Construction method of embedded steel structure column-beam joint
By installing variable cross-section steel columns flush with the concrete and connecting them to the corbel structure in the reinforced concrete structure, the problems of weakened strength in the joint area and complex construction were solved, achieving efficient and safe construction results.
Patent Information
- Application Number
- CN202411082442.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2044-08-08
AI Technical Summary
In the existing technology, the joint design of the steel corbel and the rigid steel column integrated structure weakens the structural strength of the joint area, makes on-site construction complicated, makes it impossible to set up the formwork flat, and has a high risk of collision for the climbing formwork equipment, which affects construction efficiency and safety.
The variable cross-section steel columns are installed flush with the concrete structure. After the concrete is poured through formwork, they are integrated with the corbel structure. Bolted or fully welded connections are used to avoid the steel corbels protruding and affecting construction, and to improve the overall strength in the joint area.
It improved the overall structural strength and construction efficiency of the node area, reduced on-site adjustment time, lowered construction difficulty and safety risks, and achieved efficient hoisting operations.
Smart Images

Figure CN118774392B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building construction technology, and in particular to a construction method for pre-embedded steel structure column-beam joints. Background Technology
[0002] In building structural design, it is common to use rigid connections for steel beams (or truss chords, diagonal braces, etc.) between the steel columns in the core tube and the steel columns in the outer frame on special floors. However, this approach has the following drawbacks.
[0003] 1. For example Figure 1 As shown, the design node generally adopts the method of pre-embedding stiff steel columns and steel brackets in the reinforced concrete structure 10. However, since the steel brackets and stiff steel columns are an integral structure, they need to be cut into sections on site, so that the stiff steel columns and part of the steel brackets are housed in the reinforced concrete structure 10. The upper and lower flange plates and web plates of part of the steel brackets respectively isolate the vertical and horizontal reinforcement in the reinforced concrete structure 10. In addition, the construction of the vertical reinforcement is complicated by using a connector, and the horizontal reinforcement requires opening holes in the web plate of the steel bracket, which weakens the structural strength of the node area and makes on-site construction difficult.
[0004] 2. Because some of the steel brackets protrude outwards, the formwork in the joint area cannot be set up according to the flat construction surface, and it needs to be assembled in sections, which makes construction difficult and reduces work efficiency.
[0005] 3. For super high-rise buildings, climbing formwork and other climbing equipment are often used on site. Since some steel brackets extend outward, the bracket structure may collide with the existing climbing equipment, which not only brings many inconveniences to the hoisting construction, but also increases the construction safety risks. Summary of the Invention
[0006] The purpose of this invention is to provide a construction method for pre-embedded steel structure column-beam joints, which can improve the strength of the joints themselves, facilitate construction, and increase efficiency.
[0007] To achieve this objective, the present invention adopts the following technical solution:
[0008] A construction method for a pre-embedded steel structure column-beam joint, comprising:
[0009] Step 1: Install variable cross-section steel columns in the reinforced concrete structure, making the variable cross-section steel columns flush with the edge line of the concrete structure;
[0010] Step 2: Erect formwork for the variable cross-section steel column and pour concrete;
[0011] Step 3: Connect the corbel structure and the beam structure to form an integrated structure, and install it on the part of the variable cross-section steel column exposed in the concrete.
[0012] Optionally, in step one, the variable cross-section steel column includes a first column and a second column. Both the first column and the second column extend along a first direction. The two ends of the second column are respectively connected to the first column. The cross-sectional area of the second column along the second direction is greater than the cross-sectional area of the first column. The second direction is perpendicular to the first direction.
[0013] Optionally, the first column includes an I-beam and the second column includes a kingpin. The two ends of the kingpin are respectively connected to the I-beam, and the flange of the end of the I-beam facing the reinforced concrete structure is flush with the flange of the end of the kingpin.
[0014] Optionally, after step one, the method further includes: installing a safety protection device on the outside of the steel-concrete structure.
