A method for treating hard roof by ground and downhole butt joint drilling section fracturing

By combining numerical simulation of hydraulic fracturing and numerical simulation of mining stress to optimize the design of fracturing section spacing, adopting segmented fracturing with surface and downhole interconnected boreholes, and using coiled tubing fracturing, the problems of high fracturing cost of surface horizontal wells and small fracturing range of long downhole boreholes were solved, achieving efficient roof pressure relief and cost reduction.

CN118774711BActive Publication Date: 2026-11-20HUANENG COAL TECH RES CO LTD +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410704055.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-03
Publication Date
2026-11-20
Estimated Expiration
2044-06-03

AI Technical Summary

Technical Problem

The existing horizontal well fracturing directional long boreholes have high geological steering costs for horizontal sections, while long borehole fracturing in coal mines have a small impact range on fractures.

Method used

Combining numerical simulation methods of hydraulic fracturing and mining stress, the optimal spacing between fracturing sections was designed. Fracturing was carried out in stages by drilling holes that connect the surface and the well, using coiled tubing fracturing. Staged fracturing was achieved by connecting long directional boreholes with directional wells and cementing.

Benefits of technology

It reduced construction costs, increased crack extension length and fracturing influence range, ensured the pressure relief effect on the top plate after fracturing, simplified the construction process, and improved fracturing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774711B_ABST
    Figure CN118774711B_ABST
Patent Text Reader

Abstract

The method for treating hard roof by ground and downhole butt joint drilling section fracturing of the application comprises the following steps: step one, determining fracturing layer; step two, constructing directional long drilling hole; step three, sealing and fixing the build-up section of the directional long drilling hole in the underground coal mine; step four, butt joining the directional well and the long drilling hole in the underground coal mine on the ground; step five, lowering the casing from the ground to the directional well, and extending the casing to the horizontal section of the directional long drilling hole; step six, sealing and fixing the directional well and the horizontal section of the directional long drilling hole; step seven, selecting the best fracturing section interval; and step eight, implementing section fracturing by using the continuous tubing bottom sealing and dragging section fracturing mode according to the best fracturing section interval. The application combines the hydraulic pressure numerical simulation method and the mining stress numerical simulation method to optimize the design of the best fracturing section interval, which can ensure that the cracks do not have obvious interference, ensure the roof pressure relief effect after fracturing, improve the crack extension length and the single drilling hole fracturing influence range, and reduce the cost by using the continuous tubing fracturing mode.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of coal mine rockburst disaster management technology, specifically involving a method for treating hard roof rockburst disasters through segmented fracturing via boreholes connected to the surface and underground. Background Technology

[0002] my country's coal bases are shifting westward, and mining depths are gradually increasing. Due to the coal seam deposition conditions and high mining intensity in western mining areas, they face the threat of rockburst disasters caused by hard roofs, namely the risk of rockbursts caused by sudden fractures of large-area suspended roofs during coal mining, which seriously affects the safe and efficient mining of coal.

[0003] Regional and proactive governance is the development trend of coal mine disaster management. Currently, two main methods are used to manage rockburst disasters caused by hard roofs: First, surface horizontal well segmented fracturing: This mainly uses mature fracturing equipment from the petroleum industry, allowing for large-scale fracturing operations, but also has disadvantages such as high costs associated with surface land acquisition and geological guidance for the horizontal sections of long directional boreholes. Second, underground long borehole segmented fracturing: This has advantages such as low underground drilling costs and no need to construct vertical well sections from the surface, but also has disadvantages such as small-scale fracturing operations and a small affected area of ​​the fracturing fractures.

[0004] Therefore, an improved process is needed to address the problems of high geological guidance costs in the horizontal sections of existing surface horizontal well fracturing directional long boreholes and the small impact range of fracturing fractures in long boreholes in coal mines. Summary of the Invention

[0005] The technical problem to be solved by this invention is to address the shortcomings of the prior art by providing a method for staged fracturing of hard roofs through surface and downhole boreholes. This method features a simple structure and reasonable design. By combining hydraulic fracturing numerical simulation and mining stress numerical simulation methods, the optimal spacing between fracturing sections is optimized, ensuring that the fractures do not significantly interfere with each other while guaranteeing effective roof stress relief after fracturing. Staged fracturing is implemented from the surface to the horizontal section of a long directional borehole, increasing the fracture extension length and the impact range of fracturing in a single borehole. The use of coiled tubing fracturing significantly reduces costs.

