Control method and system for spaceflight biological experiment intelligent constant-temperature box

Through the combination of demand analysis of aerospace biological experimental tasks and real-time monitoring data, the intelligent control of the thermostatic chamber is realized, which solves the problems of insufficient control accuracy, high energy consumption and inaccurate fault prediction in the existing technology, and improves the accuracy of experimental results. reliability and resource utilization efficiency.

CN118760271APending Publication Date: 2024-10-11NAT SPACE SCI CENT CAS
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411055455.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing thermostat control technology is difficult to achieve dynamic adjustment and precise control of complex experimental requirements. It consumes high energy and inaccurate fault prediction, resulting in unreliable experimental results and waste of resources.

Method used

By obtaining the aerospace biological experiment tasks, analyzing the control requirements of the thermostat, generating control demand information, determining control decisions and plans, and dynamically adjusting the real-time monitoring data of the sensor module to achieve intelligent control of the thermostat.

Benefits of technology

It improves the control accuracy of the thermostat, reduces energy consumption, realizes early warning of faults, and ensures the reliability of experimental results and efficient use of resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118760271A_ABST
    Figure CN118760271A_ABST
Patent Text Reader

Abstract

The invention discloses a control method and system for a spaceflight biological experiment intelligent constant-temperature box, and belongs to the technical field of intelligent control, and the method comprises the steps: obtaining a spaceflight biological experiment task; carrying out thermostat control demand analysis according to the spaceflight biological experiment task, and generating thermostat control demand information; making a control decision according to the thermostat control demand information, and determining a thermostat control scheme; controlling the constant-temperature box based on the constant-temperature box control scheme, and monitoring the constant-temperature box in real time through a sensor module to obtain real-time monitoring data of the constant-temperature box; and based on the thermostat control demand information and the thermostat control scheme, the thermostat is controlled and adjusted in combination with the real-time monitoring data of the thermostat. According to the invention, the technical problems of unreliable experimental results and resource waste caused by insufficient control precision, high energy consumption and inaccurate fault prediction of the constant-temperature box in the prior art are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent control technology, and in particular to a control method and system for an intelligent thermostat for aerospace biological experiments. Background Art

[0002] With the rapid development of aerospace technology, space biological experiments have become an important field for exploring space life science and medical research. Space biological experiments need to be conducted in a strictly controlled environment to ensure the accuracy and reliability of the experimental results. As a key experimental equipment, the incubator must have a high degree of intelligence and precise control capabilities to adapt to the complex and changing aerospace environment.

[0003] Existing thermostat control technology mainly relies on simple control logic and manual intervention, which makes it difficult to achieve dynamic adjustment and precise control of complex experimental requirements. In addition, traditional thermostats have obvious deficiencies in energy consumption management and fault prediction, resulting in energy waste and frequent sudden failures, which in turn affects the continuity of experiments and the reliability of data. Summary of the invention

[0004] The present application provides a control method and system for an intelligent constant temperature box for aerospace biological experiments, aiming to solve the technical problems in the prior art of insufficient constant temperature box control accuracy, high energy consumption and inaccurate fault prediction, which lead to unreliable experimental results and waste of resources.

[0005] In view of the above problems, the present application provides a control method and system for an intelligent constant temperature box for aerospace biological experiments.

[0006] The first aspect disclosed in the present application provides a control method for an intelligent constant temperature box for aerospace biological experiments, the method comprising obtaining a space biological experiment task; performing a constant temperature box control demand analysis based on the space biological experiment task to generate constant temperature box control demand information; making a control decision based on the constant temperature box control demand information to determine a constant temperature box control plan; controlling the constant temperature box based on the constant temperature box control plan, and monitoring the constant temperature box in real time through a sensor module to obtain real-time monitoring data of the constant temperature box; controlling and adjusting the constant temperature box based on the constant temperature box control demand information and the constant temperature box control plan in combination with the real-time monitoring data of the constant temperature box.

[0007] Another aspect disclosed in the present application provides a control system for an intelligent constant temperature box for aerospace biological experiments, the system including a task acquisition module for obtaining aerospace biological experiment tasks; a demand analysis module for performing constant temperature box control demand analysis based on the aerospace biological experiment tasks and generating constant temperature box control demand information; a control decision module for making a control decision based on the constant temperature box control demand information and determining a constant temperature box control plan; a real-time monitoring module for controlling the constant temperature box based on the constant temperature box control plan, and monitoring the constant temperature box in real time through a sensor module to obtain real-time monitoring data of the constant temperature box; and a control and adjustment module for controlling and adjusting the constant temperature box based on the constant temperature box control demand information and the constant temperature box control plan in combination with the real-time monitoring data of the constant temperature box.