[0015] Optionally, the safety protection device includes a steel platform or steel climbing formwork.
[0016] Optionally, before step two, the method further includes: inserting transverse and longitudinal reinforcing bars into the reinforced concrete structure and setting stirrups.
[0017] Optionally, the variable cross-section steel column is provided with a first end plate at one end facing the corbel structure, located on both sides of the variable cross-section steel column. The first end plate is provided with a plurality of first connecting holes at intervals along its own extension direction. Filler is filled into the steel-concrete structure through the first connecting holes. After the concrete of the variable cross-section steel column is poured, the filler is removed so that a reserved hole connected to the outside is formed in the concrete structure.
[0018] Optionally, the corbel structure has a second end plate at one end facing the variable cross-section steel column, corresponding to multiple first connection holes. The second end plate has multiple second connection holes. Connectors are inserted into the first connection holes, second connection holes, and reserved holes and grout is used to fill the holes, thereby fixing the corbel structure to the variable cross-section steel column.
[0019] Optionally, in step three, the corbel structure is welded to the variable cross-section steel column.
[0020] Optionally, in step three, one end of the corbel structure is welded to one end of the beam structure.
[0021] The beneficial effects of this invention are:
[0022] This invention provides a construction method for pre-embedded steel structure column-beam joints. First, variable cross-section steel columns are installed in the reinforced concrete structure, flush with the edge of the concrete structure. This facilitates rebar tying and formwork construction, improving joint construction efficiency and overall strength. Simultaneously, because the variable cross-section steel columns and corbel structures are pre-constructed in segments, the corbel structure is prevented from protruding from the concrete structure, thus avoiding interference with the construction of safety protection devices. Furthermore, it eliminates the need to cut the variable cross-section steel columns and corbel structures into segments on-site, further improving construction efficiency and operational safety. Next, formwork is erected for the variable cross-section steel columns, and concrete is poured to enhance the overall structural strength. Finally, the corbel structure and beam structure are connected to form a single integrated structure, which is then installed on the exposed portion of the variable cross-section steel columns to facilitate hoisting operations and improve work efficiency. Through these steps, the pre-embedded steel structure column-beam joint construction method of this application improves the joint's own strength, facilitates construction, and increases efficiency. Attached Figure Description
[0023] Figure 1 This is a schematic diagram of an existing pre-embedded steel structure column-beam joint;
[0024] Figure 2 This is a schematic diagram of the pre-embedded steel structure column-beam joint provided in an embodiment of the present invention. Figure 1 ;
[0025] Figure 3 This is a schematic diagram of the pre-embedded steel structure column-beam joint provided in an embodiment of the present invention. Figure 2 ;
[0026] Figure 4 yes Figure 3 A partial cross-sectional view at point AA in the middle;
[0027] Figure 5 yes Figure 3 A partial cross-sectional view at point BB.
[0028] Figure 6 yes Figure 3 A magnified view of a section at point C.
[0029] In the picture:
[0030] 10. Reinforced concrete structure; 20. Reserved hole; 1. Variable cross-section steel column; 11. First column; 12. Second column; 2. Corbel structure; 3. Beam structure; 4. First end plate; 41. First connecting hole; 5. Second end plate; 51. Second connecting hole; 6. Connecting component. Detailed Implementation
[0031] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and not intended to limit it. Furthermore, it should be noted that, for ease of description, the accompanying drawings show only the parts relevant to the present invention, and not all of the structures.
[0032] In the description of this invention, unless otherwise explicitly specified and limited, the terms "connected," "linked," and "fixed" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0033] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can include direct contact between the first and second features, or contact between the first and second features through another feature between them. Furthermore, "above," "over," and "on top" of the second feature includes the first feature directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature includes the first feature directly below or diagonally below the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.
[0034] In the description of this embodiment, the terms "upper," "lower," "right," etc., refer to the orientation or positional relationship shown in the accompanying drawings. They are used only for ease of description and simplification of operation, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the present invention. In addition, the terms "first" and "second" are used only for distinction in description and have no special meaning.
