A strain model test device and method for the influence of shield attitude deviation on strata

By using arc-shaped prefabricated plates and pressure sensors in the model test device to simulate the impact of attitude offset on the formation during excavation of shield tunnels, the simulation problems in the prior art were solved, and quantitative control and stress of uneven deformation of the formation were achieved. Field monitoring.

CN118837532BActive Publication Date: 2024-12-06SOUTHWEST JIAOTONG UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411332015.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2024-12-06
Estimated Expiration
2044-09-24

AI Technical Summary

Technical Problem

Existing indoor model experiments are difficult to effectively simulate the impact of attitude shift on the formation during the excavation of shield tunnels, and there is a lack of quantitative control methods, resulting in significant differences in soil pressure distribution and theoretical design loads.

Method used

A strain model test device including support structure, arc-shaped prefabricated plate and model box was designed. By stacking the arc-shaped prefabricated plates in the sector area, and combined with pressure sensors with the support of iron sheets and rubber bands, it simulates Uneven deformation of the formation by shield posture offset.

Benefits of technology

Quantitative simulation of shield attitude offset on uneven deformation of the formation is realized, which can accurately simulate the arrangement of arc-shaped prefabricated plates around the hole, simulate the uneven deformation of the formation during excavation, and provide changes in the stress field of the formation. Real-time monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118837532B_ABST
    Figure CN118837532B_ABST
Patent Text Reader

Abstract

This invention provides a strain model test device and method for the influence of shield tunneling attitude deviation on the stratum, relating to the field of tunneling technology. The device includes a support structure, which is a hollow cylinder, uniformly divided into multiple fan-shaped regions along its cross-section; multiple arc-shaped precast slabs, arranged within the fan-shaped regions, with adjacent layers of arc-shaped precast slabs within the same fan-shaped region nested together; and arc-shaped precast slabs of the same layer within different fan-shaped regions aligned and fixedly connected; and a model box, with a circular hole on at least one side of the model box, inside which the nested support structure and multiple arc-shaped precast slabs are placed. Based on the magnitude of the uneven deformation around the tunnel, this invention arranges arc-shaped precast slabs of varying thicknesses along the tunnel circumference. By extracting the arc-shaped precast slabs buried in the stratum and combining this with the internal support structure and soil-filled model box, the excavation simulation of the uneven deformation of the stratum due to shield tunneling attitude deviation can be quantitatively achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnels, and in particular to a strain model test device and method for the influence of shield attitude deviation on strata. Background Art

[0002] With the continuous improvement of tunnel construction technology in my country, tunnel construction is gradually developing towards larger, longer and deeper directions. The shield tunnel design is also facing more complex challenges. Therefore, the environmental impact of tunnel construction is difficult to avoid. Affected by on-site construction factors, the soil pressure measured on-site in many shield tunnels is significantly different from the theoretical design load in terms of distribution and size. The shield excavation posture determines the deformation release of the stratum around the tunnel after tunnel excavation, which directly affects the distribution of water and soil pressure on the tunnel. Existing indoor model tests rarely consider the impact of posture deviation on the stratum during tunnel excavation, and lack a good simulation method to achieve quantitative control of posture deviation and deviation direction. Summary of the invention

[0003] The purpose of the present invention is to provide a strain model test device and method for the influence of shield attitude deviation on strata, so as to improve the above problems. In order to achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0004] The present application provides a strain model test device for the influence of shield attitude deviation on strata, comprising:

[0005] A supporting structure, wherein the supporting structure is a hollow cylinder and is evenly divided into a plurality of fan-shaped areas along a cross section;

[0006] A plurality of arc-shaped prefabricated panels, wherein the arc-shaped prefabricated panels are arranged in the fan-shaped area, the sizes of the arc-shaped prefabricated panels of two adjacent layers in the same fan-shaped area fit each other, the arc-shaped prefabricated panels of the same layer in different fan-shaped areas are aligned and fixedly connected, the inner surface of the innermost arc-shaped prefabricated panel in each fan-shaped area is sleeved on the outside of the support structure, and the support structure is slidably connected to the inner surface of the sleeved arc-shaped prefabricated panel;

[0007] And a model box, wherein at least one side of the model box is provided with a circular hole, the interior of the model box is filled with a model soil sample, a sleeved supporting structure and a plurality of arc-shaped prefabricated panels are arranged inside the model box, and at least one end extends to the outside of the model box through the circular hole.