[0008] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0009] The invention adopts the technical scheme of obtaining aerospace biological experiment mission, analyzing the control demand of the incubator according to the mission, generating the control demand information of the incubator, making control decisions according to the information, determining the control scheme of the incubator, controlling the incubator based on the scheme, monitoring the incubator in real time through the sensor module, and controlling and adjusting the incubator in combination with the real-time monitoring data. The technical problems of insufficient control accuracy of the incubator, high energy consumption and inaccurate fault prediction in the prior art, which lead to unreliable experimental results and waste of resources, are solved, and the technical effects of improving the control accuracy of the incubator, reducing energy consumption, realizing early warning of faults and ensuring the reliability of experimental results are achieved.

[0010] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 A flow chart of a control method for an intelligent incubator for aerospace biological experiments is provided for the embodiment of the present application.

[0012] Figure 2 A structural schematic diagram of a control system for an intelligent constant temperature box for aerospace biological experiments is provided for the embodiment of the present application.

[0013] Explanation of the reference numerals: task acquisition module 11 , demand analysis module 12 , control decision module 13 , real-time monitoring module 14 , control adjustment module 15 . DETAILED DESCRIPTION

[0014] The overall idea of ​​the technical solution provided by this application is as follows:

[0015] The embodiment of the present application provides a control method and system for an intelligent incubator for aerospace biological experiments. First, the aerospace biological experiment task is obtained, and a detailed control demand analysis is performed to generate control demand information. Based on this information, specific control decisions and control schemes are formulated. Then, the incubator is monitored in real time through a sensor module to obtain real-time monitoring data. Combined with these real-time data and a predetermined control scheme, dynamic adjustment and control compensation are performed to ensure that the environment in the incubator always meets the experimental requirements, thereby ensuring the accuracy and reliability of the experimental results.

[0016] After introducing the basic principles of the present application, various non-limiting implementation methods of the present application will be specifically described below in conjunction with the drawings in the specification.

[0017] Embodiment 1, as Figure 1 As shown, the embodiment of the present application provides a control method for an intelligent constant temperature box for aerospace biological experiments, the method comprising:

[0018] Step S100: Obtaining a space biological experiment mission.

[0019] Specifically, space biological experiment missions are usually applied for by scientific research institutions or researchers. These applications need to describe in detail the purpose of the experiment, the content of the experiment, the required equipment and the requirements of the experimental environment. After the application is submitted, it will be reviewed to evaluate the feasibility, safety and scientific value of the experiment. The approved tasks will be included in the space biological experiment plan. The approved experimental tasks will be summarized in the space mission management system to generate detailed mission description files. These files include key information such as experimental objectives, experimental steps, required resources, experimental schedule, etc.

[0020] After receiving the task information, the thermostat control system needs to parse the information and extract key information related to temperature control. This information includes but is not limited to: target temperature range, temperature change curve, temperature control accuracy requirements, experimental cycle and key time nodes, and other special environmental control requirements (such as humidity, air pressure, etc.)

[0021] Through this step, the incubator control system can accurately obtain information about the space biological experiment mission and provide reliable basic data support for the subsequent incubator intelligent control. This process ensures the smooth execution of the experimental mission and guarantees the accuracy and reliability of the experimental results.

[0022] Step S200: performing a constant temperature box control requirement analysis according to the aerospace biological experiment mission, and generating constant temperature box control requirement information.

[0023] Specifically, the thermostat control requirements are first analyzed according to the specific requirements of the task. The first step in this analysis process is to parse the task file and extract key control parameters, such as target temperature range, temperature change curve, control accuracy requirements, experimental cycle and key time nodes.

[0024] Next, confirm the environmental conditions required for the experiment, including the temperature stability requirements and whether the temperature needs to be adjusted at a specific time point. It is necessary to combine the characteristics of the biological sample to determine the most suitable temperature and humidity conditions to ensure the accuracy of the experimental results.

[0025] Then, based on the time schedule of the experimental task, determine the start time, end time, and any key nodes that require temperature adjustment. This step will generate a time-temperature curve to help clarify the temperature requirements at different experimental stages. When determining the temperature control accuracy, it is necessary to evaluate the accuracy requirements of the incubator temperature control, such as the allowable temperature fluctuation range. For particularly sensitive experimental samples, higher temperature control accuracy is required.

[0026] At the same time, the actual control capability of the incubator must be evaluated to ensure that the equipment can meet the experimental requirements. If the equipment has limitations, appropriate adjustments must be made or the experimental requirements must be modified in consultation with the task initiator.

[0027] Finally, after all the demand information is determined, it is integrated to generate a complete constant temperature box control demand information file. This demand information includes target temperature, temperature change curve, control accuracy requirements, experimental cycle, key time nodes and other environmental conditions. The content of this file should be clear and complete to facilitate subsequent control decisions and plan formulation.

