamber, the second injection slot being used to spray a second precursor into the reaction chamber, and the third injection slot being used to spray an inert gas into the reaction chamber; a moving mechanism, the moving mechanism being arranged in the reaction chamber, the moving mechanism being used to drive the sheet material to sequentially pass through the area directly opposite to the first injection slot and the second injection slot, and being used to drive the sheet material to move from the reaction chamber into the preheating chamber and from the preheating chamber into the reaction chamber.
[0005] Optionally, a material port is provided on the preheating chamber, and the material port is used to allow the sheet material to enter or move out of the preheating chamber. The preheating chamber includes a preheating position and a transmission position arranged along the height direction of the preheating chamber. The preheating position is the position of the sheet material in the preheating chamber when the sheet material is heated. The transmission position is used to dock with the reaction chamber connected to the preheating chamber, and the transmission position is set corresponding to the material port. The coating equipment also includes: a lifting frame, which is arranged in the preheating chamber and movably connected to the preheating chamber; a first receiving frame, which is connected to the lifting frame and is used to receive the sheet material; a second receiving frame, which is used to receive the sheet material; and a second receiving frame. The second receiving frame is connected to the lifting frame and is located on a side of the first receiving frame away from the preheating position, and is used to receive the sheet material; a lifting drive component, the lifting drive component is connected to the preheating chamber and the lifting frame, and the lifting drive component is used to: drive the lifting frame to move, so that the first receiving frame moves to the preheating position to heat the received sheet material, and move the first receiving frame to the transmission position to receive the sheet material entering the preheating chamber from the material inlet, and transfer the heated sheet material to the moving mechanism; drive the lifting frame to move, so that the second receiving frame moves to the transmission position to receive the sheet material from the moving mechanism.
[0006] Optionally, a first position and a second position are set in the reaction chamber, the first position and the second position are spaced apart in the length direction of the reaction chamber, the jet mechanism is located between the second position and the first position in the length direction of the reaction chamber, and the coating equipment also includes: a movable frame, the movable frame is set in the reaction chamber and movably connected to the inner wall of the reaction chamber; a supporting frame, the supporting frame is movably connected to the movable frame, the supporting frame is used to receive the sheet material, and is used to move synchronously with the movable frame; a movable driving assembly, the movable driving assembly is connected to the movable frame, and the movable driving assembly is used to: drive the movable frame to move in the direction from the second position toward the first position, so that the supporting frame and the sheet material received by it are synchronously moved out of the reaction chamber; drive the movable frame to move in the direction from the first position toward the second position, so that the supporting frame and the sheet material received by it are moved to the second position; wherein, during the movement of the sheet material, the sheet material receives the precursor sprayed by the jet mechanism.
[0007] Optionally, the speed at which the carrier moves in the length direction of the reaction chamber is any speed between 50 mm / s and 1000 mm / s.
[0008] Optionally, the jet mechanism includes: a heating component, which is used to heat the first precursor, the second precursor and the inert gas introduced into the jet mechanism, so that the temperature of the first precursor ejected from the first jet slot is higher than the temperature of the first precursor before entering the jet mechanism, the temperature of the second precursor ejected from the second jet slot is higher than the temperature of the second precursor before entering the jet mechanism, and the temperature of the inert gas ejected from the third jet slot is higher than the temperature of the inert gas before entering the jet mechanism.
[0009] Optionally, the coating equipment also includes: a reaction heating element, which is arranged in the reaction chamber and arranged with the jet mechanism in the length direction of the reaction chamber, and the reaction heating element is used to heat the sheet material in the reaction chamber; a heat insulation board, which is installed on the inner wall of the reaction chamber, and the reaction heating element is connected to the side of the heat insulation board facing the reaction chamber, and the heat insulation board is used to prevent the heat generated by the reaction heating element from radiating outside the reaction chamber.
[0010] Optionally, the coating equipment also includes: a reaction reflecting plate, which is installed on the inner wall of the reaction chamber, and is located between the moving mechanism and the reaction heating element in the height direction of the reaction chamber. The reaction reflecting plate is used to at least partially shield the moving mechanism and reflect the heat generated by the reaction heating element toward the reaction heating element.
[0011] Optionally, the coating equipment also includes: a reaction air inlet pipe, which is installed in the reaction chamber and connected to the reaction chamber, and is used to introduce inert gas; a diffuser, which is installed on the inner wall of the reaction chamber, and has multiple diffuser grooves, which are all connected to the reaction air inlet pipe.
[0012] Optionally, the coating equipment also includes: a preheating element, which is connected to the preheating chamber, and is used to heat the preheating position in the preheating chamber so that the temperature of the preheating position is any temperature between 150 degrees Celsius and 300 degrees Celsius; a preheating outlet pipe, which is connected and communicated with the preheating chamber, and is used to connect to an exhaust device to exhaust the preheating chamber so that the air pressure in the preheating chamber is any air pressure between 1 Torr and 2 Torr.
[0013] Optionally, a preheating maintenance port and a material port are provided on the preheating chamber, and the preheating maintenance port and the material port are located on different side walls of the preheating chamber, the material port is used to allow sheet materials to enter or move out of the preheating chamber, and a reaction maintenance port is provided on the reaction chamber. The coating equipment also includes: a reaction maintenance door, which is detachably connected to the reaction chamber and is used to shield the reaction maintenance port; a preheating maintenance door, which is detachably connected to the preheating chamber and is used to shield the preheating maintenance port; a connecting valve, which is arranged between the reaction chamber and the preheating chamber, and is used to open or disconnect the connection between the reaction chamber and the preheating chamber; a shielding mechanism, which is connected to the preheating chamber, and is used to open and close the material port.
[0014] Through the coating equipment provided by the present application, the jet mechanism can simultaneously jet out multiple first precursors and multiple second precursors, and each first precursor and the second precursor are isolated by an inert gas; when the moving mechanism moves so that the sheet material passes through the corresponding position of the jet mechanism, the sheet material can receive the first precursor and the second precursor multiple times, so that a multi-layer atomic film is formed on the sheet material. In this way, the moving mechanism drives the sheet material to move in the reaction device to realize the formation of a multi-layer atomic film on the sheet material. The efficiency of the sheet material coating process can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a first structural schematic diagram of the coating equipment in an embodiment of the present application.
[0016] Figure 2 It is a second structural schematic diagram of the coating equipment in the embodiment of the present application.
[0017] Figure 3 It is a front view of the preheating device in the embodiment of the present application.
[0018] Figure 4 It is a schematic diagram of the partial structure of the preheating device in the embodiment of the present application.
[0019] Figure 5 It is a cross-sectional view of the preheating chamber in the embodiment of the present application.
[0020] Figure 6 It is the first schematic diagram of the preheating chamber and the reaction chamber in the embodiment of the present application.
[0021] Figure 7 It is a second schematic diagram of the preheating chamber and the reaction chamber in the embodiment of the present application.
[0022] Figure 8 It is a top view of the local structure of the preheating device in the embodiment of the present application.
[0023] Fig. 9 yes Figure 8 Enlarged view of point IX in the middle.
[0024] Fig.10 Schematic diagram of the reaction device in the embodiment of the present application.
[0025] Fig.11 It is a structural schematic diagram of the jet mechanism in the embodiment of the present application.
[0026] Fig.12 It is a first structural schematic diagram of the air intake seat in the embodiment of the present application.
[0027] Fig.13 It is a bottom view of the second sub-seat in the embodiment of the present application.
[0028] Fig.14 It is a top view of the jet seat in the embodiment of the present application.
[0029] Fig.15 It is a bottom view of the jet seat in the embodiment of the present application.
[0030] Fig.16 yes Fig.15 Enlarged view of XVI in the figure.
[0031] Fig.17It is a schematic diagram of the arrangement of the first jet slot, the second jet slot and the third jet slot in the embodiment of the present application.
[0032] Fig.18 It is a second structural schematic diagram of the air intake seat in the embodiment of the present application.
[0033] Fig.19 It is a first structural schematic diagram of the first sub-base in the embodiment of the present application.
[0034] Fig. 20 It is a second structural schematic diagram of the first sub-base in the embodiment of the present application.
[0035] Fig.21 It is a top view of the second sub-seat in the embodiment of the present application.
[0036] Fig. 22 It is a side view of the reaction device in the embodiment of the present application.
[0037] Fig.23 It is a schematic diagram of the internal structure of the reaction device in the embodiment of the present application.
[0038] Fig.24 It is a cross-sectional view of the reaction device in the embodiment of the present application.
[0039] Fig.25 It is a schematic diagram of the partial structure of the reaction device and the material box in the embodiment of the present application.
[0040] Fig.26 It is a schematic diagram of the first partial structure of the reaction device in the embodiment of the present application.
[0041] Fig. 27 It is a schematic diagram of the second partial structure of the reaction device in the embodiment of the present application.
[0042] Fig.28A It is a first partial schematic diagram of the mobile drive assembly in an embodiment of the present application.
[0043] Fig.28B It is a second partial schematic diagram of the mobile drive assembly in the embodiment of the present application.
[0044] Fig.29 It is a bottom view of the local structure of the reaction device in the embodiment of the present application.
[0045] Fig. 30A It is a first partial schematic diagram of the linkage component in the embodiment of the present application.
[0046] Fig. 30B It is a second partial schematic diagram of the linkage component in the embodiment of the present application.
[0047] Main component symbols:
[0048] 100, reaction device; 101, reaction chamber; 1012, opening; 1013, reaction air inlet pipe; 1014, reaction air outlet pipe; 1015, reaction maintenance port; 1016, reaction maintenance door; 1017, diffuser; 10171, diffuser slot; 1018, reaction heating element; 1019, heat shield; 10110, first position; 10111, second position; 10112, reaction reflection plate; 102, moving mechanism; 103, jet mechanism; 104, material box; 105, sheet material; 200, preheating device; 201, preheating chamber; 2011, preheating element; 2012, material port; 2013, preheating air outlet pipe; 2014, preheating maintenance port; 2015, preheating maintenance door; 2016 , preheating position; 2017, transmission position; 2018, reflector; 202, lifting mechanism; 10, fixed frame; 20, lifting assembly; 21, lifting frame; 22, first receiving frame; 23, second receiving frame; 30, lifting guide assembly; 31, lifting guide rail; 32, lifting guide wheel; 33, limiting groove; 40, lifting drive assembly; 41, lifting drive shaft; 42, lifting drive member; 43, lifting drive wheel; 44, lifting follower wheel; 45, lifting drive rope; 46, lifting connecting member; 47, connecting seat; 51, fixed extension frame; 52, supporting extension frame; 60, jet seat; 61, first jet port; 62, second jet port; 63, third jet port; 64, first jet slot; 65, second jet slot ;66, third jet slot;67, first air extraction slot;68, second air extraction slot;69, first air extraction port;610, second air extraction port;70, air inlet seat;71, first air inlet port;72, second air inlet port;73, third air inlet port;74, first exhaust port;75, second exhaust port;76, first air inlet slot;77, second air inlet slot;78, third air inlet slot;79, first exhaust slot;710, second exhaust slot;711, heating chamber;80, diverter seat;81, first sub-seat;811, first connecting port;812, second connecting port;813, third connecting port;814, first connecting slot;815, second connecting slot;816, third connecting slot;817, first collecting port;818, second collecting port; 819, first collecting slot; 8110, second collecting slot; 82, second sub-base; 821, first shunt slot; 822, second shunt slot; 823, third shunt slot; 824, first recovery slot; 825, second recovery slot; 826, first shunt port; 827, second shunt port; 828, third shunt port; 829, first recovery port; 8210, second recovery port; 8211, annular groove; 8212, liquid inlet; 8213, liquid outlet; 91, first heating element; 92, second heating element; 110, sealing ring; 120, support frame; 130, moving assembly; 131, moving frame; 1311, first connection position; 1312, second connection position; 132, carrier frame; 1321, third connection position;1322, fourth connection position; 140, first guide assembly; 141, first guide rail; 142, first guide wheel; 150, mobile drive assembly; 151, mobile drive member; 152, rotating member; 1521, rotating shaft; 1522, first drive wheel; 1523, second drive wheel; 153, first auxiliary wheel; 154, first drive rope; 155, second auxiliary wheel; 156, second drive rope; 160, second guide assembly; 161, second guide rail; 162, second guide wheel; 170, linkage assembly; 171, first linkage wheel; 172, first fixed head; 173, first linkage rope; 174, second linkage wheel; 175, second fixed head; 176, second linkage rope; 300, shielding mechanism; 301, baffle; 302, shielding drive member; 400, connecting valve. ; DETAILED DESCRIPTION
[0049] The technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.
[0050] In the present application, the term "plurality" refers to two or more. In addition, it should be understood that in the description of the present application, the terms "first", "second", etc. are only used for the purpose of distinguishing descriptions, and cannot be understood as indicating or implying relative importance, nor can they be understood as indicating or implying an order.
[0051] In the description of the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.
[0052] See also Figure 1 and Figure 2 , Figure 1 and Figure 2 1 shows a coating device provided by an embodiment of the present application. The coating device may include a reaction device 100 and a preheating device 200. The preheating device 200 may heat a sheet material 105. The reaction device 100 may coat the heated sheet material 105.
[0053] In one embodiment, the reaction device 100 may include a reaction chamber 101, a moving mechanism 102 and an injection mechanism 103. The moving mechanism 102 may be disposed in the reaction chamber 101. The moving mechanism 102 may carry a material box 104, and a plurality of sheet materials 105 may be contained in the material box 104. The moving mechanism 102 may drive the material box 104 to move back and forth in the reaction chamber 101. The injection mechanism 103 may be fixedly connected to the side wall of the reaction chamber 101, and the injection mechanism 103 may be connected to a gas source device (not shown), and may obtain a first precursor and a second precursor from the gas source device. The injection mechanism 103 may spray the first precursor and the second precursor onto the sheet material 105 located in the reaction chamber 101, so that an atomic film may be formed on the surface of the sheet material 105.
[0054] The preheating device 200 may include a preheating chamber 201. The preheating chamber 201 may be in communication with the reaction chamber 101. The moving mechanism 102 may drive the material box 104 to move from the reaction chamber 101 to the preheating chamber 201, and may drive the material box 104 to move from the preheating chamber 201 to the reaction chamber 101.
[0055] In the embodiments of the present application, the length direction of the coating device can be defined as the first horizontal direction, the width direction as the second horizontal direction, and the height direction as the vertical direction. Figure 1 and Figure 2 As shown, the first horizontal direction may be the X direction and its opposite direction, the second horizontal direction may be the Y direction and its opposite direction, and the vertical direction may be the Z direction and its opposite direction.