[0008] Furthermore, the difference in the number of slab layers of the curved prefabricated slabs in adjacent sector-shaped areas is the same.

[0009] Furthermore, the number of plate layers of the arc-shaped prefabricated panels in the multiple sector-shaped regions is stacked along the circumferential direction, and the number of plate layers of the arc-shaped prefabricated panels in the multiple sector-shaped regions is distributed in a mirror-symmetrical manner.

[0010] Furthermore, an iron sheet is disposed in contact with the outer surface of the outermost arc-shaped prefabricated plate in each sector-shaped area, and the iron sheet is slidably connected with the abutting arc-shaped prefabricated plate.

[0011] Furthermore, the arc-shaped prefabricated board includes an arc-shaped hard-soft board and a film, the film is arranged on the outer surface of the arc-shaped hard-soft board, the side of the film close to the arc-shaped hard-soft board is a sticky surface, and the side of the film away from the arc-shaped hard-soft board is a smooth surface.

[0012] Furthermore, the center line of each arc-shaped prefabricated panel along the width direction is directly opposite to the ridge line of the fan-shaped area where it is located.

[0013] Furthermore, a plurality of rubber bands are sleeved on the outer side of the iron sheet, and pressure sensors are arranged on the rubber bands.

[0014] The present application provides a strain model test device for the influence of shield attitude deviation on strata, comprising:

[0015] Evenly dividing the support structure into a plurality of regions along the cross section to obtain a plurality of fan-shaped regions;

[0016] Obtain the shield attitude offset and the thickness of the curved precast slab in each sector area;

[0017] Based on the shield attitude offset and the plate thickness, the number of layers of arc-shaped prefabricated plates required in each sector area is calculated to obtain multiple initial plate layer numbers;

[0018] Based on the initial number of plate layers, the arc-shaped prefabricated plates are arranged in each sector-shaped area, wherein the center line of each arc-shaped prefabricated plate in the width direction is aligned with the ridge line of the target area;

[0019] The adjacent curved prefabricated panels on the same layer are fixedly connected;

[0020] Wrapping the outer surface of the arc-shaped prefabricated plate located at the outermost side of each sector area with iron sheet, and arranging a pressure sensor on the outer wall of the iron sheet;

[0021] Sleeve the rubber band on the outer wall of the iron sheet to obtain a combined body;

[0022] Fill the model box with model soil samples in layers to the lowest position of the circular holes on the side;

[0023] Put the assembly into the model box horizontally through the circular hole;

[0024] Continue to fill the remaining model soil sample into the model box;

[0025] The arc-shaped prefabricated panels are pulled out one by one.

[0026] The beneficial effects of the present invention are:

[0027] The present invention arranges arc prefabricated panels of different thicknesses along the circumference of the tunnel according to the amount of uneven deformation around the tunnel. By extracting the arc prefabricated panels buried in the stratum and combining the internal support structure and the soil filling model box, the excavation simulation of the uneven deformation of the stratum due to the shield posture deviation can be quantitatively realized.

[0028] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by implementing the embodiments of the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0030] Figure 1 It is an assembly diagram described in an embodiment of the present invention;

[0031] Figure 2 It is a three-dimensional diagram of the assembly of the supporting structure, the arc-shaped prefabricated plate, the iron sheet and the rubber band described in the embodiment of the present invention;

[0032] Figure 3 It is a schematic diagram of the arrangement of the iron sheet described in an embodiment of the present invention;

[0033] Figure 4 It is a schematic diagram of the composition of the curved prefabricated panel described in an embodiment of the present invention;

[0034] Figure 5 It is a schematic flow chart of a strain model test method for the influence of shield attitude deviation on strata described in an embodiment of the present invention;

[0035] Figure 6 A schematic diagram of the numbering of the arc-shaped prefabricated panels according to an embodiment of the present invention;

[0036] Figure 7 It is a schematic diagram of the number of uniformly drawn arc-shaped prefabricated panels described in an embodiment of the present invention;

[0037] Figure 8 A schematic diagram of the number of arc-shaped prefabricated panels in the first stage of uneven extraction according to an embodiment of the present invention;

[0038] Fig. 9 A schematic diagram of the number of arc-shaped prefabricated panels in the second stage of uneven extraction according to an embodiment of the present invention;

[0039] Fig.10 It is a schematic diagram of the number of arc-shaped prefabricated panels in the third stage of uneven extraction described in an embodiment of the present invention.