[0028] Through this step, the space biological experiment mission is analyzed in detail and accurate constant temperature chamber control demand information is generated to ensure that the control of the constant temperature chamber during the experiment meets the mission requirements, thereby ensuring the accuracy and reliability of the experimental results.

[0029] Step S300: making a control decision based on the thermostat control demand information and determining a thermostat control solution.

[0030] Specifically, first, a thermostat control decision model is constructed. Through the trained control decision model, the current thermostat control demand information can be input and a preliminary thermostat control plan can be output. This plan includes specific temperature settings, adjustment steps, and time nodes. Throughout the process, it is necessary to monitor and feedback the actual operation of the thermostat in combination with real-time monitoring data. If any deviation or abnormality is found, the control plan is further adjusted through the model to ensure that the thermostat always operates in the best condition.

[0031] This step makes control decisions based on the control demand information of the thermostat. First, by building and training the control decision model, the demand information is input and the preliminary control plan is output; then, through energy consumption prediction and real-time monitoring, the plan is optimized and adjusted, and finally a thermostat control plan that can meet the experimental requirements and has reasonable energy consumption is determined. Through this process, the stability and reliability of the experimental environment can be ensured to meet the strict requirements of aerospace biological experiments.

[0032] Step S400: Control the thermostat based on the thermostat control solution, and monitor the thermostat in real time through the sensor module to obtain real-time monitoring data of the thermostat.

[0033] Specifically, first, the various parameters in the control scheme are input into the control system of the thermostat, including the target temperature setting, temperature change curve, control accuracy requirements and time nodes, etc. The control system will automatically adjust the operating state of the thermostat according to these parameters to ensure that the experimental environment meets the predetermined requirements.

[0034] At the same time, the environmental parameters in the thermostat are monitored in real time through the sensor module installed in the thermostat. The sensor module may include a temperature sensor, a humidity sensor, an air pressure sensor, etc. These sensors can continuously obtain real-time data inside the thermostat and feed this data back to the control system.

[0035] The control system analyzes the real-time monitoring data obtained by the sensor module to evaluate whether the current state of the thermostat meets the requirements of the control scheme. If any deviation is detected, the control system will automatically adjust according to the pre-set adjustment logic. For example, if the temperature sensor detects that the temperature deviates from the target value, the control system will adjust the heating or cooling device to adjust the temperature back to within the target range.

[0036] In addition, real-time monitoring data is also used to record and analyze environmental changes during the experiment, providing data support for subsequent experimental optimization. These data can be stored in the experimental recording system for researchers to use in subsequent analysis.

[0037] Through real-time monitoring of the sensor module and automatic adjustment of the control system, the incubator is always operated in the best condition to meet the strict requirements of the experiment. This process realizes precise control and real-time adjustment of the incubator, ensures the stability and reliability of the experimental environment, and thus ensures the successful conduct of the space biological experiment.

[0038] Step S500: Based on the thermostat control demand information and the thermostat control solution, the thermostat is controlled and adjusted in combination with the thermostat real-time monitoring data.

[0039] Specifically, in the actual process of controlling the thermostat, it is necessary to combine the thermostat control demand information, control scheme and real-time monitoring data to dynamically control and adjust the thermostat. First, based on the previously determined thermostat control demand information, determine the specific control conditions that the thermostat needs to achieve. These conditions include target temperature, temperature change curve, control accuracy, etc.

[0040] The thermostat control system sets the initial control parameters based on the control demand information and the pre-established control plan, and starts the thermostat to run. At the same time, the sensor module continuously monitors the temperature, humidity, air pressure and other environmental parameters inside the thermostat, and feeds these real-time data back to the control system.

[0041] The control system will analyze the real-time monitoring data to evaluate whether the current operating status of the thermostat meets the preset control requirements. For example, whether the temperature detected by the temperature sensor is within the target temperature range, whether the humidity meets the requirements, etc. If any deviation is detected, the control system will automatically make corresponding control adjustments according to the preset adjustment logic.

[0042] Specifically, the control system includes deviation analysis, generating adjustment plans, executing adjustments, feedback loops, etc. Through this real-time monitoring and dynamic adjustment method, the incubator control system can quickly respond to environmental changes and ensure that the experimental environment always meets the preset control requirements. This not only improves the accuracy and reliability of the experimental results, but also reduces the need for manual intervention, and realizes the intelligent and automated control of the incubator.

[0043] Further, a control decision is made according to the thermostat control demand information to determine a thermostat control scheme, including:

[0044] Construct a thermostat control decision model;

[0045] Based on the thermostat control demand information and according to the thermostat control decision model, the thermostat control solution is output.