[0056] It can be understood that the preheating chamber 201 and the reaction chamber 101 can be arranged in a first horizontal direction. A transmission device (not shown) can grab the material box 104 equipped with the unheated sheet material 105, and move the material box 104 into the preheating chamber 201. The preheating chamber 201 can heat the sheet material 105 that can accommodate the material box 104 and the material box 104, so that the temperature of the sheet material 105 reaches the temperature required for performing the coating process. Then the moving mechanism 102 can enter the preheating chamber 201, obtain the material box 104 from the preheating chamber 201, and move the material box 104 into the reaction chamber 101. The moving mechanism 102 can drive the material box 104 to move to a position close to the jet mechanism 103, so that the jet mechanism 103 can spray the sheet material 105 in the material box 104 to achieve coating on the sheet material 105.
[0057] After the sheet material 105 is coated, the moving mechanism 102 can move the material box 104 containing the sheet material 105 into the preheating chamber 201, and the transmission device can grab the material box 104 from the preheating chamber 201 and move the material box 104 out of the preheating chamber 201, and then the staff collects the sheet material 105 that has completed the coating.
[0058] It can be understood that the reaction device 100 can perform an atomic layer deposition (ALD) process on the sheet material 105, so that an atomic film is formed on the side of the sheet material 105 that contacts the first precursor and the second precursor. The surface of the sheet material 105 needs to first receive the first precursor and then the second precursor to form a layer of atomic film; then the formed atomic film can receive the first precursor and the second precursor in sequence to form another layer of atomic film. In this way, multiple layers of atomic films can be formed on the sheet material 105 repeatedly.
[0059] In the embodiments of the present application, the types of the first precursor and the second precursor are not specifically limited. For example, the first precursor may be water, and the second precursor may be trimethylaluminum (TMA).
[0060] In the embodiment of the present application, there is no specific limitation on the type of the sheet material 105. For example, the sheet material 105 may be, but is not limited to, a silicon sheet, a silicon carbide sheet, or the like.
[0061] In some embodiments, the preheating device 200 may include a preheating chamber 201. The preheating chamber 201 may accommodate the sheet material 105. A preheating element 2011 may be fixedly mounted on the top of the preheating chamber 201. The preheating element 2011 may heat the sheet material 105 in the preheating chamber 201.
[0062] It can be understood that the preheating chamber 201 can accommodate the material box 104 equipped with the sheet material 105 and heat the sheet material 105. When the sheet material 105 is heated for a preset time or reaches a preset temperature by the preheating element 2011, at least part of the structure of the moving mechanism 102 in the reaction chamber 101 can enter the preheating chamber 201 and receive the material box 104, and transfer the material box 104 and the sheet material 105 installed in the material box 104 from the preheating chamber 201 to the reaction device 100 for coating.
[0063] In the embodiments of the present application, the type of the preheating element 2011 is not specifically limited. For example, the preheating element 2011 may include, but is not limited to, an infrared heater, a resistive heater, etc. Exemplarily, a plurality of preheating elements 2011 may be provided on the preheating chamber 201, each of the preheating elements 2011 is fixedly connected to the preheating chamber 201, and a portion of the structure of each preheating element 2011 extends into the preheating chamber 201, and the remaining structure is located outside the preheating chamber 201; wherein some of the preheating elements 2011 are infrared heaters, and the remaining preheating elements 2011 are resistive heaters.
[0064] In some embodiments, the preheating chamber 201 is provided with a material port 2012 on a side away from the reaction chamber 101 in the first horizontal direction. The material port 2012 is connected to the preheating chamber 201. The material box 104 can enter the preheating chamber 201 through the material port 2012. The coating device can also include a shielding mechanism 300. The shielding mechanism 300 can be located outside the preheating chamber 201. The shielding mechanism 300 is fixedly installed on the preheating chamber 201, and can realize the opening or closing of the material port 2012.
[0065] The shielding mechanism 300 may include a baffle 301 and a shielding driving member 302. The stator of the shielding driving member 302 may be fixedly mounted on the outer wall of the preheating chamber 201, and the baffle 301 may be fixedly mounted on the mover of the shielding driving member 302. The baffle 301 and the side wall of the preheating chamber 201 where the material opening 2012 is opened are slidably matched in the vertical direction. When the shielding driving member 302 is working, the baffle 301 may be driven to move in the vertical direction, so that the baffle 301 blocks or does not block the material opening 2012, thereby realizing the control of opening or closing the material opening 2012.
[0066] In the embodiments of the present application, there is no specific limitation on the fixing method during the fixed installation and fixed connection. For example, the fixing method may include, but is not limited to, screw fixing, welding fixing, buckle fixing, integral molding fixing, etc.
[0067] In the embodiment of the present application, there is no specific limitation on the type of the shielding driving member 302. For example, the shielding driving member 302 may be, but is not limited to, a linear motor, a rodless cylinder, and the like.
[0068] Please also read Figure 3 In some embodiments, a preheating air outlet pipe 2013 is fixedly installed on the side wall of the preheating chamber 201. The preheating air outlet pipe 2013 is connected to the preheating chamber 201. The preheating air outlet pipe 2013 can be connected to an exhaust device (not shown), and the exhaust device can extract gas from the preheating chamber 201 through the preheating air outlet pipe 2013 to make the air pressure in the preheating chamber 201 reach the preheating air pressure. The preset air pressure is the target value or target range that the air pressure in the reaction chamber 101 needs to reach when the reaction chamber 101 is coating the sheet material 105.
[0069] It can be understood that the preheating chamber 201 can be connected to the reaction chamber 101, and then the sheet material 105 that has completed preheating in the preheating chamber 201 can enter the reaction chamber 101 for coating. Therefore, each time the sheet material 105 enters the preheating chamber 201 for heating and the material port 2012 is closed, the exhaust device can exhaust air in the preheating chamber 201 through the preheating air outlet pipe 2013 to reduce the influence of the air pressure in the preheating chamber 201 on the coating effect of the sheet material 105 in the reaction chamber 101.
[0070] In the embodiments of the present application, there is no specific limitation on the air pressure maintained in the preheating chamber 201. For example, the air pressure in the preheating chamber 201 can be maintained at any air pressure between 1 Torr and 2 Torr.
[0071] In some embodiments, the coating device may further include a connecting valve 400. The connecting valve 400 is located between the preheating chamber 201 and the reaction chamber 101, and may open or disconnect the connection between the preheating chamber 201 and the reaction chamber 101. The connecting valve 400 may be fixedly mounted on the preheating chamber 201 and / or the reaction chamber 101.
[0072] In the embodiment of the present application, there is no specific limitation on the type of the connecting valve 400. For example, the connecting valve 400 may be, but is not limited to, a gate valve.
[0073] It can be understood that before the material port 2012 is opened, the connecting valve 400 can disconnect the connection between the preheating chamber 201 and the reaction chamber 101, thereby reducing the impact of the air pressure change in the preheating chamber 201 on the air pressure in the reaction chamber 101, so that the air pressure in the reaction chamber 101 is maintained at a preset pressure.
[0074] In some embodiments, a preheating maintenance opening 2014 is provided on the side wall of the preheating chamber 201 in the second horizontal direction. A preheating maintenance door 2015 is provided at the preheating opening 1012. The preheating maintenance door 2015 is detachably connected to the outer wall of the preheating chamber 201, and the preheating maintenance door 2015 can shield the preheating maintenance opening 2014.
[0075] In the embodiments of the present application, the detachable connection method is not specifically limited. For example, the detachable connection method may include, but is not limited to, screw connection, bolt connection, snap connection, etc.
[0076] It can be understood that after the preheating maintenance door 2015 blocks the preheating maintenance port 2014 , the side of the preheating maintenance door 2015 facing the inside of the preheating chamber 201 can form a part of the inner wall of the preheating chamber 201 .
[0077] Please also read Figure 4 and Figure 5 In some embodiments, the preheating device 200 may further include a lifting mechanism 202. The lifting mechanism 202 is located in the preheating chamber 201. The lifting mechanism 202 may include a fixed frame 10, a lifting assembly 20, a lifting guide assembly 30, and a lifting drive assembly 40. The fixed frame 10 may be fixedly mounted on the inner wall of the preheating chamber 201 on one side close to the reaction chamber 101. The lifting guide assembly 30 may be connected between the lifting assembly 20 and the fixed frame 10 to realize that the lifting assembly 20 is movably connected to the fixed frame 10 in the vertical direction, so that the lifting assembly 20 can be lifted and lowered in the preheating chamber 201. The lifting drive assembly 40 is connected to the lifting assembly 20. The lifting drive assembly 40 can drive the lifting assembly 20 to move in the vertical direction when it is working.
[0078] The preheating chamber 201 has a preheating position 2016 and a transfer position 2017. In the vertical direction, the height of the preheating position 2016 is greater than the height of the transfer position 2017. The lifting assembly 20 can receive the material box 104 equipped with the sheet material 105, and move the sheet material 105 to the preheating position 2016 and the transfer position 2017 when moving. The preheating position 2016 is a position in the preheating chamber 201 close to the preheating element 2011. When the sheet material 105 moves to the preheating position 2016, the preheating element 2011 can heat the sheet material 105, so that the temperature of the sheet material 105 rises to a temperature condition that meets the coating processing. The transfer position 2017 is a position in the preheating chamber 201 corresponding to the material port 2012 in the first horizontal direction, and corresponding to the connection between the preheating chamber 201 and the reaction chamber 101. The transfer position 2017 can realize the docking of the preheating chamber 201 and the reaction chamber 101. When the sheet material 105 moves to the transfer position 2017, the moving mechanism 102 in the reaction chamber 101 can enter the preheating chamber 201 to obtain the sheet material from the lifting assembly 20, or a transmission device (not shown) located outside the preheating chamber 201 can grab the material box 104 containing the sheet material 105 that has been coated from the lifting device through the material port 2012, and move the material box 104 out of the preheating chamber 201; when the structure for receiving the sheet material 105 in the lifting assembly 20 that has not received the sheet material 105 moves to the transfer position 2017, the moving mechanism 102 can move the material box 104 containing the sheet material 105 that has been coated from the reaction chamber 101 to the lifting assembly 20, or the transmission device located outside the preheating chamber 201 can move the material box 104 containing the sheet material 105 to the lifting assembly 20 through the material port 2012.
[0079] In the embodiments of the present application, the structure of the transmission device is not specifically limited. For example, the transmission device can be, but is not limited to, a multi-axis robot arm.
[0080] It can be understood that the lifting mechanism 202 can move the material box 104 to a position close to the preheating element 2011 for heating, and can move the material box 104 to a position close to the material port 2012 or the reaction chamber 101 to achieve the transfer of the material box 104. In this way, the sheet material 105 can be heated at a position close to the preheating element 2011 while the material box 104 can be moved into and out of the preheating chamber 201, which can improve the heating efficiency of the sheet material 105, thereby improving the efficiency of the coating process of the sheet material 105.
[0081] In other embodiments, the lifting mechanism 202 may not include the fixing frame 10, and the lifting assembly 20 may be movably connected to the inner wall of the preheating chamber 201 in the vertical direction, and the lifting guide assembly 30 may be connected between the inner wall of the preheating chamber 201 and the lifting assembly 20.
[0082] In some cases, please also refer to Figure 6 As shown, the preheating element 2011 is arranged on the top of the preheating chamber 201. At this time, the preheating position 2016 is located above the transfer position 2017, and the material port 2012 and the position where the preheating chamber 201 and the reaction chamber 101 are connected are located below the preheating position 2016 in the vertical direction.
[0083] In other cases, please also refer to Figure 7 The preheating element 2011 can be arranged at the bottom of the preheating chamber 201. At this time, the preheating position 2016 can be located below the transfer position 2017, and the material port 2012 and the position where the preheating chamber 201 and the reaction chamber 101 are connected are located above the preheating position 2016 in the vertical direction.
[0084] In the embodiment of the present application, there is no specific limitation on the temperature of the preheating position 2016. For example, the temperature of the preheating position 2016 can be any temperature between 150 degrees Celsius and 300 degrees Celsius. It is understood that the heat generated by the preheating member 2011 can increase the temperature of the preheating position 2016, thereby increasing the temperature of the sheet material 105 located at the preheating position 2016.
[0085] In some embodiments, the lifting assembly 20 may include a lifting frame 21, a first receiving frame 22, and a second receiving frame 23. The lifting frame 21 is movably connected to the fixed frame 10 in the vertical direction, and the lifting frame 21 is connected to the lifting guide assembly 30 and the lifting drive assembly 40. The first receiving frame 22 and the second receiving frame 23 are arranged at intervals in the vertical direction, and the second receiving frame 23 is located on the side of the first receiving frame 22 away from the preheating member 2011. The first receiving frame 22 and the second receiving frame 23 are both fixedly connected to the lifting frame 21, and the first receiving frame 22 and the second receiving frame 23 can both receive the material box 104 equipped with the sheet material 105. Among them, the first receiving rack 22 and the sheet material 105 received by the first receiving rack 22 can rise to the preheating position 2016 and descend to the transmission position 2017; the second receiving rack 23 and the sheet material 105 received by the second receiving rack 23 can move to the transmission position 2017 and the side of the transmission position 2017 away from the preheating position 2016.
[0086] It can be understood that the material box 104 equipped with the sheet material 105 that has not been heated and coated can enter the preheating chamber 201 through the material opening 2012, and be received on the first receiving frame 22 moved to the transmission position 2017, and then the lifting drive assembly 40 can drive the lifting frame 21 to rise, so that the first receiving frame 22 and the sheet material 105 received by the first receiving frame 22 are moved to the preheating position 2016 for heating. At this time, the second receiving frame 23 is located at the transmission position 2017.
[0087] When the sheet material 105 on the first receiving frame 22 is heated, the connecting valve 400 can be opened, the moving mechanism 102 can move the material box 104 equipped with the coated sheet material 105 to the transfer position 2017, and the lifting drive assembly 40 can drive the lifting frame 21 to rise a specified distance so that the second receiving frame 23 receives the material box 104 on the moving mechanism 102 and separates the material box 104 from the moving mechanism 102. Then the moving mechanism 102 can be moved into the reaction chamber 101.
[0088] Then the lifting drive assembly 40 can drive the lifting frame 21 to descend again, so that the first receiving frame 22 and the preheated sheet material 105 received by the first receiving frame 22 move to the transfer position 2017. The moving mechanism 102 enters the mobile preheating chamber 201 again, and then the lifting drive assembly 40 drives the lifting frame 21 to descend a specified distance, so that the material box 104 equipped with the preheated sheet material 105 is received on the moving mechanism 102 and separated from the first receiving frame 22. Then it can be moved into the reaction chamber 101 and the connecting valve 400 can be closed. The sheet material 105 moved into the reaction chamber 101 can be coated. The lifting drive assembly 40 can drive the lifting frame 21 to rise, so that the second receiving frame 23 and the sheet material 105 on the second receiving frame 23 are moved to the transmission position 2017, and then the material port 2012 is opened, and the transmission device can take out the material box 104 equipped with the sheet material 105 on the second receiving frame 23 from the preheating chamber 201 through the material port 2012.