[0040] Markings in the figure:

[0041] 1. Model box; 2. Support structure; 3. Arc-shaped prefabricated board; 4. Iron sheet; 5. Rubber band; 6. Pressure sensor; 31. Arc-shaped hard-soft board; 32. Film; 41. Arch top iron sheet block; 42. Left arch waist iron sheet block; 43. Right arch waist iron sheet block; 44. Arch bottom iron sheet block. DETAILED DESCRIPTION

[0042] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0043] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0044] Embodiment 1:

[0045] This embodiment provides a strain model test device for the effect of shield attitude deviation on the stratum, see Figure 1 :

[0046] Support structure 2, the support structure 2 is a hollow cylinder, and the support structure 2 is evenly divided into a plurality of sector-shaped areas along the cross section;

[0047] A plurality of arc-shaped prefabricated panels 3 are arranged in a sector-shaped area. The sizes of the arc-shaped prefabricated panels 3 of two adjacent layers in the same sector-shaped area fit each other. The arc-shaped prefabricated panels 3 of the same layer in different sector-shaped areas are aligned and fixedly connected. The inner surface of the innermost arc-shaped prefabricated panel 3 of each sector-shaped area is sleeved on the outer side of the supporting structure 2. The supporting structure 2 is slidably connected to the inner surface of the sleeved arc-shaped prefabricated panel 3.

[0048] and a model box 1, wherein at least one side of the model box 1 is provided with a circular hole, the model box 1 is filled with a model soil sample, the sleeved support structure 2 and a plurality of arc-shaped prefabricated panels 3 are arranged inside the model box 1, and at least one end thereof extends to the outside of the model box 1 through the circular hole;

[0049] In the embodiment of the present application, the support structure 2 is simulated using a PE pipe, which is lightweight and high-strength, not easy to deform, and easy to place the model. The support structure 2 is sleeved inside the arc-shaped prefabricated panel 3, and the two can slide freely at the contact surface. The support structure 2 is divided into 12 sector-shaped areas along the cross section. The number of sector-shaped areas may be different for different geological conditions, and there is no special restriction here. Considering that the shield posture offset in different sector-shaped areas is not the same, the number of layers of arc-shaped prefabricated panels 3 set in each sector-shaped area is also different. Figure 1 As shown in , the number of layers of the curved prefabricated panels 3 located at the nine o'clock direction is significantly less than the number of layers of the curved prefabricated panels 3 located at the three o'clock direction.

[0050] The number of plate layers of the arc-shaped prefabricated panels 3 in adjacent sector-shaped regions is the same, the number of plate layers of the arc-shaped prefabricated panels 3 in multiple sector-shaped regions is stacked along the circumferential direction, and the number of plate layers of the arc-shaped prefabricated panels 3 in multiple sector-shaped regions is distributed in a mirror-symmetrical manner;

[0051] In the embodiment of the present application, under normal circumstances, the change of the shield posture offset is linear between multiple sector areas, such as Figure 2 As shown, the preset offset direction in this application is the horizontal 9 o'clock direction, and the offset is 3mm. Therefore, the minimum thickness of the filling layer composed of the arc prefabricated panels 3 is 2mm, located at the 9 o'clock direction, and the maximum thickness is 8mm, located at the 3 o'clock direction. The thickness change between the two is uniformly transitioned by using different numbers of arc prefabricated panels 3. The arc prefabricated panels 3 are assembled in a through-seam manner.

[0052] In order to appropriately reduce the gap between the circular hole of the model box 1 and the supporting structure 2, 4 layers of arc-shaped prefabricated panels 3 are evenly arranged on the outside of the supporting structure 2. Therefore, 6 arc-shaped prefabricated panels 3 are arranged at the 9 o'clock direction around the hole, and 12 arc-shaped prefabricated panels 3 are arranged at the 3 o'clock direction. From 3 o'clock to 9 o'clock, 11, 10, 9, 8, and 7 arc-shaped prefabricated panels 3 are arranged in the corresponding fan-shaped areas in the clockwise and counterclockwise directions.