[0035] like Figures 2-6 As shown in the figure, this embodiment provides a construction method for a pre-embedded steel structure column-beam joint, which includes:
[0036] Step 1: Install variable cross-section steel column 1 in the steel-concrete structure 10, so that the variable cross-section steel column 1 is flush with the edge line of the concrete structure.
[0037] Step 2: Erect formwork for the variable cross-section steel column 1 and pour concrete.
[0038] Step 3: Connect the corbel structure 2 and the beam structure 3 to form an integrated structure, and install it on the part of the variable cross-section steel column 1 that is exposed in the concrete.
[0039] In this embodiment, firstly, a variable cross-section steel column 1 is installed in the reinforced concrete structure 10, making the variable cross-section steel column 1 flush with the edge of the concrete structure. This facilitates rebar tying and formwork construction, avoiding the cutting and weakening of the internal rebar in the concrete structure by traditional steel brackets. This effectively improves the overall structural strength and stability of the joint area, increasing the construction efficiency and overall strength of the joint. Simultaneously, since the variable cross-section steel column 1 and the bracket structure 2 are pre-constructed in segments, the steel brackets are prevented from protruding from the concrete structure, thus avoiding interference with the construction of safety protection devices. Furthermore, there is no need to cut the variable cross-section steel column 1 and bracket structure 2 into segments on-site, improving construction efficiency and operational safety. Then, formwork is erected for the variable cross-section steel column 1, and concrete is poured to improve the overall structural strength. Finally, the bracket structure 2 and the beam structure 3 are connected to form an integrated structure and installed on the exposed concrete portion of the variable cross-section steel column 1. This reduces on-site adjustment and splicing time, facilitating hoisting operations and improving work efficiency. Through the above steps, the construction method of the pre-embedded steel structure column-beam joint in this embodiment improves the joint's own strength, facilitates construction, and increases efficiency.
[0040] Specifically, such as Figure 2 and Figure 3 As shown, in step one, the variable cross-section steel column 1 includes a first column 11 and a second column 12. Both the first column 11 and the second column 12 extend along a first direction. The two ends of the second column 12 are connected to the first column 11, which is equivalent to segmenting the entire first column 11 at the corresponding node positions and installing the second column 12 accordingly, ensuring the continuity and stability of the variable cross-section steel column 1 in the main stress direction. The cross-sectional area of the second column 12 along the second direction is larger than that of the first column 11. The second direction is perpendicular to the first direction, which allows the variable cross-section steel column 1 to more effectively distribute and bear loads from the lateral or vertical directions, improving the overall load-bearing capacity and stability of the node. Moreover, by using the first column 11 and the second column 12 with different cross-sectional areas, raw materials can be saved and construction costs reduced while meeting the node strength requirements. The end of the second column 12 facing the corbel structure 2 is flush with the concrete surface, thus providing a flat working surface for the binding of the reinforcing bars and avoiding the construction obstacles caused by the outward extension of the steel corbel in traditional methods. At the same time, the flat formwork construction surface also reduces the need for piecemeal assembly of formwork, improving construction efficiency and quality.
[0041] It is understandable that the first direction refers to the longitudinal or vertical direction of the building structure, and no further restrictions are placed on the first direction here.
[0042] More specifically, in this embodiment, the first column 11 includes an I-beam, capable of withstanding significant bending stress, while its thinner web helps reduce weight. The second column 12 includes a kingpin, with both ends connected to the I-beam, effectively distributing and bearing loads from the lateral or vertical directions, while also ensuring a more stable connection between the kingpin and the I-beam. The flange of the I-beam facing the reinforced concrete structure 10 is flush with the flange of the kingpin, ensuring a smooth transition between the two. This not only facilitates rebar tying and formwork construction but also reduces stress concentration caused by changes in the steel column cross-section, improving the overall strength and durability of the joint. In other embodiments, the first column 11 and the second column 12 can also utilize structures such as H-beams, as long as the aforementioned functions are achieved. No specific structural limitations are imposed on the components described herein.