[0089] In this way, the lifting mechanism 202 has two stations for receiving the material box 104 in the moving assembly 130 through the arrangement of the first receiving frame 22 and the second receiving frame 23, so that when the sheet material 105 received by one receiving frame is preheated, the other receiving frame can receive the sheet material 105 that has been coated. The efficiency of the coating process of the sheet material 105 can be improved.
[0090] In some embodiments, the preheating device 200 may further include a reflective plate 2018, which may be disposed in the preheating chamber 201 and fixedly connected to the inner wall of the preheating chamber 201. The reflective plate 2018 is located on the side of the transmission position 2017 away from the preheating position 2016 in the vertical direction. The reflective plate 2018 may reflect the heat generated by the preheating element 2011, so that the heat generated by the preheating element 2011 flows from a position away from the preheating element 2011 to a position close to the preheating element 2011.
[0091] It can be understood that the reflective plate 2018 can be located at one end of the preheating chamber 201 that is away from the preheating position 2016 in the vertical direction. The heat generated by the preheating element 2011 flows in the vertical direction and reaches the reflective plate 2018 after passing through the preheating position 2016 and the transmission position 2017. The reflective plate 2018 can reflect the heat to the preheating position 2016 by mirror reflection, thereby reducing the heat loss at the preheating position 2016, increasing the temperature of the preheating position 2016, and improving the efficiency of heating the sheet material at the preheating position 2016.
[0092] In the embodiment of the present application, there is no specific limitation on the material of the reflective plate 2018. For example, the material of the reflective plate 2018 may include, but is not limited to, aluminum alloy, steel alloy, and the like.
[0093] Please also read Figure 8 and Fig. 9 In some embodiments, the lifting guide assembly 30 may include a plurality of lifting guide rails 31 and a plurality of lifting guide wheels 32. The plurality of lifting guide rails 31 correspond to the plurality of lifting guide wheels 32 one by one. The plurality of lifting guide rails 31 are fixedly mounted on the fixed frame 10 and extend in the vertical direction. The plurality of lifting guide rails 31 may be arranged at intervals along the second horizontal direction. Each group of lifting guide wheels 32 includes at least one lifting guide wheel 32. Each lifting guide wheel 32 may be rotatably connected to the lifting frame 21, and the axial direction of each lifting guide wheel 32 coincides with the first horizontal direction. The plurality of lifting guide wheels 32 are arranged at intervals in the second horizontal direction. When the number of the lifting guide wheels 32 in each group of lifting guide wheels 32 is multiple, the plurality of lifting guide wheels 32 are arranged at intervals in the vertical direction. The peripheral wall of each group of lifting guide wheels 32 may be slidably matched with the corresponding lifting guide rail 31.
[0094] A limiting groove 33 may be provided on the peripheral wall of each lifting guide wheel 32. The width of the limiting groove 33 gradually decreases in the direction from the peripheral wall of the lifting guide wheel 32 toward the center of the lifting guide wheel 32. One side of each lifting guide rail 31 that is used to abut against the lifting guide wheel 32 is adapted to the limiting groove 33 and is accommodated in the corresponding limiting groove 33. The inner wall of the limiting groove 33 can abut against the lifting guide rail 31, thereby limiting the movement of the lifting guide wheel 32 and the lifting guide rail 31 in the axial direction of the lifting guide wheel 32 (i.e., the first horizontal direction).
[0095] It can be understood that the restriction of the relative movement between the lifting guide wheel 32 and the lifting guide rail 31 realizes the restriction of the relative movement between the lifting frame 21 and the fixed frame 10 in the same direction.
[0096] In the embodiment of the present application, there is no specific limitation on the number of lifting guide rails 31 and lifting guide wheels 32. For example, two lifting guide rails 31 can be provided, and two groups of lifting guide wheels 32 can be provided. One side of each lifting guide rail 31 facing the other lifting guide rail 31 is used to enter the corresponding limiting groove 33. In this way, the two lifting guide rails 31 can support two groups of lifting guide wheels 32 in the second horizontal direction, thereby limiting the movement of the lifting assembly 20 in the second horizontal direction.
[0097] It can be understood that the lifting guide assembly 30 can limit the movement of the lifting assembly 20 in the first horizontal direction and the second horizontal direction, and can guide the movement of the lifting assembly 20 in the vertical direction through the contact between the lifting guide wheel 32 and the lifting guide rail 31, so as to realize the movably connection between the lifting assembly 20 and the fixing frame 10 in the vertical direction. The rolling friction between the lifting guide wheel 32 and the lifting guide rail 31 can improve the smoothness of the movement of the lifting assembly 20.
[0098] In some embodiments, the lifting drive assembly 40 may include a belt transmission group, a lifting drive shaft 41 and a lifting drive member 42. The lifting drive shaft 41 is rotatably connected to the inner wall of the preheating chamber 201, and the length direction of the lifting drive shaft 41 coincides with the second horizontal direction. The stator of the lifting drive member 42 is fixedly installed on the preheating maintenance door 2015, and the mover is fixedly connected to the lifting drive shaft 41. The lifting drive member 42 can drive the lifting drive shaft 41 to rotate.
[0099] The belt transmission group may include a lifting drive wheel 43, a lifting follower wheel 44, a lifting drive rope 45 and a lifting connection member 46. The lifting drive wheel 43 may be fixedly connected to the lifting drive shaft 41 and coaxially arranged with the lifting drive shaft 41. The lifting drive shaft 41 may transmit the lifting drive wheel 43. The lifting follower wheel 44 may be rotatably connected to the inner wall of the preheating chamber 201. The lifting drive rope 45 may be wound around the corresponding lifting drive wheel 43 and the lifting follower wheel 44. The lifting connection member 46 may be fixedly installed on the lifting drive rope 45 and fixedly connected to the lifting frame 21. The lifting drive wheel 43 and the lifting follower wheel 44 may be spaced apart in the vertical direction, and the lifting connection member 46 may be located between the lifting drive wheel 43 and the lifting follower wheel 44. When the lifting drive member 42 drives the lifting drive shaft 41 to rotate, the lifting drive wheel 43 rotates synchronously, causing the lifting follower wheel 44 and the lifting drive rope 45 to rotate synchronously, thereby causing the lifting connecting member 46 to move in the vertical direction, and further causing the lifting assembly 20 to move in the vertical direction.
[0100] For example, a connection seat 47 may be fixedly connected to the inner wall of the preheating chamber 201 and / or the fixing frame 10, and the lifting follower wheel 44 may be rotatably connected to the connection seat 47, thereby realizing a rotatable connection with the inner wall of the preheating chamber 201.
[0101] The lifting drive shaft 41 can be rotatably connected to the preheating maintenance door 2015 and rotatably connected to the fixed extension frame 51 extended from the fixed frame 10, so as to realize the rotatable connection between the lifting drive shaft 41 and the inner wall of the preheating chamber 201.
[0102] It is understood that the rotatable connection can be achieved by a rotating connection member, so that the two components can rotate relative to each other. In the embodiments of the present application, the type of the rotating connection member is not specifically limited. For example, the rotating connection member can be, but is not limited to, a pin, a bearing, a coupling, a hinge, etc.
[0103] In the embodiment of the present application, there is no specific limitation on the type of the lifting drive member 42. For example, the lifting drive member 42 may be, but is not limited to, a reduction motor.
[0104] In the embodiment of the present application, the number of the belt drive groups is not specifically limited. For example, the number of the belt drive groups can be two, the two belt drive groups are spaced apart in the second horizontal direction, and the lifting drive wheel 43 in each belt drive group is fixedly connected to the lifting drive shaft 41.
[0105] Through the preheating device 200 and the lifting mechanism 202 provided in the embodiment of the present application, after the material box 104 equipped with the sheet material 105 that has not been heated and coated can enter the preheating chamber 201 through the material opening 2012 and be received on the first receiving frame 22 moved to the transmission position 2017, the lifting drive assembly 40 can drive the lifting frame 21 to rise, so that the first receiving frame 22 and the sheet material 105 received by the first receiving frame 22 are moved to the preheating position 2016 for heating. At this time, the second receiving frame 23 is located at the transmission position 2017.
[0106] When the sheet material 105 on the first receiving frame 22 is heated, the connecting valve 400 can be opened, the moving mechanism 102 can move the material box 104 equipped with the coated sheet material 105 to the transfer position 2017, and the lifting drive assembly 40 can drive the lifting frame 21 to rise a specified distance so that the second receiving frame 23 receives the material box 104 on the moving mechanism 102 and separates the material box 104 from the moving mechanism 102. Then the moving mechanism 102 can be moved into the reaction chamber 101.
[0107] Then the lifting drive assembly 40 can drive the lifting frame 21 to descend again, so that the first receiving frame 22 and the preheated sheet material 105 received by the first receiving frame 22 move to the transfer position 2017. The moving mechanism 102 enters the mobile preheating chamber 201 again, and then the lifting drive assembly 40 drives the lifting frame 21 to descend a specified distance, so that the material box 104 equipped with the preheated sheet material 105 is received on the moving mechanism 102 and separated from the first receiving frame 22. Then it can be moved into the reaction chamber 101 and the connecting valve 400 can be closed. The sheet material 105 moved into the reaction chamber 101 can be coated. The lifting drive assembly 40 can drive the lifting frame 21 to rise, so that the second receiving frame 23 and the sheet material 105 on the second receiving frame 23 are moved to the transmission position 2017, and then the material port 2012 is opened, and the transmission device can take out the material box 104 equipped with the sheet material 105 on the second receiving frame 23 from the preheating chamber 201 through the material port 2012.
[0108] In this way, the lifting mechanism 202 can move the received sheet material 105 to a position close to the preheating part 2011 for heating, thereby improving the heating effect of the sheet material 105. At the same time, the lifting component 20 is provided with two receiving racks for receiving the material box 104, so that when the sheet material 105 received by one receiving rack is preheated, the other receiving rack can receive the sheet material 105 that has completed the coating. The efficiency of the sheet material 105 in completing the coating process can be improved. In the prior art, the sheet material is directly heated to the process temperature in the process chamber and then the coating process begins. The heating and the process have a sequence, and this process wastes the heating time. The present application separates the preheating process and the process process by providing a first receiving rack 22 and a second receiving rack 23, so that the preheating and the process can be carried out simultaneously, thereby improving the processing efficiency.
[0109] Please also read Fig.10 In some embodiments, an opening 1012 is provided on a side wall of the reaction chamber 101, and the opening 1012 is connected to the space in the reaction chamber 101. Part of the structure of the jet mechanism 103 can extend into the reaction chamber 101 from the opening 1012, and the remaining structure is located outside the reaction chamber 101 and fixedly connected to the side wall of the reaction chamber 101. At the same time, the position where the jet mechanism 103 is connected to the side wall of the reaction chamber 101 is sealed to reduce the leakage of the first precursor and the second precursor in the reaction chamber 101.
[0110] In the embodiment of the present application, there is no specific limitation on the opening position of the opening 1012. For example, the opening 1012 can be opened at the top of the reaction chamber 101.
[0111] In some embodiments, the jet mechanism 103 may be disposed at the top of the reaction chamber 101, and the jet mechanism 103 may jet the first precursor and the second precursor toward the bottom of the reaction chamber 101, and jet an inert gas between each jet of the first precursor and the second precursor to block the first precursor and the second precursor by the inert gas. At the same time, a plurality of exhaust slots may be provided on the jet mechanism 103 to extract the first precursor and the second precursor that are not attached to the sheet material 105, respectively. The jet mechanism 103 may be connected to an exhaust device (not shown), which may realize the extraction of the first precursor and the second precursor, respectively, through the jet mechanism 103.
[0112] It can be understood that while the first precursor and the second precursor are extracted through the gas extraction slot, the inert gas between each stream of the first precursor and each stream of the second precursor can be extracted simultaneously.
[0113] In the embodiments of the present application, the type of the inert gas is not specifically limited. For example, the inert gas may be, but is not limited to, nitrogen.
[0114] In the embodiment of the present application, the length direction of the jet mechanism 103 coincides with the width direction of the coating device, that is, coincides with the second horizontal direction. The width direction of the jet mechanism 103 coincides with the length direction of the coating device, that is, coincides with the first horizontal direction. The height direction of the jet mechanism 103 coincides with the height direction of the coating device, that is, coincides with the vertical direction.
[0115] In some embodiments, the jet mechanism 103 may include a jet seat 60 and an air intake assembly. The jet seat 60 and the air intake assembly are arranged in a vertical direction, and the jet seat 60 is fixedly connected to the air intake assembly.
[0116] Please also read Fig.11 and Fig.12 The air inlet assembly is provided with a first air inlet 71, a second air inlet 72 and a third air inlet 73. The first air inlet 71 can be fed with a first precursor (such as water), the second air inlet 72 can be fed with a second precursor (such as TMA), and the third air inlet 73 can be fed with an inert gas.
[0117] Please also read Fig.13 The air inlet assembly is provided with a plurality of first diverter grooves 821, a plurality of second diverter grooves 822, and a plurality of third diverter grooves 823 on the side facing the air injection seat 60. The first air inlet 71 can be connected with each of the first diverter grooves 821 through the first channel in the air inlet assembly, the second air inlet 72 can be connected with each of the second diverter grooves 822 through the second channel in the air inlet assembly, and the third air inlet 73 can be connected with each of the third diverter grooves 823 through the third channel in the air inlet assembly.
[0118] Please also read Fig.14 The side of the jet seat 60 facing the air intake assembly is provided with a plurality of first jet ports 61, a plurality of second jet ports 62, and a plurality of third jet ports 63. Each first flow diverter groove 821 corresponds to at least one first jet port 61, and is docked and communicated with the corresponding first jet port 61. Each second flow diverter groove 822 corresponds to at least one second jet port 62, and is docked and communicated with the corresponding second jet port 62. Each third flow diverter groove 823 corresponds to at least one third jet port 63, and is docked and communicated with the corresponding third jet port 63.
[0119] Please also read Fig.15 and Fig.16A plurality of first jet slots 64, a plurality of second jet slots 65 and a plurality of third jet slots 66 are provided on the side of the jet seat 60 away from the air intake assembly. Each first jet slot 64 is connected to at least one first jet port 61, each second jet slot 65 is connected to at least one second jet port 62, and each third jet slot 66 is connected to at least one third jet port 63. The plurality of first jet slots 64, the plurality of second jet slots 65 and the plurality of third jet slots 66 are arranged at intervals in the first horizontal direction. Each third jet slot 66 is located between a first jet slot 64 and a second jet slot 65 in the first horizontal direction.