[0053] The outer surface of the outermost arc-shaped prefabricated plate 3 in each sector area is abutted with an iron sheet 4, which is slidably connected to the abutted arc-shaped prefabricated plate 3; the iron sheet 4 is wrapped outside the assembled arc-shaped prefabricated plate 3, and the iron sheet 4 is a thin flexible iron sheet. The arrangement of the iron sheet 4 is as follows Figure 3 As shown, in order to prevent soil from entering the assembly gap of the iron sheet 4, the arch bottom iron sheet block 44 is arranged first, and then the left arch waist iron sheet block 42 and the right arch waist iron sheet block 43 are arranged, and the lower sides of the left arch waist iron sheet block 42 and the right arch waist iron sheet block 43 are arranged above the arch bottom iron sheet block 44, and finally the arch top iron sheet block 41 is arranged, and the left and right sides of the arch top iron sheet block 41 are respectively arranged above the left arch waist iron sheet block 42 and the right arch waist iron sheet block 43.

[0054] The arc-shaped prefabricated plate 3 comprises an arc-shaped hard-soft plate 31 and a film 32. The film 32 is arranged on the outer surface of the arc-shaped hard-soft plate 31. The side of the film 32 close to the arc-shaped hard-soft plate 31 is a sticky surface, and the side of the film 32 away from the arc-shaped hard-soft plate 31 is a smooth surface. Figure 4 As shown, the arc-shaped prefabricated plate 3 is composed of an arc-shaped hard soft plate 31 and a film 32. The arc-shaped hard soft plate 31 is a 1 mm thick PVC plate. The overall thickness of the film 32 is 0.05 mm. One side of the film 32 has a strong adhesive surface with a viscosity coefficient of 18-20 N / 4 cm, while the other side is a smooth surface with a smaller friction coefficient of 0.05-0.15.

[0055] The center line of each arc-shaped prefabricated panel 3 along the width direction is directly opposite to the ridge line of the sector-shaped area where it is located.

[0056] A plurality of rubber bands 5 are sleeved on the outer side of the iron sheet 4, and a pressure sensor 6 is arranged on the rubber band 5; Figure 2 As shown, a plurality of ultra-thin and highly elastic rubber bands 5 are also sleeved on the outside of the iron sheet 4, which are used to fix the combination of the supporting structure 2, the arc-shaped prefabricated plate 3 and the iron sheet 4, and provide the iron sheet 4 with sufficient power to shrink inward. The pressure sensor 6 arranged between the iron sheet 4 and the model soil sample can monitor the changes in the stratum stress field during the extraction of the arc-shaped prefabricated plate 3 in real time. The pressure sensor 6 can be fixed based on the rubber band 5.

[0057] Embodiment 2:

[0058] This embodiment provides a strain model test method for the influence of shield attitude deviation on strata.

[0059] See also Figure 5 , the figure shows that the method includes step S10, step S20, step S30, step S40, step S50, step S60, step S70, step S80, step S90, step S100 and step S110:

[0060] Step S10. Evenly divide the support structure 2 into multiple regions along the cross section to obtain multiple sector-shaped regions;

[0061] Step S20. Obtain the shield posture offset of each sector area and the plate thickness of the arc prefabricated plate 3;

[0062] Step S30. Based on the shield posture offset and the plate thickness, the number of layers of the arc-shaped prefabricated plate 3 required in each sector area is calculated to obtain multiple initial plate layers;

[0063] Step S40. Based on the initial number of plate layers, the curved prefabricated plates 3 are correspondingly arranged in each sector area, wherein the center line of each curved prefabricated plate 3 along the width direction is directly opposite to the ridge line of the target area;

[0064] Step S50: fixing and connecting adjacent curved prefabricated panels 3 on the same layer;

[0065] Step S60: Wrap the outer surface of the arc-shaped prefabricated plate 3 located at the outermost side of each sector area with an iron sheet 4, and set a pressure sensor 6 on the outer wall of the iron sheet 4;

[0066] Step S70. The rubber band 5 is sleeved on the outer wall of the iron sheet 4 to obtain a combined body;

[0067] Step S80. Fill the model box 1 with model soil samples in layers to the lowest position of the circular holes on the side;

[0068] Step S90. Place the assembly horizontally into the model box 1 through the circular hole;

[0069] Step S100. Continue to fill the remaining model soil sample into the model box 1;

[0070] Step S110. Pull out the arc-shaped prefabricated panels 3 in sequence;

[0071] Specifically, firstly, the number of layers of arc prefabricated panels 3 required in each sector area is determined according to the shield posture offset and the plate thickness of the arc prefabricated panels 3, and multiple arc prefabricated panels 3 are correspondingly arranged on multiple sector areas of the support structure 2, and iron sheets 4 are wrapped on the outermost arc prefabricated panels 3, and multiple rubber bands 5 are put on the iron sheets 4 to provide contraction force for the iron sheets 4. The rubber bands 5 can also be used to fix the pressure sensor 6 arranged on the outside of the iron sheets 4.

