Uncertain factor quantitative analysis method for active access of grid-connected main body to power distribution system
Through uncertainty modeling and state space modeling, combined with Monte Carlo simulation and Sobol method, the uncertainty factors caused by the access of grid-connected entities are identified and evaluated, and the inadequacies in grid security management and risk assessment in the existing technology are solved. Accurate questions enable more efficient risk assessment and equipment maintenance.
Patent Information
- Application Number
- CN202411001810.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-25
AI Technical Summary
Existing technology cannot effectively monitor and analyze the operating status of the power distribution system in real time, resulting in grid security management and risk assessment that are not accurate and timely, and there is a lack of efficient data analysis tools and models to deal with the uncertainties caused by the access of grid-connected entities. .
Using the methods of uncertainty modeling, state space modeling, Monte Carlo simulation and sensitivity analysis, by establishing probability model and state space model, the uncertainty factors of the power system are identified and evaluated, and the Sobol method is used to conduct parameter sensitivity Analyze and identify the uncertain factors that have the greatest impact on the system.
It improves the accuracy of risk assessment and real-time response capabilities, optimizes equipment maintenance and safety management, and provides more accurate data support and decision-making basis.
Smart Images

Figure CN118797952A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of uncertainty analysis of a power system, and in particular to a quantitative analysis method of uncertainty factors of a grid-connected entity actively connected to a power distribution system. Background Art
[0002] With the development of new energy power systems, especially the active access of grid-connected entities, the distribution system has become increasingly complex. Existing technologies have limitations in dealing with this complexity. Existing technologies cannot effectively monitor and analyze the operating status of the distribution system in real time, resulting in inaccurate and in-time security management and risk assessment of the power grid.
[0003] The prior art has the following deficiencies:
[0004] Lack of real-time data processing capabilities. Existing methods effectively collect and analyze the operating data of the distribution system in real time, resulting in risk assessment that is not timely and accurate enough. Limitations of risk assessment methods. Existing risk assessment methods may not be comprehensive enough to fully utilize all available data, especially electricity usage data on the user side. Insufficient handling of uncertainty factors. Existing methods lack efficient data analysis tools and models to handle the uncertainty factors brought about by the access of grid-connected entities. Insufficient equipment maintenance and safety management. Existing methods lack detailed detection of physical defects and potential safety hazards of equipment, resulting in insufficient optimization of equipment maintenance and safety management.
[0005] Therefore, we need a more efficient quantitative analysis method that can process and analyze large amounts of real-time data, identify the uncertainty factors brought about by the access of grid-connected entities, obtain the key uncertainty factors that comprehensively affect the safe and stable operation of the active distribution system, and support the safe and stable operation of the distribution system. Summary of the invention
[0006] In view of the above deficiencies in the prior art, the technical problem to be solved by the present invention is to provide a quantitative analysis method for uncertain factors of active access of grid-connected entities to the distribution system, so as to improve the efficiency and accuracy of risk assessment of the distribution network system, and make complex grid data easier to understand and analyze.
[0007] In order to achieve the above objectives, the present invention adopts the following technical solutions:
[0008] A quantitative analysis method for uncertain factors of a grid-connected entity actively connected to a power distribution system comprises the following steps:
[0009] S1. Uncertainty modeling: Collect data related to uncertainties through the distribution system database, and list all uncertainties that may affect the operation of the distribution system (load fluctuations, intermittent nature of renewable energy, equipment aging, etc.). Establish a probability model for the uncertainties to quantify their uncertainties. The probability model includes:
[0010] Use normal distribution to simulate load fluctuations, N represents Poisson distribution, μ l is the mean value of the load, σ l 2 is the standard deviation;
[0011] Poisson distribution is used to simulate the intermittency of renewable energy, where P represents Poisson distribution and λ is the expected value of renewable energy generation per unit time;
[0012] Use exponential distribution to model equipment failure rate: X age ~E(β), E represents exponential distribution, which describes the failure time of equipment or components, that is, the time interval between two failures, and β is the inverse of the failure rate, which represents the average number of failures per unit time.
[0013] S2. State space modeling, integrating the uncertainty factor model established in step S1, establishing state equations and observation equations, and constructing a unified state space model to describe the evolution of the power system state over time;
[0014] S3. Evaluate the probability of failure of the power system under the influence of uncertain factors, and use Monte Carlo simulation to simulate the state space model established in step S2 to estimate the failure probability;
[0015] S4. Sensitivity analysis, change the parameters of the state-space model constructed in step S2, use the Sobol method to evaluate the impact of parameter changes on the system, evaluate the impact of parameter changes in the state-space model on the system output, and identify the uncertainties that have the greatest impact on the system.
