A building level measuring device and its use method
Patent Information
- Application Number
- CN202411238887.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2044-09-05
AI Technical Summary
The existing level measurement method is difficult to accurately detect the height difference of bridge support columns in bridge construction, especially when the height difference is small, the detection results are inaccurate and difficult to obtain quickly.
A building level measurement device is designed, including a calibration device and a side seat, using the angle calibration component and observation component to set the liquid level through the liquid level, combined with the motor and worm gear meshing mechanism, fine-tune the hanger deflection angle, and pass the colored liquid and Float detection enables accurate measurement of height difference.
The accuracy and speed of bridge support column height detection is improved, and the horizontal height difference between adjacent buildings can be quickly and accurately obtained, solving the problems of inaccurate detection results and slow speed in the prior art.
Smart Images

Figure CN118758255B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of level measurement for building construction, and in particular to a building level measurement device and a use method thereof. Background Art
[0002] Leveling, also known as "geometric leveling", is a method of measuring the height difference between two points on a building to be measured using a level and a level rod.
[0003] In particular, during bridge construction, it is necessary to measure the height difference of different bridge support columns to ensure that their heights are consistent, thereby improving the supporting performance of the bridge. However, due to the selection of construction points for the bridge support columns, some bridge support columns have a certain inclination angle with the ground after construction. At this time, if the existing leveling method is used, the detection result will be inaccurate. At the same time, when building parallel bridges, there must be no height difference between two adjacent groups of bridge columns. If the height difference between two adjacent groups of bridge columns is small, the existing leveling method cannot quickly obtain the detection result.
[0004] Therefore, the present application provides a building level measuring device and a method for using the same to meet the needs. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a building level measuring device and a method for using the same. The horizontality of the observation component can be set through the angle correction component so that the liquid in the observation component is level. At the same time, the observation component is used to detect the height of different bridge support columns to solve the problem that the detection results of the existing leveling method are inaccurate and it is difficult to observe the detection results if the height difference is small.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0007] A building level measuring device comprises a calibration device and a side seat, wherein the calibration device and the side seat are both provided with multiple groups, the calibration device comprises a hanger, an angle calibration assembly is provided at the bottom of the hanger, and the angle calibration assembly is composed of a semicircular positioning cylinder and a movable seat, the movable seat is located inside the hanger and can rotate inside the hanger, and an observation assembly is installed on the top of the movable seat; an arc-shaped worm gear is fixedly installed on the outer wall of the middle part of the semicircular positioning cylinder, a gear groove is provided at the bottom of the movable seat, bearings are installed on both end walls of the gear groove, and the inner walls of two groups of the bearings are connected to the same worm, the worm is located inside the gear groove, and the worm is rotatably connected to the movable seat through the bearing, the worm is meshed with the arc-shaped worm gear, and the movable seat is rotatably connected to the semicircular positioning cylinder through the cooperation of the worm and the arc-shaped worm gear, a motor 1 is fixedly installed on the outer wall of the movable seat, and the output end of the motor 1 is fixedly connected to the end wall of the worm.
[0008] Optionally, a front swivel seat is fixedly installed on the top of the front end of the semicircular positioning cylinder, a rear swivel seat is fixedly installed on the top of the end of the semicircular positioning cylinder, and both the rear swivel seat and the inner walls of the front swivel seat are provided with movable areas, a second arc-shaped limit groove is provided on the top of the front end of the front swivel seat, a first arc-shaped limit groove is provided on the inner wall of the front swivel seat, and a third arc-shaped limit groove is provided on the top of the end of the rear swivel seat.
[0009] Optionally, the front end and the bottom end of the movable seat are both provided with limited areas, the front rotating seat and the rear rotating seat are respectively located in the limited areas at the front and rear ends, and are both rotationally contacted with the inner walls of the limited areas, the two groups of inner end walls of the limited areas are fixedly installed with positioning strips, and the two groups of positioning strips are rotationally connected to the end walls of the front rotating seat and the rear rotating seat respectively, the two groups of outer end walls of the limited areas are fixedly installed with assembly blocks by bolts, the two groups of assembly blocks are respectively located in the two groups of movable areas, and the top side walls of the two groups of assembly blocks are rotationally connected to the inner walls of the second arc-shaped limiting groove and the third arc-shaped limiting groove respectively, and the bottom side wall of the assembly block located in the front rotating seat is rotationally connected to the inner wall of the first arc-shaped limiting groove.
[0010] Optionally, a bottom mounting groove is formed on the inner wall of the bottom of the hanger, and arc-shaped grooves are formed on both side walls of the bottom of the hanger. The front swivel seat has the same radius as the rear swivel seat, the radius of the front swivel seat is smaller than the radius of the arc-shaped groove on the left and larger than the radius of the arc-shaped groove on the right. The front swivel seat is plugged into the arc-shaped groove on the left, and the semicircular positioning cylinder and the cross-section of the bottom mounting groove form a complete circle. The semicircular positioning cylinder and the inner wall of the bottom mounting groove are plugged with the same positioning stud, a gasket is sleeved on the left end wall of the positioning stud, and the gasket is in contact with the end wall of the semicircular positioning cylinder, a locking nut is provided at the outermost end of the positioning stud, and the locking nut is used in conjunction with the positioning stud.