[0006] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is: a method for treating hard roofs by segmented fracturing of boreholes connected to the surface and downhole, characterized by comprising the following steps: Step 1: Determine the fracturing strata based on the comprehensive geological columnar section of the mine and the key layer theory; Step 2: Constructing directional long boreholes into the fracturing layer underground in the coal mine: The computer calculates the minimum curvature of the borehole, determines the borehole trajectory, and constructs directional long boreholes into the fracturing layer underground in accordance with the borehole trajectory. The directional long boreholes include a directional section and a horizontal section. Step 3: Seal the inclined section of the long directional borehole in the coal mine by injecting cement from underground; Step 4: Construct a directional well on the ground, connecting the directional well to the starting position of the horizontal section of the directional long borehole; Step 5: Run the casing from the surface into the directional well. The casing is run into the bottom of the directional well and extends into the horizontal section of the long directional borehole. Step 6: Inject cement from the wellhead of the directional well into the space between the casing and the well wall to seal the directional well; Step 7: Select the optimal fracturing section spacing: Step 701: Establish a geological model and define its geometric parameters, including... and fracturing spacing. , This represents the fracturing spacing of the i-th fracturing operation in the geological model. n is a positive integer; finite element method (FEM) software is used to perform hydraulic fracturing numerical simulation on the geological model to calculate the fracture deflection angle of the geological model. ,like If so, the geological model corresponding to that geometric parameter is selected as the analysis model. This represents the fracture deflection angle during the i-th hydraulic fracturing operation in the geological model; Step 702: Using finite difference software, perform numerical simulation of mining stress on the analysis model, output the peak value of the advance support pressure under different fracturing spacing, and obtain the set of peak values ​​of the advance support pressure. For the peak set of advance support pressure Sort from largest to smallest, the value of L1 is a set. The fracturing spacing corresponding to the first peak value of the advance support pressure in the middle; Step 703: If If L1 is selected as the optimal fracturing section spacing, proceed to step eight; otherwise, proceed to step 704, where L0 represents the maximum basic top overhang length under the hydraulic support strength of the working face. Step 704: Reassign a value to L1, where L1 takes the value of a set. Find the fracturing spacing corresponding to the next lower peak advance support pressure and return to step 703; Step 8: Based on the optimal fracturing section spacing, adopt the coiled tubing bottom seal drag fracturing method to carry out segmented fracturing from the ground to the horizontal section of the directional long borehole.

[0007] The above-mentioned method for treating hard roofs by segmented fracturing through boreholes connecting the surface and the well is characterized in that: in step seven... The calculation method is as follows: , This represents the coordinates of the fracturing fluid injection point in the i-th geological model. This represents the coordinates of the upper endpoint of the hydraulic fracture in the i-th geological model. This represents the coordinates of the lower endpoint of the hydraulic fracture in the i-th geological model. This represents the deflection angle of the fracture in the upper part of the wellbore of the i-th geological model. This represents the deflection angle of the fracture at the bottom of the wellbore in the i-th geological model.

[0008] The above-mentioned method for treating hard roofs by segmented fracturing of boreholes connecting the surface and the well is characterized in that: in step seven, the computer calculates according to the formula... Calculate the maximum basic cantilever length L0, where Indicates the top distance of the support frame. This indicates the maximum support strength of the hydraulic support. This indicates a uniformly distributed load over the critical layer. The load on the rock strata itself represents the length of the overhang between the key strata and the coal seam.