[0016] Furthermore, the method for constructing the state space model includes:
[0017] S21. Using the model established for the uncertainty factors in step S1, select key response indicators that can characterize the change of the system state, and the key response indicators can quantify the impact of the uncertainty factors on the system;
[0018] Key response indicators include: node voltage amplitude and phase angle, which reflect the voltage stability of the power system; generator output power, which indicates the power supply capacity; line flow, which reflects the condition of power flowing through the system; load fluctuation, which affects the supply and demand balance of the power grid; the accuracy of renewable energy power generation prediction, which affects the scheduling and planning of the power grid; equipment failure rate, which affects the reliability and maintenance requirements of the system.
[0019] S22. Determine the state variable, select the key response indicator as the state variable, and the state variable should be able to directly or indirectly reflect the influence of the uncertainty factor;
[0020] S23. Establish a state equation and a dynamic relationship between state variables. The state equation is expressed as a set of differential equations or difference equations to describe the changes of state variables over time. The state equation formula is:
[0021]
[0022] X(t)=[V t (t), P g (t), I l (t), P l (t), P r (t), λ(t), f(t), ...];
[0023] In the formula, is the derivative of the state vector, which indicates the rate of change of the state over time; A is the state matrix, which describes the dynamic relationship between state variables; X(t) is the state variable, which is the minimum information set describing the current state of the system; B is the input matrix, which links the control input to the state change; U(t) is the control input vector, including power input, load change, etc.; ω(t) is the process noise, which indicates the internal random disturbance that cannot be captured by the model; V t (t) represents the voltage amplitude and phase angle of each node in the power system, P g (t) represents the output power of each generator in the system at time t; I l (t) represents the current flowing through each line in the system, usually including the real part (active power flow) and the imaginary part (reactive power flow); P l (t) represents the total load in the system or the load of each node in the time period t; P r (t) represents the predicted power generation from renewable energy sources such as wind and solar energy; λ(t) represents the rate at which equipment in the system may fail; f(t) represents the operating frequency of the power system;
[0024] S24. Establish observation equations, establish the relationship between state variables and observable variables, observable variables include node voltage, line current, power, etc. The observation equations are expressed as a set of algebraic equations, and the observation equation formula is:
[0025]
[0026]
[0027] The observation model allows estimating state variables from observable variables, integrating data from different sensors. By taking into account the observation noise, the observation model handles the uncertainty in the actual measurements.
[0028] Z(t) is the observation vector, which contains a set of variables that can be directly measured from the power system, such as node voltage, line current, power, etc.; C is a coefficient matrix used to map state variables to the observation space, which defines how state variables affect observable variables; D is the direct transfer matrix, which is used to map control inputs directly to the observation space. The direct transfer matrix describes the direct impact of control inputs on observable variables; υ(t) is the observation noise, which represents the random errors and external interferences in the measurement process. The observation noise is usually assumed to be Gaussian white noise, which has zero mean and a certain variance;
[0029] S25. Construct a state space model, combine the state equation and the observation equation to construct a state space model; the state space model formula is expressed as:
[0030]
[0031] is the derivative of the state vector, X(t) is the state variable, A is the state matrix, B is the input matrix, U(t) is the control input vector, ω(t) is the process noise, Z(t) is the observation vector, C is the observation matrix which is a coefficient matrix, D is the direct transfer matrix, and υ(t) is the observation noise.
