Garden construction management is prevented from slipping and is drained with floor brick
By designing covering components and movable brick reset spring structures on garden paving bricks, the problems of unstable paving brick laying and poor drainage were solved, thereby improving ground safety and drainage efficiency.
Patent Information
- Application Number
- CN202411077068.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-08-07
AI Technical Summary
Existing garden paving bricks are prone to being washed away by rainwater during installation, causing the foundation to sink and affecting the stability and safety of the paving bricks. At the same time, snow accumulation can easily block drainage ditches, affecting drainage efficiency.
The first and second covering parts on the main body of the floor tile press down on the fixing blocks of adjacent floor tiles to ensure the stability of the floor tiles. Through the design of movable tiles and return springs, the drainage channel is automatically adjusted when there is a large amount of snow or rainwater to prevent blockage and improve drainage efficiency.
It effectively prevents paving stones from lifting and tripping pedestrians, ensures the ground is stable, and drains water quickly during snow or heavy rain, avoiding foundation damage and blockage by water and snow accumulation, thus improving safety and drainage performance.
Smart Images

Figure CN118854733B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of garden paving technology, and in particular to a non-slip and drainage paving brick for garden construction and management. Background Technology
[0002] Floor tiles are a type of floor decoration material, also called floor bricks. They are made from clay and are hard, pressure-resistant, wear-resistant, and moisture-proof. Some are glazed for decorative purposes. Floor tiles come in a wide variety of colors and patterns, offering a large selection. Based on material, they can be divided into glazed tiles, unglazed tiles, polished tiles, vitrified tiles, etc. They are widely used in public and residential buildings, and are frequently used in gardens and roadside greenbelts. Nowadays, with increasing emphasis on greenery, urban gardens are becoming more and more common. To facilitate walking in these gardens, a large number of floor tiles are laid during their construction. However, considering the frequent watering of gardens and the fact that water cannot drain quickly during rainy weather, which can affect pedestrian traffic, a spaced-out stacking method is often used during installation. This method is inconvenient and poses a safety hazard such as falls. Furthermore, this method easily creates muddy surfaces, significantly impacting usability. The existing publication number is CN201721174601.X
[0003] A type of anti-slip drainage paving brick for garden construction management, while convenient for use with the bricks to effectively improve drainage and accelerate the drainage rate, leaves gaps between the bricks during installation. This allows rainwater to easily erode the foundation during heavy rains, causing the soil within the foundation to sink, making the paving bricks unstable and prone to tripping, thus posing a safety hazard. Another example is existing publication number CN201920393911.3.
[0004] This invention relates to a non-slip drainage paving brick for garden construction and management. The brick has several long grooves on its upper surface, creating an uneven surface that increases friction. It also has several raised points on its surface, with the upper surfaces of these points not aligned with the brick's surface. These raised points further enhance friction and improve slip resistance. While the structure is simple, it is suitable for rainy or snowy weather. However, during snowfall, snow can easily accumulate in the long grooves after being trampled by pedestrians, causing blockages and hindering drainage. To address these issues, this application proposes a non-slip drainage paving brick for garden construction and management. Summary of the Invention
[0005] (I) Purpose of the Invention
[0006] To address the technical problems existing in the background art, this invention proposes an anti-slip drainage paving brick for garden construction management. By having a first and second covering piece on the paving brick body press down on a first and second fixing block on adjacent paving brick bodies, the paving brick body becomes more stable and less prone to tilting, effectively preventing pedestrians from tripping and making it safer and more reliable. It also prevents rainwater from eroding the foundation, causing pits and damage to the paving brick body. Furthermore, when snow accumulates and the rainwater volume is high, stepping on the movable brick and squeezing the return spring causes the movable brick to descend, connecting the rectangular drainage hole on the adjusting brick with the drainage groove on the paving brick body, accelerating drainage. When the return spring returns to its original position and pushes the movable brick back to its original position, the movable brick pushes out the snow blocking the drainage ditch, further accelerating drainage and achieving good drainage effect.
[0007] (II) Technical Solution
[0008] This invention provides a non-slip and drainage paving brick for garden construction management, comprising a paving brick body, an adjustable brick, a movable brick, a first fixing block, a second fixing block, a first covering component, a second covering component, a drainage ditch, a raised strip, a fixing component, a return spring, a limiting slider, and a raised block;
[0009] The first and second fixing blocks are disposed on the main body of the floor tile, and the first and second fixing blocks are located on adjacent sides of the main body of the floor tile; the first and second covering pieces are disposed on the main body of the floor tile and located on adjacent sides of the main body of the floor tile, and the first covering piece is located on the opposite side of the first fixing block, and the second covering piece is located on the opposite side of the second fixing block; the protruding strip is disposed on the main body of the floor tile and forms a drainage ditch; the main body of the floor tile is provided with a frustum-shaped groove and a drainage groove; the adjusting brick is slidably disposed on the main body of the floor tile, and the adjusting brick is provided with a rectangular drainage hole; the rectangular drainage hole is connected to the drainage groove on the main body of the floor tile; the adjusting brick is provided with a limiting piece, and the main body of the floor tile is provided with a sliding groove, and the limiting piece is slidably disposed on the main body of the floor tile and located in the sliding groove;
[0010] The limiting slider is set on the movable brick, and the adjusting brick is provided with a limiting groove. The limiting slider is slidably set on the adjusting brick and located in the limiting groove. The fixing part is slidably set on the adjusting brick, and the return spring is set on the fixing part and abuts against the movable brick. The protrusions are set on the movable brick, and the number of protrusions is multiple and evenly distributed.