[0009] The above-mentioned method for treating hard roofs through segmented fracturing using boreholes connected to the surface and underground is characterized in that: in step three, the computer calculates the fracturing process according to the formula Vsn=0.9×L×1 / 4×π×dzx. 2 Calculate the amount of cement slurry used in the directional drilling section of a long underground directional borehole in a coal mine, where L represents the length of the directional drilling section of the long underground directional borehole in the coal mine, and dzx represents the diameter of the directional drilling section of the long underground directional borehole in the coal mine.

[0010] The above-mentioned method for treating hard roofs by segmented fracturing through boreholes connecting the surface and underground is characterized by the following method for determining the fracturing layer based on the comprehensive geological columnar section of the mine and the key layer theory: the fracturing layer should meet the following conditions: within 100m above the target coal seam, the rock strata have a uniaxial compressive strength ≥100MPa and a thickness ≥10m of thick hard sandstone.

[0011] The above-mentioned method for staged fracturing of hard roofs via surface and downhole interconnected boreholes is characterized in that: step eight includes the following specific methods: Step 801: Use activated water to clean and flush the wellbore of the directional well; Step 802: Run the fracturing string from the directional well. The fracturing string enters the horizontal section of the directional long borehole. The fracturing string includes coiled tubing and a packer. Open the valves of the coiled tubing and open the gate valve of the annulus. Step 803: Replace the working fluid in the wellbore with fracturing fluid-based fluid; Step 804: Pull back the coiled tubing and connect the casing coupling to the positioner for depth positioning; Step 805: Lower the coiled tubing to set the packer, and inject perforation-carrying fracturing fluid into the fracturing string through the coiled tubing. Step 806: After perforation is completed, stop adding sand to the coiled tubing and inject annular fluid into the annulus. Step 807: After the fracturing operation is completed, move the fracturing string upward by a distance L1 to the position of the next section to be fractured, and repeat steps 805-806 to complete the construction operation of the next section to be fractured.

[0012] The above-mentioned method for treating hard roofs by segmented fracturing of boreholes connected to the surface and the well is characterized in that: the sand ratio in the sand-carrying fracturing fluid is 6%~8%, and the sand in the sand-carrying fracturing fluid is 20~40 mesh quartz sand.

[0013] The above-mentioned method for staged fracturing of hard roofs via surface and downhole interconnected boreholes is characterized in that: the perforation flow rate of the proppant-carrying fracturing fluid is 0.8~1.0 m. 3 / min.

[0014] The above-mentioned method for treating hard roofs through segmented fracturing via surface and downhole drilling is characterized in that: the displacement of the annulus is 5-8 m³ / h. 3 / min.

[0015] Compared with the prior art, the present invention has the following advantages: 1. The present invention has a simple structure, reasonable design, and is convenient to implement and use.

[0016] 2. This invention involves constructing directional long boreholes in key layers, with the horizontal section of the directional long boreholes entering the fracturing layer. This makes the fracturing operation more precise in terms of the layer location, reduces the cost of layer location control, and thus lowers the overall construction cost.

[0017] 3. In this invention, a casing is run from the directional well to the horizontal section of the directional long borehole, which is connected to the surface construction of the directional well. The casing extends into the horizontal section of the directional long borehole, avoiding the disadvantages of high construction difficulty and time-consuming and labor-intensive material transportation caused by running the casing from the well to the horizontal section of the directional long borehole.

[0018] 4. This invention involves cementing the directional well, which is constructed on the ground and connected to the directional long borehole, into the space between the casing and the well wall through the wellhead of the directional well to seal the directional well and conduct cementing quality inspection. This overcomes the problem of cementing the horizontal section of the directional long borehole in underground coal mines and the inability to conduct cementing quality inspection.

[0019] 5. This invention combines hydraulic fracturing numerical simulation methods and mining stress numerical simulation methods to optimize the design of the best fracturing section spacing. During the process of hydraulic fracturing to directionally fracture the roof strata, it can ensure that the fractures do not cause significant interference, and also ensure the roof pressure relief effect after fracturing. This changes the stress distribution state of the rock mass, reduces the stress in the excavation area, and cuts off the physical propagation path of the pre-support stress of the working face, so as to ensure the smooth implementation of roadway excavation.