[0120] The side of the jet seat 60 facing away from the air inlet assembly may be disposed toward the material box 104 and the sheet material 105 on the material box 104. The first jet slot 64 may receive the first precursor through the first channel and the first jet port 61 to spray the first precursor toward the sheet material 105. The second jet slot 65 may receive the second precursor through the second channel and the second jet port 62 to spray the second precursor toward the sheet material 105. The third jet slot 66 may spray an inert gas to block the first precursor from flowing toward the second precursor, and block the second precursor from flowing toward the first precursor.
[0121] It is understood that the first air inlet 71, the second air inlet 72 and the third air inlet 73 can be connected to an air inlet device (not shown). Each air inlet device can drive the gas in the corresponding container to enter the first air inlet 71, the second air inlet 72 or the third air inlet 73. In the embodiments of the present application, the type of the air inlet device is not specifically limited. For example, the air inlet device can be, but is not limited to, an air pump.
[0122] It can be understood that the first jet port 61, the second jet port 62, the third jet port 63, the first jet slot 64, the second jet slot 65 and the third jet slot 66 can all be strip slots extending along the second horizontal direction. Each first jet port 61, each second jet port 62 and each third jet port 63 are arranged at intervals in the first horizontal direction, and each first jet slot 64, each second jet slot 65 and each third jet slot 66 are arranged at intervals in the first horizontal direction.
[0123] It can be understood that in the first horizontal direction, the arrangement of the first jet slot 64, the second jet slot 65 and the third jet slot 66 can be: the first jet slot 64A, the third jet slot 66A, the second jet slot 65A, the first jet slot 64B, the third jet slot 66B, the second jet slot 65B, the third jet slot 66C, the first jet slot 64C... and so on, that is, on both sides of each third jet slot 66, a first jet slot 64 is opened on one side, and a second jet slot 65 is opened on the other side.
[0124] It is understood that the first precursor and the second precursor may produce a chemical reaction when they contact the environment outside the surface of the sheet material 105, thereby affecting the processing of the sheet material 105. For example, when the first precursor is water and the second precursor is TMA, the first precursor and the second precursor may burn when they contact at a position away from the sheet material 105 in the reaction chamber 101.
[0125] In this way, a third jet slot 66 is set between each first jet slot 64 and the adjacent second jet slot 65, and the third jet slot 66 sprays an inert gas, which can enable the inert gas to block the first precursor and the second precursor, reduce the probability of the first precursor and the second precursor directly contacting at a position away from the sheet material 105 in the reaction chamber 101, and improve the safety and stability of the process treatment of the sheet material 105.
[0126] In the embodiments of the present application, the type of the inert gas is not specifically limited. For example, the inert gas may be, but is not limited to, nitrogen.
[0127] It can be understood that the number of the first air inlet 71 is less than the number of the first diverter slots 821, and the number of the first diverter slots 821 can be less than or equal to the number of the first gas injection slots 64. The number of the second air inlet 72 is less than the number of the second diverter slots 822, and the number of the second diverter slots 822 can be less than or equal to the number of the second gas injection slots 65. The number of the third air inlet 73 is less than the number of the third diverter slots 823, and the number of the third diverter slots 823 can be less than or equal to the number of the third gas injection slots 66. In this way, the gas introduced from the first air inlet 71, the second air inlet 72 and the third air inlet 73 can be diverted through the first channel, the second channel and the third channel respectively, and the side of the gas injection seat 60 away from the gas inlet assembly can simultaneously eject multiple streams of the first precursor, the second precursor and the inert gas. In this way, the sheet material 105 moves once in the first horizontal direction, and the side of the sheet material 105 facing the gas injection mechanism 103 can receive the first precursor and the second precursor in turn for multiple times, thereby forming a multi-layer atomic film on the sheet material 105. The reciprocating movement of the sheet material 105 in the first horizontal direction may increase the number of layers of the atomic film formed on the sheet material 105 .
[0128] By isolating the first precursor and the second precursor with an inert gas, the first precursor and the second precursor can be ejected simultaneously. In this way, the jet mechanism 103 provided in the present application can achieve the ejection of multiple strands of the first precursor and the second precursor while reducing the contact between the first precursor and the second precursor at a position away from the sheet material 105. When the reaction device 100 processes the sheet material 105, it is not necessary to repeatedly inject the first precursor, the inert gas, the second precursor, and the inert gas into the reaction chamber 101 in sequence. In this way, the jet mechanism 103 provided in the embodiment of the present application can improve the processing efficiency of the sheet material 105 while improving the processing safety.
[0129] In the embodiments of the present application, there is no specific limitation on the fixing method during the fixed connection and fixed installation. For example, the fixing method may include, but is not limited to, screw fixing, bolt fixing, welding fixing, buckle fixing, etc.
[0130] In some embodiments, among the plurality of first air-jet slots 64 , the plurality of second air-jet slots 65 , and the plurality of third air-jet slots 66 arranged in the first horizontal direction, the air-jet slots located on both sides are the first air-jet slots 64 .
[0131] It can be understood that the first jet slot 64 can be used to eject the first precursor (such as water) that is not harmful to the environment or human body, and the second jet slot 65 can be used to eject the second precursor (such as TMA) that is harmful to the environment or human body. Setting the jet slots on both sides as the first jet slot 64 can reduce the probability of the second precursor leaking from both sides of the multiple first jet slots 64, the multiple second jet slots 65, and the multiple third jet slots 66 arranged in the first horizontal direction, thereby reducing the pollution to the environment and the damage to the health of the workers during the reaction process.
[0132] In some embodiments, Fig.15 and Fig.16As shown, a plurality of first air extraction slots 67 and a plurality of second air extraction slots 68 may be provided on a side of the air injection seat 60 away from the air inlet assembly. The number of the first air extraction slots 67 may be greater than or equal to the number of the first air injection slots 64, and the number of the second air extraction slots 68 may be greater than or equal to the number of the second air injection slots 65. Each of the first air extraction slots 67 corresponds to one of the first air injection slots 64, and each of the first air extraction slots 67 is located on one side of the corresponding first air injection slot 64 in the first horizontal direction, and is spaced apart from the corresponding first air injection slot 64. Each of the second air extraction slots 68 corresponds to one of the second air injection slots 65, and each of the second air extraction slots 68 is located on one side of the corresponding second air injection slot 65 in the first horizontal direction, and is spaced apart from the corresponding second air injection slot 65. The first air extraction slots 67 are used to extract the inert gas and the first precursor that is not received by the sheet material 105, and the second air extraction slots 68 are used to extract the inert gas and the second precursor that is not received by the sheet material 105. Each of the first air extraction slots 67 and each of the second air extraction slots 68 are spaced apart from the third air injection slot 66 in the first horizontal direction.
[0133] like Fig.14 As shown, the side of the air injection seat 60 facing the air inlet assembly is further provided with a plurality of first air suction ports 69 and a plurality of second air suction ports 610. Each first air suction port 69 is communicated with a first air suction groove 67. Each second air suction port 610 is communicated with a second air suction groove 68.
[0134] like Fig.12 and Fig.13 As shown, a first exhaust port 74 and a second exhaust port 75 may be provided on the side of the air intake assembly facing away from the air injection seat 60. A plurality of first recovery slots 824 and a plurality of second recovery slots 825 may be provided on the side of the air intake assembly facing the air injection seat 60. The first exhaust port 74 may be connected to each first recovery slot 824 through the fourth channel in the air intake assembly. The second exhaust port 75 may be connected to each second recovery slot 825 through the fifth channel in the air intake assembly. Each first recovery slot 824 corresponds to at least one first air extraction port 69, and each first recovery slot 824 is connected to and communicated with the corresponding first air extraction port 69. Each second recovery slot 825 corresponds to at least one second air extraction port 610, and each second recovery slot 825 is connected to and communicated with the corresponding second air extraction port 610.
[0135] In the embodiment of the present application, there is no specific limitation on the quantitative relationship between the first air extraction port 69 and the first recovery slot 824, and the quantitative relationship between the second air extraction port 610 and the second recovery slot 825. For example, the number of the first recovery slots 824 may be N times the number of the first air extraction ports 69, and the N first recovery slots 824 spaced apart in the second horizontal direction are connected to the same first air extraction port 69; the number of the second recovery slots 825 may be N times the number of the second air extraction ports 610, and the N second recovery slots 825 spaced apart in the second horizontal direction are connected to the same second air extraction port 610; wherein N is an integer greater than 1.
[0136] In the embodiment of the present application, there is no specific limitation on the quantitative relationship between the first air extraction slots 67 and the first air injection slots 64, and the quantitative relationship between the second air extraction slots 68 and the second air injection slots 65. For example, each first air injection slot 64 is provided with a first air extraction slot 67 on both sides in the first horizontal direction, that is, the number of the first air extraction slots 67 is twice the number of the first air injection slots 64; each second air injection slot 65 is provided with a second air extraction slot 68 on both sides in the first horizontal direction, that is, the number of the second air extraction slots 68 is twice the number of the second air injection slots 65.
[0137] It can be understood that the first air extraction slot 67 can absorb the first precursor that does not participate in the formation of the atomic film, and at the same time absorb the inert gas ejected from the adjacent third gas injection slot 66. The second air extraction slot 68 can absorb the second precursor that does not participate in the formation of the atomic film, and at the same time absorb the inert gas ejected from the third gas injection slot 66. In this way, a part of the absorbed gas can flow to the first exhaust port 74 through the first air extraction port 69 and the fourth channel, and the remaining part can flow to the second exhaust port 75 through the second air extraction port 610 and the fifth channel. The first exhaust port 74 and the second exhaust port 75 can be connected to a gas extraction device (not shown) respectively, so as to realize the extraction of the first precursor, the second precursor and the inert gas. The extracted first precursor and the second precursor can be collected in a designated space for processing, so as to reduce the leakage of the precursor to cause atmospheric pollution and production accidents. In the embodiment of the present application, the type of the gas extraction device is not specifically limited. For example, the gas extraction device can be, but is not limited to, an air pump.
[0138] It is understandable that some precursors (such as TMA) are toxic, so they need to be extracted and then processed to reduce the damage to the health of workers caused by the toxicity of the precursors.
[0139] In some embodiments, the jet seat 60 may include a plurality of vertical plates, each of which has one or more strip grooves spaced along the second horizontal direction on one side of the vertical direction facing the air inlet assembly, and one strip groove on the other side, and each of which has a through groove on at least one side of the first horizontal direction. The strip grooves on both sides of each vertical plate can form a first air extraction port 69 and a first air extraction groove 67, or a second air extraction port 610 and a second air extraction groove 68, respectively. The through grooves of each vertical plate in the first horizontal direction can cooperate to form a first jet groove 64, a second jet groove 65, or a third jet groove 66. In this way, after a plurality of vertical plates are arranged in the first horizontal direction and fixedly connected, the assembly of a jet seat 60 can be realized.
[0140] In some embodiments, Fig.11 As shown, the air intake assembly may include an air intake seat 70 and a diverter seat 80. The diverter seat 80 is located between the air intake seat 70 and the air injection seat 60 in the vertical direction, and is fixedly connected to the air intake seat 70 and the air injection seat 60. Part of the structure of the diverter seat 80 protrudes from the side of the air injection seat 60 in the second horizontal direction and the first horizontal direction, and is fixedly connected to the side wall of the reaction chamber 101, thereby realizing the fixed connection between the air injection mechanism 103 and the reaction chamber 101.
[0141] Please also read Fig.17 The first air inlet 71, the second air inlet 72 and the third air inlet 73 are all provided on the air inlet seat 70. The air inlet seat 70 is provided with a first air inlet groove 76, a second air inlet groove 77 and a third air inlet groove 78 on one side thereof facing the diverter seat 80. The first air inlet groove 76 is connected to the first air inlet 71. The second air inlet 72 is connected to the second air inlet groove 77, and the third air inlet 73 is connected to the third air inlet groove 78.
[0142] like Fig.11 As shown, the diverter seat 80 may include a first sub-seat 81 and a second sub-seat 82. The first sub-seat 81 and the second sub-seat 82 are arranged in the vertical direction, the first sub-seat 81 is located between the second sub-seat 82 and the inlet seat 70, and the second sub-seat 82 is located between the first sub-seat 81 and the exhaust seat. The second sub-seat 82 can be fixedly connected to the inner wall of the reaction chamber 101. The first sub-seat 81 is fixedly connected to the second sub-seat 82 and the inlet seat 70, and the second sub-seat 82 is fixedly connected to the exhaust seat 60.
[0143] Please also read Fig.18 and Fig.19The first sub-seat 81 has a first communication port 811, a second communication port 812 and a third communication port 813 on the side facing the air inlet seat 70, and has a first communication groove 814, a second communication groove 815 and a third communication groove 816 on the side facing the second sub-seat 82. The first communication port 811 is connected to and communicated with the first air inlet groove 76, and is connected to the first communication groove 814. The second communication port 812 is connected to and communicated with the second air inlet groove 77, and is connected to the second communication groove 815. The third communication port 813 is connected to and communicated with the third air inlet groove 78, and is connected to the third communication groove 816. The first communication groove 814, the second communication groove 815 and the third communication groove 816 are all arranged at intervals in the second horizontal direction, and the first communication groove 814, the second communication groove 815 and the third communication groove 816 extend along the first horizontal direction.
[0144] Please also read Fig. 20 and Fig.21 , the second sub-seat 82 is provided with a first diverter port 826, a second diverter port 827 and a third diverter port 828 on the side facing the air inlet seat 70. The first diverter port 826, the second diverter port 827 and the third diverter port 828 are all arranged at intervals in the second horizontal direction, and the first diverter port 826, the second diverter port 827 and the third diverter port 828 are all extended along the first horizontal direction. A plurality of first diverter slots 821, a plurality of second diverter slots 822 and a plurality of third diverter slots 823 are provided on the side of the second sub-seat 82 facing the air injection seat 60. The first diverter port 826 is connected to and communicated with the first connecting slot 814, and the first diverter port 826 is connected to each of the first diverter slots 821. The second diverter port 827 is connected to and communicated with the second connecting slot 815, and the second diverter port 827 is connected to each of the second diverter slots 822. The third diversion port 828 is connected to and communicates with the third connecting groove 816 , and the third diversion port 828 is communicated with each of the third diversion grooves 823 .