[0046] Specifically, building a thermostat control decision model includes data collection, data cleaning, data partitioning, and model training. During the training process, the model continuously adjusts internal parameters to optimize its prediction accuracy. Model verification and optimization: Use the test set to verify the trained model and evaluate its prediction ability. Based on the verification results, further optimize the model to ensure its reliability in practical applications.

[0047] Then, the specific constant temperature box control demand information is input into the trained decision model. The control demand information includes the target temperature, temperature change curve, control accuracy requirements, experimental cycle and key time nodes. The decision model analyzes and generates the best control plan based on the input demand information. The plan includes specific operating steps and parameter settings, such as temperature set point, adjustment time point, adjustment range, etc. The generated control plan is preliminarily evaluated to ensure its rationality and feasibility. If there is any unreasonableness in the plan, manual adjustment or re-optimization of the decision model is required.

[0048] Through this step, control decisions can be made effectively based on the thermostat control demand information and a specific control plan can be generated. Constructing and applying the thermostat control decision model can improve the accuracy and reliability of the control plan, ensure that the temperature control of the thermostat during the experiment reaches the expected target, and thus ensure the accuracy and consistency of the experimental results.

[0049] Furthermore, a thermostat control decision model is constructed, including: obtaining a thermostat control decision record set; performing data cleaning based on the thermostat control decision record set to generate a thermostat control decision data set; dividing the thermostat control decision data set according to a predetermined ratio to generate a thermostat control decision training set and a thermostat control decision test set; training a neural network based on the thermostat control decision training set to obtain the thermostat control decision model; and performing test feedback optimization on the thermostat control decision model based on the thermostat control decision test set.

[0050] Specifically, a large number of thermostat control decision records are collected from experimental records, equipment logs, and control systems. These records include the temperature control requirements, set control parameters, actual control operations, and experimental results of each experiment. The data collected from different sources are integrated to form a complete set of thermostat control decision records. Through data analysis and processing technology, noise data and erroneous data in the record set are removed, such as abnormal data caused by sensor failure. For missing values ​​in data records, interpolation or other methods are used to fill them to ensure data integrity. The data is normalized to meet the requirements of model training, such as unifying data format and dimension.

[0051] The cleaned data is labeled and divided into different categories or labels according to different control requirements and experimental results. The processed data is stored in a database or file system to form a constant temperature box control decision data set.

[0052] The control decision data set is divided into a training set and a test set according to a predetermined ratio (e.g., 80:20). The training set is used for model training, and the test set is used for model verification.

[0053] Construct a neural network model and set the initial parameters and structure of the model, such as the number of layers, the number of neurons in each layer, activation function, etc. Use the training set data to train the neural network and adjust the model parameters through the back propagation algorithm to minimize the prediction error. During the training process, the model continuously learns the relationship between the control requirements and the actual control results. Monitor the error changes and model performance during the training process in real time to ensure that the model gradually converges.

[0054] Use the test set data to verify the trained model and evaluate its predictive ability on unseen data. The test set can be used to detect whether the model is overfitting or underfitting. According to the test results, adjust the model structure or parameters for optimization. For example, if the model performs poorly under certain control requirements, you can increase the training data or adjust the network structure. Repeat the test and optimization until the model reaches a satisfactory performance level.

[0055] Through this step, a trained and optimized thermostat control decision model is constructed, which can output the best control scheme according to the input thermostat control demand information, thereby improving the control accuracy of the thermostat and the reliability of the experimental results.

[0056] Furthermore, making a control decision based on the thermostat control demand information and determining the thermostat control scheme also includes: predicting energy consumption based on the thermostat control scheme to obtain predicted thermostat control energy consumption; setting expected thermostat control energy consumption based on the aerospace biological experiment mission; judging whether the predicted thermostat control energy consumption meets the expected thermostat control energy consumption; if the predicted thermostat control energy consumption does not meet the expected thermostat control energy consumption, adjusting and optimizing the thermostat control scheme based on the expected thermostat control energy consumption.

[0057] Specifically, the expected constant temperature box control energy consumption refers to the energy consumption target value set according to the aerospace biological experiment mission, and the constant temperature box is expected not to exceed this energy consumption value during the execution of the mission. After making control decisions based on the constant temperature box control demand information and determining the constant temperature box control plan, energy consumption forecasting is also required to ensure that the energy consumption is within an acceptable range. First, energy consumption forecasting is performed based on the constant temperature box control plan. An energy consumption model is usually used to calculate the energy consumption of the constant temperature box during the execution of the control plan. The energy consumption model takes into account the heating, cooling, insulation and other operations of the constant temperature box, as well as environmental changes and control accuracy requirements during the experimental cycle.