[0020] 6. This invention adopts a continuous tubing bottom-sealed drag-driven segmented fracturing method, which performs segmented fracturing from the ground to the horizontal section of a directional long borehole, improving fracturing construction efficiency, increasing fracture extension length and the fracturing influence range of a single borehole.

[0021] In summary, this invention features a simple structure and reasonable design. By combining numerical simulation methods for hydraulic fracturing and mining stress, it optimizes the spacing between fracturing sections, ensuring that the fractures are not significantly disturbed while also guaranteeing the decompression effect on the roof after fracturing. The segmented fracturing, implemented from the ground to the horizontal section of the directional long borehole, increases the fracture extension length and the impact range of fracturing in a single borehole. Furthermore, the use of coiled tubing fracturing significantly reduces costs.

[0022] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0023] Figure 1 This is a flowchart of the method of the present invention.

[0024] Figure 2 This is a schematic diagram of segmented fracturing using coiled tubing bottom seal.

[0025] Figure 3 This is a schematic diagram showing the connection between a directional well and the horizontal section of a directional long borehole.

[0026] Figure 4 This is a schematic diagram of the peak value of the advance support pressure above the coal seam.

[0027] Figure 5 This is a schematic diagram of the crack deflection angle.

[0028] Explanation of reference numerals in the attached figures: Detailed Implementation

[0029] The method of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments.

[0030] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. The present invention will now be described in detail with reference to the accompanying drawings and embodiments.

[0031] It should be noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the exemplary embodiments according to this application. As used herein, the singular form is intended to include the plural form as well, unless the context clearly indicates otherwise. Furthermore, it should be understood that when the terms "comprising" and / or "including" are used in this specification, they indicate the presence of features, steps, operations, devices, components, and / or combinations thereof.

[0032] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of this application described herein can be implemented, for example, in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.

[0033] For ease of description, spatial relative terms such as "above," "on top of," "on the upper surface of," "above," etc., are used herein to describe the spatial positional relationship of a device or feature as shown in the figures to other devices or features. It should be understood that spatial relative terms are intended to encompass different orientations in use or operation beyond the orientation of the device as described in the figures. For example, if the device in the figures were inverted, a device described as "above" or "on top of" other devices or structures would subsequently be positioned as "below" or "under" other devices or structures. Thus, the exemplary term "above" can include both "above" and "below." The device may also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatial relative descriptions used herein will be interpreted accordingly.

[0034] like Figure 1 As shown, the present invention provides a method for treating hard roofs using segmented fracturing through a borehole connecting the surface and the well, comprising the following steps: Step 1: Determine the fracturing zone based on the mine's comprehensive geological columnar section and key layer theory. In practical application, the method for determining the fracturing zone based on the mine's comprehensive geological columnar section and key layer theory is as follows: The fracturing zone should meet the following conditions: within 100m above the target coal seam, the rock strata are thick, hard sandstone with a uniaxial compressive strength ≥100MPa and a thickness ≥10m.

[0035] Step 2: Constructing a directional long borehole into the fracturing layer underground in the coal mine: The computer calculates the minimum curvature of the borehole, determines the borehole trajectory, and drills from the underground roadway 5 into the fracturing layer 9 according to the borehole trajectory. The directional long borehole includes a directional section and a horizontal section.

[0036] like Figure 3As shown, in actual use, directional long borehole drilling includes a horizontal section 7 and a directional drilling section 6. The computer calculates the borehole diameter according to the formula... Calculate the minimum curvature of the borehole, where D z d represents the inner diameter of a directional long borehole used for fracturing, in meters (m). t L is the outer diameter of the casing, in meters (m). t This refers to the length of a single sleeve, in meters (m).

[0037] Step 3: Seal the inclined section 6 of the long directional borehole in the coal mine with cement from underground. In Step 3, the computer calculates the angle based on the formula Vsn=0.9×L×1 / 4×π×dzx. 2 Calculate the amount of cement slurry used in the directional drilling section 6 of the underground coal mine, where L represents the length of the directional drilling section of the underground coal mine, and dzx represents the diameter of the directional drilling section of the underground coal mine.