[0011] Optionally, an arc-shaped rotation groove is opened at the bottom left side of the hanger, and the arc-shaped rotation groove is located at the top of the arc-shaped mounting groove on the left side and has the same center. An arc-shaped rotation block is fixedly installed on the left side wall of the movable seat, and the arc-shaped rotation block is located inside the arc-shaped rotation groove and is rotatably connected to the inner wall of the arc-shaped rotation groove.
[0012] Optionally, the observation assembly includes a transparent observation tube, which is fixedly connected to the top of the movable seat by bolts, and the transparent observation tube is vertically arranged between the movable seat, the inner walls at both ends of the transparent observation tube are fixedly installed with the same sliding rod, a floating ball is slidably connected to the sliding rod, and the outer wall of the sliding rod is provided with visible scale lines, connecting valves are sealed and fixedly connected at the tube openings at both ends of the bottom of the transparent observation tube, a vent hole is opened on the top of the transparent observation tube, two adjacent groups of connecting valves located on different calibration devices are sealed and fixedly connected with the same connecting pipe, and a zero scale line is provided on the middle outer wall of the transparent observation tube.
[0013] Optionally, slide rails are fixedly installed on both sides of the middle part of the side seat, and the two end walls in the middle part of the side seat are rotatably connected with the same screw rod, and motor 2 is fixedly installed on the top of the side seat, and the output end of motor 2 is fixedly connected to the end wall of the screw rod, and slide plates are slidably connected to the two groups of slide rails, and three groups of damping spring columns are fixedly installed on the two groups of slide plates, and the other ends of the damping spring columns are fixedly connected to the end walls of the hanger, and a threaded seat is fixedly installed on the end wall of the hanger, and the screw rod is threadedly matched with the threaded seat.
[0014] Optionally, movable grooves are provided on both sides of the hanger, the connecting pipe passes through the movable grooves, an observation device is fixedly installed on the inner wall of the top of the hanger, and the observation device observes the floating ball in the observation component.
[0015] Optionally, a top seat is provided on the top of the hanger, an inner slide is opened in the middle of the top seat, the inner wall of the inner slide is slidably connected to the slide, an inner frame is fixedly installed on the inner wall of the front end of the slide, a wire twisting roller is rotatably connected to the inner wall in the middle of the inner frame, a motor three is fixedly installed on the outer wall of the inner frame, and the output end of the motor three is fixedly connected to the end wall of the wire twisting roller, a steel cable is wound on the wire twisting roller, and the bottom of the steel cable is clamped with the center of the top of the hanger.
[0016] Optionally, a method for using a building level measuring device further includes the following specific operating steps:
[0017] S1: Install multiple sets of top seats on the top of different building top beams, and make the top surface of the top seats flush with the top of the building top beams. At the same time, install multiple sets of side seats on different building walls, and drive motor 2 so that multiple sets of hangers are at the same height and are all located in the middle of the side seats;
[0018] S2: Open the connecting valve and inject colored liquid into the connecting pipe to make it enter each transparent observation tube. At this time, observe whether the liquid in the transparent observation tube is tilted. According to the tilt degree of the liquid in the transparent observation tube, drive the motor to drive the worm to rotate, so as to mesh with the arc-shaped worm wheel, thereby forcing the movable seat to rotate in the arc-shaped rotating groove, and at the same time cooperate to push different damping spring columns on the rear side of the hanger to fine-tune the deflection angle of the hanger, so that the top surface of the liquid in all transparent observation tubes is level;
[0019] S3: Then, the colored liquid is continuously injected into the transparent observation tube through the connecting tube, so that the colored liquid lifts up the floating ball in the transparent observation tube, so that the top surface of the floating ball coincides with the zero scale line. Since the transparent observation tube and the connecting tube can form a communicating vessel, and the multiple groups of hangers are located at the same height, the liquid levels in all transparent observation tubes are at the same height, and the top surfaces of all floating balls coincide with the zero scale line.
[0020] S4: close the connecting valve on the side wall of the third group of transparent observation tubes, so that a connecting vessel is formed between the first two groups of transparent observation tubes and the connected connecting pipe, and at the same time drive the motor 3 on the top of the first group of transparent observation tubes, so that the steel cable on the wire rope roller is released. When the bottom of the steel cable is just engaged with the top of the hanger, that is, the steel cable is tightened, the input of the motor 3 is stopped and the number of turns of the lowered steel cable is recorded. According to the number of turns of the steel cable on the first group of wire rope rollers, drive the other group of wire rope rollers to release the same number of turns of the steel cable;
[0021] S5: By driving the second motor on the second set of transparent observation tubes, the screw rod is meshed with the threaded seat, thereby changing the position of the hanger on the side seat, so that the bottom of the steel cable on the second set of stranded wire rollers can be engaged with the top of the hanger, that is, the second set of steel cables is also tightened. At this time, the liquid level in the two sets of transparent observation tubes will change. The position change of the floating ball in the transparent observation tube is observed by the observation device, and the scale change of the floating ball on the sliding rod is read. After calculation, the height difference between the first two sets of buildings can be obtained;
[0022] S6: After the inspection of the first two groups of buildings is completed, the connection between the second group of steel cables and the hanger is loosened, and the position of the second group of hangers is reset so that the position of the float returns to the zero scale line, the connecting valve on the left side of the second group of transparent observation tubes is closed, and the connecting valve on the right side is opened. At the same time, the connecting valve on the right side of the third group of transparent observation tubes is closed, so that the second and third groups of transparent observation tubes and the connected connecting pipes can form a communicating vessel. Repeat the above operation to obtain the horizontal height difference between each group of buildings and the first group of buildings.