[0072] Specifically, step S110 specifically includes step S111, step S112, step S113, step S114, step S115, step S116, step S117, step S118, step S119 and step S1110:

[0073] Step S111. Determine a first sector-shaped region from the initial number of board layers in a plurality of sector-shaped regions, the first sector-shaped region being the sector-shaped region corresponding to the minimum initial number of board layers;

[0074] Step S112. Determine an initial number of layers to be drawn based on the initial number of layers in the first sector-shaped area and a preset target number of layers, where the initial number of layers to be drawn is used to characterize the difference between the initial number of layers in the first sector-shaped area and the target number of layers;

[0075] Step S113. Perform uniform pulling based on the preset pulling order and the initial number of pulled layers to obtain the first number of board layers in each sector area after pulling. Uniform pulling is used to characterize that the arc prefabricated board 3 with the initial number of pulled layers is pulled out for each sector area. The preset pulling order is set based on the principle that deformation in the gravity direction is completed first.

[0076] Specifically, Figure 6 and Figure 7 As shown, the divided sector areas are numbered respectively, P1, P2-L, P2-R, P3-L, P3-R, P4-L, P4-R, P5-L, P5-R, P6-L, P6-R, and P7.

[0077] Due to the displacement of the shield posture, when the excavation is just completed, the boundary of the stratum and the boundary of the supporting structure 2 are not in contact. At this time, the gap between the boundary of the stratum and the boundary of the supporting structure 2, that is, the gap around the hole, is unevenly distributed. Therefore, during the contraction process, the boundary of the stratum first undergoes a phased overall uniform synchronous contraction along the hole. In the experimental simulation of this application, it is considered that the preset gap corresponding to the four layers of the arc prefabricated panels 3 is 0, that is, the arc prefabricated panels 3 in each fan-shaped area need to be pulled out to a number of four.

[0078] The prefabricated layers composed of the arc prefabricated panels 3 are uniformly pulled out 2 layers along the circumference of the hole, following the principle that the deformation in the gravity direction is completed first. When the prefabricated layers are pulled out, they are pulled out alternately from left to right in accordance with the principle of gradual transition from the arch top to the arch bottom. The pulling order of each sector area is: P1, P2-L, P2-R, P3-L, P3-R, P4-L, P4-R, P5-L, P5-R, P6-L, P6-R, P7. After pulling, the following is obtained Figure 7 A schematic diagram showing the number of arc-shaped prefabricated panels 3 in multiple sector-shaped areas is shown.

[0079] Step S114. Remove the first sector area from the sequence of preset extraction orders to obtain a first extraction order;

[0080] Step S115. Single-layer extraction is performed on multiple sector-shaped regions based on the first extraction sequence to obtain the number of second board layers in each sector-shaped region after extraction;

[0081] Step S116. Determine operation: determine a plurality of second sector-shaped regions from the number of second board layers in the plurality of sector-shaped regions, the number of second board layers in the second sector-shaped regions being the target number of board layers;

[0082] Step S117. As an operation: taking the plurality of second sector-shaped areas as a sector-shaped area set;

[0083] Step S118. Removal operation: removing the fan-shaped regions in the fan-shaped region set from the sequence of the preset extraction order to obtain a second extraction order;

[0084] Step S119. Extraction operation: extracting a single layer from a plurality of sector-shaped regions based on a second extraction sequence, and obtaining an updated number of second board layers in each sector-shaped region after extraction;

[0085] Step S1110. Repeat the determination operation, the taking operation, the removal operation and the extraction operation until all the fan-shaped regions are included in the fan-shaped region set, then stop the extraction and the formation shrinkage deformation is completed;

[0086] Specifically, after the uniform shrinkage of the stratum boundary is completed, due to the uneven distribution of the excavation gap, the stratum boundary on the side of the attitude deviation direction first contacts the inner support structure, while the gaps in the other directions are reduced but not reduced to zero. At this time, the uneven shrinkage simulation begins, and the different extraction amounts are studied in stages, which is divided into three stages.