[0038] Step 4: Construct directional well 1 on the ground surface 8. Directional well 1 is connected to the starting position of the horizontal section of the directional long borehole.

[0039] Step 5: Run casing 2 from the ground surface 8 into directional well 1. Run casing 2 into the bottom of directional well 1 and extend it into the horizontal section of the directional long borehole.

[0040] Step 6: Inject cement from the wellhead of directional well 1 into the space between casing 2 and the well wall to seal directional well 1.

[0041] Step 7: Select the optimal fracturing section spacing: Step 701: Establish a geological model and define its geometric parameters, including rock mechanics parameters, geostress parameters, and fracturing spacing. , This represents the fracturing spacing of the i-th fracturing operation in the geological model. Where n is a positive integer. Finite element method (FEM) software is used to perform hydraulic fracturing numerical simulation on the geological model, and the fracture deflection angle of the geological model is calculated. ,like If so, the geological model corresponding to that geometric parameter is selected as the analysis model. This represents the fracture deflection angle of the i-th hydraulic fracturing operation in the geological model.

[0042] The rock mechanics parameters and in-situ stress parameters of the target fracturing layer in the actual geological body were collected, as shown in Table 1. The rock mechanics parameters include layer thickness (m), cohesion (MPa), internal friction angle (°), and density (kg / m³). 3 ), tensile strength (MPa), elastic modulus (GPa), Poisson's ratio; ground stress parameters include vertical stress σ V (MPa), maximum horizontal principal stress σ H (MPa), minimum horizontal principal stress σh (MPa).

[0043] Table 1 Geological Model Entity Parameters

[0044] A two-dimensional finite element hydraulic fracturing numerical simulation model was established in the finite element software ABAQUS. The numerical simulation model only required a single layer, i.e., the fracturing layer. The rock layer thickness was the same as the actual thickness, and the rock layer length was set to six times the rock layer thickness. The left and right boundaries of the model were constrained by displacement in the x-direction, and the top and bottom boundaries were constrained by displacement in the y-direction. A minimum horizontal principal stress was applied in the x-direction, and a vertical stress was applied in the y-direction. Using the extended finite element method, the initiation and propagation process of the first fracturing segment was first simulated, and then the second segment was fracturing to obtain the propagation morphology of the fractures in the second fracturing segment. Clean water was used as the fracturing fluid in the fracturing simulation.

[0045] Crack deflection angle This data was obtained from hydraulic fracturing numerical simulations. In one possible embodiment, the spacing between the fracturing segments was 10m, 15m, 20m, 25m, 30m, 35m, and 40m. The hydraulic fracturing numerical simulations analyzed the fracture deflection angles when the spacing between the fracturing segments was 10m, 15m, 20m, 25m, 30m, 35m, and 40m. When the deflection angle When the angle is ≤10°, it is assumed that the adjacent fractures will not deflect under the corresponding fracture spacing conditions. If the corresponding fracture spacing is d, then d is the optimal fracture spacing.

[0046] Step 702: Using finite difference software, perform numerical simulation of mining stress on the analysis model, output the peak value of the advance support pressure under different fracturing spacing, and obtain the set of peak values ​​of the advance support pressure. For the peak set of advance support pressure Sort from largest to smallest, the value of L1 is a set. The fracturing spacing corresponding to the first peak of the advanced support pressure.

[0047] A finite difference numerical simulation model was established in the finite difference software FLAC3D, using a finite number of mesh nodes to replace the continuous solution domain, simulating the support pressure distribution at different fracturing intervals at the working face. The geological model was established based on the mine's comprehensive geological columnar section and the actual geological bodies of the target strata. In the numerical simulation model, from bottom to top, the model should include the coal seam, the fracturing layer, and the rock strata within a thickness of 10m above the fracturing layer, with the rock strata length set to 500m. Fixed constraint boundaries were set at the front, back, left, right, and bottom of the model, and the Mohr-Coulomb yield criterion was used for calculation. 60m coal pillars were left on both sides and behind the working face in the model to eliminate stress concentrations generated during the simulation.