[0058] After obtaining the predicted incubator control energy consumption, it is necessary to compare it with the expected energy consumption set according to the space biological experiment mission. The expected incubator control energy consumption is a pre-set energy consumption target to ensure that the experiment is efficient and sustainable in energy use. If the predicted energy consumption is within the expected value range, it means that the current control scheme is appropriate and can be directly executed.

[0059] If the predicted thermostat control energy consumption exceeds the expected value, the control scheme needs to be adjusted and optimized. This includes identifying the cause of high energy consumption: analyzing the energy consumption model to find out which operations or links lead to higher energy consumption. For example, whether the heating or cooling operations are frequent during certain time periods, or whether the temperature control accuracy requirements are too high. Optimize control parameters: adjust the parameters in the control scheme according to the cause of high energy consumption. For example, appropriately relax the temperature control accuracy requirements, optimize the heating and cooling time nodes, or improve the insulation performance of the thermostat. Re-predict energy consumption: re-predict the energy consumption of the optimized control scheme, and calculate whether the adjusted energy consumption meets the expected value. Repeated optimization: If the new predicted energy consumption still does not meet the expected value, continue to adjust and optimize until the predicted energy consumption reaches or falls below the expected value.

[0060] Among them, the key to building an energy consumption model is to accurately simulate the energy consumption of the thermostat under different operating conditions. First, a large amount of historical data is collected, including the actual energy consumption data of the thermostat under different temperature settings, environmental conditions, operating time and experimental types. Next, analyze these data to identify the main factors affecting energy consumption, such as the frequency and intensity of heating and cooling, the performance of insulation materials, and fluctuations in ambient temperature. Then, use statistical analysis and machine learning algorithms (such as regression analysis or neural networks) to establish a mathematical model to establish a corresponding relationship between these influencing factors and actual energy consumption. Finally, through model training and verification, the prediction accuracy of the model is continuously optimized to ensure its applicability and accuracy under different experimental conditions. It can provide a reliable basis for the optimization of the control scheme and ensure the energy efficiency of the thermostat operation.

[0061] Through this step, it can be ensured that the energy consumption of the incubator is within the expected range during the execution of the control scheme, which not only meets the needs of the experiment, but also achieves efficient use of energy. This process improves the economy and sustainability of the incubator control by combining energy consumption prediction and control scheme optimization, ensuring that space biological experiments can be carried out efficiently in an environment with limited resources.

[0062] Furthermore, based on the thermostat control demand information and the thermostat control scheme, the thermostat is controlled and adjusted in combination with the thermostat real-time monitoring data, including: the thermostat real-time monitoring data includes the thermostat internal environment monitoring data and the thermostat control monitoring data; deviation analysis is performed based on the thermostat control demand information and the thermostat internal environment monitoring data to obtain the box internal environment deviation analysis result; deviation analysis is performed based on the thermostat control scheme and the thermostat control monitoring data to generate the thermostat control deviation analysis result; control compensation analysis is performed based on the box internal environment deviation analysis result and the thermostat control deviation analysis result to obtain the thermostat control compensation scheme; the thermostat is controlled and adjusted according to the thermostat control compensation scheme.

[0063] Specifically, the deviation analysis refers to comparing the actual monitoring data with the preset target, identifying and quantifying the degree of deviation. The control compensation analysis is based on the deviation analysis results, formulating corresponding control adjustment measures to compensate for the deviation.

[0064] In the actual process of controlling the thermostat, it is necessary to control and adjust based on the thermostat control demand information and the thermostat control scheme, combined with real-time monitoring data. First of all, the real-time monitoring data includes the environmental monitoring data and control monitoring data in the thermostat. Environmental monitoring data such as temperature and humidity can reflect the actual environmental status in the thermostat in real time; control monitoring data such as heater power and cooler status can reflect the operating status of the thermostat control system.

[0065] Deviation analysis is performed based on the constant temperature box control demand information and environmental monitoring data. The goal of deviation analysis is to compare the actual environmental parameters with the preset control requirements, identify the difference between the actual environment and the target environment, quantify the difference, and generate the in-box environmental deviation analysis results.

[0066] At the same time, control deviation analysis is performed based on the thermostat control scheme and control monitoring data. The purpose of this step is to identify the operation deviation of the control system by comparing the actual control operation with the preset control scheme, and generate the thermostat control deviation analysis results.

[0067] Based on the deviation analysis results of the above two parts, control compensation analysis is carried out. Control compensation analysis combines the results of the in-box environment deviation analysis with the results of the constant temperature box control deviation analysis to formulate corresponding control adjustment measures to compensate for the detected deviation and ensure that the environment in the constant temperature box meets the experimental requirements.