[0087] The first stage Figures 7 and 8 As shown, at this time, the preset gap amount at the 9 o'clock direction around the tunnel, that is, on the fan-shaped area P4-L, becomes zero, and the remaining gap amount at the 9 o'clock to 3 o'clock direction around the tunnel is gradually increasing. When simulating uneven stratum shrinkage, the prefabricated layer on the outer periphery of the tunnel is unevenly extracted by 2 layers along the tunnel. The first extraction order is: P1, P2-L, P2-R, P3-L, P3-R, P4-R, P5-L, P5-R, P6-L, P6-R, P7 (at this time, the gap amount on P4-L is already 0 and does not need to be extracted), and the second extraction order is: P1, P2-L, P2-R, P3-R, P4-R, P5-R, P6-L, P6-R, P7 (at this time, the gap amount on P3-L, P4-L, and P5-L is already 0 and does not need to be extracted).

[0088] The second stage Figures 8 to 9As shown, at this time, the preset gap between 7 o'clock and 11 o'clock around the hole becomes zero, and the uneven shrinkage simulation continues. The remaining prefabricated layers are unevenly extracted by 2 layers along the hole. The first extraction order is: P1, P2-R, P3-R, P4-R, P5-R, P6-R, P7 (at this time, the gap on P2-L, P3-L, P4-L, P5-L, P6-L is already 0, no extraction is required), and the second extraction order is: P2-R, P3-R, P4-R, P5-R, P6-R (at this time, the gap on P1, P2-L, P3-L, P4-L, P5-L, P6-L, P7 is already 0, no extraction is required).

[0089] The third stage Figures 9 and 10 As shown, at this time, the preset gaps between 5 o'clock and 12 o'clock and at 1 o'clock around the hole are already zero, and the uneven shrinkage simulation is continued. The remaining peripheral prefabricated layers are unevenly extracted by 2 layers along the hole. The first extraction sequence is: P3-R, P4-R, P5-R, and the second extraction sequence is: P4-R. At this point, the gaps on all fan-shaped areas have become 0, and the stratum shrinkage deformation is completed.

[0090] The above extraction sequence is the extraction sequence corresponding to the shield posture shifting toward the three o'clock direction. When the shield posture shift direction changes, the extraction sequence of the corresponding uneven shrinkage simulation will change, and no special restrictions are imposed here.

[0091] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

[0092] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A strain model test device for the effect of shield attitude deviation on strata, It is characterized in that include: A supporting structure (2), wherein the supporting structure (2) is a hollow cylinder, and the supporting structure (2) is evenly divided into a plurality of sector-shaped areas along a cross section; A plurality of arc-shaped prefabricated panels (3), wherein the arc-shaped prefabricated panels (3) are arranged in the fan-shaped area, the sizes of the arc-shaped prefabricated panels (3) of two adjacent layers in the same fan-shaped area fit each other, the arc-shaped prefabricated panels (3) of the same layer in different fan-shaped areas are aligned and fixedly connected, the inner surface of the innermost arc-shaped prefabricated panel (3) of each fan-shaped area is sleeved on the outside of the support structure (2), and the support structure (2) is slidably connected to the inner surface of the sleeved arc-shaped prefabricated panel (3); and a model box (1), wherein at least one side of the model box (1) is provided with a circular hole, the model box (1) is filled with a model soil sample, the sleeved support structure (2) and a plurality of arc-shaped prefabricated panels (3) are arranged inside the model box (1), and at least one end extends out of the model box (1) through the circular hole; According to the magnitude of the uneven deformation around the tunnel, the arc-shaped prefabricated panels (3) are arranged with different thicknesses along the tunnel; The difference in the number of plate layers of the curved prefabricated plates (3) in adjacent sector-shaped areas is the same; The number of plate layers of the arc-shaped prefabricated panels (3) in the plurality of sector-shaped regions is stacked in a circumferential direction, and the number of plate layers of the arc-shaped prefabricated panels (3) in the plurality of sector-shaped regions is distributed in a mirror-symmetrical manner.

2. The strain model test device for the influence of shield attitude deviation on strata according to claim 1, It is characterized in that An iron sheet (4) is disposed in contact with the outer surface of the outermost arc-shaped prefabricated plate (3) in each sector-shaped area, and the iron sheet (4) is slidably connected to the arc-shaped prefabricated plate (3) in contact therewith.