[0145] In the embodiments of the present application, there is no specific limitation on the number of the first air inlet groove 76, the second air inlet groove 77, the third air inlet groove 78, the first connecting port 811, the second connecting port 812, the third connecting port 813, the first connecting groove 814, the second connecting groove 815, the third connecting groove 816, the first jet port 61, the second jet port 62 and the third jet port 63.
[0146] For example, the first air inlet groove 76, the second air inlet groove 77, the third air inlet groove 78, the first connecting port 811, the second connecting port 812, the third connecting port 813, the first connecting groove 814, the second connecting groove 815, the third connecting groove 816, the first jet port 61, the second jet port 62 and the third jet port 63 may be one or two; wherein the number of the first air inlet groove 76, the second air inlet groove 77 and the third air inlet groove 78 is respectively the same as the number of the first connecting port 811, the second connecting port 812 and the third connecting port 813, and the number of the first connecting groove 814, the second connecting groove 815 and the third connecting groove 816 is respectively the same as the number of the first jet port 61, the second jet port 62 and the third jet port 63. The number of the first air inlet groove 76 is greater than or equal to the number of the first air inlet ports 71, and less than or equal to the number of the first connecting groove 814. The number of the second air inlet grooves 77 is greater than or equal to the number of the second air inlet ports 72, and less than or equal to the number of the second connecting grooves 815, and the number of the third air inlet grooves 78 is greater than or equal to the number of the third air inlet ports 73, and less than or equal to the number of the second connecting grooves 815. The number of the first diverter grooves 821 is greater than the number of the first diverter ports 826 (i.e., the number of the first connecting grooves 814), the number of the second diverter grooves 822 is greater than the number of the second diverter ports 827 (i.e., the number of the second connecting grooves 815), and the number of the third diverter grooves 823 is greater than the number of the third diverter ports 828 (i.e., the number of the third connecting grooves 816).
[0147] It can be understood that the position of each first air inlet groove 76 corresponds to the position of a first communication port 811, so that the first air inlet groove 76 is connected to the first sub-seat 81 after the air inlet seat 70 is connected to the first sub-seat 81. Similarly, the positional relationship between the second air inlet groove 77 and the second communication port 812, the positional relationship between the third air inlet groove 78 and the third communication port 813, the positional relationship between the first communication groove 814 and the first diversion port 826, the positional relationship between the second communication groove 815 and the second diversion port 827, and the positional relationship between the third communication groove 816 and the third diversion port 828 can be the same or similar to the positional relationship between the first air inlet groove 76 and the first communication port 811, and will not be repeated here.
[0148] It can be understood that each first air inlet groove 76, each first connecting port 811, each first connecting groove 814 and each first diversion port 826 cooperate to form a first channel, which can realize the communication between the first air inlet 71 and each first diversion groove 821, so that the first precursor can achieve a single-port entry and multiple-stream output diversion effect. Similarly, each second air inlet groove 77, each second connecting port 812, each second connecting groove 815 and each second diversion port 827 cooperate to form a second channel. Each third air inlet groove 78, each third connecting port 813, each third connecting groove 816 and each third diversion port 828 cooperate to form a third channel.
[0149] It can be understood that each first diversion port 826 extending along the first horizontal direction is connected to each first diversion slot 821 extending along the second horizontal direction, which can improve the uniformity of the first precursor distribution in each first diversion slot 821, thereby improving the uniformity of the first precursor ejected from the first jetting slot 64, and improving the processing effect of the sheet material 105. Similarly, the connection between the second diversion port 827 and the second diversion slot 822, and the connection between the third diversion port 828 and the third diversion slot 823 can achieve the same or similar effects, which will not be repeated here.
[0150] In some embodiments, the first exhaust port 74 and the second exhaust port 75 are provided on the air intake seat 70, and the air intake seat 70 is provided with a first exhaust groove 79 and a second exhaust groove 710 on one side facing the first sub-seat 81. The first exhaust groove 79 is connected to the first exhaust port 74, and the second exhaust groove 710 is connected to the second exhaust port 75.
[0151] The first sub-seat 81 has a first collecting port 817 and a second collecting port 818 on one side facing the air inlet seat 70, and has a plurality of first collecting slots 819 and a plurality of second collecting slots 8110 on one side facing the second sub-seat 82. The plurality of first collecting slots 819 and the plurality of second collecting slots 8110 are spaced apart in the second horizontal direction and extend along the first horizontal direction.
[0152] A plurality of first recovery ports 829 and a plurality of second recovery ports 8210 are provided on the side of the second sub-seat 82 facing the first sub-seat 81. The plurality of first recovery ports 829 and the plurality of second recovery ports 8210 are arranged at intervals in the second horizontal direction and extend along the first horizontal direction. A plurality of first recovery slots 824 and a plurality of second recovery slots 825 are provided on the side of the second sub-seat 82 facing the jet seat 60. Each first recovery port 829 is docked and connected with the corresponding first collecting slot 819, and is connected with the plurality of first recovery slots 824. Each second recovery port 8210 is docked and connected with the corresponding second collecting slot 8110, and is connected with the plurality of second recovery slots 825.
[0153] In the embodiments of the present application, there is no specific limitation on the number of the first exhaust groove 79, the second exhaust groove 710, the first collecting port 817, the second collecting port 818, the first gas suction port 69, the second gas suction port 610, the first recovery groove 824, the second recovery groove 825, the first collecting groove 819, the second collecting groove 8110, the first recovery port 829 and the second recovery port 8210.
[0154] For example, the number of the first exhaust slot 79 and the second exhaust slot 710 can be one, and the number of the first collecting slot 819, the second collecting slot 8110, the first recovery port 829, the second recovery port 8210, the first recovery slot 824, and the second recovery slot 825 can all be multiple. The number of the first collecting port 817 and the second collecting port 818 are respectively the same as the number of the first exhaust slot 79 and the second exhaust slot 710, and the number of the first collecting slot 819 and the second collecting slot 8110 are respectively the same as the number of the first recovery port 829 and the second recovery port 8210.
[0155] It can be understood that the first exhaust slot 79, the first collection port 817, each first collection slot 819 and each first recovery port 829 cooperate to form a fourth channel, which can realize the communication between the first exhaust port 74 and each first recovery slot 824, so that the gas extracted from the plurality of first gas extraction slots 67 can be collected to the first exhaust port 74 through the fourth channel. The second exhaust slot 710, the second collection port 818, each second collection slot 8110 and each second recovery port 8210 cooperate to form a fifth channel, which can realize the communication between the second exhaust port 75 and each second recovery slot 825, so that the gas extracted from the plurality of second gas extraction slots 68 can be collected to the second exhaust port 75 through the fifth channel.
[0156] It can be understood that each first recovery port 829 extending along the first horizontal direction is connected to each first recovery slot 824 extending along the second horizontal direction, which can improve the uniformity of the distribution of the first precursor in each first diverter slot 821, thereby improving the uniformity of the first precursor ejected from the first jetting slot 64, and improving the processing effect of the sheet material 105. Similarly, the connection between the second diverter port 827 and the second diverter slot 822, and the connection between the third diverter port 828 and the third diverter slot 823 can achieve the same or similar effects, which will not be repeated here.
[0157] In some embodiments, the jet mechanism 103 may further include a heating assembly. The heating assembly may include a first heating element 91 and a second heating element 92. A heating chamber 711 is provided on the air inlet seat 70, and the heating chamber 711 is connected to the third air inlet port 73 and the third air inlet groove 78. The first heating element 91 may be accommodated in the heating chamber 711 and fixedly connected to the air inlet seat 70. The second heating element 92 may be disposed in the air inlet seat 70 and located close to the first channel and the second channel. The second heating element 92 may be fixedly connected to the air inlet seat 70. Among them, the first heating element 91 may heat the inert gas entering the heating chamber 711. The second heating element 92 may heat the first precursor flowing in the first channel and the second precursor flowing in the second channel.
[0158] It is understood that when the ALD process is performed on the sheet material 105, the temperature in the reaction chamber 101 needs to rise to a specified temperature (for example, greater than or equal to 200 degrees Celsius). The heating component heats the first precursor, the second precursor, and the inert gas, which can reduce the temperature drop of the reaction chamber 101 after the first precursor, the second precursor, and the inert gas enter the reaction chamber 101, and can reduce the impact of temperature changes on the processing of the sheet material 105.
[0159] In the embodiment of the present application, there is no specific limitation on the types of the first heating element 91 and the second heating element 92. For example, the first heating element 91 can be, but is not limited to, an electric heating rod, an electric heating fin, etc. The second heating element 92 can be, but is not limited to, an electric heating rod, an electric heating fin, etc.
[0160] In some embodiments, the second sub-seat 82 is provided with an annular groove 8211 on one side facing the jet seat 60. The annular groove 8211 is connected end to end and is located outside each of the first diverter groove 821, the second diverter groove 822, the third diverter groove 823, the first recovery groove 824 and the second recovery groove 825, that is, each of the first diverter groove 821, the second diverter groove 822, the third diverter groove 823, the first recovery groove 824 and the second recovery groove 825 is located in the area surrounded by the annular groove 8211. The jet mechanism 103 may further include a sealing ring 110. The sealing ring 110 may be accommodated in the annular groove 8211 and adapted to the annular groove 8211. The sealing ring 110 may abut against the outer side of the side wall of the reaction chamber 101 on which the opening 1012 is provided, and the jet seat 60 may enter the reaction chamber 101 through the opening 1012.
[0161] It can be understood that the sealing ring 110 can block the gap between the side wall of the reaction chamber 101 and the second sub-seat 82 , thereby limiting the gas in the reaction chamber 101 from leaking through the opening 1012 .
[0162] In some embodiments, a cooling channel (not shown) may also be provided in the second sub-seat 82, and the cooling channel is arranged near the annular groove 8211 and is spaced apart from the annular groove 8211. The cooling channel may be annular. A liquid inlet 8212 and a liquid outlet 8213 are spaced apart on the side of the second sub-seat 82. The liquid inlet 8212 and the liquid outlet 8213 are connected to the cooling channel. A cooling circulation device (not shown) may be connected to the liquid inlet 8212 and the liquid outlet 8213 through a pipeline, and the cooling circulation device may drive the coolant to flow into the cooling channel through the liquid inlet 8212, and the cooling channel may absorb the heat of the sealing ring 110, and then flow out of the cooling channel from the liquid outlet 8213 to achieve heat dissipation of the sealing ring 110.
[0163] In some cases, the cooling channel can be arranged around the annular groove 8211, that is, the cooling channel can be located outside the annular groove 8211. In other cases, the annular groove 8211 can be arranged around the cooling channel, that is, the annular groove 8211 can be located outside the cooling channel. The embodiments of the present application are not limited to this.
[0164] It can be understood that the sealing ring 110 is in contact with the side wall of the reaction chamber 101, and the heat in the reaction chamber 101 is transferred to the sealing ring 110 through the side wall of the reaction chamber 101, so that the sealing ring 110 is heated up, and the structural strength and service life of the sealing ring 110 are reduced. The coolant in the cooling channel can dissipate heat from the sealing ring 110, reduce the temperature of the sealing ring 110, and thus increase the service life of the sealing ring 110.
[0165] In the embodiments of the present application, there is no specific limitation on the type of the cooling liquid. For example, the cooling liquid may be, but is not limited to, water.
[0166] Through the jet mechanism 103 and the reaction device 100 provided by the embodiment of the present application, the jet mechanism 103 introduces a first precursor, a second precursor and an inert gas on the air inlet seat 70, and the jet mechanism 103 can simultaneously jet multiple first precursors, multiple second precursors and multiple inert gases on the side facing the sheet material 105, so that the sheet material 105 moving through the side facing the first jet slot 64, the second jet slot 65 and the third jet slot 66 on the jet seat 60 can be coated with a multi-layer atomic film in one movement, which can improve the efficiency of coating the sheet material 105; the jet mechanism 103 can replace the scheme of injecting the first precursor, the inert gas, the second precursor and the inert gas into the reaction chamber in sequence by jetting multiple first precursors, multiple second precursors and multiple inert gases at the same time, thereby reducing the waste of the first precursor and the second precursor.
[0167] At the same time, the jet mechanism 103 can exhaust multiple gases (for example, the first precursor, the second precursor and / or the inert gas) through multiple first exhaust grooves 67 and multiple second exhaust grooves 68, and the gases extracted from the multiple first exhaust grooves 67 are gathered into a first exhaust port 74 to be discharged from the jet mechanism 103, and the gases extracted from the multiple second exhaust grooves 68 are gathered into a second exhaust port 75 to be discharged from the jet mechanism 103, thereby reducing the probability of the first precursor and the second precursor contacting and reacting at a position away from the sheet material 105 in the reaction chamber 101, thereby improving the safety of processing the sheet material 105.
[0168] Please also read Fig. 22In some embodiments, a reaction gas inlet pipe 1013 may be fixedly connected to the bottom of the reaction chamber 101. The reaction gas inlet pipe 1013 is in communication with the reaction chamber 101. The reaction gas inlet pipe 1013 may be connected to a gas source device (not shown) and obtain an inert gas from the gas source device. The reaction gas inlet pipe 1013 introduces an inert gas into the reaction chamber 101 to block the first precursor and the second precursor from flowing from the top of the reaction chamber 101 to the bottom of the reaction chamber 101.
[0169] It can be understood that the gas source device connected to the jet mechanism 103 and the reaction gas inlet pipe 1013 can be the same gas source device or different gas source devices, and the embodiments of the present application are not limited to this.
[0170] It can be understood that the flow direction of the inert gas entering the reaction chamber 101 through the reaction gas inlet pipe 1013 is opposite to the flow direction of the first precursor, the second precursor and the inert gas ejected from the gas ejection mechanism 103. Therefore, the inert gas ejected from the reaction gas inlet pipe 1013 can block the flow of the first precursor and the second precursor toward the bottom of the reaction chamber 101, thereby preventing the first precursor and the second precursor from converging at the bottom of the reaction chamber 101.
[0171] Since the first precursor (e.g., water) and the second precursor (e.g., trimethylaluminum) may cause a reaction that affects safety (e.g., combustion, explosion, etc.) when they are in direct contact in the reaction chamber 101, by preventing the first precursor and the second precursor from gathering at the bottom of the reaction chamber 101, it is possible to avoid accidents caused by the first precursor and the second precursor contacting at a position far from the sheet material 105.
[0172] In other embodiments, the reaction air inlet pipe 1013 may be disposed at the top of the reaction chamber 101, and the jet mechanism 103 may be disposed at the bottom of the reaction chamber 101. The embodiments of the present application are not limited to this.