[0032] S3. Evaluate the probability of failure of the power system under the influence of uncertain factors, and use Monte Carlo simulation to simulate the state space model established in step S2 to estimate the failure probability;
[0033] Further, the state space model established in step S2 is simulated using Monte Carlo simulation to estimate the failure probability. The specific method includes:
[0034] S31. Sampling uncertain factors. Using the probability model established in step S1, randomly sample each uncertainty factor (such as load fluctuation, renewable energy intermittency, equipment aging, etc.), and use a pseudo-random number generator to generate sample data based on these probability models;
[0035] S32. Set the number of simulations. Use the relationship between the confidence interval and the uncertainty factor sample to estimate the required number of simulations and range. The number of simulations should be large enough to reduce the variance of the simulation results and improve the stability and credibility of the results. The number of simulations is estimated by the following formula:
[0036]
[0037] Ns Estimated number of simulations; Z α / 2 is the Z value corresponding to the confidence level of the normal distribution; for the common 95% confidence level, Z α / 2 About 1.96, this value means that under normal distribution, the proportion of areas within 1.96 standard deviations from the mean is about 95%; E m is the acceptable error range of the simulation results, also known as the half-width of the confidence interval, which means that we hope that the error between the simulation results and the true value does not exceed this range. m The smaller it is, the higher our requirement for simulation accuracy is. Correspondingly, the number of simulations N required is s The larger the N s refers to the dimension of the state vector, i.e. the number of state variables;
[0038] S33. Simulate system operation. For each set of sample data of uncertain factors, input the sample data into the state space model established in step S2 to obtain the predicted values of the state variables and observed variables of the power system under the given sample of uncertain factors;
[0039] S34. Determine whether the system fails. According to the preset failure criteria, determine whether the system fails under the current uncertain factor sample. The failure criteria judgment formula is:
[0040]
[0041]
[0042] The failure conditions satisfied by X(t) include:
[0043] V min ≤V i (t)≤V max ;
[0044] P g,i,min (t)≤P g,i (t)≤P g,i,max (t);
[0045] I l,i,max ≥I l,i (t);
[0046] P l,min ≤P l (t)≤P l,max ;
[0047] P r,min ≤P r (t)≤P r,max ;
[0048] λ(t)≤λ max;
[0049] f min ≤f(t)≤f max ;
[0050] V min and V max are the minimum and maximum safety thresholds of the node voltage, V i (t) is the voltage of each node; P g,i,min (t) and P g,i,max (t) are the minimum and maximum output power limits of the ith generator; I l,i,max is the power flow capacity of the ith line; P l,min and P l,max is the minimum and maximum safety threshold of the load, P r,min and P r,max are the minimum and maximum safety thresholds for renewable energy generation; max is the maximum safety threshold of equipment failure rate; f min and f max are the minimum and maximum safety thresholds of the system frequency;
[0051] S35. Statistics of failure times. Record the number of system failures;
[0052] The number of system failures in all simulation samples in step S34 is counted, and the formula is expressed as:
[0053]
[0054] N s is the total number of simulations, F i is the failure logic variable of the ith simulation;
[0055] S36. Calculate the failure probability. Based on the number of failures and the total number of simulations, calculate the failure probability of the system under the influence of uncertain factors. The calculation formula is:
[0056]
[0057] N F is the number of failures, N s is the total number of simulations.
[0058] S4. Sensitivity analysis, changing the parameters of the state-space model constructed in step S2, using the Sobol method to evaluate the impact of parameter changes on the system, evaluating the impact of parameter changes in the state-space model on the system output, and identifying the uncertainties that have the greatest impact on the system;
[0059] S41. Parameter definition: Determine the initial estimated range of each parameter based on historical data and the physical meaning of the model;
[0060] S42. Conduct sensitivity analysis experiments: Based on the state space model constructed in step S2, systematically change each parameter value of the state space model, conduct a series of simulation experiments, and record the results;
[0061] S43. Calculate sensitivity index: Based on the experimental results of S42, calculate the sensitivity index to evaluate the impact of the parameters on the system. The calculation formula for the sensitivity index is:
[0062]
[0063] Among them, K i is a fixed parameter, Var(P F |K i |) is the fixed parameter K i Variance of failure probability at time t; Var(P F ) is the total variance of the failure probability when all parameters vary;
[0064] S44. Analysis results: According to the size of the sensitivity index, determine which uncertain factors have the greatest impact on the system and those parameters that have the greatest impact on the probability of system failure, that is, identify sensitive factors.
[0065] In summary, due to the adoption of the above technical solution, the beneficial technical effects of the invention are:
[0066] 1. Improve the accuracy of risk assessment
[0067] By establishing a probabilistic model to quantify the uncertainty of uncertain factors (such as load fluctuations, intermittent renewable energy, and equipment aging), accurate input data is provided for risk assessment. The state space model is constructed to integrate the dynamic characteristics of the power system state over time, so that risk assessment can be based on the actual dynamic behavior of the system. Monte Carlo simulation is used to estimate the failure probability, taking into account the combined impact of multiple uncertain factors, which improves the accuracy of risk assessment results.
[0068] 2. Enhance the system's real-time response capabilities
[0069] The probabilistic model can be updated in real time to reflect the latest system status, providing data support for rapid response.