[0048] In the numerical simulation of mining stress, the finite difference software FLAC3D was used to pre-create fractures in the fracturing layer of the analysis model. The number of fractures was multiple, such as... Figure 5 As shown, the distance between two adjacent cracks is the crack spacing d. In one possible embodiment, the crack spacing is selected as d, (d+5), (d+10), (d+15), (d+20), (d+25), and (d+30). Using the FILE language in FLAC3D software, the working face is automatically excavated every 5m. Numerical simulation is used to obtain the distribution of the peak value of the advance support pressure. After each calculation and balancing, the running result file is saved, and the advance support pressure curve of the working face is output.

[0049] By examining the pre-support pressure curve of the working face, the peak pre-support pressure under different fracturing intervals was obtained to ensure the effective depressurization of the roof after fracturing. Peak pre-support pressure. It is obtained based on the advance support pressure curve of the working face.

[0050] Step 703: If If L1 is selected as the optimal fracturing section spacing, proceed to step eight; otherwise, proceed to step 704. L0 represents the maximum basic top overhang length under the hydraulic support strength of the working face.

[0051] Computer according to formula Calculate the maximum basic cantilever length L0, where Indicates the top distance of the support frame. This indicates the maximum support strength of the hydraulic support. This indicates a uniformly distributed load over the critical layer. The load on the rock strata itself represents the length of the overhang between the key strata and the coal seam.

[0052] Step 704: Reassign a value to L1, where L1 takes the value of a set. Return to step 703 for the fracturing spacing corresponding to the next higher peak of the advance support pressure. Each opening fracture generates an additional stress field on the surrounding rock and adjacent fractures, affecting fracture width and propagation path. Decreasing the spacing between fracturing sections increases the net pressure within the fracture and leads to strong and significant inter-fracture interference; increasing the fracture spacing reduces the net pressure within the fracture, negligibles the impact of inter-fracture interference, and reduces stress disturbance. However, excessively large fracture spacing reduces the weakening effect of fracturing a hard roof.

[0053] Therefore, this application combines hydraulic fracturing numerical simulation method and mining stress numerical simulation method to optimize the design of the optimal fracturing section spacing. During the process of hydraulic fracturing to directionally fracture the roof strata, it can ensure that the fractures do not cause significant interference, and also ensure the roof pressure relief effect after fracturing, change the stress distribution state of the rock mass, reduce the stress in the excavation area, and cut off the physical propagation path of the pre-support stress of the working face, so as to ensure the smooth implementation of roadway excavation.

[0054] like Figure 4 As shown, the black solid on the right of the bottom layer represents the coal seam, and the second layer from the top is the critical layer. The thick black solid line above the working face in the figure represents the advance support pressure curve of the working face before hydraulic fracturing. The thick black dashed line represents the advance support pressure curve of the working face after hydraulic fracturing of the hard rock strata. The peak advance support pressure reflected by the dashed line is smaller than that reflected by the solid line. The distance between the peak value of the dashed line and the working face is greater than that of the peak value of the solid line. In other words, after hydraulic fracturing, the stress in the excavation zone of the working face decreases, and the peak advance support pressure is farther away from the coal wall, resulting in better performance.

[0055] Step 8: Based on the optimal fracturing section spacing, employ the coiled tubing bottom-seal dragged segmented fracturing method to perform segmented fracturing from the ground to the horizontal section of the directional long borehole. The coiled tubing bottom-seal dragged segmented fracturing method refers to the process where, after each layer is fractured, the packer is retrieved, the fracturing string is lifted under pressure, dragged to the next target layer, and then the packer is directly pressurized and set to perform fracturing.

[0056] In this embodiment, the specific method of step eight includes: Step 801: Use activated water to clean and flush the wellbore of directional well 1; Step 802: Run the fracturing string from directional well 1. The fracturing string enters the horizontal section of the directional long borehole. The fracturing string includes coiled tubing 3 and a packer. Open the valve of coiled tubing 3 and open the annulus gate. During fracturing, inject fracturing fluid into the annulus formed between coiled tubing 3 and casing 2.