[0173] Please also read Fig.23 In some embodiments, a diffuser 1017 may be fixedly connected to the inner wall of the reaction chamber 101, and the diffuser 1017 is located at a position where the reaction air inlet pipe 1013 is connected to the reaction chamber 101. The diffuser 1017 is arranged corresponding to the jet mechanism 103, and a plurality of diffuser grooves 10171 are provided on the diffuser 1017, and the plurality of diffuser grooves 10171 may be arranged at intervals in the second horizontal direction. The plurality of diffuser grooves 10171 are all connected to the reaction air inlet pipe 1013, so as to realize the connection between the reaction air inlet pipe 1013 and the reaction chamber 101.
[0174] It can be understood that the diffuser 1017 can be a hollow box. After the reaction gas inlet pipe 1013 is introduced with inert gas, the inert gas can flow into the diffuser 1017 and flow along the second horizontal direction to fill the diffuser 1017, and then be sprayed into the reaction chamber 101 through the plurality of diffuser slots 10171, so that the pressure value in the reaction chamber 101 is maintained within a preset pressure range.
[0175] In some embodiments, a reaction gas outlet pipe 1014 may be fixedly connected to the reaction chamber 101. The reaction gas outlet pipe 1014 is in communication with the reaction chamber 101. The reaction gas outlet pipe 1014 may be connected to an exhaust device (not shown), which may exhaust gas from the reaction chamber 101 through the reaction gas outlet pipe 1014, thereby adjusting the air pressure in the reaction chamber 101 so that the air pressure in the reaction chamber 101 is maintained within a preset air pressure range.
[0176] It can be understood that the exhaust devices connected to the jet mechanism 103, the preheating chamber 201 and the reaction gas outlet pipe 1014 can be the same exhaust device or different exhaust devices, and the embodiments of the present application are not limited to this.
[0177] It can be understood that the preset air pressure range may correspond to the air pressure that the environment of the sheet material 105 needs to reach when the reaction device 100 coats the sheet material 105 .
[0178] In the embodiment of the present application, the connection position of the reaction gas outlet pipe 1014 on the reaction chamber 101 is not specifically limited. Fig. 22 As shown, the reaction gas outlet pipe 1014 can be located at the bottom of the reaction chamber 101 .
[0179] Please also read Fig.24 In some embodiments, a reaction heating element 1018 and a heat insulating plate 1019 may be further provided in the reaction chamber 101. The heat insulating plate 1019 may be fixedly mounted on the inner wall of the reaction chamber 101 and located on the side wall of the reaction chamber 101 where the jet mechanism 103 is installed. The heat insulating plate 1019 and the jet mechanism 103 are arranged in a first horizontal direction. The reaction heating element 1018 may be fixedly mounted on a side of the heat insulating plate 1019 facing the reaction chamber 101. The reaction heating element 1018 may heat the reaction chamber 101, thereby heating the sheet material 105 located in the reaction chamber 101.
[0180] In this way, the temperature of the sheet material 105 in the reaction chamber 101 can be maintained within the temperature range required by the coating process. The heat insulation board 1019 can block the heat generated by the reaction heating element 1018 from radiating out of the reaction chamber 101, reduce the heat loss in the reaction chamber 101, and thus improve the efficiency of heating the sheet material 105.
[0181] In the embodiment of the present application, there is no specific limitation on the type of the reaction heating element 1018. For example, the reaction heating element 1018 may include, but is not limited to, an infrared heater, a resistive heater, and the like.
[0182] It is understood that the number of the reaction heating element 1018 and the heat insulation board 1019 can be one or more, and the embodiments of the present application are not limited to this. Fig.24 As shown, the number of the reaction heating element 1018 and the heat insulation plate 1019 can be two, the two reaction heating elements 1018 are respectively located on both sides of the jet mechanism 103 in the first horizontal direction, and the two heat insulation plates 1019 are respectively located on both sides of the jet mechanism 103 in the first horizontal direction.
[0183] In the embodiment of the present application, there is no specific limitation on the material of the heat insulation board 1019. For example, the material of the heat insulation board 1019 may be aluminum silicate, but is not limited to aluminum silicate, and may also be a mica heat insulation board, a ceramic heat insulation board, etc.
[0184] In some embodiments, a reaction maintenance port 1015 is provided on one side of the reaction chamber 101 in the second horizontal direction, and a reaction maintenance door 1016 is detachably connected to the reaction chamber 101. The reaction maintenance door 1016 can shield the reaction maintenance port 1015.
[0185] In the embodiments of the present application, the detachable connection method is not specifically limited. For example, the detachable connection method may include, but is not limited to, screw connection, bolt connection, snap connection, etc.
[0186] It can be understood that when the reaction maintenance door 1016 is installed on the reaction chamber 101, the side of the reaction maintenance door 1016 facing the inside of the reaction chamber 101 can form part of the inner wall of the reaction chamber 101. Part of the mechanism of the moving mechanism 102 can be installed on the reaction maintenance door 1016 to achieve connection with the reaction chamber 101.
[0187] In the embodiment of the present application, a first position 10110 and a second position 10111 are set in the reaction chamber 101. The first position 10110 and the second position 10111 are arranged at intervals in the first horizontal direction, and are respectively located at two ends of the reaction chamber 101 in the first horizontal direction. The first position 10110 is located at one end of the reaction chamber 101 close to the preheating chamber 201, and the second position 10111 is located at one end of the reaction chamber 101 away from the preheating chamber 201.
[0188] It can be understood that in the first horizontal direction, the jet mechanism 103 is located between the first position 10110 and the second position 10111 .
[0189] It can be understood that the length direction of the reaction chamber 101 can coincide with the length direction of the coating device, that is, the length direction of the reaction chamber 101 coincides with the first horizontal direction. Similarly, the width direction of the reaction chamber 101 coincides with the second horizontal direction, and the height direction of the reaction chamber 101 coincides with the vertical direction.
[0190] Please also read Fig.25 and Fig.26 In some embodiments, the moving mechanism 102 may include a support frame 120, a moving assembly 130, a first guide assembly 140, and a moving drive assembly 150. The support frame 120 may be fixedly connected to the inner wall of the reaction chamber 101. The moving assembly 130 may be movably connected to the support frame 120 in a first horizontal direction, thereby being movably connected to the inner wall of the reaction chamber 101 in the first horizontal direction. The moving assembly 130 may receive the material box 104. The first guide assembly 140 may be connected to the support frame 120 and the moving assembly 130, and the moving assembly 130 may be movably connected to the support frame 120. The moving drive assembly 150 may be connected to the reaction chamber 101 and / or the reaction maintenance door 1016, and connected to the moving assembly 130. The mobile driving component 150 can drive the mobile component 130 to move in the first horizontal direction, so that the sheet material 105 held by the mobile component 130 can move back and forth in the reaction chamber 101, can move from the second position 10111 in the reaction chamber 101 to the first position 10110, and enter the preheating chamber 201 after passing the first position 10110; and can move from the first position 10110 to the second position 10111 after passing the first position 10110.
[0191] It can be understood that the moving assembly 130 and the jet mechanism 103 are spaced apart in the vertical direction, and the space between the moving assembly 130 and the jet mechanism 103 in the vertical direction is greater than the height of the material box 104 equipped with the sheet material 105. In this way, the movement of the moving assembly 130 can make the material box 104 approach the jet mechanism 103 in the first horizontal direction, and pass through the projection position of the jet mechanism 103 in the vertical direction, so that the first precursor and the second precursor sprayed by the jet mechanism 103 can be attached to the sheet material 105 in sequence.
[0192] In some embodiments, the moving assembly 130 may include a moving frame 131 and a carrying frame 132. The moving frame 131 is movably connected to the support frame 120 in the first horizontal direction. The carrying frame 132 is movably connected to the moving frame 131 in the first horizontal direction. The carrying frame 132 can carry the material box 104. The first guide assembly 140 can be connected to the moving frame 131 to achieve movably connecting the moving frame 131 and the support frame 120 in the first horizontal direction.
[0193] The first guide assembly 140 may include a plurality of first guide rails 141 and a plurality of groups of first guide wheels 142. The plurality of first guide rails 141 are fixedly mounted on the mobile frame 131 and extend in the first horizontal direction. The plurality of first guide rails 141 may be spaced apart in the second horizontal direction. In the plurality of groups of first guide wheels 142, each of the first guide wheels 142 may be rotatably connected to the support frame 120. The plurality of groups of first guide wheels 142 are spaced apart in the second horizontal direction. The axial direction of each first guide wheel 142 coincides with the vertical direction. The peripheral wall of each group of first guide wheels 142 abuts against at least one first guide rail 141, and each first guide rail 141 abuts against the peripheral wall of at least one group of first guide wheels 142.
[0194] In the embodiment of the present application, a plurality of through slots may be provided on the moving frame 131, the bearing frame 132 and the support frame 120, and the through slots may vertically penetrate the moving frame 131, the bearing frame 132 and the support frame 120. The through slots may allow the inert gas introduced into the reaction chamber 101 from the reaction gas inlet pipe 1013 to pass through, that is, the inert gas ejected from the diffuser slot 10171 may pass through.
[0195] It is understood that the number of first guide wheels 142 in each group of first guide wheels 142 can be one or more, and the embodiments of the present application do not limit this. When the number of first guide wheels 142 in each group of first guide wheels 142 is multiple, the multiple first guide wheels 142 are arranged in the first horizontal direction.
[0196] For example, Fig.25 and Fig.26 As shown, the first guide assembly 140 may include two first guide rails 141 and two groups of first guide wheels 142 . The two first guide rails 141 are located between the two groups of first guide rails 141 . The two first guide rails 141 and the two groups of first guide wheels 142 correspond one to one, and each group of first guide wheels 142 abuts against the corresponding first guide rail 141 .
[0197] For example, the first guide assembly 140 may include two first guide rails 141 and two groups of first guide wheels 142 , the two groups of first guide wheels 142 are located between the two first guide rails 141 , the two first guide rails 141 and the two groups of first guide wheels 142 correspond one to one, and each group of first guide wheels 142 abuts against the corresponding first guide rail 141 .
[0198] It can be understood that the first guide wheel 142 can be provided with a limiting groove 33, and a part of the structure of the first guide rail 141 can be adapted to the limiting groove 33. The shape of the upper limit groove 33 of the first guide wheel 142 can be the same or similar to the shape of the upper limit groove 33 of the lifting guide wheel 32, and the way in which the first guide rail 141 cooperates with the limiting groove 33 can be the same or similar to the way in which the lifting guide rail 31 cooperates with the limiting groove 33, which will not be described in detail here.
[0199] For example, the width of the limiting groove 33 gradually decreases in the direction from the peripheral wall of the first guide wheel 142 toward the center of the first guide wheel 142. One side of each first guide rail 141 used to abut against the first guide wheel 142 can be adapted to the limiting groove 33 and accommodated in the corresponding limiting groove 33. The inner wall of the limiting groove 33 can abut against the first guide rail 141, thereby limiting the movement of the first guide wheel 142 and the first guide rail 141 in the axial direction (i.e., vertical direction) of the first guide wheel 142.
[0200] It is understandable that Fig.25 and Fig.26 As shown, two groups of first guide wheels 142 clamp two first guide rails 141, which can limit the relative movement of the first guide rail 141 and the first guide wheel 142 in the second horizontal direction, thereby limiting the relative movement of the mobile frame 131 and the support frame 120 in the second horizontal direction. The limiting groove 33 can limit the movement of the first guide wheel 142 and the first guide rail 141 in the vertical direction, thereby limiting the relative movement of the mobile frame 131 and the support frame 120 in the vertical direction. In this way, the mobile frame 131 and the support frame 120 can be movably connected in the first horizontal direction. At the same time, the rolling friction between the first guide wheel 142 and the first guide rail 141 can improve the smoothness of the movement of the mobile frame 131.
[0201] In some embodiments, the moving mechanism 102 may further include a second guide assembly 160. The second guide assembly 160 may be connected to the support frame 132 and the moving frame 131. The second guide assembly 160 may enable the support frame 132 and the moving frame 131 to be movably connected in the first horizontal direction.
[0202] The second guide assembly 160 may include a plurality of second guide rails 161 and a plurality of groups of second guide wheels 162. The plurality of second guide rails 161 are fixedly mounted on the carrier 132 and extend along the first horizontal direction. The plurality of second guide rails 161 may be spaced apart in the second horizontal direction. In the plurality of groups of second guide wheels 162, each second guide wheel 162 is rotatably connected to the carrier 132. The plurality of groups of second guide wheels 162 are spaced apart in the second horizontal direction. The axial direction of each second guide wheel 162 coincides with the vertical direction. The peripheral wall of each group of second guide wheels 162 abuts against at least one second guide rail 161, and each second guide rail 161 abuts against the peripheral wall of at least one group of second guide wheels 162.
[0203] It is understood that the number of the second guide wheels 162 in each group of second guide wheels 162 can be one or more, and the embodiments of the present application do not limit this. When the number of the second guide wheels 162 in each group of second guide wheels 162 is multiple, the multiple second guide wheels 162 are arranged in the first horizontal direction.
[0204] For example, Fig.21 and Fig. 22 As shown, the second guide assembly 160 may include two second guide rails 161 and two groups of second guide wheels 162 . The two second guide rails 161 are located between the two groups of second guide rails 161 . The two second guide rails 161 and the two groups of second guide wheels 162 correspond one to one, and each group of second guide wheels 162 abuts against the corresponding second guide rail 161 .
[0205] For example, the second guide assembly 160 may include two second guide rails 161 and two groups of second guide wheels 162 , the two groups of second guide wheels 162 are located between the two second guide rails 161 , the two second guide rails 161 and the two groups of second guide wheels 162 correspond one to one, and each group of second guide wheels 162 abuts against the corresponding second guide rail 161 .
[0206] It can be understood that the second guide wheel 162 can be provided with a limiting groove 33, and a part of the structure of the second guide rail 161 can be adapted to the limiting groove 33. The shape of the upper limit groove 33 of the second guide wheel 162 can be the same or similar to the shape of the upper limit groove 33 of the first guide wheel 142, and the way in which the second guide rail 161 cooperates with the limiting groove 33 can be the same or similar to the way in which the first guide rail 141 cooperates with the limiting groove 33, which will not be described in detail here.
[0207] In some embodiments, the mobile mechanism 102 may further include a linkage assembly 170. The linkage assembly 170 is connected to the mobile frame 131 and to the carrier frame 132. When the mobile drive assembly 150 is working, the mobile frame 131 can be driven to move in the first horizontal direction; the movement of the mobile frame 131 can drive the linkage assembly 170 to move, and the carrier frame 132 can be synchronously moved along the direction of movement of the mobile frame 131. In this way, the mobile assembly 130 can be extended and retracted in the first horizontal direction through the movement of the mobile frame 131 and the carrier frame 132, and when the mobile assembly 130 is extended, the carrier frame 132 can enter the preheating chamber 201 and move to the transfer position 2017 in the preheating chamber 201.