[0070] State-space models allow real-time monitoring of system states and rapid prediction of potential changes, providing a basis for real-time decision making. Simulations can be completed in a reasonable amount of time, making real-time risk assessment and response possible.
[0071] 3. Optimize equipment maintenance and safety management
[0072] Probabilistic models identify uncertain factors such as equipment aging, can predict equipment failure rates, and provide data support for maintenance plans. State space models simulate the impact of equipment failures on system status, helping to develop preventive measures and optimize safety management. Sensitivity analysis identifies the uncertain factors that have the greatest impact on the system, providing a basis for equipment maintenance and safety management. BRIEF DESCRIPTION OF THE DRAWINGS
[0073] Figure 1 Flowchart of the quantitative analysis method for uncertainties of grid-connected entities actively connected to the distribution system. DETAILED DESCRIPTION
[0074] In order to make the purpose, technical solution and advantages of the invention more clear, the invention is further described in detail below in combination with the embodiments. It should be understood that the specific embodiments described here are only used to explain the invention and are not used to limit the invention.
[0075] like Figure 1 The method for quantitatively analyzing uncertain factors of a grid-connected entity actively connected to a power distribution system comprises the following steps:
[0076] S1. Uncertainty factor modeling: collect uncertainties through the distribution system database, conduct probability modeling on uncertainties (load fluctuations, intermittent nature of renewable energy, equipment aging, etc.), and analyze the specific impact of each uncertain factor on the distribution system; establishing a probability model includes:
[0077] Use a normal distribution to simulate load fluctuations: N represents Poisson distribution, μl is the mean of the load, is the standard deviation;
[0078] Poisson distribution is used to simulate the intermittency of renewable energy: P represents Poisson distribution, and λ is the expected value of renewable energy generation per unit time;
[0079] Use exponential distribution to model equipment failure rate: X age ~E(β), E represents exponential distribution, which describes the failure time of equipment or components, that is, the time interval between two failures, and β is the inverse of the failure rate, which represents the average number of failures per unit time.
[0080] S2. State space modeling, integrating the uncertainty factor model established in step S1, establishing state equations and observation equations, and constructing a unified state space model to describe the evolution of the power system state over time.
[0081] Furthermore, the method for constructing the state space model includes:
[0082] S21. Using the model established for the uncertainty factors in step S1, based on the understanding of the impact of the uncertainty factors, select key response indicators that can characterize the change of the system state, and the key response indicators can quantify the impact of the uncertainty factors on the system;
[0083] Based on the probability model in S1, key response indicators such as node voltage and generator output power are selected as state variables, and state equations describing the dynamic relationship between state variables are established. The state equations and observation data are combined to construct observation equations to form a complete state space model, which integrates the dynamic characteristics of the power system and provides a theoretical basis for real-time monitoring and prediction.
[0084] Key indicators include: node voltage amplitude and phase angle, which reflect the voltage stability of the power system; generator output power, which indicates the power supply capacity; line flow, which reflects the condition of power flowing through the system; load fluctuation, which affects the supply and demand balance of the power grid; the accuracy of renewable energy power generation prediction, which affects the scheduling and planning of the power grid; equipment failure rate, which affects the reliability and maintenance requirements of the system.
[0085] S22. Determine the state variable, select the key response indicator as the state variable, the state variable should be able to directly or indirectly reflect the influence of uncertainty factors, the state variable may include node voltage amplitude and phase angle, generator output power, etc.;
[0086] S23. Establish a state equation and a dynamic relationship between state variables. The state equation is expressed as a set of differential equations or difference equations to describe the changes of state variables over time. The state equation formula is:
[0087]
[0088] X(t)=[V t (t), P g (t), I l (t), P l (t), P r (t), λ(t), f(t), ...];
[0089] The state equation combines state variables, state matrix, control input, input matrix and process noise to describe the evolution of system state over time. The state equation captures the dynamic characteristics of the power system over time, such as changes in voltage and frequency. Through control input, the system state is adjusted to achieve system stability and optimization. The introduction of process noise enables the model to handle uncertain factors in actual operation.