[0023] Compared with the prior art, the present invention has at least the following beneficial effects:
[0024] In the above scheme, by opening the connecting valve and injecting colored liquid into the connecting pipe, it enters into each transparent observation tube. At this time, it is observed whether the liquid in the transparent observation tube is tilted. According to the tilt degree of the liquid in the transparent observation tube, the motor 1 is driven to drive the worm to rotate, thereby engaging with the arc-shaped worm wheel, thereby forcing the movable seat to rotate in the arc-shaped rotating groove, and at the same time, the different damping spring columns on the rear side of the hanger are pushed to fine-tune the deflection angle of the hanger so that the top surface of the liquid in all transparent observation tubes is horizontal. At the same time, according to the running time of the motor 1, the number of rotations of the motor 1 can be calculated, thereby obtaining the number of rotations of the worm, and according to the number of matching circles of the arc-shaped worm wheel and the worm, the deflection angle of the movable seat can be obtained, thereby calculating the inclination angle of the building to be measured and the horizontal plane.
[0025] The motor three on the top of the first set of transparent observation tubes is driven to release the steel cable on the wire rope roller. When the bottom of the steel cable is just engaged with the top of the hanger, the steel cable is tightened. At this time, the input of motor three is stopped and the number of turns of the lowered steel cable is recorded. According to the number of turns of the steel cable on the first set of wire rope rollers, the other set of wire rope rollers is driven to release the same number of turns of steel cable. By driving the motor two on the second set of transparent observation tubes, the screw is engaged with the threaded seat, thereby changing the position of the hanger on the side seat, so that the bottom of the steel cable on the second set of wire rope rollers can be engaged with the top of the hanger, that is, the second set of steel cables is also tightened. At this time, the liquid level in the two sets of transparent observation tubes will change. The position change of the float in the transparent observation tube is observed by the observation device. By reading the scale change of the float on the slide bar, the height difference between the first two sets of buildings can be obtained through calculation. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The accompanying drawings, which are incorporated herein and constitute a part of the specification, illustrate embodiments of the invention and, together with the description, further serve to explain the principles of the invention and to enable those skilled in the relevant art to make and use the invention.
[0027] Figure 1 A schematic diagram of the installation of a detection structure in a building level measurement device on a building;
[0028] Figure 2 It is a three-dimensional structural schematic diagram of a detection structure in a building level measurement device;
[0029] Figure 3 It is a schematic diagram of the three-dimensional structure of the calibration device;
[0030] Figure 4 This is a structural diagram of the connection between the observation assembly and the movable seat;
[0031] Figure 5 It is a structural schematic diagram of the angle correction component;
[0032] Figure 6 This is a split diagram of the angle correction component;
[0033] Figure 7 This is the installation structure diagram of each component on the semicircular positioning cylinder;
[0034] Figure 8 This is the connection structure diagram between the semicircular positioning cylinder and the hanger;
[0035] Fig. 9 It is a schematic diagram of the structure of the observation component;
[0036] Fig.10 It is a schematic diagram of the structure inside the hanger;
[0037] Fig.11 This is a schematic diagram of the installation of the positioning studs;
[0038] Fig.12 It is a schematic diagram of the structure of each component on the top seat;
[0039] Fig.13 It is the connection structure diagram of the calibration device and the side seat;
[0040] Fig.14 This is a schematic diagram of the installation of the damping spring column and the slide plate.
[0041] Calibration device 100, hanger 101, bottom mounting groove 102, arc-shaped mounting groove 103, arc-shaped rotating groove 104, movable groove 105, observation device 106, angle calibration assembly 110, semicircular positioning cylinder 111, front rotating seat 112, movable area 113, first arc-shaped limiting groove 114, second arc-shaped limiting groove 115, rear rotating seat 116, third arc-shaped limiting groove 117, arc-shaped worm wheel 118, movable seat 120, gear mounting groove 121, bearing 122, worm 123, arc-shaped rotating block 124, limiting area 125, positioning strip 126, assembly block 127, electric Machine one 128, positioning stud 130, gasket 131, fixing nut 132, observation assembly 140, transparent observation tube 141, slide rod 142, visible scale line 143, float 144, connecting valve 145, vent hole 146, connecting pipe 147, zero scale line 148, slide plate 150, damping spring column 151, threaded seat 160, side seat 200, slide rail 210, screw 220, motor two 230, top seat 240, inner slide 241, slide 242, inner frame 243, wire twisting roller 244, motor three 245, steel cable 246.
