Railway steel rail joint clamping plate fatigue performance detection device and detection method
By designing a fatigue performance testing device for railway rail joint splints and using electro-hydraulic servo actuators to simulate the force conditions when a train passes by, it solves the problem of difficulty in detecting fatigue performance in the existing technology, achieves high-precision fatigue performance assessment, and improves improve the safety of railway lines.
Patent Information
- Application Number
- CN202411074997.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-10-18
AI Technical Summary
The existing technology is difficult to effectively detect the fatigue performance of railway rail joint splints, and cannot simulate the stress of the splints when a train passes, affecting line safety.
Design a railway rail joint splint fatigue performance testing device, including rail, splint, bolt connection pair, two-way pressure head tooling, electro-hydraulic servo actuator and controller. By simulating the stress situation when the train passes, the electro-hydraulic servo The actuator realizes coordinated loading in both directions of tension and compression to detect the fatigue performance of the splint.
It achieves effective detection of the fatigue performance of rail joint splints, enables more intuitive observation of splint damage, has high load accuracy, simulates actual stress conditions, and improves the accuracy and safety of detection.
Smart Images

Figure CN118794823A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of detection equipment, and in particular to a device and method for detecting fatigue performance of a railway rail joint clamp. Background Art
[0002] Rail joint splints are important connecting parts of rails on conventional lines. They are used in conjunction with bolted joints to connect rails together and withstand bending moments and lateral forces like rails. According to statistics, the number of rail joint splints in use on my country's railway lines has already exceeded 8 million. Their service life and safety have an important impact on the safety of the entire line. In addition, all railway line-related products, except for rail joint splints, have testing methods for evaluating product fatigue performance.
[0003] Therefore, it is necessary to provide a device and a method for detecting fatigue performance of railway rail joint splints, which can simulate the stress conditions of the splints when a train passes and effectively evaluate the fatigue performance of the splints. Summary of the invention
[0004] To achieve the above purpose, the present invention provides a railway rail joint splint fatigue performance detection device, which can simulate the stress condition of the railway rail joint splint when a train passes, and effectively evaluate the fatigue performance of the railway rail joint splint. The specific technical solution is as follows:
[0005] A railway rail joint clamp fatigue performance detection device, comprising:
[0006] A rail joint clamp connection joint, comprising two rails, two rail joint clamps and a bolt connection pair, wherein the two rails are arranged adjacent to each other on the left and right sides and a rail gap is formed between the two rails, and one rail joint clamp is attached to the front and rear sides of the two rails respectively, and the two rail joint clamps cooperate with the bolt connection pair to connect the two rails, and the area including the rail joint clamp located in the middle position of the rail joint clamp connection joint is the clamp area, and the left and right sides of the clamp area on the rail joint clamp connection joint are respectively non-clamp areas;
[0007] Four sets of bidirectional pressure head tooling, each set of the bidirectional pressure head tooling includes an upper pressure part and a lower pressure part, the upper pressure part and the lower pressure part are arranged opposite to each other up and down and are fixedly connected, a space for the rail joint clamping plate connecting joint to pass through is formed between the upper pressure part and the lower pressure part, the upper pressure part is provided with a downwardly extending arc-shaped upper protrusion on the side facing the lower pressure part, and the lower pressure part is provided with an upwardly extending arc-shaped lower protrusion on the side facing the upper pressure part, the arc-shaped upper protrusion and the arc-shaped lower protrusion are arranged opposite to each other up and down and both extend in the front-back direction, the rail joint clamping plate The connecting joint passes through the space of each set of the two-way pressure head tooling and is abutted and pressed by the corresponding arc-shaped upper protrusion and arc-shaped lower protrusion of each set of the two-way pressure head tooling. The four sets of two-way pressure head tooling are respectively the first two-way pressure head tooling, the second two-way pressure head tooling, the third two-way pressure head tooling and the fourth two-way pressure head tooling, and they are sequentially spaced and distributed along the left and right directions. The second two-way pressure head tooling and the third two-way pressure head tooling are both arranged in the clamping plate area and are symmetrically arranged about the rail joint. The first two-way pressure head tooling and the fourth two-way pressure head tooling are both arranged in the non-clamping plate area and are symmetrically arranged about the rail joint.
[0008] Two supports, which are a first support and a second support, the first support is located below the first bidirectional pressure head tooling and the two are fixedly connected, and the second support is located below the fourth bidirectional pressure head tooling and the two are fixedly connected;
[0009] Two electro-hydraulic servo actuators, which are a first electro-hydraulic servo actuator and a second electro-hydraulic servo actuator, wherein the first electro-hydraulic servo actuator is disposed above the second bidirectional ram tooling and acts on the second bidirectional ram tooling, and the second electro-hydraulic servo actuator is disposed above the third bidirectional ram tooling and acts on the third bidirectional ram tooling;
[0010] A controller is electrically connected to the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator, and the controller stores loading curves corresponding to the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator, respectively, so that the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator act on the matching bidirectional pressure head tooling according to the corresponding loading curves.