[0090] In the formula, is the derivative of the state vector, which indicates the rate of change of the state over time; A is the state matrix, which describes the dynamic relationship between state variables; X(t) is the state variable, which is the minimum information set describing the current state of the system; B is the input matrix, which links the control input to the state change; U(t) is the control input vector, including power input, load change, etc.; ω(t) is the process noise, which indicates the internal random disturbance that cannot be captured by the model; V t (t) represents the voltage amplitude and phase angle of each node in the power system, P g (t) represents the output power of each generator in the system at time t; I l (t) represents the current flowing through each line in the system, usually including the real part (active power flow) and the imaginary part (reactive power flow); P l (t) represents the total load in the system or the load of each node at time t; P r (t) represents the predicted power generation from renewable energy sources such as wind and solar energy; λ(t) represents the rate at which equipment in the system may fail; f(t) represents the operating frequency of the power system;
[0091] S24. Establish observation equations, establish the relationship between state variables and observable variables, observable variables include node voltage, line current, power, etc. The observation equation can be expressed as a set of algebraic equations, and the observation equation formula is:
[0092] Z(t)=CX(t)+DU(t)+υ(t);
[0093] X(t)=[V t (t), P g (t), I l (t), P l (t), P r (t), λ(t), f(t), ...];
[0094] The observation model allows estimating state variables from observable variables, integrating data from different sensors. By taking into account the observation noise, the observation model handles the uncertainty in the actual measurements.
[0095] Z(t) is the observation vector, which contains a set of variables that can be directly measured from the power system, such as node voltage, line current, power, etc.; C is the observation matrix, which is a coefficient matrix used to map state variables to the observation space. It defines how state variables affect observable variables; D is the direct transfer matrix, which is used to map control inputs directly to the observation space. The direct transfer matrix describes the direct impact of control inputs on observable variables; υ(t) is the observation noise, which represents the random errors and external interferences in the measurement process. The observation noise is usually assumed to be Gaussian white noise with zero mean and a certain variance;
[0096] S25. Construct a state space model, combine the state equation and the observation equation to construct a state space model; the state space model formula is expressed as:
[0097]
[0098] is the derivative of the state vector, X(t) is the state variable, A is the state matrix, B is the input matrix, U(t) is the control input vector, ω(t) is the process noise, Z(t) is the observation vector, C is the observation matrix which is a coefficient matrix, D is the direct transfer matrix, and υ(t) is the observation noise.
[0099] S3. Evaluate the probability of failure of the power system under the influence of uncertain factors, and use Monte Carlo simulation to simulate the state space model established in step S2 to estimate the failure probability;
[0100] Set the confidence level percentage of the Monte Carlo simulation and determine the number of simulations based on the required accuracy; use a pseudo-random number generator to perform sampling based on the probability model to obtain sample data of uncertain factors; input the sample data into the state space model to simulate the system operation and predict the state variables and observed variables; determine the system state based on the failure criteria, count the number of failures and calculate the failure probability.
[0101] Further, the state space model established in step S2 is simulated using Monte Carlo simulation to estimate the failure probability. The specific method includes:
[0102] S31. Set the number of simulations. Use the relationship between the confidence interval and the sample size to estimate the required number and range of simulations. The number of simulations should be large enough to reduce the variance of the simulation results and improve the stability and credibility of the results. The number of simulations is estimated by the following formula:
[0103]
[0104] N s Estimated number of simulations; Z α / 2 is the Z value corresponding to the confidence level of the normal distribution, for the common 95% confidence level; Z α / 2 About 1.96, this value means that under normal distribution, the proportion of areas within 1.96 standard deviations from the mean is about 95%; E m is the acceptable error range of the simulation results, also known as the half-width of the confidence interval, which means that we hope that the error between the simulation results and the true value does not exceed this range. m The smaller it is, the higher our requirement for simulation accuracy is. Correspondingly, the number of simulations N required is s The larger the N srefers to the dimension of the state vector, i.e. the number of state variables;
[0105] S32. Sampling uncertain factors. Using the probability model established in step S1, randomly sample each uncertainty factor (such as load fluctuation, renewable energy intermittency, equipment aging, etc.), and use a pseudo-random number generator to generate sample data based on these probability models;
[0106] S33. Simulate system operation. For each set of sample data of uncertain factors, input the sample data into the state space model established in step S2 to obtain the predicted values of the state variables and observed variables of the power system under the given sample of uncertain factors;