[0057] Step 803: Replace the working fluid in the wellbore with fracturing fluid-based fluid; Step 804: Pull back the coiled tubing 3, and connect the casing 2 coupling to the positioner 4 for depth positioning. In actual use, the casing 2 is equipped with a casing coupling, and the casing coupling is used to connect the positioner to accurately control the lowering depth.

[0058] Step 805: Lower the coiled tubing to set the packer, and inject perforation-carrying fracturing fluid into the fracturing string through the coiled tubing. In actual use, the sand ratio in the carrying fracturing fluid is 6%-8%, and the sand in the carrying fracturing fluid is 20-40 mesh quartz sand. The volume ratio of quartz sand to carrying fracturing fluid is 6%-8%, that is, 0.06-0.08 liters of quartz sand are added to 1 m of carrying fracturing fluid. The perforation flow rate of the carrying fracturing fluid is 0.8-1.0 m. 3 / min.

[0059] Step 806: After perforation, stop adding sand to the coiled tubing and inject annular fluid into the annulus. In actual use, the annulus displacement is 5-8 m³ / s. 3 / min.

[0060] Step 807: After the fracturing operation is completed, retrieve the coiled tubing. The packer sleeve will be automatically retrieved. Move the fracturing string upwards a distance L1 to the next fracturing section. Repeat steps 805-806 to complete the fracturing operation for the next section. By raising the fracturing string layer by layer in this way, fracturing operations can be carried out in multiple fracturing sections.

[0061] Compared with conventional fracturing technology, coiled tubing fracturing can save a lot of operation time, reduce the probability of accidents, reduce environmental pollution, and significantly reduce costs.

[0062] The above description is merely an embodiment of the present invention and is not intended to limit the present invention in any way. Any simple modifications, alterations, or equivalent structural changes made to the above embodiments based on the technical essence of the present invention shall still fall within the protection scope of the present invention.

Claims

1. A method for treating hard roofs using segmented fracturing via surface and downhole borehole connections, characterized in that: Includes the following steps: Step 1: Determine the fracturing strata based on the comprehensive geological columnar section of the mine and the key layer theory; Step 2: Constructing directional long boreholes into the fracturing layer underground in the coal mine: The computer calculates the minimum curvature of the borehole, determines the borehole trajectory, and constructs directional long boreholes into the fracturing layer underground in accordance with the borehole trajectory. The directional long boreholes include a directional section and a horizontal section. Step 3: Seal the inclined section of the long directional borehole in the coal mine by injecting cement from underground; Step 4: Construct a directional well on the ground, connecting the directional well to the starting position of the horizontal section of the directional long borehole; Step 5: Run the casing from the surface into the directional well. The casing is run into the bottom of the directional well and extends into the horizontal section of the long directional borehole. Step 6: Inject cement from the wellhead of the directional well into the space between the casing and the well wall to seal the directional well; Step 7: Select the optimal fracturing section spacing: Step 701: Establish a geological model and define its geometric parameters, including rock mechanics parameters, geostress parameters, and fracturing spacing. , This represents the fracturing spacing of the i-th fracturing operation in the geological model. n is a positive integer; finite element method (FEM) software is used to perform hydraulic fracturing numerical simulation on the geological model. After hydraulic fracturing, the fracture deflection angle of the geological model is calculated. ,like If so, the geological model corresponding to that geometric parameter is selected as the analysis model. This represents the fracture deflection angle during the i-th hydraulic fracturing operation in the geological model; Step 702: Using finite difference software, perform numerical simulation of mining stress on the analysis model, output the peak value of the advance support pressure under different fracturing spacing, and obtain the set of peak values ​​of the advance support pressure. For the peak set of advance support pressure Sort from largest to smallest, the value of L1 is a set. The fracturing spacing corresponding to the first peak value of the advance support pressure in the middle; Step 703: If If L1 is selected as the optimal fracturing section spacing, proceed to step eight; otherwise, proceed to step 704, where L0 represents the maximum basic top overhang length under the hydraulic support strength of the working face. Step 704: Reassign a value to L1, where L1 takes the value of a set. Find the fracturing spacing corresponding to the next lower peak advance support pressure and return to step 703; Step 8: Based on the optimal fracturing section spacing, adopt the coiled tubing bottom seal drag fracturing method to carry out segmented fracturing from the ground to the horizontal section of the directional long borehole.