[0042] As shown in the figure, in order to clearly implement the structure of the embodiment of the present invention, specific structures and devices are marked in the figure, but this is only for illustrative purposes and is not intended to limit the present invention to the specific structure, device and environment. According to specific needs, ordinary technicians in this field can adjust or modify these devices and environments. DETAILED DESCRIPTION
[0043] The following is a detailed description of a building level measuring device and a method of using the same provided by the present invention in conjunction with the accompanying drawings and specific embodiments. At the same time, it is explained here that in order to make the embodiments more detailed, the following embodiments are the best and preferred embodiments, and those skilled in the art may also adopt other alternative methods to implement some known technologies; and the accompanying drawings are only for a more specific description of the embodiments, and are not intended to specifically limit the present invention.
[0044] like Figure 1 and Figure 6As shown, an embodiment of the present invention provides a building level measuring device, including a calibration device 100 and a side seat 200, each of which is provided with multiple groups, and the calibration device 100 includes a hanger 101, and a calibration component 110 is provided at the bottom of the hanger 101, and the calibration component 110 is composed of a semicircular positioning cylinder 111 and a movable seat 120, and the movable seat 120 is located inside the hanger 101 and can rotate in the hanger 101, and an observation component 140 is installed on the top of the movable seat 120; An arc-shaped worm wheel 118 is fixedly installed on the outer wall of the movable seat 120, a gear groove 121 is opened at the bottom of the movable seat 120, bearings 122 are installed on both end walls of the gear groove 121, and the inner walls of the two sets of bearings 122 are connected to the same worm 123, the worm 123 is located inside the gear groove 121, and the worm 123 is rotatably connected to the movable seat 120 through the bearing 122, the worm 123 is meshed with the arc-shaped worm wheel 118, and the movable seat 120 is rotatably connected to the semicircular positioning cylinder 111 through the cooperation of the worm 123 and the arc-shaped worm wheel 118, and the movable seat 120 is rotatably connected to the semicircular positioning cylinder 111, and the movable seat 1 20 The outer wall is fixedly mounted with a motor 128, and the output end of the motor 128 is fixedly connected to the end wall of the worm 123. In the present invention, the connecting valve 145 is opened and the colored liquid is injected into the connecting pipe 147 to enter each transparent observation tube 141. At this time, it is observed whether the liquid in the transparent observation tube 141 is tilted. According to the tilt degree of the liquid in the transparent observation tube 141, the motor 128 is driven to drive the worm 123 to rotate, thereby meshing with the arc worm wheel 118, thereby forcing the movable seat 120 to rotate. The hanger 101 rotates inside and cooperates with pushing different damping spring columns 151 on the rear side of the hanger 101 to fine-tune the deflection angle of the hanger 101, so that the top surface of the liquid in all transparent observation tubes 141 is level. In particular, according to the running time of the motor 128, the number of rotations of the motor 128 can be calculated, thereby the number of rotations of the worm 123 can be obtained, and according to the number of matching circles of the arc worm wheel 118 and the worm 123, the deflection angle of the movable seat 120 can be obtained, thereby calculating the inclination angle of the building to be measured and the horizontal plane.
[0045] As an implementation method in this embodiment, Figures 5 to 8 As shown, a front rotating seat 112 is fixedly installed on the top of the front end of the semicircular positioning cylinder 111, and a rear rotating seat 116 is fixedly installed on the top of the end of the semicircular positioning cylinder 111, and the inner walls of the rear rotating seat 116 and the front rotating seat 112 are both provided with a movable area 113, and the assembly block 127 can move in the movable area 113, a second arc-shaped limiting groove 115 is opened on the top of the front end of the front rotating seat 112, a first arc-shaped limiting groove 114 is opened on the inner wall of the front rotating seat 112, and a third arc-shaped limiting groove 117 is opened on the top of the end of the rear rotating seat 116.
[0046] The movable seat 120 is provided with a limited area 125 at the front end and the bottom of the end. The front rotating seat 112 and the rear rotating seat 116 are respectively located in the limited areas 125 at the front and rear ends, and are both in rotational contact with the inner walls of the limited areas 125. The inner end walls of the two groups of limited areas 125 are fixedly installed with positioning strips 126, and the two groups of positioning strips 126 are respectively rotatably connected to the end walls of the front rotating seat 112 and the rear rotating seat 116. The outer end walls of the two groups of limited areas 125 are fixedly installed with assembly blocks 127 by bolts. The two groups of assembly blocks 127 are respectively located in the two groups of movable areas 113, and the top side walls of the two groups of assembly blocks 127 are respectively rotatably connected to the inner walls of the second arc-shaped limiting groove 115 and the third arc-shaped limiting groove 117. The bottom side wall of the assembly block 127 located in the front rotating seat 112 is rotatably connected to the inner wall of the first arc-shaped limiting groove 114.