[0107] S34. Determine whether the system fails. According to the preset failure criteria, determine whether the system fails under the current uncertain factor sample. The failure criteria judgment formula is:
[0108]
[0109] X(t)=[V t (t), P g (t), I l (t), P l (t), P r (t), λ(t), f(t), ...];
[0110] The failure conditions satisfied by X(t) include:
[0111] V min ≤V i (t)≤V max ;
[0112] P g,i,min (t)≤P g,i (t)≤P g,i,max (t);
[0113] I l,i,max ≥I l,i (t);
[0114] P l,min ≤P l (t)≤P l,max ;
[0115] P r,min ≤P r (t)≤P r,max ;
[0116] λ(t)≤λ max ;
[0117] f min ≤f(t)≤fmax ;
[0118] V min and V max are the minimum and maximum safety thresholds of the node voltage, V i (t) is the voltage of each node; P g,i,min (t) and P g,i,max (t) are the minimum and maximum output power limits of the ith generator; I l,i,max is the power flow capacity of the ith line; P l,min , and P l,max is the minimum and maximum safety threshold of the load, P r,min and P r,max are the minimum and maximum safety thresholds for renewable energy generation; max is the maximum safety threshold of equipment failure rate; f min and f max are the minimum and maximum safety thresholds of the system frequency;
[0119] S35. Statistics of failure times. Record the number of system failures;
[0120] The number of system failures in all simulation samples in step S34 is counted, and the formula is expressed as:
[0121]
[0122] N s is the total number of simulations, F i is the failure logic variable of the ith simulation;
[0123] S36. Calculate the failure probability. Based on the number of failures and the total number of simulations, calculate the failure probability of the system under the influence of uncertain factors. The calculation formula is:
[0124]
[0125] N F is the number of failures, N s is the total number of simulations.
[0126] S4. Sensitivity analysis, changing the parameters of the state-space model constructed in step S2, using the Sobol method to evaluate the impact of parameter changes on the system, evaluating the impact of parameter changes in the state-space model on the system output, and identifying the uncertainties that have the greatest impact on the system;
[0127] S41. Parameter definition: Determine the initial estimated range of each parameter based on historical data and the physical meaning of the model;
[0128] S42. Conduct sensitivity analysis experiments: Based on the state space model constructed in step S2, systematically change each parameter value of the state space model, conduct a series of simulation experiments, and record the results;
[0129] S43. Calculate sensitivity index: Based on the experimental results of S42, calculate the sensitivity index to evaluate the impact of the parameters on the system. The calculation formula for the sensitivity index is:
[0130]
[0131] Among them, K i is a fixed parameter, Var(P F |K i |) is the fixed parameter K i Variance of failure probability at time t; Var(P F ) is the total variance of the failure probability when all parameters vary;
[0132] S44. Analysis results: According to the size of the sensitivity index, determine which uncertain factors have the greatest impact on the system and those parameters that have the greatest impact on the probability of system failure, that is, identify sensitive factors.
[0133] A quantitative analysis method for uncertain factors of a grid-connected entity actively connected to a power distribution system comprises the following steps:
[0134] S1. Uncertainty factor modeling: collect uncertainties through the distribution system database, conduct probability modeling on uncertainties (load fluctuations, intermittent nature of renewable energy, equipment aging, etc.), and analyze the specific impact of each uncertain factor on the distribution system; establishing a probability model includes:
[0135] Use a normal distribution to simulate load fluctuations: N represents Poisson distribution, μ l is the mean value of the load, is the standard deviation;
[0136] Poisson distribution is used to simulate the intermittency of renewable energy: P represents Poisson distribution, and λ is the expected value of renewable energy generation per unit time;
[0137] Use exponential distribution to model equipment failure rate: X age ~E(β), E represents exponential distribution, which describes the failure time of equipment or components, that is, the time interval between two failures, and β is the inverse of the failure rate, which represents the average number of failures per unit time.
[0138] The above description is a preferred embodiment of the invention and is not intended to limit the invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the invention should be included in the protection scope of the invention.
Claims
1. A quantitative analysis method for uncertain factors of a grid-connected entity actively connected to a power distribution system, comprising the following steps: S1. Uncertainty modeling: collect data related to uncertainties through the distribution system database, list all uncertainties that may affect the operation of the distribution system, and establish a probability model for the uncertainties to quantify their uncertainties; S2. State space modeling, integrating the uncertainty factor model established in step S1, establishing state equations and observation equations, and constructing a unified state space model to describe the evolution of the power system state over time; S3. Evaluate the probability of failure of the power system under the influence of uncertain factors, simulate the state space model established in step S2 using Monte Carlo simulation, and estimate the failure probability; S4. Sensitivity analysis, changing the parameters of the state-space model constructed in step S2, using the Sobol method to evaluate the impact of parameter changes in the state-space model on the system output, and identifying the uncertainties that have the greatest impact on the system.