2. The method for treating hard roofs using segmented fracturing via surface and downhole boreholes as described in claim 1, characterized in that: In step seven The calculation method is as follows: , This represents the coordinates of the fracturing fluid injection point in the i-th geological model. This represents the coordinates of the upper endpoint of the hydraulic fracture in the i-th geological model. This represents the coordinates of the lower endpoint of the hydraulic fracture in the i-th geological model. This represents the deflection angle of the fracture in the upper part of the wellbore of the i-th geological model. This represents the deflection angle of the fracture at the bottom of the wellbore in the i-th geological model.

3. A method for treating hard roofs using segmented fracturing via surface and downhole boreholes as described in claim 1 or 2, characterized in that: In step seven, the computer uses the formula Calculate the maximum basic cantilever length L0, where Indicates the top distance of the support frame. This indicates the maximum support strength of the hydraulic support. This indicates a uniformly distributed load over the critical layer. The load on the rock strata itself represents the length of the overhang between the key strata and the coal seam.

4. The method for treating hard roofs using segmented fracturing via surface and downhole boreholes as described in claim 1, characterized in that: In step three, the computer calculates Vsn according to the formula Vsn=0.9×L×1 / 4×π×dzx 2 Calculate the amount of cement slurry used in the directional drilling section of a long underground directional borehole in a coal mine, where L represents the length of the directional drilling section of the long underground directional borehole in the coal mine, and dzx represents the diameter of the directional drilling section of the long underground directional borehole in the coal mine.

5. The method for treating hard roofs using segmented fracturing via surface and downhole boreholes as described in claim 1, characterized in that: Based on the comprehensive geological columnar section of the mine and the key layer theory, the method for determining the fracturing layer is as follows: the fracturing layer should meet the following conditions: within 100m above the target coal seam, the rock strata are thick and hard sandstone with a uniaxial compressive strength ≥100MPa and a thickness ≥10m.

6. The method for treating hard roofs using segmented fracturing via surface and downhole boreholes as described in claim 1, characterized in that: The specific methods for step eight include: Step 801: Use activated water to clean and flush the wellbore of the directional well; Step 802: Run the fracturing string from the directional well. The fracturing string enters the horizontal section of the directional long borehole. The fracturing string includes coiled tubing and a packer. Open the valves of the coiled tubing and open the gate valve of the annulus. Step 803: Replace the working fluid in the wellbore with fracturing fluid-based fluid; Step 804: Pull back the coiled tubing and connect the casing coupling to the positioner for depth positioning; Step 805: Lower the coiled tubing to set the packer, and inject perforation-carrying fracturing fluid into the fracturing string through the coiled tubing. Step 806: After perforation is completed, stop adding sand to the coiled tubing and inject annular fluid into the annulus. Step 807: After the fracturing operation is completed, move the fracturing string upward by a distance L1 to the position of the next section to be fractured, and repeat steps 805-806 to complete the construction operation of the next section to be fractured.

7. A method for treating hard roofs using segmented fracturing via surface and downhole boreholes as described in claim 6, characterized in that: The sand ratio in the proppant-carrying fracturing fluid is 6% to 8%, and the sand in the proppant-carrying fracturing fluid is 20 to 40 mesh quartz sand.

8. A method for treating hard roofs using segmented fracturing via surface and downhole boreholes as described in claim 6, characterized in that: The perforation flow rate of the proppant-carrying fracturing fluid is 0.8~1.0 m. 3 / min.

9. A method for treating hard roofs using segmented fracturing via surface and downhole boreholes as described in claim 6, characterized in that: The displacement of the annulus is 5~8m³. 3 / min.

Citation Information

Patent Citations

  • Hydraulic fracturing method for vertical topping based on supporting stress distribution characteristics of left coal pillar