3. The strain model test device for the influence of shield attitude deviation on strata according to claim 1, It is characterized in that The arc-shaped prefabricated plate (3) comprises an arc-shaped hard-soft plate (31) and a film (32), wherein the film (32) is arranged on the outer surface of the arc-shaped hard-soft plate (31), the side of the film (32) close to the arc-shaped hard-soft plate (31) is a sticky surface, and the side of the film (32) away from the arc-shaped hard-soft plate (31) is a smooth surface.

4. The strain model test device for the effect of shield attitude deviation on strata according to claim 1, It is characterized in that The center line of each arc-shaped prefabricated plate (3) along the width direction is directly opposite to the center ridge line of the sector-shaped area where it is located.

5. The strain model test device for the influence of shield attitude deviation on strata according to claim 2, It is characterized in that A plurality of rubber bands (5) are sleeved on the outer side of the iron sheet (4), and a pressure sensor is arranged on the rubber bands (5).

6. A strain model test method for the effect of shield attitude deviation on strata, suitable for use in the strain model test device for the effect of shield attitude deviation on strata as claimed in any one of claims 1 to 5, It is characterized in that include: The supporting structure (2) is evenly divided into a plurality of regions along the cross section to obtain a plurality of sector-shaped regions; Obtaining the shield attitude offset and the plate thickness of the arc-shaped prefabricated plate (3) in each sector area; Based on the shield attitude offset and the plate thickness, the number of layers of the arc-shaped prefabricated plate (3) required in each sector area is calculated to obtain a plurality of initial plate layer numbers; Based on the initial number of plate layers, the arc-shaped prefabricated plates (3) are correspondingly arranged in each sector-shaped area, wherein the center line of each arc-shaped prefabricated plate (3) along the width direction is directly opposite to the ridge line of the target area; The adjacent curved prefabricated panels (3) located on the same layer are fixedly connected; Wrapping the outer surface of the arc-shaped prefabricated plate (3) located at the outermost side of each sector-shaped area with an iron sheet (4), and arranging a pressure sensor on the outer wall of the iron sheet (4); The rubber band (5) is sleeved on the outer wall of the iron sheet (4) to obtain a combined body; Filling the model box (1) with model soil samples in layers to the lowest position of the circular holes on the side; Putting the assembly horizontally into the model box (1) through the circular hole; Continuing to fill the remaining model soil sample into the model box (1); The arc-shaped prefabricated panels (3) are pulled out in sequence.

7. The strain model test method for the effect of shield attitude deviation on strata according to claim 6, It is characterized in that Sequentially pulling out the arc-shaped prefabricated panels (3) comprises: Determine a first sector-shaped region from the initial number of board layers in the plurality of sector-shaped regions, the first sector-shaped region being the sector-shaped region corresponding to the minimum initial number of board layers; Determine an initial number of layers to be drawn based on the initial number of layers in the first sector-shaped area and a preset target number of layers, wherein the initial number of layers to be drawn is used to represent the difference between the initial number of layers in the first sector-shaped area and the target number of layers; Uniform drawing is performed based on a preset drawing sequence and the initial number of drawn layers to obtain the first number of plate layers in each sector area after drawing. The uniform drawing is used to characterize the arc prefabricated plate (3) in which the initial number of drawn layers is drawn for each sector area. The preset drawing sequence is set based on the principle that deformation in the gravity direction is completed first.

8. The strain model test method for the influence of shield attitude deviation on strata according to claim 7, It is characterized in that Uniform drawing is performed based on the preset drawing sequence and the initial number of drawn layers to obtain the first number of board layers in each sector area after drawing, and then the following steps are included: Removing the first sector-shaped area from the sequence of the preset extraction order to obtain a first extraction order; Performing single-layer extraction on a plurality of fan-shaped regions based on the first extraction sequence to obtain the number of second board layers in each fan-shaped region after extraction; Determine operation: determine a plurality of second sector-shaped regions from the number of second board layers in the plurality of sector-shaped regions, the number of second board layers in the second sector-shaped regions being the target number of board layers; As an operation: taking the plurality of second fan-shaped areas as a fan-shaped area set; Removal operation: removing the fan-shaped areas in the fan-shaped area set from the sequence of the preset extraction order to obtain a second extraction order; Extraction operation: extract a single layer from multiple fan-shaped areas based on the second extraction sequence to obtain the updated second board layer number in each fan-shaped area after extraction. The determining operation, the taking operation, the removing operation and the extracting operation are repeated until all the fan-shaped areas are included in the fan-shaped area set, and then the extracting is stopped and the formation shrinkage and deformation is completed.