[0043] Specifically, following step one, the process also includes installing safety protection devices on the outside of the reinforced concrete structure 10. These safety protection devices include steel platforms or steel climbing formwork, providing construction workers with a stable and safe working platform for subsequent concrete pouring, rebar tying, formwork installation, and high-altitude operations. Furthermore, those skilled in the art are familiar with the specific structure and working principles of steel platforms and steel climbing formwork, and will not elaborate further here.
[0044] Specifically, prior to step two, the process includes: inserting transverse and longitudinal reinforcing bars into the reinforced concrete structure 10, and setting stirrups to improve the overall strength, stability, and durability of the joint structure. The specific arrangement of the transverse and longitudinal reinforcing bars and stirrups can be determined according to relevant design requirements and will not be elaborated upon here.
[0045] The connection method between the variable cross-section steel column 1 and the corbel structure 2 is explained below:
[0046] First, the variable cross-section steel column 1 and the corbel structure 2 can be connected by bolts and welds, such as... Figures 2-6 As shown, the variable cross-section steel column 1 has a first end plate 4 at the end facing the corbel structure 2. By setting the first end plate 4, a connection foundation is provided for the connection between the variable cross-section steel column 1 and the corbel structure 2. Figure 3 and Figure 4 As shown, on both sides of the variable cross-section steel column 1, the first end plate 4 is provided with a plurality of first connecting holes 41 spaced apart along its extension direction. The plurality of first connecting holes 41 are respectively located on opposite sides of the first end plate 4 and are connected to the outside to facilitate connection of various components. Fillers, such as foam, rubber, or other easily removable lightweight materials, are filled into the reinforced concrete structure 10 through the first connecting holes 41. Figure 2 and Figure 6As shown, after the concrete of the variable cross-section steel column 1 is poured and the concrete reaches a certain strength requirement, the filler is removed so that a reserved hole 20 connected to the outside is formed in the concrete structure, which facilitates subsequent construction operations.
[0047] More specifically, such as Figures 2-6 As shown, the corbel structure 2 has a second end plate 5 facing the variable cross-section steel column 1, corresponding to multiple first connection holes 41. The second end plate 5 has multiple second connection holes 51, the number, position, and size of which match the first connection holes 41 on the first end plate 4, to facilitate the subsequent insertion of the connector 6. The connector 6 is inserted into the first connection holes 41, second connection holes 51, and reserved holes 20, and grouting is performed to fix the corbel structure 2 to the variable cross-section steel column 1, giving the connection a high load-bearing capacity and good seismic performance. The connector 6 is made of high-strength bolts, anchors, or other fasteners with high strength and good connection performance. The specific structure of the connector 6 is not specified here. Furthermore, the grouting material should be a high-strength, fluid, and easily curing grout, such as cement-based grout or epoxy resin grout, which will not be elaborated further here.
[0048] It is understandable that the second end plate 5 is set on the web of the corbel structure 2. Through the above steps, the bolt connection between the web of the corbel structure 2 and the variable cross-section steel column 1 can be realized, while the flange plate of the corbel structure 2 and the variable cross-section steel column 1 are connected by welding, thereby realizing the bolted and welded connection between the variable cross-section steel column 1 and the corbel structure 2, which improves the strength and load-bearing capacity of the overall structure.
[0049] Secondly, in step three, the variable cross-section steel column 1 and the corbel structure 2 can also be connected by full welding. By welding the flange plate and web plate of the corbel structure 2 to the variable cross-section steel column 1, the work efficiency is improved and the construction is facilitated. The construction personnel can choose bolted welding connection or full welding connection according to the on-site work requirements.
[0050] Specifically, in step three, one end of the corbel structure 2 is welded to one end of the beam structure 3, connecting the corbel structure 2 and the beam structure 3 to form an integrated structure. This improves the connection strength and reduces the time for on-site adjustment and splicing, facilitating installation during hoisting operations. Alternatively, the corbel structure 2 and the beam structure 3 can also be connected by bolt welding; this is not a specific limitation.