[0068] Finally, the thermostat is controlled and adjusted according to the control compensation scheme. Specific adjustment measures include adjusting the power of the heater and cooler, changing the ventilation and humidity control parameters, etc. These adjustment measures can respond to environmental changes in real time to ensure that the environment in the thermostat is always maintained within the preset control requirement range.

[0069] Through this step, dynamic control and adjustment of the constant temperature box can be achieved to ensure that it always provides a stable and accurate environment under different experimental conditions, thereby ensuring the reliability and consistency of the experimental results.

[0070] Furthermore, a deviation analysis is performed based on the control demand information of the constant temperature box and the environmental monitoring data inside the constant temperature box to obtain an analysis result of the internal environment deviation, which also includes: evaluating the degree of deviation based on the analysis result of the internal environment deviation to obtain an evaluation coefficient of the internal environment deviation; judging whether the evaluation coefficient of the internal environment deviation is greater than / equal to an evaluation threshold of the internal environment deviation; and generating an early warning signal of the internal environment deviation if the evaluation coefficient of the internal environment deviation is greater than / equal to the evaluation threshold of the internal environment deviation.

[0071] Specifically, the deviation degree evaluation refers to evaluating the deviation analysis results and quantifying the severity of the deviation. The in-box environment deviation evaluation coefficient refers to the quantitative value obtained through the deviation degree evaluation, which indicates the severity of the deviation. The in-box environment deviation evaluation threshold is a preset limit value for judging whether the deviation is acceptable.

[0072] When dynamically controlling and adjusting the thermostat, it is necessary to perform deviation analysis based on the thermostat control demand information and the environmental monitoring data inside the thermostat. First, collect the real-time environmental monitoring data inside the thermostat, such as temperature and humidity, and compare these data with the target values ​​in the control demand information to identify the deviation of environmental parameters and generate the deviation analysis results of the environment inside the thermostat.

[0073] Next, the degree of deviation is evaluated based on the results of the in-box environment deviation analysis. This step quantifies the impact of the deviation on the experimental environment by calculating the severity of the deviation. The calculated in-box environment deviation evaluation coefficient represents the quantitative degree of deviation. The larger this coefficient is, the more serious the deviation is.

[0074] Then, it is determined whether the in-box environment deviation evaluation coefficient is greater than or equal to the preset in-box environment deviation evaluation threshold. This threshold is set according to the tolerance of the experiment, indicating that deviations within this value are acceptable, and deviations exceeding this value affect the accuracy and reliability of the experimental results.

[0075] If the deviation evaluation coefficient is greater than or equal to the threshold, an early warning signal of the in-box environment deviation is generated. This early warning signal prompts the control system and operators to adjust the control parameters of the constant temperature box or take other measures to correct the deviation and ensure that the experimental environment is restored to the preset control requirement range.

[0076] Through this step, the changes in the environment in the constant temperature chamber can be effectively monitored, and potential environmental deviation problems can be discovered and warned in a timely manner, ensuring that the constant temperature chamber always provides environmental conditions that meet the requirements throughout the entire experimental process, thereby ensuring the accuracy and reliability of the experimental results.

[0077] Furthermore, the method includes: predicting the failure probability based on the real-time monitoring data of the thermostat to obtain the failure probability of the thermostat; inputting the failure probability of the thermostat into a thermostat failure classification warning table to generate a thermostat failure warning signal.

[0078] Specifically, during the operation of the thermostat, the real-time monitoring data of the thermostat is continuously obtained through the sensor module, and the monitoring data is input into the fault probability prediction model. The model can analyze the historical data and real-time data to predict the probability of failure of the thermostat within a certain period of time. The fault probability prediction model is constructed using statistical analysis methods or machine learning algorithms, such as logistic regression, decision trees or neural networks. These models can output a fault probability value when new data is input by learning the relationship between historical fault data and real-time monitoring data.

[0079] After obtaining the failure probability of the thermostat, it is input into the thermostat failure classification warning table. The warning table divides the failure risk into different levels, such as low risk, medium risk and high risk, according to the size of the failure probability. Each level corresponds to a different warning threshold. When the failure probability reaches a certain threshold, the system will generate a corresponding failure warning signal.

[0080] Fault warning signals can be notified to operators in a variety of ways, such as alarm sounds, display prompts, or notifications sent via the network. Warning signals prompt operators to inspect, maintain, or take other preventive measures on the incubator to prevent potential faults from affecting the experimental process.

[0081] Through this step, the system can monitor and predict the failure risk of the incubator in real time, and issue an alarm in time when the failure probability reaches the warning threshold. This early warning mechanism improves the reliability and safety of the incubator operation, ensuring the stability of the experimental environment and the accuracy of the experimental results.