[0047] A bottom mounting groove 102 is provided on the inner wall at the bottom of the hanger 101, and arc-shaped mounting grooves 103 are provided on both side walls of the bottom of the hanger 101. The front swivel seat 112 and the rear swivel seat 116 have the same radius. The radius of the front swivel seat 112 is smaller than the radius of the arc-shaped mounting groove 103 on the left and larger than the radius of the arc-shaped mounting groove 103 on the right. The front swivel seat 112 is plugged into the arc-shaped mounting groove 103 on the left, and the semicircular positioning cylinder 111 and the cross-section of the bottom mounting groove 102 form a complete circle. The semicircular positioning cylinder 111 and the inner wall of the bottom mounting groove 102 are plugged with the same positioning stud 130, and a gasket 131 is sleeved on the left end wall of the positioning stud 130, and the gasket 131 is in contact with the end wall of the semicircular positioning cylinder 111, and a fixing nut 132 is provided at the outermost end of the positioning stud 130, and the fixing nut 132 is used in conjunction with the positioning stud 130.
[0048] An arc-shaped rotation groove 104 is opened at the bottom left side of the hanger 101, and the arc-shaped rotation groove 104 is located at the top of the arc-shaped mounting groove 103 on the left side, and the center of the circle is the same. An arc-shaped rotation block 124 is fixedly installed on the left side wall of the movable seat 120, and the arc-shaped rotation block 124 is located inside the arc-shaped rotation groove 104 and is rotatably connected to the inner wall of the arc-shaped rotation groove 104. In the present application, the output shaft of the driving motor 128 drives the worm 123 to engage with the arc-shaped worm gear 118, so that the assembly block 127 rotates in the first arc-shaped limit groove 114, the second arc-shaped limit groove 115 and the third arc-shaped limit groove 117 respectively. At the same time, since the semicircular positioning cylinder 111 is fixed to the bottom mounting groove 102 by the positioning stud 130, the movable seat 120 can rotate on the arc-shaped worm gear 118.
[0049] In this embodiment, if Figure 3 and Fig. 9As shown, the observation assembly 140 includes a transparent observation tube 141, which can facilitate observation of the position of a floating ball 144 in the transparent observation tube 141. The transparent observation tube 141 is fixedly connected to the top of the movable seat 120 by bolts, and the transparent observation tube 141 and the movable seat 120 are vertically arranged. The inner walls of both ends of the transparent observation tube 141 are fixedly installed with the same sliding rod 142, and the floating ball 144 is slidably connected to the sliding rod 142. The outer wall of the sliding rod 142 is provided with a visible scale line 143. The tube openings at both ends of the bottom of the transparent observation tube 141 are sealed and fixedly connected with connecting valves 145. The two sets of connecting valves 145 can be freely controlled. The two adjacent transparent observation tubes 141 are opened and closed, so that a communicating vessel is formed between the two adjacent transparent observation tubes 141 and the connecting pipe 147. A vent hole 146 is provided on the top of the transparent observation tube 141, and the vent hole 146 can ensure that the transparent observation tube 141 is connected to the external air pressure. The two adjacent connecting valves 145 located on different calibration devices 100 are sealed and fixedly connected with the same connecting pipe 147. A zero scale line 148 is provided on the outer wall of the middle part of the transparent observation tube 141; movable grooves 105 are provided on both sides of the hanger 101, and the connecting pipe 147 runs through the movable grooves 105. An observation device 106 is fixedly installed on the inner wall of the top of the hanger 101, and the observation device 106 is The observation assembly 140 is observed by the floating ball 144. In the present application, a colored liquid is injected into the transparent observation tube 141 through the connecting pipe 147 to lift the floating ball 144 in the transparent observation tube 141, so that the top surface of the floating ball 144 coincides with the zero scale line 148. Since the transparent observation tube 141 and the connecting pipe 147 can form a communicating vessel, and the multiple groups of hangers 101 are located at the same height, the liquid levels in all transparent observation tubes 141 are the same, and the top surfaces of all floating balls 144 coincide with the zero scale line 148. In particular, when it is necessary to detect the horizontal height difference between two adjacent groups of buildings, by driving the first The motor 230 on the second set of transparent observation tubes 141 enables the screw 220 to mesh with the threaded seat 160, thereby changing the position of the hanger 101 on the side seat 200, so that the bottom of the steel cable 246 on the second set of twisted wire rollers 244 can be engaged with the top of the hanger 101, that is, the second set of steel cables 246 are also tightened. At this time, the liquid level in the two sets of transparent observation tubes 141 will change, and the position change of the float 144 in the transparent observation tube 141 is observed through the observation device 106. By reading the scale change of the float 144 on the slide bar 142, the height difference between the first two groups of buildings can be obtained through calculation.
[0050] In this embodiment, if Fig.13 and Fig.14As shown, slide rails 210 are fixedly installed on both sides of the middle part of the side seat 200, and the same screw 220 is rotatably connected to the two end walls of the middle part of the side seat 200. A second motor 230 is fixedly installed on the top of the side seat 200, and the output end of the second motor 230 is fixedly connected to the end wall of the screw 220. Slide plates 150 are slidably connected to the two groups of slide rails 210, and three groups of damping spring columns 151 are fixedly installed on the two groups of slide plates 150, and the other ends of the damping spring columns 151 are fixedly connected to the end wall of the hanger 101, and a threaded seat 160 is fixedly installed on the end wall of the hanger 101, and the screw 220 is threadedly matched with the threaded seat 160.