[0051] It should be noted that the construction method for the embedded steel structure column-beam joint in this embodiment, through optimization of the embedded column-beam rigid connection joint construction method, solves the problems caused by the traditional "rigid steel column + steel bracket" design joint, such as weakened structural strength of the joint area, inconvenience for component hoisting, rebar tying, and formwork construction. At the same time, it also solves the problem of collision between the steel bracket and safety protection devices (such as climbing formwork or steel platforms), thereby achieving the effects of convenient construction, time saving, reduced modification, and guaranteed accuracy.
[0052] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the implementation of the present invention. Those skilled in the art will be able to make various obvious changes, readjustments, and substitutions without departing from the scope of protection of the present invention. It is neither necessary nor possible to exhaustively describe all embodiments here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the claims of the present invention.
Claims
1. A construction method for pre-embedded steel structure column-beam joints, characterized in that, include: Step 1: Install variable cross-section steel columns (1) in the reinforced concrete structure (10) so that the variable cross-section steel columns (1) are flush with the edge line of the concrete structure; Step 2: Set up formwork for the variable cross-section steel column (1) and pour concrete; Step 3: Connect the corbel structure (2) and the beam structure (3) to form an integrated structure, and install it on the part of the variable cross-section steel column (1) exposed in the concrete; The variable cross-section steel column (1) is provided with a first end plate (4) at one end facing the corbel structure (2). The first end plate (4) is provided with a plurality of first connecting holes (41) at intervals along its own extension direction. Filler is filled into the steel-concrete structure (10) through the first connecting holes (41). After the variable cross-section steel column (1) is poured with concrete, the filler is removed so that a reserved hole (20) connected to the outside is formed in the concrete structure. The corbel structure (2) has a second end plate (5) facing the variable cross-section steel column (1), corresponding to multiple first connection holes (41). The second end plate (5) has multiple second connection holes (51). The corbel structure (2) is fixedly connected to the variable cross-section steel column (1) by passing a connector (6) through the first connection hole (41), the second connection hole (51) and the reserved hole (20) and filling it with grout.
2. The construction method for the pre-embedded steel structure column-beam joint according to claim 1, characterized in that, In step one, the variable cross-section steel column (1) includes a first column (11) and a second column (12). Both the first column (11) and the second column (12) extend along the first direction. The two ends of the second column (12) are respectively connected to the first column (11). The cross-sectional area of the second column (12) along the second direction is greater than the cross-sectional area of the first column (11). The second direction is perpendicular to the first direction.
3. The construction method for the pre-embedded steel structure column-beam joint according to claim 2, characterized in that, The first column (11) includes an I-beam, and the second column (12) includes a king-shaped steel bar. The two ends of the king-shaped steel bar are respectively connected to the I-beam. The flange of the end of the I-beam facing the steel-concrete structure (10) is flush with the flange of the end of the king-shaped steel bar.
4. The construction method for the pre-embedded steel structure column-beam joint according to claim 1, characterized in that, After step one, the method also includes: installing a safety protection device on the outside of the steel-concrete structure (10).
5. The construction method for the pre-embedded steel structure column-beam joint according to claim 4, characterized in that, Safety protection devices include steel platforms or steel climbing formwork.
6. The construction method for the pre-embedded steel structure column-beam joint according to claim 1, characterized in that, Before step two, the method also includes: inserting transverse and longitudinal reinforcing bars in the steel-concrete structure (10) and setting stirrups.
7. The construction method for the pre-embedded steel structure column-beam joint according to any one of claims 1-6, characterized in that, In step three, one end of the corbel structure (2) is welded to one end of the beam structure (3).
Citation Information
Patent Citations
Construction method for arranging steel corbel on concrete frame column
CN103572973A
Connecting structure of concrete-filled steel pipe column and steel framed beam
JP1994306947A