[0082] In summary, the control method for the intelligent incubator for aerospace biological experiments provided in the embodiments of the present application has the following technical effects:

[0083] 1. Through a systematic approach, ensure that the control requirements of the incubator in aerospace biological experiments are accurately identified and met, achieve high-precision and stable temperature control, and thus ensure the reliability and consistency of experimental results.

[0084] 2. By building a constant temperature box control decision model, the decision-making process is automated, the accuracy and adaptability of the control scheme are improved, human errors are reduced, control efficiency is improved, and the optimal operating state of the constant temperature box under different experimental conditions is ensured.

[0085] 3. Through real-time monitoring and control and adjustment, ensure that the environment in the constant temperature box always meets the preset requirements, realize dynamic adjustment and precise control, improve the stability and adaptability of the constant temperature box, and ensure the continuity of the experimental process and the accuracy of the experimental results.

[0086] Embodiment 2, based on the same inventive concept as the control method for the intelligent constant temperature box for aerospace biological experiments in the above embodiment, Figure 2 As shown, the embodiment of the present application provides a control system for an intelligent constant temperature box for aerospace biological experiments, the system comprising:

[0087] The mission acquisition module 11 is used to obtain the space biological experiment mission;

[0088] A demand analysis module 12 is used to analyze the control demand of the thermostat according to the aerospace biological experiment task and generate the control demand information of the thermostat;

[0089] A control decision module 13, used to make a control decision according to the thermostat control demand information and determine a thermostat control solution;

[0090] A real-time monitoring module 14 is used to control the thermostat based on the thermostat control scheme, and to monitor the thermostat in real time through the sensor module to obtain real-time monitoring data of the thermostat;

[0091] The control and regulation module 15 is used to control and regulate the thermostat based on the control demand information of the thermostat and the control scheme of the thermostat in combination with the real-time monitoring data of the thermostat.

[0092] Furthermore, the system is also used to perform the following steps:

[0093] Construct a thermostat control decision model;

[0094] Based on the thermostat control demand information and according to the thermostat control decision model, the thermostat control solution is output.

[0095] Furthermore, the system is also used to perform the following steps:

[0096] Obtain the thermostat control decision record set;

[0097] Performing data cleaning according to the thermostat control decision record set to generate a thermostat control decision data set;

[0098] Dividing the thermostat control decision data set according to a predetermined ratio to generate a thermostat control decision training set and a thermostat control decision test set;

[0099] Training a neural network according to the thermostat control decision training set to obtain the thermostat control decision model;

[0100] The thermostat control decision model is tested and optimized based on the thermostat control decision test set.

[0101] Furthermore, the system is also used to perform the following steps:

[0102] Perform energy consumption prediction according to the thermostat control scheme to obtain predicted thermostat control energy consumption;

[0103] According to the aerospace biological experiment mission, setting the expected constant temperature box to control energy consumption;

[0104] Determining whether the predicted thermostat control energy consumption meets the expected thermostat control energy consumption;

[0105] If the predicted thermostat control energy consumption does not meet the expected thermostat control energy consumption, the thermostat control scheme is adjusted and optimized according to the expected thermostat control energy consumption.

[0106] Furthermore, the system is also used to perform the following steps:

[0107] The real-time monitoring data of the thermostat box includes the environmental monitoring data inside the thermostat box and the control monitoring data of the thermostat box;

[0108] Perform deviation analysis based on the constant temperature box control demand information and the constant temperature box internal environment monitoring data to obtain the box internal environment deviation analysis result;

[0109] Perform deviation analysis according to the thermostat control scheme and the thermostat control monitoring data to generate a thermostat control deviation analysis result;

[0110] Perform control compensation analysis based on the in-box environment deviation analysis result and the constant temperature box control deviation analysis result to obtain a constant temperature box control compensation solution;

[0111] The thermostat is controlled and adjusted according to the thermostat control compensation scheme.

[0112] Furthermore, the system is also used to perform the following steps:

[0113] According to the in-box environment deviation analysis result, a deviation degree evaluation is performed to obtain an in-box environment deviation evaluation coefficient;

[0114] Determine whether the in-box environment deviation evaluation coefficient is greater than / equal to the in-box environment deviation evaluation threshold;

[0115] If the in-box environment deviation evaluation coefficient is greater than / equal to the in-box environment deviation evaluation threshold, an in-box environment deviation warning signal is generated.

[0116] Furthermore, the system is also used to perform the following steps:

[0117] Performing a failure probability prediction based on the real-time monitoring data of the thermostat to obtain a failure probability of the thermostat;

[0118] The thermostat failure probability is input into a thermostat failure classification warning table to generate a thermostat failure warning signal.

[0119] Any step of the method described above can be stored as a computer instruction or program in an unlimited computer memory, and can be called and recognized by an unlimited computer processor to implement any method in the embodiments of the present application, without any unnecessary restrictions.