[0011] Preferably, the upper pressing portion includes an upper pressing plate and an upper pressing roller, the axial direction of the upper pressing roller is arranged along the front-to-back direction and a portion of it is embedded in the lower surface of the upper pressing plate, and the lower pressing portion includes a lower pressing plate and a lower pressing roller, the axial direction of the lower pressing roller is arranged along the front-to-back direction and a portion of it is embedded in the upper surface of the lower pressing plate, and a screw passing through the four opposite corners of the upper pressing plate and the lower pressing plate is provided to fix the upper pressing plate and the lower pressing plate together.
[0012] Preferably, the bolt connection pair comprises six bolts and matching nuts and spring washers.
[0013] Preferably, the distance between the first support and the second support is 1400 mm.
[0014] Preferably, the distance between the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator is 400 mm.
[0015] Preferably, the controller comprises a loading curve forming unit for forming loading curves corresponding to the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator, which is electrically connected to the actual working condition simulation calculation model unit and the experimental tooling simulation calculation model unit:
[0016] The actual working condition simulation calculation model unit is used to simulate the force simulation calculation of the rail joint clamp under the actual working condition and give the actual working condition calculation result, which includes two first simulated rails, two wheels, two first simulated rail joint clamps, six groups of first simulated bolt connection pairs and ten rubber pads. The two first simulated rail joint clamps are fixedly installed on the waist position of the two butted first simulated rails by the six groups of first simulated bolt connection pairs according to the actual working condition, and the rail gap is 8mm. The ten rubber pads are evenly spaced and located between the two first simulated rails. The bottom of the real rail and the spacing between them is 700mm, the two wheels are both circular rings with a radius of 420mm, the two wheels are symmetrically distributed about the rail gap and the distance between them is 1800mm, the materials of the first simulated rail, wheel, first simulated rail joint splint, first simulated bolt connection pair, and rubber pad are all linear elastic models, the first simulated rail, wheel, first simulated rail joint splint, first simulated bolt connection pair: elastic modulus is 210GPa, Poisson's ratio is 0.29, density is 7800kg / m 3 ; Rubber pad: elastic modulus is 80MPa, Poisson's ratio is 0; the preload of the first simulated bolt connection pair is 700N·m torque, which is converted into a bolt preload of 127kN. The center gravity of a single wheel is 127.4kN. The angular velocity of the wheel is 80rad / s. All contact surfaces are set to hard contact, and the friction coefficient is 0.2. The non-joint end face of the first simulated rail can only rotate laterally along the first simulated rail, the wheel can only rotate axially, and the rubber pad is displaced in all directions at the bottom;
[0017] The experimental tooling simulation calculation model unit is used to simulate the force simulation calculation of the railway rail joint splint fatigue performance detection device and give the actual tooling calculation results, which includes two second simulation rails, two second simulation rail joint splints, six sets of second simulation bolt connection pairs, and eight cylindrical rollers. The eight cylindrical rollers correspond to the four upper pressure rollers and the four lower pressure rollers in the four sets of bidirectional pressure head tooling respectively. The four upper rollers of the eight cylindrical rollers are roller No. 1, roller No. 2, roller No. 3 and roller No. 4 from left to right, and the four lower rollers of the eight cylindrical rollers are roller No. 5, roller No. 6, roller No. 7 and roller No. 8 from left to right. Roller No. 1 and roller No. 5 are arranged correspondingly from top to bottom, roller No. 2 and roller No. 6 are arranged correspondingly from top to bottom, and roller No. 3 is arranged correspondingly from top to bottom. The No. 1 roller and the No. 7 roller are arranged in correspondence with each other, and the No. 4 roller and the No. 8 roller are arranged in correspondence with each other. The two second simulated rail joint clamps are fixedly installed on the waist position of the two second simulated rails by six sets of second simulated bolt connection pairs. The rail gap is 8mm. The material parameters, boundary conditions and contact conditions of the second simulated rail, the second simulated rail joint clamp and the second simulated bolt connection pair are consistent with the first simulated rail, the first simulated rail joint clamp and the first simulated bolt connection pair of the actual working condition simulation calculation model unit. The spacing between the No. 1 roller and the No. 4 roller is 1400mm, and the spacing between the No. 2 roller and the No. 3 roller is 400mm. The eight cylindrical rollers adopt a linear elastic model with an elastic modulus of 210GPa, a Poisson's ratio of 0.29 and a density of 7800kg / m 3 , the relative position constraints between roller No. 2 and roller No. 6, roller No. 3 and roller No. 7 are realized by MPC connection, which can make the axial rotation and vertical displacement and other degrees of freedom completely constrained. Roller No. 1, roller No. 4, roller No. 5 and roller No. 8 are set to only allow axial rotation and other degrees of freedom completely constrained. Roller No. 2 and roller No. 6 simulate the first electro-hydraulic servo actuator to load the second simulated rail on the left, and roller No. 3 and roller No. 7 simulate the second electro-hydraulic servo actuator to load the second simulated rail on the right, and obtain several groups of actual tooling calculation results;
[0018] The loading curve forming unit is executed as follows: the several groups of actual tooling calculation results are compared with the actual working condition calculation results, and the final actual tooling calculation results that match the actual working condition calculation results are selected, and then the forces loaded on roller No. 2 and roller No. 6 and the forces loaded on roller No. 3 and roller No. 7 when the final actual tooling calculation results are obtained are determined. The forces loaded on roller No. 2 and roller No. 6 are the loading curves corresponding to the first electro-hydraulic servo actuator, and the forces loaded on roller No. 3 and roller No. 7 are the loading curves corresponding to the second electro-hydraulic servo actuator.