2. According to claim 1, a quantitative analysis method for uncertain factors of a grid-connected entity actively connected to a power distribution system is characterized in that: The probability model established in step S1 includes: Use a normal distribution to simulate load fluctuations: N represents Poisson distribution, μ l is the mean value of the load, σ l 2 is the standard deviation; Poisson distribution is used to simulate the intermittency of renewable energy: P represents Poisson distribution, and λ is the expected value of renewable energy generation per unit time; Use exponential distribution to model equipment failure rate: X age ~E(β), where E represents exponential distribution, describing the failure time of a device or component, i.e., the time interval between two failures, and β is the inverse of the failure rate, representing the average number of failures per unit time.
3. The method for quantitatively analyzing uncertain factors of a grid-connected entity actively connected to a power distribution system according to claim 1, characterized in that: In step S2, the method for constructing the state space model includes: S21. Using the model established for the uncertainty factors in step S1, select key response indicators that can characterize the change of the system state, and quantify the impact of the uncertainty factors on the system according to the key response indicators; S22. Determine the state variable, select the key response indicator as the state variable, the state variable can directly reflect the influence of uncertainty factors; S23. Establish a state equation and a dynamic relationship between state variables. The state equation is expressed as a set of differential equations to describe the changes of state variables over time. The state equation formula is: X(t)=[V t (t),P g (t),I l (t),P l (t),P r (t),λ(t),f(t),...]; In the formula, is the derivative of the state vector, which indicates the rate of change of the state over time; A is the state matrix, which describes the dynamic relationship between state variables; X(t) is the state variable, which is the minimum information set describing the current state of the system; B is the input matrix, which links the control input to the state change; U(t) is the control input vector, including power input and load change; ω(t) is the process noise, which indicates the internal random disturbance that cannot be captured by the model; V t (t) represents the voltage amplitude and phase angle of each node in the power system, P g (t) represents the output power of each generator in the system at time t; I l (t) represents the magnitude of the current flowing through each line in the system, including the real part and the imaginary part; P l (t) represents the total load in the system or the load of each node in the time period t; P r (t) represents the predicted power generation from renewable energy sources such as wind and solar energy; λ(t) represents the rate at which equipment in the system may fail; f(t) represents the operating frequency of the power system; S24. Establish observation equations, establish the relationship between state variables and observable variables, the observable variables include node voltage, line current and power, the observation equations are expressed as a set of algebraic equations, and the observation equation formula is: Z(t)=CX(t)+DU(t)+υ(t); X(t)=[V t (t),P g (t),I l (t),P l (t),P r (t),λ(t),f(t),...]; Observation models allow estimating state variables from observable variables, integrating data from different sources, and by taking into account observation noise, observation models deal with the uncertainty in actual measurements; Z(t) is the observation vector, which contains a set of variables measured directly from the power system, such as node voltage, line current, and power; C is the observation matrix, which is a coefficient matrix used to map state variables to the observation space. It defines how state variables affect observable variables; D is the direct transfer matrix, which is used to map control inputs directly to the observation space. The direct transfer matrix describes the direct impact of control inputs on observable variables; υ(t) is the observation noise, which represents the random errors and external interferences in the measurement process. The observation noise is Gaussian white noise, which has zero mean and a certain variance; S25. Construct a state space model, combine the state equation and the observation equation to construct a state space model. The state space model formula is expressed as: is the derivative of the state vector, X(t) is the state variable, A is the state matrix, B is the input matrix, U(t) is the control input vector, ω(t) is the process noise, Z(t) is the observation vector, C is the observation matrix which is a coefficient matrix, D is the direct transfer matrix, and vt) is the observation noise.
4. The method for quantitatively analyzing uncertain factors of a grid-connected entity actively connected to a power distribution system according to claim 3, characterized in that: The key indicators described in step S21 include: node voltage amplitude and phase angle, which reflect the voltage stability of the power system; generator output power, which indicates the supply capacity of the power supply; line flow, which reflects the condition of power flowing through the system; load fluctuation, which affects the supply and demand balance of the power grid; the accuracy of renewable energy power generation prediction, which affects the scheduling and planning of the power grid; equipment failure rate, which affects the reliability and maintenance requirements of the system.