[0051] In this embodiment, if Figure 1 , Figure 2 and Fig.12 As shown, a top seat 240 is provided on the top of the hanger 101, an inner slide 241 is provided in the middle of the top seat 240, and a slide 242 is slidably connected to the inner wall of the inner slide 241. By moving the slide 242 in the inner slide 241, it can be ensured that when the steel cable 246 is lowered, there is no tilt between the steel cable 246 and the hanger 101. An inner frame 243 is fixedly installed on the inner wall of the front end of the slide 242, and a twisting roller 244 is rotatably connected to the inner wall of the middle part of the inner frame 243. A motor 3 245 is fixedly installed on the outer wall of the inner frame 243, and the output end of the motor 3 245 is fixedly connected to the end wall of the twisting roller 244. A steel cable 246 is wound around the wire roller 244, and the bottom of the steel cable 246 is engaged with the center of the top of the hanger 101. In the present application, the motor three 245 on the top of the first group of transparent observation tubes 141 is driven to release the steel cable 246 on the wire roller 244. When the bottom of the steel cable 246 is just engaged with the top of the hanger 101, that is, the steel cable 246 is tightened, the input of the motor three 245 is stopped and the number of turns of the lowered steel cable is recorded. According to the number of turns of the steel cable 246 released on the first group of wire rollers 244, the other group of wire rollers 244 is driven to release the same number of turns of the steel cable 246.
[0052] The method for using the building level measuring device provided by the present invention is to install multiple groups of top seats 240 on the tops of different building top beams, and make the top surfaces of the top seats 240 flush with the tops of the building top beams, and at the same time install multiple groups of side seats 200 on different building walls, and drive motor 230 to make multiple groups of hangers 101 at the same height and all located in the middle of the side seats 200.
[0053] Open the connecting valve 145 and inject colored liquid into the connecting tube 147 to allow it to enter each transparent observation tube 141. At this time, observe whether the liquid in the transparent observation tube 141 is tilted. According to the degree of tilt of the liquid in the transparent observation tube 141, drive the motor 128 to drive the worm 123 to rotate, thereby engaging with the arc-shaped worm gear 118, thereby forcing the movable seat 120 to rotate in the arc-shaped rotating groove 104. At the same time, cooperate with the different damping spring columns 151 on the rear side of the push bracket 101 to fine-tune the deflection angle of the hanger 101 so that the top surface of the liquid in all transparent observation tubes 141 is level.
[0054] Thereafter, colored liquid continues to be injected into the transparent observation tube 141 through the connecting tube 147, so that the floating ball 144 in the transparent observation tube 141 is lifted up, and the top surface of the floating ball 144 coincides with the zero scale line 148. Since the transparent observation tube 141 and the connecting tube 147 can form a communicating vessel, and the multiple groups of hangers 101 are located at the same height, the liquid levels in all transparent observation tubes 141 are the same, and the top surfaces of all floating balls 144 coincide with the zero scale line 148.
[0055] Close the connecting valve 145 on the side wall of the third group of transparent observation tubes 141 to form a connecting vessel between the first two groups of transparent observation tubes 141 and the connected connecting pipe 147, and at the same time drive the motor 3 245 on the top of the first group of transparent observation tubes 141 to release the steel cable 246 on the wire rope roller 244. When the bottom of the steel cable 246 is just engaged with the top of the hanger 101, that is, the steel cable 246 is tightened, the input of the motor 3 245 is stopped and the number of turns of the lowered steel cable is recorded. According to the number of turns of the steel cable 246 on the first group of wire rope rollers 244, drive the other group of wire rope rollers 244 to release the same number of turns of the steel cable 246.
[0056] By driving the motor 230 on the second group of transparent observation tubes 141, the screw 220 is meshed with the threaded seat 160, thereby changing the position of the hanger 101 on the side seat 200, so that the bottom of the steel cable 246 on the second group of twisted wire rollers 244 can be engaged with the top of the hanger 101, that is, the second group of steel cables 246 are also tightened. At this time, the liquid level in the two groups of transparent observation tubes 141 will change, and the position change of the float 144 in the transparent observation tube 141 is observed through the observation device 106. By reading the scale change of the float 144 on the slide bar 142, the height difference between the first two groups of buildings can be obtained through calculation.
[0057] After the inspection of the first two groups of buildings is completed, the connection between the second group of steel cables 246 and the hanger 101 is loosened, and the position of the second group of hangers 101 is reset at the same time, so that the position of the float 144 returns to the zero scale line 148, the connecting valve 145 on the left side of the second group of transparent observation tubes 141 is closed, the connecting valve 145 on the right side is opened, and the connecting valve 145 on the right side of the third group of transparent observation tubes 141 is closed at the same time, so that the second and third groups of transparent observation tubes 141 and the connected connecting pipes 147 can form a communicating vessel, and the above operations are repeated to obtain the horizontal height difference between each group of buildings and the first group of buildings.
[0058] The present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention. In order to make the public have a thorough understanding of the present invention, specific details are described in detail in the following preferred embodiments of the present invention, but those skilled in the art can fully understand the present invention without the description of these details. In addition, in order to avoid unnecessary confusion about the essence of the present invention, well-known methods, processes, procedures, components and circuits are not described in detail.