[0019] Preferably, the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator are both connected to the corresponding bidirectional pressure head fixture via a ball joint.
[0020] Preferably, it further includes a cast iron platform, wherein the first support and the second support are both fixedly mounted on the cast iron platform, and also includes a gantry fixedly mounted on the cast iron platform, wherein the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator are suspended on the crossbeam portion of the gantry.
[0021] Preferably, the rated load of the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator are both 250 kN, and the accuracy is both level 1.
[0022] The provided railway rail joint clamp fatigue performance detection device has the following technical effects:
[0023] The first and second electro-hydraulic servo actuators can realize bidirectional coordinated loading of tension and compression with high load accuracy. They can simulate the actual stress conditions of the rail joint splint when a train passes, effectively detect the fatigue performance of the rail joint splint, and more intuitively observe whether the rail joint splint is damaged.
[0024] Among them, the first support is located below the first bidirectional pressure head fixture and the two are fixedly connected, and the second support is located below the fourth bidirectional pressure head fixture and the two are fixedly connected; the bidirectional pressure head fixtures at both ends are installed on the corresponding supports, which can provide upward and downward restraining forces acting on the rail joint clamp connection joint. That is, the action of the bidirectional pressure head simulates the action of the sleeper and fastener system on the line, on the one hand, it ensures that the rail will not move upward or downward when the rail joint clamp is subjected to tension and compression forces, and on the other hand, it will not constrain the deformation of the rail along the length direction, so that the loads applied by the first and second electro-hydraulic servo actuators are effectively transmitted to the rail joint clamp.
[0025] The present invention also provides a method for detecting fatigue performance of railway rail joint splints using the above-mentioned railway rail joint splint fatigue performance detection device, comprising the following steps:
[0026] The first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator are started, and the controller provides a loading curve corresponding to the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator so that the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator act on a matching bidirectional pressure head tooling according to the corresponding loading curve to simulate the stress condition of the rail joint clamp when a train passes;
[0027] After loading is completed, observe whether the rail joint splint is damaged.
[0028] This detection method has the same technical effect as above. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1A schematic structural diagram showing a specific implementation of a device for detecting fatigue performance of a railway rail joint splint of the present invention;
[0030] Figure 2 Show Figure 1 The structural diagram of the bidirectional pressure head tooling, where the left picture is the main view and the right picture is the side view;
[0031] Figure 3 Show Figure 1 A schematic diagram of the structure of the middle rail joint clamp connection joint, wherein the left figure is the main view and the right figure is the side view;
[0032] Figure 4 The simulation calculation model in the actual working condition simulation calculation model unit is shown;
[0033] Figure 5 The simulation calculation model in the experimental tooling simulation calculation model unit is shown;
[0034] Figure 6 1 shows a loading curve corresponding to a first electro-hydraulic servo actuator and a second electro-hydraulic servo actuator in a specific embodiment, wherein a solid line represents a loading curve corresponding to the first electro-hydraulic servo actuator, and a dotted line represents a loading curve corresponding to the second electro-hydraulic servo actuator;
[0035] Figure 7 A simulation calculation cloud diagram showing the tensile stress of the rail joint clamp in the actual working condition simulation calculation model unit;
[0036] Figure 8 The simulation calculation cloud diagram of the tensile stress of the rail joint clamp in the actual tooling simulation calculation model unit is shown;
[0037] Fig. 9 A simulation calculation cloud diagram showing the compressive stress of the rail joint clamp in the actual working condition simulation calculation model unit;
[0038] Fig.10 The simulation calculation cloud diagram of the compressive stress of the rail joint clamp in the actual tooling simulation calculation model unit is shown;
[0039] Fig.11 A simulation calculation cloud diagram showing the shear stress on the rail joint clamp in the actual working condition simulation calculation model unit;
[0040] Fig.12 The simulation calculation cloud diagram of the shear stress on the rail joint splint in the actual tooling simulation calculation model unit is shown.