[0208] Please also read Fig. 27 In some embodiments, the mobile driving assembly 150 may include a mobile driving member 151 , a rotating member 152 , a first auxiliary wheel 153 , a first driving rope 154 , a second auxiliary wheel 155 , and a second driving rope 156 .
[0209] The stator of the mobile driving member 151 is fixedly connected to the reaction chamber 101 or the reaction maintenance door 1016. The rotating member 152 is rotatably connected to the inner wall of the reaction chamber 101, and the axial direction of the central axis of rotation of the rotating member 152 coincides with the second horizontal direction. The first auxiliary wheel 153 and the second auxiliary wheel 155 are both rotatably connected to the support frame 120, so as to be rotatably connected to the inner wall of the reaction chamber 101. The first auxiliary wheel 153 and the second auxiliary wheel 155 are spaced apart in the first horizontal direction and the second horizontal direction, and the first auxiliary wheel 153 is located on the side of the rotating member 152 away from the second auxiliary wheel 155 in the first horizontal direction.
[0210] Please also read Fig.28A , one end of the first driving rope 154 is fixedly connected to the rotating member 152, and the other end is fixedly connected to the first connecting position 1311 on the mobile frame 131. The portion between the two ends of the first driving rope 154 can be wound around the first auxiliary wheel 153. The first connecting position 1311 is located on the mobile frame 131. Among them, the first auxiliary wheel 153 can divide the first driving rope 154 into two parts, and the first part and the second part of the first driving rope 154 are arranged at intervals in the vertical direction. The first part of the first driving rope 154 is wound around the rotating member 152 and fixedly connected to the rotating member 152, and extends from the rotating member 152 to the first auxiliary wheel 153 along the first horizontal direction; the second part of the first driving rope 154 can extend from the first auxiliary wheel 153 along the first horizontal direction to the first connecting position 1311.
[0211] Please also read Fig.28B , one end of the second driving rope 156 is fixedly connected to the rotating member 152, and the other end is fixedly connected to the second connecting position 1312 on the mobile frame 131. The portion between the two ends of the second driving rope 156 can be wound around the second auxiliary wheel 155. The second connecting position 1312 is located on the mobile frame 131. The second connecting position 1312 and the first connecting position 1311 are spaced apart in the first horizontal direction, and are spaced apart in the second horizontal direction. Among them, the second auxiliary wheel 155 can divide the second driving rope 156 into two parts, the first part and the second part of the second driving rope 156 are spaced apart in the vertical direction, the first part of the second driving rope 156 is wound around the rotating member 152 and fixedly connected to the rotating member 152, and extends from the rotating member 152 along the first horizontal direction to the second auxiliary wheel 155; the second part of the second driving rope 156 can extend from the second auxiliary wheel 155 along the first horizontal direction to the second connecting position 1312.
[0212] It is understood that the rotatable connection is achieved by a rotating connector, which can enable the two components to rotate relative to each other. In the embodiments of the present application, the type of the rotating connector is not specifically limited. For example, the rotating connector can be, but is not limited to, a pin, a bearing, a coupling, etc.
[0213] In the embodiment of the present application, the positions of the first auxiliary wheel 153 and the second auxiliary wheel 155 on the support frame 120 are not specifically limited. For example, the first auxiliary wheel 153 is located on the side of the support frame 120 away from the preheating chamber 201 in the first horizontal direction, and is located on the side of the support frame 120 close to the reaction maintenance door 1016 in the second horizontal direction. The second auxiliary wheel 155 is located on the side of the support frame 120 close to the preheating chamber 201 in the first horizontal direction, and is located on the side of the support frame 120 away from the reaction maintenance door 1016 in the second horizontal direction. Exemplarily, the first auxiliary wheel 43 and the second auxiliary wheel 45 can both be located on the projection of the support frame 10 in the vertical direction, and are respectively located at the two ends of a diagonal connecting line of the projection.
[0214] In the embodiment of the present application, the positions of the first connection position 1311 and the second connection position 1312 are not specifically limited. For example, the first connection position 1311 can be located on the side of the mobile frame 131 close to the preheating chamber 201 in the first horizontal direction, and on the side of the mobile frame 131 close to the reaction maintenance door 1016 in the second horizontal direction; the first connection position 1311 can be located on the side of the rotating member 152 away from the first auxiliary wheel 153 in the first horizontal direction. The second connection position 1312 can be located on the side of the mobile frame 131 away from the preheating chamber 201 in the first horizontal direction, and on the side of the mobile frame 131 away from the reaction maintenance door 1016 in the second horizontal direction; the second connection position 1311 can be located between the rotating member 152 and the first auxiliary wheel 153 in the first horizontal direction.
[0215] It can be understood that a rope clamping member can be fixedly installed on the first connection position 1311 and the second connection position 1312, and the rope clamping member can clamp and fix the first drive rope 154 or the second drive rope 156, so that the first drive rope 154 is fixedly installed on the first connection position 1311, and the second drive rope 156 is fixedly installed on the second connection position 1312.
[0216] like Fig.28A and Fig.28B As shown, in the embodiment of the present application, the rotatable member 152 can rotate along a first circumferential direction a and a second circumferential direction b. The first circumferential direction is opposite to the second circumferential direction.
[0217] When the rotating member 152 rotates along the first circumferential direction, since the rotating member 152 and the first auxiliary wheel 153 are relatively fixed, the length of the first driving rope 154 between the rotating member 152 and the first auxiliary wheel 153 remains unchanged; as the first driving rope 154 is wound around the rotating member 152 due to the rotation of the rotating member 152, the length of the first driving rope 154 between the first auxiliary wheel 153 and the first connecting position 1311 is shortened, so that the moving frame 131 moves from the first position 10110 to the second position 10111. The moving frame 131 can move until its projection in the vertical direction coincides with the projection of the support frame 120 in the vertical direction, and then the moving frame 131 extends out of the side of the support frame 120 away from the preheating chamber 201 in the direction away from the preheating chamber 201. The moving frame 131 can continue to move, so that the material box 104 moves to the second position 10111.
[0218] When the rotating member 152 rotates along the second circumferential direction, since the rotating member 152 and the second auxiliary wheel 155 are relatively fixed, the length of the second driving rope 156 between the rotating member 152 and the second auxiliary wheel 155 remains unchanged; as the second driving rope 156 is wound around the rotating member 152 due to the rotation of the rotating member 152, the length of the second driving rope 156 between the second auxiliary wheel 155 and the second connecting position 1312 is shortened, so that the moving frame 131 moves from the second position 10111 to the first position 10110. The moving frame 21 can move until its projection in the vertical direction coincides with the projection of the support frame 10 in the vertical direction, and then the moving frame 21 extends out of the side of the support frame 10 close to the preheating chamber 201 in a direction away from the preheating chamber 201. The moving frame 21 can continue to move, so that the material box 104 passes the first position 10110 and then enters the preheating chamber 201.
[0219] In some embodiments, the rotating member 152 may include a rotating shaft 1521, a first driving wheel 1522, and a second driving wheel 1523. The rotating shaft 1521 is rotatably connected to the inner wall of the reaction chamber 101 and is fixedly connected to the mover of the mobile driving member 151. The rotating shaft 1521 extends along the second horizontal direction. The first driving wheel 1522 and the second driving wheel 1523 are fixedly mounted on the rotating shaft 1521 and are coaxially arranged with the rotating shaft 1521. The first driving wheel 1522 and the second driving wheel 1523 are spaced apart in the second horizontal direction. The first driving rope 154 may be fixedly connected to the first driving wheel 1522 and partially wound around the first driving wheel 1522. The second driving rope 156 may be fixedly connected to the second driving wheel 1523 and partially wound around the second driving wheel 1523.
[0220] It can be understood that the mobile driving member 151 can drive the rotating shaft 1521 to rotate, so that the first driving wheel 1522 and the second driving wheel 1523 rotate synchronously. When the rotating shaft 1521 rotates along the first circumferential direction, the first driving wheel 1522 reels the first driving rope 154 to make the moving frame 131 move away from the preheating chamber 201. At this time, the second driving wheel 1523 rotates synchronously, and the movement of the moving frame 131 pulls the second driving rope 156 to move synchronously, so that the second driving rope 156 at least partially wound around the second driving wheel 1523 is separated from the second driving wheel 1523.
[0221] When the rotating shaft 1521 rotates along the second circumferential direction, the second driving wheel 1523 reels the second driving rope 156 to make the moving frame 131 approach the preheating chamber 201. At this time, the first driving wheel 1522 rotates synchronously, and the movement of the moving frame 131 pulls the first driving rope 154 to move synchronously, so that the first driving rope 154 at least partially wound around the first driving wheel 1522 is separated from the first driving wheel 1522.
[0222] In the embodiment of the present application, there is no specific limitation on the type of the moving driving member 151. For example, the moving driving member 151 may be, but is not limited to, a reduction motor.
[0223] For example, one end of the rotating shaft 1521 is rotatably connected to the reaction maintenance door 1016, and the other end is rotatably connected to the support frame 120, so as to realize the rotatable connection between the rotating shaft 1521 and the inner wall of the reaction chamber 101. The mobile driving member 151 can be fixedly installed on the reaction maintenance door 1016 and connected to one end of the rotating shaft 1521 close to the reaction maintenance door 1016. The mobile driving member 151 is located outside the reaction chamber 101.
[0224] In other embodiments, the number of the rotating member 152 and the moving driving member 151 can be multiple, and the first driving rope 154 and the second driving rope 156 can be respectively connected to different rotating members 152. The multiple rotating members 152 and the multiple moving driving members 151 can correspond to each other one by one, and each moving driving member 151 can drive the corresponding rotating member 152 to rotate. In this way, the moving frame 131 can be driven to move in the direction close to the preheating chamber 201 and the direction away from the preheating chamber 201 respectively through different moving driving members 151 and rotating members 152.
[0225] Please also read Fig.29In some embodiments, the linkage assembly 170 may include a first linkage wheel 171, a first fixed head 172, a first linkage rope 173, a second linkage wheel 174, a second fixed head 175, and a second linkage rope 176. The first linkage wheel 171 and the second linkage wheel 174 are both rotatably connected to the moving frame 131, and are spaced apart in the first horizontal direction and in the second horizontal direction. The axial directions of the first linkage wheel 171 and the second linkage wheel 174 both coincide with the second horizontal direction.
[0226] Please also read Fig. 30A , the first fixed head 172 is fixedly connected to the support frame 120, so that the first fixed head 172 is fixedly connected to the inner wall of the reaction chamber 101. One end of the first linkage rope 173 is fixedly connected to the first fixed head 172, and the other end is fixedly connected to the third connection position 1321 on the carrier 132. The part between the two ends of the first linkage rope 173 can be wound around the first linkage wheel 171. Among them, the first linkage wheel 171 can divide the first linkage rope 173 into two parts. The first part and the second part of the first linkage rope 173 are spaced apart in the vertical direction. The first part of the first linkage rope 173 can be fixedly connected to the first fixed head 172 and extend to the first linkage wheel 171 along the first horizontal direction. The second part of the first linkage rope 173 can extend from the first linkage wheel 171 to the third connection position 1321.
[0227] Please also read Fig. 30B , the second fixed head 175 is fixedly connected to the support frame 120, so that the second fixed head 175 is fixedly connected to the inner wall of the reaction chamber 101. The second fixed head 175 and the first fixed head 172 are spaced apart in the first horizontal direction and the second horizontal direction. One end of the second linkage rope 176 is fixedly connected to the second fixed head 175, and the other end is fixedly connected to the fourth connection position 1322 on the carrier 132. The portion between the two ends of the second linkage rope 176 can be wound around the second linkage wheel 174. Among them, the second linkage wheel 174 can divide the second linkage rope 176 into two parts. The first part and the second part of the second linkage rope 176 are spaced apart in the vertical direction. The first part of the second linkage rope 176 can be fixedly connected to the second fixed head 175 and extend to the second linkage wheel 174 along the first horizontal direction. The second part of the second linkage rope 176 can extend from the second linkage wheel 174 to the fourth connection position 1322.
[0228] It can be understood that the first fixed head 172 and the second fixed head 175 can be fixedly mounted on the support extension frame 52, respectively, and the support extension frame 52 can be fixedly mounted on the support frame 120. In this way, the first fixed head 172 and the second fixed head 175 can be fixedly connected on the support frame 120. The first fixed head 172 can fix the first linkage rope 173 by clamping, and the second fixed head 175 can fix the second linkage rope 176 by clamping.
[0229] In the embodiment of the present application, there is no specific limitation on the positions of the first linkage wheel 171 and the second linkage wheel 174 on the mobile frame 131. For example, the first linkage wheel 171 may be located on a side of the mobile frame 131 away from the preheating chamber 201 in the first horizontal direction, and the second linkage wheel 174 may be located on a side of the mobile frame 131 close to the preheating chamber 201 in the first horizontal direction. The first linkage wheel 171 may be located on a side of the mobile frame 131 close to the reaction maintenance door 1016 in the second horizontal direction, and the second linkage wheel 174 may be located on a side of the mobile frame 131 away from the reaction maintenance door 1016 in the second horizontal direction.
[0230] In the embodiment of the present application, there is no specific limitation on the positions of the first fixing head 172 and the second fixing head 175. For example, the first fixing head 172 may be located on the side of the support frame 120 close to the preheating chamber 201 in the first horizontal direction, and the second fixing head 175 may be located on the side of the support frame 120 far from the preheating chamber 201 in the first horizontal direction. The first fixing head 172 may be located on the side of the support frame 120 close to the reaction maintenance door 1016 in the second horizontal direction, and the second fixing head 175 may be located on the side of the support frame 120 far from the reaction maintenance door 1016 in the second horizontal direction.
[0231] In the embodiment of the present application, the positions of the third connection position 1321 and the fourth connection position 1322 are not specifically limited. For example, the third connection position 1321 can be located on the side of the carrier 132 close to the preheating chamber 201 in the first horizontal direction, and can be located on the side of the carrier 132 close to the reaction maintenance door 1016 in the second horizontal direction; the third connection position 1321 is located on the side of the first fixed head 172 away from the first linkage wheel 171 in the first horizontal direction. The fourth connection position 1322 can be located on the side of the carrier 132 away from the preheating chamber 201 in the first horizontal direction, and can be located on the side of the carrier 132 away from the reaction maintenance door 1016 in the second horizontal direction; the fourth connection position 1322 is located between the second fixed head 175 and the second linkage wheel 174 in the first horizontal direction.