[0059] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A building level measuring device, comprising a calibration device (100) and a side seat (200), wherein the calibration device (100) and the side seat (200) are provided in multiple groups, characterized in that: The calibration device (100) comprises a hanger (101), wherein an angle calibration component (110) is provided at the bottom of the hanger (101), and the angle calibration component (110) is composed of a semicircular positioning cylinder (111) and a movable seat (120), wherein the movable seat (120) is located inside the hanger (101) and can rotate inside the hanger (101), and an observation component (140) is installed on the top of the movable seat (120); An arc-shaped worm wheel (118) is fixedly mounted on the outer wall of the middle part of the semicircular positioning cylinder (111); a gear groove (121) is provided at the bottom of the movable seat (120); bearings (122) are mounted on both end walls of the gear groove (121); the inner walls of two groups of bearings (122) are connected to the same worm (123); the worm (123) is located inside the gear groove (121); the worm (123) is rotatably connected to the movable seat (120) through the bearing (122); the worm (123) is meshed with the arc-shaped worm wheel (118); the movable seat (120) is rotatably connected to the semicircular positioning cylinder (111) through the cooperation between the worm (123) and the arc-shaped worm wheel (118); a motor (128) is fixedly mounted on the outer wall of the movable seat (120); and the output end of the motor (128) is fixedly connected to the end wall of the worm (123); Slide rails (210) are fixedly installed on both sides of the middle of the side seat (200), and the two end walls of the middle of the side seat (200) are rotatably connected to the same screw rod (220). Motor 2 (230) is fixedly installed on the top of the side seat (200), and the output end of motor 2 (230) is fixedly connected to the end wall of the screw rod (220). Slide plates (150) are slidably connected to the two groups of the slide rails (210), and three groups of damping spring columns (151) are fixedly installed on the two groups of the slide plates (150), and the other ends of the damping spring columns (151) are fixedly connected to the end wall of the hanger (101). A threaded seat (160) is fixedly installed on the end wall of the hanger (101), and the screw rod (220) is threadedly matched with the threaded seat (160); A front rotating seat (112) is fixedly mounted on the top of the front end of the semicircular positioning cylinder (111), a rear rotating seat (116) is fixedly mounted on the top of the end of the semicircular positioning cylinder (111), and both the inner walls of the rear rotating seat (116) and the front rotating seat (112) are provided with a movable area (113), a second arc-shaped limiting groove (115) is opened on the top of the front end of the front rotating seat (112), a first arc-shaped limiting groove (114) is opened on the inner wall of the front rotating seat (112), and a third arc-shaped limiting groove (117) is opened on the top of the end of the rear rotating seat (116); The front end and the bottom of the movable seat (120) are both provided with a limiting area (125), the front rotating seat (112) and the rear rotating seat (116) are respectively located in the limiting areas (125) at the front and rear ends, and are both in rotational contact with the inner wall of the limiting area (125), and the inner end walls of the two groups of the limiting areas (125) are fixedly installed with positioning strips (126), and the two groups of positioning strips (126) are respectively rotatably connected to the end walls of the front rotating seat (112) and the rear rotating seat (116), and the two The outer end walls of the two groups of limiting areas (125) are fixed with assembly blocks (127) by bolts, the two groups of assembly blocks (127) are respectively located in the two groups of active areas (113), and the top side walls of the two groups of assembly blocks (127) are rotatably connected to the inner walls of the second arc-shaped limiting groove (115) and the third arc-shaped limiting groove (117), respectively, and the bottom side wall of the assembly block (127) located in the front rotating seat (112) is rotatably connected to the inner wall of the first arc-shaped limiting groove (114); The bottom inner wall of the hanger (101) is provided with a bottom groove (102), and both side walls of the bottom of the hanger (101) are provided with arc grooves (103). The front rotating seat (112) and the rear rotating seat (116) have the same radius, and the radius of the front rotating seat (112) is smaller than the radius of the arc groove (103) on the left side and larger than the radius of the arc groove (103) on the right side. The front rotating seat (112) is plugged into the arc groove (103) on the left side, and the semicircular positioning cylinder (111 ) and the cross section of the bottom mounting groove (102) form a complete circle, the semicircular positioning cylinder (111) and the inner wall of the bottom mounting groove (102) are plugged with the same positioning stud (130), the left end wall of the positioning stud (130) is sleeved with a gasket (131), and the gasket (131) is in contact with the end wall of the semicircular positioning cylinder (111), and the outermost end of the positioning stud (130) is provided with a fixing nut (132), and the fixing nut (132) is used in conjunction with the positioning stud (130); The bottom left side of the hanger (101) is provided with an arc-shaped rotation groove (104), the arc-shaped rotation groove (104) is located at the top of the arc-shaped mounting groove (103) on the left side, and the arc-shaped rotation block (124) is fixedly installed on the left side wall of the movable seat (120), the arc-shaped rotation block (124) is located inside the arc-shaped rotation groove (104), and is rotatably connected to the inner wall of the arc-shaped rotation groove (104); The observation assembly (140) comprises a transparent observation tube (141), the transparent observation tube (141) being fixedly connected to the top of the movable seat (120) by means of bolts, and the transparent observation tube (141) and the movable seat (120) are arranged vertically, the inner walls at both ends of the transparent observation tube (141) are fixedly mounted with a same sliding rod (142), a floating ball (144) is slidably connected to the sliding rod (142), the outer wall of the sliding rod (142) is provided with a visible scale line (143), the tube openings at both ends of the bottom of the transparent observation tube (141) are both sealed and fixedly connected with a connecting valve (145), the top of the transparent observation tube (141) is provided with a vent hole (146), two adjacent groups of the connecting valves (145) located on different calibration devices (100) are sealed and fixedly connected with a same connecting pipe (147), and the outer wall of the middle part of the transparent observation tube (141) is provided with a zero scale line (148).