[0041] Attached Figure 1-12 Meaning of each reference numeral in the figure:
[0042] 1 rail joint splint connection joint, 2 rail, 3 rail joint splint, 4 splint area, 5 non-splint area, 6 bidirectional pressure head tooling, 7 first bidirectional pressure head tooling, 8 second bidirectional pressure head tooling, 9 third bidirectional pressure head tooling, 10 fourth bidirectional pressure head tooling, 11 first support, 12 second support, 13 first electro-hydraulic servo actuator, 14 second electro-hydraulic servo actuator, 15 upper pressure plate, 16 upper pressure roller, 17 lower pressure plate, 18 lower pressure roller, 19 screw, 20 bolts, 21 first simulated rail, 22 wheel, 23 first simulated rail joint plate, 24 first simulated bolt connection pair, 25 rubber pad, 26 second simulated rail, 27 second simulated rail joint plate, 28 second simulated bolt connection pair, 29 roller No. 1, 30 roller No. 2, 31 roller No. 3, 32 roller No. 4, 33 roller No. 5, 34 roller No. 6, 35 roller No. 7, 36 roller No. 8, 37 cast iron platform, 38 gantry. DETAILED DESCRIPTION
[0043] like Figure 1-3 As shown, the present invention provides a railway rail joint clamp fatigue performance detection device, comprising:
[0044] A rail joint clamp connection joint 1, comprising two rails 2, two rail joint clamps 3 and a bolt connection pair, wherein the two rails 2 are arranged adjacent to each other on the left and right sides and a rail gap is formed therebetween, and one rail joint clamp 3 is attached to the front and rear sides of the two rails 2 respectively, and the two rail joint clamps 3 cooperate with the bolt connection pair to connect the two rails 2, and the area including the rail joint clamps 3 at the middle position of the rail joint clamp connection joint 1 is a clamp area 4, and the left and right sides of the clamp area 4 on the rail joint clamp connection joint 1 are non-clamp areas 5 respectively;
[0045] Four sets of bidirectional pressure head fixtures 6, each set of the bidirectional pressure head fixtures 6 includes an upper pressure part and a lower pressure part, the upper pressure part and the lower pressure part are arranged opposite to each other up and down and are fixedly connected, a space for the rail joint clamping plate connecting joint 1 to pass through is formed between the upper pressure part and the lower pressure part, a circular arc-shaped upper protrusion extending downward is provided on the side of the upper pressure part facing the lower pressure part, and a circular arc-shaped lower protrusion extending upward is provided on the side of the lower pressure part facing the upper pressure part, the circular arc-shaped upper protrusion and the circular arc-shaped lower protrusion are arranged opposite to each other up and down and both extend in the front-back direction, and the rail joint clamping plate connecting joint 1 passes through The space of each set of the two-way pressure head tooling 6 is abutted and pressed by the corresponding arc-shaped upper protrusion and arc-shaped lower protrusion of each set of the two-way pressure head tooling 6. The four sets of two-way pressure head tooling 6 are respectively the first two-way pressure head tooling 7, the second two-way pressure head tooling 8, the third two-way pressure head tooling 9 and the fourth two-way pressure head tooling 10, and they are sequentially spaced and distributed along the left and right directions. The second two-way pressure head tooling 8 and the third two-way pressure head tooling 9 are both arranged in the clamping plate area 4 and are symmetrically arranged about the rail gap. The first two-way pressure head tooling 7 and the fourth two-way pressure head tooling 10 are both arranged in the non-clamping plate area 5 and are symmetrically arranged about the rail gap.
[0046] Two supports, namely a first support 11 and a second support 12, wherein the first support 11 is located below the first bidirectional pressure head fixture 7 and the two are fixedly connected, and the second support 12 is located below the fourth bidirectional pressure head fixture 10 and the two are fixedly connected;
[0047] Two electro-hydraulic servo actuators, namely a first electro-hydraulic servo actuator 13 and a second electro-hydraulic servo actuator 14, wherein the first electro-hydraulic servo actuator 13 is disposed above the second bidirectional ram fixture 8 and acts on the second bidirectional ram fixture 8, and the second electro-hydraulic servo actuator 14 is disposed above the third bidirectional ram fixture 9 and acts on the third bidirectional ram fixture 9;
[0048] A controller is electrically connected to the first electro-hydraulic servo actuator 13 and the second electro-hydraulic servo actuator 14, and the controller stores loading curves corresponding to the first electro-hydraulic servo actuator 13 and the second electro-hydraulic servo actuator 14, respectively, so that the first electro-hydraulic servo actuator 13 and the second electro-hydraulic servo actuator 14 act on the matching bidirectional pressure head tooling 6 according to the corresponding loading curves.
[0049] The bidirectional pressing head fixture 6 is installed on the corresponding first support 11 and second support 12, and can provide upward and downward restraining forces acting on the rail joint clamp connection joint 1.
[0050] In a specific implementation manner, Figure 2As shown, the upper pressing portion includes an upper pressing plate 15 and an upper pressing roller 16, the axial direction of the upper pressing roller 16 is arranged along the front-to-back direction and a part of it is embedded in the lower surface of the upper pressing plate 15, and the lower pressing portion includes a lower pressing plate 17 and a lower pressing roller 18, the axial direction of the lower pressing roller 18 is arranged along the front-to-back direction and a part of it is embedded in the upper surface of the lower pressing plate 17, and a screw 19 is provided at the four opposite corners of the upper pressing plate 15 and the lower pressing plate 17, which passes through the two and can fix the upper pressing plate 15 and the lower pressing plate 17 to be connected.
[0051] In a specific implementation manner, Figure 3 As shown, the bolt connection pair includes six bolts 20 and matching nuts and spring washers. The bolts 20 are high-strength bolts, which are standard parts with high strength used for rail connection.
[0052] The distance between the first support 11 and the second support 12 is 1400 mm, and the distance between the first electro-hydraulic servo actuator 13 and the second electro-hydraulic servo actuator 14 is 400 mm.