[0232] It can be understood that rope clamping parts can be fixedly installed on the third connection position 1321 and the fourth connection position 1322, and the rope clamping parts can clamp and fix the first linkage rope 173 or the second linkage rope 176, so that the first linkage rope 173 is fixedly installed on the third connection position 1321, and the second linkage rope 176 is fixedly installed on the fourth connection position 1322.
[0233] It can be understood that the mobile driving member 151 can drive the rotating shaft 1521 to rotate, so as to drive the mobile frame 131 to move in the first horizontal direction. When the mobile frame 131 moves in the direction away from the preheating chamber 201, since the position of the first fixed head 172 remains unchanged, the length of the first linkage rope 173 between the first fixed head 172 and the first linkage wheel 171 increases, so that the length of the first linkage rope 173 between the first linkage wheel 171 and the third connection position 1321 decreases, so that the carrier 132 moves from the first position 10110 to the second position. The carrier 132 can be moved out of the preheating chamber 201 and enter the first position 110110; the carrier 132 continues to move until the projection in the vertical direction coincides with the projection in the vertical direction of the mobile frame 131, and then the carrier 132 extends out of the side of the mobile frame 131 away from the preheating chamber 201 in the direction away from the preheating chamber 201. The carrier 132 can continue to move to the second position 10111.
[0234] When the mobile frame 131 moves toward the preheating chamber 201, since the position of the second fixed head 175 remains unchanged, the length of the second linkage rope 176 between the second fixed head 175 and the second linkage wheel 174 increases, so that the length of the first linkage rope 173 between the second linkage wheel 174 and the fourth connection position 1322 decreases, so that the carrier 132 moves from the second position 10111 toward the preheating chamber 201. The carrier 132 can move until its projection in the vertical direction coincides with the projection of the mobile frame 131 in the vertical direction, and then the carrier 132 extends out of the side of the mobile frame 131 close to the preheating chamber 201 in the direction close to the preheating chamber 201. The carrier 132 can continue to move to move into the preheating chamber 201, so as to receive the material box 104 from the preheating chamber 201 or move the material box 104 from the reaction chamber 101 into the preheating chamber 201.
[0235] In the embodiment of the present application, there is no specific limitation on the moving speed of the carrier 22 and the sheet material 105 carried thereon. For example, the moving speed of the carrier 22 and the sheet material 105 carried thereon in the first horizontal direction can be any speed between 50 mm / s and 1000 mm / s, which has a good passivation effect. Preferably, when the moving speed of the sheet material 105 is 150 mm / s, it can ensure the rapid coating of the sheet material, improve production efficiency, and reduce the occurrence of the circumferential coating phenomenon.
[0236] It can be understood that the jet mechanism 103 can be located in the middle of the reaction chamber 101 in the first horizontal direction. When the carrier 132 moves in the reaction chamber 101 along the first horizontal direction, the sheet material 105 on the carrier 132 can pass through the position of the projection of the jet mechanism 103 in the vertical direction. In this way, the carrier 132 moves back and forth in the reaction chamber 101, so that the sheet material 105 can pass through the position of the projection of the jet mechanism 103 multiple times, so that the jet mechanism 103 sequentially receives the first precursor and the second precursor multiple times, so that a multi-layer atomic film can be formed on the sheet material 105.
[0237] When the atomic film coating is completed, the carrier 132 can be moved into the preheating chamber 201, so as to move the plated sheet material 105 into the preheating chamber 201, and the material box 104 equipped with the plated sheet material 105 can be moved out of the preheating chamber 201 through the preheating chamber 201 and the transmission device. Then the carrier 132 can receive the material box 104 equipped with the uncoated sheet material 105 from the preheating chamber 201 and move it into the reaction chamber 101. The carrier 132 can reciprocate in the first horizontal direction in the reaction chamber 101 again to coat the sheet material 105 again.
[0238] In some embodiments, a reaction reflector 10112 is further provided in the reaction chamber 101, and the reaction reflector 10112 is fixedly mounted on the inner wall of the reaction chamber 101. The reaction reflector 10112 is located between the moving mechanism 102 and the reaction heating element 1018 in the vertical direction, and the reaction reflector 10112 can at least partially shield the moving mechanism 102 and reflect the heat generated by the reaction heating element 1018 in the direction toward the reaction heating element 1018.
[0239] It is understood that the number of the reaction reflector 10112 can be one or more, and the embodiments of the present application are not limited to this. Fig.23 As shown, there are two reaction reflective plates 10112, and the two reaction reflective plates 10112 are spaced apart in the second horizontal direction.
[0240] It can be understood that the reaction reflector 10112 can reflect the heat flowing from the reaction heating element 1018 to the moving mechanism 102 toward the location where the reaction heating element 1018 is set, reducing the heat loss in the area between the reaction heating element 1018 and the reaction reflector 10112, and improving the heating efficiency of the sheet material 105 in the area. At the same time, the reflection of heat by the reaction reflector 10112 can block the flow of heat to the moving mechanism 102, reduce the probability of the moving mechanism 102 being damaged due to high temperature, and improve the service life of the moving mechanism 102.
[0241] In the reaction device 100 provided in the embodiment of the present application, the mobile driving member 151 can drive the rotating member 152 to rotate in the first circumferential direction, so that the mobile frame 131 moves from the first position 10110 to the second position 10111, so that the mobile frame 131 is away from the preheating chamber 201; while the mobile frame 131 is away from the preheating chamber 201, the linkage assembly 170 can drive the carrier 132 to move out of the preheating chamber 201 and move away from the preheating chamber 201 simultaneously. In the process of the carrier 132 moving away from the preheating chamber 201, the sheet material 105 can pass through the position corresponding to the jet mechanism 103 and receive the first precursor and the second precursor sprayed by the jet mechanism 103 to form an atomic film on the sheet material 105. When the sheet material 105 carried by the carrier 132 is located at the second position 10111, the mobile driving member 151 can stop working.
[0242] Then, the moving driving member 151 can drive the rotating member 152 to rotate in the second circumferential direction, so that the moving frame 131 moves in the direction from the second position 10111 to the first position 10110, so that the moving frame 131 approaches the preheating chamber 201 in the first horizontal direction; while the moving frame 131 approaches the preheating chamber 201, the linkage assembly 170 can drive the carrier 132 to synchronously approach the preheating chamber 201. In the process of the carrier 132 approaching the preheating chamber 201, the sheet material 105 can pass through the position corresponding to the jet mechanism 103 again, and receive the first precursor and the second precursor sprayed by the jet mechanism 103, so as to form an atomic film on the sheet material 105. After the carrier 132 enters the preheating chamber 201, the moving driving member 151 can stop working.
[0243] Through the moving mechanism 102 and the reaction device 100 provided in the embodiment of the present application, the material box 104 carried by the moving component 130 can be moved in the reaction chamber 101 along the length direction of the reaction chamber 101, so that the material box 104 can be close to and pass through the position where the jet mechanism 103 is set, so that the sheet material 105 in the material box 104 can receive the precursor sprayed by the jet mechanism 103 to complete the coating. In this way, it can be avoided that the sheet material 105 is maintained at a position away from the jet mechanism 103 during coating, so that the sheet material 105 can be close to the jet mechanism 103 for coating, and the coating effect of the sheet material 105 can be improved.
[0244] Through the coating device provided by the embodiment of the present application, the jet mechanism 103 can simultaneously jet multiple first precursors and multiple second precursors, and each first precursor and each second precursor are isolated by an inert gas; when the moving mechanism 102 moves so that the sheet material 105 passes through the corresponding position of the jet mechanism 103, the sheet material 105 can receive the first precursor and the second precursor multiple times, so that a multi-layer atomic film is formed on the sheet material 105. In this way, the moving mechanism 102 drives the sheet material 105 to move in the reaction device 100 to realize the formation of a multi-layer atomic film on the sheet material 105. The efficiency of the film coating process of the sheet material 105 can be improved.
[0245] It is obvious to those skilled in the art that the present application is not limited to the details of the above exemplary embodiments, and that the present application can be implemented in other specific forms without departing from the spirit or basic features of the present application. Therefore, no matter from which point of view, the above embodiments of the present application should be regarded as exemplary and non-restrictive, and the scope of the present application is defined by the attached claims rather than the above description, and therefore it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present application.
Claims
1. A coating device for coating a sheet material. It is characterized in that The coating equipment comprises: A reaction chamber, used for accommodating the sheet material; A preheating chamber, the preheating chamber is connected to the reaction chamber, the preheating chamber is used to accommodate the sheet material, the preheating chamber is provided with a preheating element, and the preheating element is used to heat the sheet material in the preheating chamber; an air jet mechanism, the air jet mechanism being connected to the reaction chamber, the air jet mechanism being provided with a first air jet slot, a second air jet slot and a third air jet slot, the third air jet slot being located between the first air jet slot and the second air jet slot, the first air jet slot being used to jet a first precursor into the reaction chamber, the second air jet slot being used to jet a second precursor into the reaction chamber, and the third air jet slot being used to jet an inert gas into the reaction chamber; A moving mechanism is arranged in the reaction chamber, and is used to drive the sheet material to pass through the area opposite to the first jet slot and the second jet slot in sequence, and to drive the sheet material to move from the reaction chamber into the preheating chamber and from the preheating chamber into the reaction chamber.
2. The coating device according to claim 1, It is characterized in that The preheating chamber is provided with a material port, the material port is used to allow the sheet material to enter or move out of the preheating chamber, the preheating chamber includes a preheating position and a transmission position arranged along the height direction of the preheating chamber, the preheating position is the position of the sheet material in the preheating chamber when it is heated, the transmission position is used to dock with a reaction chamber connected to the preheating chamber, and the transmission position is arranged corresponding to the material port, the coating equipment also includes: A lifting frame, the lifting frame is disposed in the preheating chamber and movably connected to the preheating chamber; A first receiving frame, the first receiving frame is connected to the lifting frame, and the first receiving frame is used to receive the sheet material; a second receiving frame, the second receiving frame being connected to the lifting frame and being located at a side of the first receiving frame away from the preheating position, the second receiving frame being used for receiving the sheet material; A lifting drive assembly, the lifting drive assembly is connected to the preheating chamber and the lifting frame, and the lifting drive assembly is used to: Drive the lifting frame to move, so that the first receiving frame moves to the preheating position to heat the received sheet material, and move the first receiving frame to the transfer position to receive the sheet material entering the preheating chamber from the material inlet, and transfer the heated sheet material to the moving mechanism; The lifting frame is driven to move, so that the second receiving frame moves to the transfer position to receive the sheet material from the moving mechanism.
3. The coating device according to claim 1, It is characterized in that A first position and a second position are arranged in the reaction chamber, the first position and the second position are arranged at intervals in the length direction of the reaction chamber, the jet mechanism is located between the second position and the first position in the length direction of the reaction chamber, and the coating device further includes: A movable rack, the movable rack being arranged in the reaction chamber and movably connected to an inner wall of the reaction chamber; A carrier frame, the carrier frame is movably connected to the moving frame, the carrier frame is used to receive the sheet material, and is used to move synchronously with the moving frame; A mobile drive assembly, the mobile drive assembly is connected to the mobile frame, and the mobile drive assembly is used for: Driving the movable frame to move in a direction from the second position toward the first position, so that the supporting frame and the sheet material supported thereon are synchronously moved out of the reaction chamber; Driving the movable frame to move in a direction from the first position toward the second position, so that the carrier frame and the sheet material supported thereon move to the second position; Wherein, during the movement of the sheet material, the sheet material receives the precursor sprayed by the spray mechanism.
4. The coating device according to claim 3, It is characterized in that The speed at which the carrier moves in the length direction of the reaction chamber is any speed between 50 mm / s and 1000 mm / s.
5. The coating device according to claim 1, It is characterized in that The jet mechanism comprises: A heating component is used to heat the first precursor, the second precursor and the inert gas introduced into the jet mechanism, so that the temperature of the first precursor ejected from the first jet slot is higher than the temperature of the first precursor before it is introduced into the jet mechanism, the temperature of the second precursor ejected from the second jet slot is higher than the temperature of the second precursor before it is introduced into the jet mechanism, and the temperature of the inert gas ejected from the third jet slot is higher than the temperature of the inert gas before it is introduced into the jet mechanism.
6. The coating device according to claim 1, It is characterized in that The coating equipment also includes: A reaction heating element, which is arranged in the reaction chamber and arranged in parallel with the jet mechanism in the length direction of the reaction chamber, and is used to heat the sheet material in the reaction chamber; The heat insulation board is installed on the inner wall of the reaction chamber, and the reaction heating element is connected to the side of the heat insulation board facing the reaction chamber. The heat insulation board is used to prevent the heat generated by the reaction heating element from radiating outside the reaction chamber.
7. The coating device according to claim 6, It is characterized in that The coating equipment also includes: A reaction reflecting plate is installed on the inner wall of the reaction chamber. The reaction reflecting plate is located between the moving mechanism and the reaction heating element in the height direction of the reaction chamber. The reaction reflecting plate is used to at least partially shield the moving mechanism and reflect the heat generated by the reaction heating element toward the reaction heating element.
8. The coating device according to claim 6, It is characterized in that The coating equipment also includes: A reaction air inlet pipe, the reaction air inlet pipe is installed in the reaction chamber and communicated with the reaction chamber, and the reaction air inlet pipe is used to introduce the inert gas; A diffuser is installed on the inner wall of the reaction chamber, and a plurality of diffuser grooves are provided on the diffuser, and the plurality of diffuser grooves are all connected to the reaction air inlet pipe.
9. The coating device according to claim 1, It is characterized in that The coating equipment also includes: A preheating element, the preheating element is connected to the preheating chamber, and the preheating element is used to heat a preheating position in the preheating chamber so that the temperature of the preheating position is any temperature between 150 degrees Celsius and 300 degrees Celsius; A preheating air outlet pipe is connected and communicated with the preheating chamber, and the preheating air outlet pipe is used to connect an exhaust device to exhaust air from the preheating chamber so that the air pressure in the preheating chamber is any one of 1 Torr to 2 Torr.
10. The coating device according to claim 1, It is characterized in that The preheating chamber is provided with a preheating maintenance port and a material port, the preheating maintenance port and the material port are located on different side walls of the preheating chamber, the material port is used to allow the sheet material to enter or move out of the preheating chamber, the reaction chamber is provided with a reaction maintenance port, and the coating equipment further comprises: A reaction maintenance door, which is detachably connected to the reaction chamber and is used to cover the reaction maintenance port; A preheating maintenance door, which is detachably connected to the preheating chamber and is used to cover the preheating maintenance port; A connecting valve, the connecting valve is arranged between the reaction chamber and the preheating chamber, and the connecting valve is used to open or disconnect the connection between the reaction chamber and the preheating chamber; A shielding mechanism is connected to the preheating chamber and is used to open and close the material port.