[0120] Furthermore, the first or second mentioned above may not only represent an order relationship, but may also represent a specific concept, and / or refer to multiple elements that can be selected individually or in full. Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.

Claims

1. A control method for an intelligent thermostat for aerospace biological experiments, characterized in that: The method comprises: Obtained space biological experiment mission; Performing a constant temperature box control demand analysis according to the aerospace biological experiment mission and generating constant temperature box control demand information; Make a control decision based on the thermostat control demand information and determine a thermostat control plan; The thermostat is controlled based on the thermostat control scheme, and the thermostat is monitored in real time through a sensor module to obtain real-time monitoring data of the thermostat; Based on the thermostat control demand information and the thermostat control scheme, the thermostat is controlled and adjusted in combination with the thermostat real-time monitoring data.

2. The method according to claim 1, characterized in that A control decision is made according to the thermostat control demand information to determine a thermostat control solution, including: Construct a thermostat control decision model; Based on the thermostat control demand information and according to the thermostat control decision model, the thermostat control solution is output.

3. The method according to claim 2, characterized in that Construct a thermostat control decision model, including: Obtain the thermostat control decision record set; Performing data cleaning according to the thermostat control decision record set to generate a thermostat control decision data set; Dividing the thermostat control decision data set according to a predetermined ratio to generate a thermostat control decision training set and a thermostat control decision test set; Training a neural network according to the thermostat control decision training set to obtain the thermostat control decision model; The thermostat control decision model is tested and optimized based on the thermostat control decision test set.

4. The method according to claim 1, characterized in that The invention also includes: making a control decision based on the thermostat control demand information and determining a thermostat control plan. Perform energy consumption prediction according to the thermostat control scheme to obtain predicted thermostat control energy consumption; According to the aerospace biological experiment mission, setting the expected constant temperature box to control energy consumption; Determining whether the predicted thermostat control energy consumption meets the expected thermostat control energy consumption; If the predicted thermostat control energy consumption does not meet the expected thermostat control energy consumption, the thermostat control scheme is adjusted and optimized according to the expected thermostat control energy consumption.

5. The method according to claim 1, characterized in that Based on the thermostat control demand information and the thermostat control scheme, the thermostat is controlled and adjusted in combination with the thermostat real-time monitoring data, including: The real-time monitoring data of the thermostat box includes the environmental monitoring data inside the thermostat box and the control monitoring data of the thermostat box; Perform deviation analysis based on the constant temperature box control demand information and the constant temperature box internal environment monitoring data to obtain the box internal environment deviation analysis result; Perform deviation analysis according to the thermostat control scheme and the thermostat control monitoring data to generate a thermostat control deviation analysis result; Perform control compensation analysis based on the in-box environment deviation analysis result and the constant temperature box control deviation analysis result to obtain a constant temperature box control compensation solution; The thermostat is controlled and adjusted according to the thermostat control compensation scheme.

6. The method according to claim 5, characterized in that The method further includes: performing deviation analysis according to the constant temperature box control demand information and the constant temperature box internal environment monitoring data to obtain the box internal environment deviation analysis result; According to the in-box environment deviation analysis result, a deviation degree evaluation is performed to obtain an in-box environment deviation evaluation coefficient; Determine whether the in-box environment deviation evaluation coefficient is greater than / equal to the in-box environment deviation evaluation threshold; If the in-box environment deviation evaluation coefficient is greater than / equal to the in-box environment deviation evaluation threshold, an in-box environment deviation warning signal is generated.

7. The method according to claim 1, characterized in that The method comprises: Performing a failure probability prediction based on the real-time monitoring data of the thermostat to obtain a failure probability of the thermostat; The thermostat failure probability is input into a thermostat failure classification warning table to generate a thermostat failure warning signal.

8. A control system for an intelligent thermostat for aerospace biological experiments, characterized in that: For executing the method according to any one of claims 1 to 7, the system comprises: Mission acquisition module, used to obtain space biological experiment missions; A demand analysis module, used to analyze the control demand of the thermostat according to the aerospace biological experiment mission and generate the control demand information of the thermostat; A control decision module, used to make a control decision based on the thermostat control demand information and determine a thermostat control plan; A real-time monitoring module is used to control the thermostat based on the thermostat control scheme, and to monitor the thermostat in real time through the sensor module to obtain real-time monitoring data of the thermostat; A control and adjustment module is used to control and adjust the thermostat based on the control demand information of the thermostat and the control scheme of the thermostat in combination with the real-time monitoring data of the thermostat.

Citation Information

Cited By

  • Intelligent heating wire temperature control system based on monitoring data analysis

    CN118963466A

  • Constant-temperature incubator intelligent control method and system based on deep learning

    CN121349240A