[0053] In a specific implementation manner, Figure 4-6 As shown, the controller includes a loading curve forming unit for forming loading curves corresponding to the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator, which is electrically connected to the actual working condition simulation calculation model unit and the experimental tooling simulation calculation model unit:
[0054] The actual working condition simulation calculation model unit is used to simulate the force simulation calculation of the rail joint clamp plate 3 under the actual working condition and give the actual working condition calculation result, which includes two first simulation rails 21, two wheels 22, two first simulation rail joint clamp plates 23, six groups of first simulation bolt connection pairs 24 and ten rubber pads 25. The two first simulation rail joint clamp plates 23 are fixedly installed at the waist position of the two first simulation rails 21 connected to each other by the six groups of first simulation bolt connection pairs 24 according to the actual working condition. The rail gap is 8mm. The ten rubber pads 25 are evenly spaced and located between the two first simulation rails. The bottom of the first simulated rail 21 and the spacing between them is 700mm, the two wheels 22 are both circular rings with a radius of 420mm, the two wheels 22 are symmetrically distributed about the rail gap and the distance between them is 1800mm, the materials of the first simulated rail 21, the wheel 22, the first simulated rail joint clamp 23, the first simulated bolt connection pair 24, and the rubber pad 25 all adopt a linear elastic model, the first simulated rail 21, the wheel 22, the first simulated rail joint clamp 23, the first simulated bolt connection pair 24: the elastic modulus is 210GPa, the Poisson's ratio is 0.29, and the density is 7800kg / m 3; Rubber pad 25: elastic modulus is 80MPa, Poisson's ratio is 0; the preload force of the first simulated bolt connection pair 24 is 700N·m of torque, which is converted into a bolt preload force of 127kN. The center gravity of a single wheel 22 is 127.4kN. The angular velocity of the wheel 22 is 80rad / s. All contact surfaces are set to hard contact, and the friction coefficient is 0.2. The non-joint end face of the first simulated rail can only rotate laterally along the first simulated rail 21, the wheel 22 can only rotate axially, and the rubber pad 25 is displaced in all directions at the bottom;
[0055] In the actual working condition simulation calculation model unit, the preload force of the first simulated bolt connection pair 24 is 700 N·m torque, which is converted into a bolt preload force of 127 kN (because ABAQUS display analysis cannot directly apply bolt preload force, the bolt preload force is applied by implicit calculation in this study, and then the calculated stress field is input into the explicit analysis to apply the equivalent analysis effect of bolt preload force), and the axle weight of 26 tons is converted into a gravity of 127.4 kN applied to the center of a single wheel 22, and the angular velocity of the wheel 22 is set to 80 rad / s according to the vehicle speed of 120 km / h.
[0056] The size of the grid determines the accuracy and scale of the model calculation results. To save the calculation cost, it is sufficient to ensure that the part that needs to provide the calculation results has a reasonable grid accuracy. The rubber pad 25 uses a hexahedral structure grid, and all other parts are divided into hexahedral swept grids with a grid size of 10mm. The middle part of the joint clamp is meshed with a grid size of 2mm. The rails far from the center are not the focus of the simulation, and the grid size is 60mm, with a total of 80630 units.
[0057] The experimental tooling simulation calculation model unit is used to simulate the force simulation calculation of the railway rail joint clamp fatigue performance detection device and give the actual tooling calculation results, which includes two second simulation rails 26, two second simulation rail joint clamps 27, six sets of second simulation bolt connection pairs 28, and eight cylindrical rollers. The eight cylindrical rollers correspond to the four upper pressure rollers 16 and the four lower pressure rollers 18 in the four sets of bidirectional pressure head tooling 6 respectively. The four upper ones of the eight cylindrical rollers are roller No. 1 29, roller No. 2 30, roller No. 31 and roller No. 4 32 from left to right, and the four lower ones of the eight cylindrical rollers are roller No. 5 33, roller No. 6 34, roller No. 7 35 and roller No. 8 36 from left to right. Roller No. 1 29 and roller No. 5 33 are arranged correspondingly from top to bottom, roller No. 2 30 and roller No. 6 34 are arranged correspondingly from top to bottom, and roller No. 3 The first roller 29 and the second roller 32 are arranged in correspondence with each other, and the second roller 31 and the seventh roller 35 are arranged in correspondence with each other. The second roller 32 and the eighth roller 36 are arranged in correspondence with each other. The two second simulated rail joint clamps 27 are fixedly installed on the waist position of the two second simulated rails 26 connected to each other by six sets of second simulated bolt connection pairs 28. The rail gap is 8mm. The material parameters, boundary conditions and contact conditions of the second simulated rail 26, the second simulated rail joint clamps 27 and the second simulated bolt connection pairs 28 are consistent with the first simulated rail 21, the first simulated rail joint clamps 23 and the first simulated bolt connection pairs 24 of the actual working condition simulation calculation model unit. The spacing between the first roller 29 and the fourth roller 32 is 1400mm, and the spacing between the second roller 30 and the third roller 31 is 400mm. The eight cylindrical rollers adopt a linear elastic model with an elastic modulus of 210GPa, a Poisson's ratio of 0.29 and a density of 7800kg / m 3 , the MPC connection between the No. 2 roller 30 and the No. 6 roller 34, the No. 3 roller 31 and the No. 7 roller 35 is used for relative position constraint, so that the axial rotation and vertical displacement and the other degrees of freedom are completely constrained. The No. 1 roller 29, the No. 4 roller 32, the No. 5 roller 33, and the No. 8 roller 36 are set to only allow axial rotation and the other degrees of freedom are completely constrained. The No. 2 roller 30 and the No. 6 roller 34 simulate the first electro-hydraulic servo actuator 13 to load the second simulated rail 26 on the left side, and the No. 3 roller 31 and the No. 7 roller 35 simulate the second electro-hydraulic servo actuator 14 to load the second simulated rail 26 on the right side, and obtain several groups of actual tooling calculation results;
[0058] A loading curve forming unit is used to form loading curves corresponding to the first electro-hydraulic servo actuator 13 and the second electro-hydraulic servo actuator 14, and is performed as follows: the several groups of actual tooling calculation results are compared with the actual working condition calculation results, and the final actual tooling calculation results that match the actual working condition calculation results are selected, and then the forces loaded on the No. 2 roller 30 and the No. 6 roller 34 and the forces loaded on the No. 3 roller 31 and the No. 7 roller 35 when the final actual tooling calculation results are obtained are determined. The forces loaded on the No. 2 roller 30 and the No. 6 roller 34 are the loading curves corresponding to the first electro-hydraulic servo actuator 13, and the forces loaded on the No. 3 roller 31 and the No. 7 roller 35 are the loading curves corresponding to the second electro-hydraulic servo actuator 14.