5. The method for quantitatively analyzing uncertain factors of a grid-connected entity actively connected to a power distribution system according to claim 1, characterized in that: In step S3, the state space model established in step S2 is simulated using Monte Carlo simulation, and the method for estimating the failure probability includes: S31. Sampling uncertainty factors. Using the probability model established in step S1, randomly sample each uncertainty factor, and use a pseudo-random number generator to generate sample data according to the established probability model; S32. Set the number of simulations. Use the relationship between the confidence interval and the uncertainty factor sample to estimate the required number of simulations and range. The number of simulations should be large enough. The number of simulations is estimated by the following formula: N s Estimated number of simulations; Z a / 2 is the Z value corresponding to the confidence level of the normal distribution; E m It is the acceptable error range of the simulation results, also known as the half-width of the confidence interval, indicating that it is hoped that the error between the simulation results and the true value does not exceed this range. m The smaller the value, the higher the requirement for simulation accuracy. Accordingly, the number of simulations required N s The larger the N s refers to the dimension of the state vector, i.e. the number of state variables; S33. Simulate system operation. For each set of sample data of uncertain factors, input the sample data into the state space model established in step S2 to obtain the predicted values of the state variables and observed variables of the power system under the given sample of uncertain factors; S34. Determine whether the system fails. According to the preset failure criteria, determine whether the system fails under the current uncertain factor sample. The failure criteria judgment formula is: X(t)=[V t (t),P g (t),I l (t),P l (t),P r (t),λ(t),f(t),...]; S35. Statistics of failure times. Record the number of system failures; The number of system failures in all simulation samples in step S34 is counted, and the formula is expressed as: N s is the total number of simulations, F i is the failure logic variable of the ith simulation; S36. Calculate the failure probability. According to the number of failures and the total number of simulations, calculate the failure probability of the system under the influence of uncertain factors. The calculation formula is: N F is the number of failures, N s is the total number of simulations.
6. A quantitative analysis method for uncertain factors of active access of a grid-connected entity to a power distribution system according to claim 5, characterized in that: The failure conditions satisfied by X(t) include: V min ≤V i (t)≤V max ; P g,i,min (t)≤P g,i (t)≤P g,i,max (t); I l,i,max ≥I l,i (t)); P l,min ≤P l (t)≤P l,max ; P r,min ≤P r (t)≤P r,max ; λ(t)≤λ max ; f min ≤f(t)≤f max ; V min and V max are the minimum and maximum safety thresholds of the node voltage, V i (t) is the voltage of each node; P g,i,min (t) and P g,i,max (t) are the minimum and maximum output power limits of the ith generator; I l,i,max is the power flow capacity of the ith line; P l,min and P l,max is the minimum and maximum safety threshold of the load, P r,min and P r,max are the minimum and maximum safety thresholds for renewable energy generation; max is the maximum safety threshold of equipment failure rate; f min and f max are the minimum and maximum safety thresholds for system frequency.
7. The method for quantitatively analyzing uncertain factors of a grid-connected entity actively connected to a power distribution system according to claim 1, characterized in that: In step S4, the Sobol method is used to evaluate the impact of parameter changes on the system, evaluate the impact of parameter changes in the state space model on the system output, and identify the most influential uncertain factors on the system. The method includes: S41. Parameter definition: Determine the initial estimated range of each parameter based on historical data and the physical meaning of the model; S42. Conduct a sensitivity analysis experiment. Based on the state space model constructed in step S2, systematically change each parameter value of the state space model, conduct a series of simulation experiments, and record the results; S43. Calculate the sensitivity index. According to the experimental results of S42, calculate the sensitivity index to evaluate the influence of the parameters on the system. The calculation formula of the sensitivity index is: Among them, K i is a fixed parameter, Var(P F |K i |) is the fixed parameter K i Variance of failure probability at time t; Var(P F ) is the total variance of the failure probability when all parameters vary; S44. Analyze the results and, based on the size of the sensitivity index, determine which uncertainties have the greatest impact on the system and which parameters have the greatest impact on the probability of system failure, that is, identify sensitive factors.
Citation Information
Patent Citations
Power distribution system probability reliability assessing method based on analytical method
CN104376504A
Monte-Carlo simulation based small interference probability risk analysis and simulation method
CN106709641A
Wind power grid-connection system operational reliability evaluation method considering uncertainty factors
CN107681691A
Method and system for calculating and evaluating residual fatigue life of metal structure based on digital twinning
CN117594164A
Manufacturing system production scheduling and maintenance decision joint optimization method oriented to toughness guarantee
CN117973757A
Cited By
Uncertain factor quantitative analysis method for active access of grid-connected main body to power distribution system
CN119787471A