2. A building level measuring device according to claim 1, characterized in that: Both sides of the hanger (101) are provided with movable grooves (105), the connecting pipe (147) passes through the movable grooves (105), and an observation device (106) is fixedly installed on the inner wall of the top of the hanger (101), and the observation device (106) observes the floating ball (144) in the observation component (140).
3. A building level measuring device according to claim 2, characterized in that: A top seat (240) is provided at the top of the hanger (101), an inner slideway (241) is provided in the middle of the top seat (240), a slideway (242) is slidably connected to the inner wall of the inner slideway (241), an inner frame (243) is fixedly installed on the inner wall of the front end of the slideway (242), a wire twisting roller (244) is rotatably connected to the inner wall of the middle part of the inner frame (243), a motor three (245) is fixedly installed on the outer wall of the inner frame (243), and the output end of the motor three (245) is fixedly connected to the end wall of the wire twisting roller (244), a steel cable (246) is wound around the wire twisting roller (244), and the bottom of the steel cable (246) is clamped with the center of the top of the hanger (101).
4. The method for using a building level measuring device according to claim 3, characterized in that: The specific steps are as follows: S1: installing multiple sets of top seats (240) on the top of different building top beams, and making the top surface of the top seats (240) flush with the top of the building top beams, and installing multiple sets of side seats (200) on different building walls, and driving motor 2 (230) so that the multiple sets of hangers (101) are located at the same height and are all located in the middle of the side seats (200); S2: Open the connecting valve (145) and inject colored liquid into the connecting pipe (147) so that the colored liquid enters each transparent observation tube (141). At this time, observe whether the liquid in the transparent observation tube (141) is tilted. According to the tilt degree of the liquid in the transparent observation tube (141), drive the motor 1 (128) to drive the worm (123) to rotate, thereby engaging with the arc-shaped worm gear (118), thereby forcing the movable seat (120) to rotate in the arc-shaped rotating groove (104). At the same time, different damping spring columns (151) on the rear side of the push hanger (101) are cooperated to fine-tune the deflection angle of the hanger (101), so that the top surface of the liquid in all transparent observation tubes (141) is level; S3: Then, the colored liquid is continuously injected into the transparent observation tube (141) through the connecting tube (147) so as to lift up the floating ball (144) in the transparent observation tube (141) so that the top surface of the floating ball (144) coincides with the zero scale line (148). Since the transparent observation tube (141) and the connecting tube (147) can form a communicating vessel and the plurality of hangers (101) are located at the same height, the liquid levels in all transparent observation tubes (141) are the same, and the top surfaces of all floating balls (144) coincide with the zero scale line (148); S4: closing the connecting valve (145) on the side wall of the third group of transparent observation tubes (141), so that a connecting vessel is formed between the first two groups of transparent observation tubes (141) and the connected connecting pipe (147), and at the same time driving the motor three (245) on the top of the first group of transparent observation tubes (141) so that the steel cable (246) on the wire twisting roller (244) is released. When the bottom of the steel cable (246) is just engaged with the top of the hanger (101), that is, the steel cable (246) is tightened, the input of the motor three (245) is stopped and the number of turns of the steel cable released is recorded. According to the number of turns of the steel cable (246) on the first group of wire twisting rollers (244), the other group of wire twisting rollers (244) is driven to release the same number of turns of the steel cable (246); S5: By driving the second motor (230) on the second set of transparent observation tubes (141), the screw rod (220) is meshed with the threaded seat (160), thereby changing the position of the hanger (101) on the side seat (200), so that the bottom of the steel cable (246) on the second set of twisted wire rollers (244) can be engaged with the top of the hanger (101), that is, the second set of steel cables (246) is also tightened. At this time, the liquid level in the two sets of transparent observation tubes (141) will change, and the position change of the floating ball (144) in the transparent observation tube (141) is observed through the observation device (106). By reading the scale change of the floating ball (144) on the sliding rod (142), the height difference between the first two sets of buildings can be obtained through calculation; S6: After the inspection of the first two groups of buildings is completed, the connection between the second group of steel cables (246) and the hanger (101) is released, and the position of the second group of hangers (101) is reset so that the position of the float (144) returns to the zero scale line (148). The connecting valve (145) on the left side of the second group of transparent observation tubes (141) is closed, and the connecting valve (145) on the right side is opened. At the same time, the connecting valve (145) on the right side of the third group of transparent observation tubes (141) is closed, so that the second and third groups of transparent observation tubes (141) and the connected connecting pipes (147) can form a connecting vessel. The above operation is repeated to obtain the horizontal height difference between each group of buildings and the first group of buildings.