[0059] Among them, the establishment of the simulation calculation model is based on the simulation calculation of Abaqus engineering simulation software.
[0060] like Figure 6 As shown, through the simulation of the above-mentioned large amount of data, the optimal loading curves corresponding to the first electro-hydraulic servo actuator 13 and the second electro-hydraulic servo actuator 14 are obtained.
[0061] In a specific implementation manner, the first electro-hydraulic servo actuator 13 and the second electro-hydraulic servo actuator 14 are both connected to the corresponding bidirectional pressure head fixture 6 through a ball joint, thereby applying corresponding force to the rail 2 .
[0062] In this specific implementation, Figure 1 As shown, it also includes a cast iron platform 37, and the first support 11 and the second support 12 are both fixedly mounted on the cast iron platform 37. It also includes a gantry 38 fixedly mounted on the cast iron platform 37, and the crossbeam part of the gantry 38 suspends the first electro-hydraulic servo actuator 13 and the second electro-hydraulic servo actuator 14.
[0063] The rated loads of the first electro-hydraulic servo actuator 13 and the second electro-hydraulic servo actuator 14 are both 250 kN, and the precision is both level 1.
[0064] A detection method for a railway rail joint splint fatigue performance detection device is provided, and the detection method comprises the following steps:
[0065] Assemble the rail joint clamp plate 3 to be tested and the rail 2 into a rail joint clamp plate connection joint 1 through bolts 20 (the bolts 20 are high-strength bolts);
[0066] Install the first support 11 and the second support 12 on the cast iron platform 37;
[0067] Install the first bidirectional pressing head fixture 7 and the fourth bidirectional pressing head fixture 10 on the first support 11 and the second support 12 respectively;
[0068] Pass the rail joint clamping plate connecting joint 1 through four sets of bidirectional pressure head fixtures 6 and install them thereon, center the rail gap, tighten the screw 19, and ensure that there is no gap between the upper pressure roller 16, the lower pressure roller 18 and the rail 2;
[0069] Connect the corresponding electro-hydraulic servo actuator to the rail joint clamping plate connection joint 1 through the bidirectional pressure head fixture 6, tighten the screw 19 to ensure that there is no gap between the upper pressure roller 16, the lower pressure roller 18 and the rail 2;
[0070] The obtained loading curves corresponding to the first electro-hydraulic servo actuator 13 and the second electro-hydraulic servo actuator 14 are imported and the corresponding electro-hydraulic servo actuators are started to simulate the stress condition of the rail joint clamping plate 3 when a train passes by;
[0071] After the test is completed, check whether the rail joint clamping plate 3 is damaged.
[0072] The present invention adopts the above technical solution. The first and second electro-hydraulic servo actuators can realize bidirectional coordinated loading of tension and compression with high load accuracy. They can simulate the actual stress conditions of the rail joint splint 3 when a train passes, and can effectively detect the fatigue performance of the rail joint splint.
[0073] The weak areas of the rail joint splint 3 are the top and bottom of the middle part. The main reason for the fracture of the rail joint splint 3 is that the bottom of the middle part of the rail joint splint 3 is subjected to tensile-compressive alternating stress, and the top of the middle part of the rail joint splint 3 is subjected to shear stress. The difference between the tensile stress, compressive stress, and shear stress in the weak areas of the rail joint splint 3 in the fatigue test and the actual working conditions is an important indicator for evaluating the fatigue test plan. Figure 7-12 As shown, it is a simulation calculation cloud diagram of tensile stress, compressive stress and shear stress in the weak area of the rail joint clamp 3 under actual working conditions and using the test scheme of the present invention (i.e. the above-mentioned actual working condition calculation results and actual tooling calculation results). It can be seen from the figure that the use of the test scheme of the present invention can make the distribution and size of tensile stress and compressive stress at the bottom of the middle part of the rail joint clamp 3 very close to that under actual working conditions, and the distribution and size of shear stress at the top of the middle part of the rail joint clamp 3 are very close to that under actual working conditions.
[0074] In addition, through simulation calculation, it can be found that in the traditional three-point bending fatigue test scheme, the weak area of the rail joint clamp 3 is only subjected to tensile stress, not compressive stress, and the middle section of the rail joint clamp 3 is not subjected to shear stress, which is very different from the stress under actual working conditions. Therefore, the stress on the weak area of the rail joint clamp 3 in the test scheme of the present invention is closer to the stress under actual working conditions, and the fatigue performance of the clamp can be better tested.
Claims
1. A railway rail joint splint fatigue performance detection device, It is characterized in that include: A rail joint clamp connection joint, comprising two rails, two rail joint clamps and a bolt connection pair, wherein the two rails are arranged adjacent to each other on the left and right sides and a rail gap is formed between the two rails, and one rail joint clamp is attached to the front and rear sides of the two rails respectively, and the two rail joint clamps cooperate with the bolt connection pair to connect the two rails, and the area including the rail joint clamp located in the middle position of the rail joint clamp connection joint is the clamp area, and the left and right sides of the clamp area on the rail joint clamp connection joint are respectively non-clamp areas; Four sets of bidirectional pressure head tooling, each set of the bidirectional pressure head tooling includes an upper pressure part and a lower pressure part, the upper pressure part and the lower pressure part are arranged opposite to each other up and down and are fixedly connected, a space for the rail joint clamping plate connecting joint to pass through is formed between the upper pressure part and the lower pressure part, the upper pressure part is provided with a downwardly extending arc-shaped upper protrusion on the side facing the lower pressure part, and the lower pressure part is provided with an upwardly extending arc-shaped lower protrusion on the side facing the upper pressure part, the arc-shaped upper protrusion and the arc-shaped lower protrusion are arranged opposite to each other up and down and both extend in the front-back direction, the rail joint clamping plate The connecting joint passes through the space of each set of the two-way pressure head tooling and is abutted and pressed by the corresponding arc-shaped upper protrusion and arc-shaped lower protrusion of each set of the two-way pressure head tooling. The four sets of two-way pressure head tooling are respectively the first two-way pressure head tooling, the second two-way pressure head tooling, the third two-way pressure head tooling and the fourth two-way pressure head tooling, and they are sequentially spaced and distributed along the left and right directions. The second two-way pressure head tooling and the third two-way pressure head tooling are both arranged in the clamping plate area and are symmetrically arranged about the rail joint. The first two-way pressure head tooling and the fourth two-way pressure head tooling are both arranged in the non-clamping plate area and are symmetrically arranged about the rail joint. Two supports, which are a first support and a second support, the first support is located below the first bidirectional pressure head tooling and the two are fixedly connected, and the second support is located below the fourth bidirectional pressure head tooling and the two are fixedly connected; Two electro-hydraulic servo actuators, which are a first electro-hydraulic servo actuator and a second electro-hydraulic servo actuator, wherein the first electro-hydraulic servo actuator is disposed above the second bidirectional ram tooling and acts on the second bidirectional ram tooling, and the second electro-hydraulic servo actuator is disposed above the third bidirectional ram tooling and acts on the third bidirectional ram tooling; A controller is electrically connected to the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator, and the controller stores loading curves corresponding to the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator, respectively, so that the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator act on the matching bidirectional pressure head tooling according to the corresponding loading curves.
2. The railway rail joint clamp fatigue performance detection device according to claim 1, It is characterized in that The upper pressing part includes an upper pressing plate and an upper pressing roller, the axial direction of the upper pressing roller is arranged along the front-to-back direction and a part of it is embedded in the lower surface of the upper pressing plate, the lower pressing part includes a lower pressing plate and a lower pressing roller, the axial direction of the lower pressing roller is arranged along the front-to-back direction and a part of it is embedded in the upper surface of the lower pressing plate, and a screw that passes through the four opposite corners of the upper pressing plate and the lower pressing plate is provided to fix the upper pressing plate and the lower pressing plate.
3. The railway rail joint clamp fatigue performance detection device according to claim 2, It is characterized in that The bolt connection pair comprises six bolts, matching nuts and spring washers.
4. The railway rail joint clamp fatigue performance detection device according to claim 3, It is characterized in that The distance between the first support and the second support is 1400 mm.
5. The railway rail joint clamp fatigue performance detection device according to claim 4, It is characterized in that The distance between the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator is 400 mm.
6. The railway rail joint clamp fatigue performance detection device according to claim 5, It is characterized in that The controller includes a loading curve forming unit for forming loading curves corresponding to the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator, which is electrically connected to the actual working condition simulation calculation model unit and the experimental tooling simulation calculation model unit: The actual working condition simulation calculation model unit is used to simulate the force simulation calculation of the rail joint clamp under the actual working condition and give the actual working condition calculation result, which includes two first simulated rails, two wheels, two first simulated rail joint clamps, six groups of first simulated bolt connection pairs and ten rubber pads. The two first simulated rail joint clamps are fixedly installed on the waist position of the two butted first simulated rails by the six groups of first simulated bolt connection pairs according to the actual working condition, and the rail gap is 8mm. The ten rubber pads are evenly spaced and located between the two first simulated rails. The bottom of the real rail and the spacing between them is 700mm, the two wheels are both circular rings with a radius of 420mm, the two wheels are symmetrically distributed about the rail gap and the distance between them is 1800mm, the materials of the first simulated rail, wheel, first simulated rail joint splint, first simulated bolt connection pair, and rubber pad are all linear elastic models, the first simulated rail, wheel, first simulated rail joint splint, first simulated bolt connection pair: elastic modulus is 210GPa, Poisson's ratio is 0.29, density is 7800kg / m 3 ; Rubber pad: elastic modulus is 80MPa, Poisson's ratio is 0; the preload of the first simulated bolt connection pair is 700N·m torque, which is converted into a bolt preload of 127kN. The center gravity of a single wheel is 127.4kN. The angular velocity of the wheel is 80rad / s. All contact surfaces are set to hard contact, and the friction coefficient is 0.
2. The non-joint end face of the first simulated rail can only rotate laterally along the first simulated rail, the wheel can only rotate axially, and the rubber pad is displaced in all directions at the bottom; The experimental tooling simulation calculation model unit is used to simulate the force simulation calculation of the railway rail joint splint fatigue performance detection device and give the actual tooling calculation results, which includes two second simulation rails, two second simulation rail joint splints, six sets of second simulation bolt connection pairs, and eight cylindrical rollers. The eight cylindrical rollers correspond to the four upper pressure rollers and the four lower pressure rollers in the four sets of bidirectional pressure head tooling respectively. The four upper rollers of the eight cylindrical rollers are roller No. 1, roller No. 2, roller No. 3 and roller No. 4 from left to right, and the four lower rollers of the eight cylindrical rollers are roller No. 5, roller No. 6, roller No. 7 and roller No. 8 from left to right. Roller No. 1 and roller No. 5 are arranged correspondingly from top to bottom, roller No. 2 and roller No. 6 are arranged correspondingly from top to bottom, and roller No. 3 is arranged correspondingly from top to bottom. The No. 1 roller and the No. 7 roller are arranged in correspondence with each other, and the No. 4 roller and the No. 8 roller are arranged in correspondence with each other. The two second simulated rail joint clamps are fixedly installed on the waist position of the two second simulated rails by six sets of second simulated bolt connection pairs. The rail gap is 8mm. The material parameters, boundary conditions and contact conditions of the second simulated rail, the second simulated rail joint clamp and the second simulated bolt connection pair are consistent with the first simulated rail, the first simulated rail joint clamp and the first simulated bolt connection pair of the actual working condition simulation calculation model unit. The spacing between the No. 1 roller and the No. 4 roller is 1400mm, and the spacing between the No. 2 roller and the No. 3 roller is 400mm. The eight cylindrical rollers adopt a linear elastic model with an elastic modulus of 210GPa, a Poisson's ratio of 0.29 and a density of 7800kg / m 3 , the relative position constraints between roller No. 2 and roller No. 6, roller No. 3 and roller No. 7 are realized by MPC connection, which can make the axial rotation and vertical displacement and other degrees of freedom completely constrained. Roller No. 1, roller No. 4, roller No. 5 and roller No. 8 are set to only allow axial rotation and other degrees of freedom completely constrained. Roller No. 2 and roller No. 6 simulate the first electro-hydraulic servo actuator to load the second simulated rail on the left, and roller No. 3 and roller No. 7 simulate the second electro-hydraulic servo actuator to load the second simulated rail on the right, and obtain several groups of actual tooling calculation results; The loading curve forming unit is executed as follows: the several groups of actual tooling calculation results are compared with the actual working condition calculation results, and the final actual tooling calculation results that match the actual working condition calculation results are selected, and then the forces loaded on roller No. 2 and roller No. 6 and the forces loaded on roller No. 3 and roller No. 7 when the final actual tooling calculation results are obtained are determined. The forces loaded on roller No. 2 and roller No. 6 are the loading curves corresponding to the first electro-hydraulic servo actuator, and the forces loaded on roller No. 3 and roller No. 7 are the loading curves corresponding to the second electro-hydraulic servo actuator.
7. The railway rail joint clamp fatigue performance detection device according to claim 6, It is characterized in that The first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator are both connected to the corresponding bidirectional pressure head fixture via a ball joint.
8. The railway rail joint clamp fatigue performance detection device according to claim 7, It is characterized in that It also includes a cast iron platform, the first support and the second support are both fixedly mounted on the cast iron platform, and also includes a gantry fixedly mounted on the cast iron platform, the crossbeam portion of the gantry suspends the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator.
9. The railway rail joint clamp fatigue performance detection device according to claim 8, It is characterized in that The rated loads of the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator are both 250 kN, and the precision is both level 1.
10. A method for detecting fatigue performance of railway rail joint splints using the railway rail joint splint fatigue performance detection device according to any one of claims 1 to 9, comprising the following steps: The first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator are started, and the controller provides a loading curve corresponding to the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator so that the first electro-hydraulic servo actuator and the second electro-hydraulic servo actuator act on a matching bidirectional pressure head tooling according to the corresponding loading curve to simulate the stress condition of the rail joint clamp when a train passes; After loading is completed, observe whether the rail joint splint is damaged.
Citation Information
Cited By
High-speed rail roadbed power loading head device
CN122591381A