[0011] Preferably, the inner arc-shaped groove on the main body of the floor tile allows the adjusting tile to slide into the arc-shaped groove after it rotates, thus securing the adjusting tile to the main body of the floor tile.
[0012] Preferably, it also includes a covering block, which is disposed on the main body of the floor tile and is respectively attached to the first fixing block and the second fixing block.
[0013] Preferably, the first fixing block and the second fixing block are at the same height, the first covering member and the second covering member are at the same height, and the top end of the first fixing block and the bottom end of the first covering member are at the same height.
[0014] Preferably, the main body of the floor tile is provided with four sets of drainage grooves, and the four sets of drainage grooves are arranged in a circular array on the main body of the floor tile.
[0015] Preferably, the adjusting brick is provided with four sets of limiting grooves, and the limiting grooves are arranged in a ring array on the adjusting brick and located in the middle of adjacent rectangular drainage holes.
[0016] Preferably, the fixing member is provided with a cylindrical groove, and the reset spring is slidably disposed on the fixing member and located in the cylindrical groove.
[0017] Preferably, the return spring is provided with an anti-corrosion sleeve, and the return spring is a stainless steel spring.
[0018] Preferably, it also includes the method of using anti-slip and drainage paving bricks for garden construction management, including the following specific steps;
[0019] S1. When starting to lay the tiles, first prepare the foundation to make the ground level, then lay the main body of the tiles on the foundation, and then press the first and second fixing blocks with the first and second covering pieces on the adjacent tiles to prevent the tiles from loosening.
[0020] S2. Then, place the return spring into the cylindrical groove on the fixing part, and place the fixing part into the frustum groove of the main body of the floor tile.
[0021] S3. Slide the movable brick onto the adjusting brick using the limit slider, then slide the adjusting brick onto the main body of the floor tile and slide the fixing piece onto the adjusting brick so that the return spring abuts against the movable brick.
[0022] S4. Rotate the adjusting brick so that the limiting piece on the adjusting brick slides into the arc-shaped groove on the main body of the floor tile, and fix the adjusting brick on the main body of the floor tile to complete the installation.
[0023] Compared with the prior art, the above-mentioned technical solution of the present invention has the following beneficial technical effects: By pressing the first covering member 7 and the second covering member 8 on the main body of the floor tile against the first fixing block 4 and the second fixing block 5 on the adjacent main body of the floor tile, the main body of the floor tile 1 becomes more stable and less prone to tilting, effectively preventing pedestrians from tripping and making it safer and more reliable. At the same time, it prevents rainwater from washing away the foundation, causing the foundation to become pitted and easily damaging the main body of the floor tile 1. On the other hand, when snow accumulates and blocks the drainage ditch or when there is a large amount of rainwater, stepping on the movable brick 3 and squeezing the return spring 15 causes the movable brick 3 to descend, making the rectangular drainage hole 12 on the adjusting brick 2 and the drainage groove 10 on the main body of the floor tile 1 connect, thus accelerating drainage. When the return spring 15 returns to its original position and pushes the movable brick 3 to return to its original position, the movable brick 3 pushes out the ice block blocking the drainage ditch 9, accelerating the melting speed of the ice block and the flow of ice water, preventing the accumulation of ice water to thaw and block the drainage outlet on the main body of the floor tile 1, resulting in good drainage effect. Attached Figure Description
[0024] Figure 1 This is a structural schematic diagram of an anti-slip and drainage paving brick for garden construction management proposed in this invention.
[0025] Figure 2 This is a schematic diagram of the structure of a non-slip drainage paving brick for garden construction management proposed in this invention.
[0026] Figure 3 This is a cross-sectional structural diagram of an anti-slip and drainage paving brick for garden construction management proposed in this invention.
[0027] Figure 4 This is a rendering of the effect of laying anti-slip and drainage paving bricks for garden construction management proposed in this invention.
[0028] Reference numerals in the attached drawings: 1. Main body of the floor tile; 2. Adjustable tile; 3. Movable tile; 4. First fixing block; 5. Second fixing block; 6. Covering block; 7. First covering component; 8. Second covering component; 9. Drainage ditch; 10. Drainage channel; 11. Protrusion; 12. Rectangular drainage hole; 13. Limiting groove; 14. Fixing component; 15. Return spring; 16. Limiting slider; 17. Protrusion. Detailed Implementation
[0029] like Figure 1-4 As shown, the present invention proposes a non-slip drainage paving brick for garden construction management, comprising a paving brick body 1, an adjusting brick 2, a movable brick 3, a first fixing block 4, a second fixing block 5, a first covering part 7, a second covering part 8, a drainage ditch 9, a protruding strip 11, a fixing part 14, a return spring 15, a limiting slider 16, and a protrusion 17.
[0030] The first fixing block 4 and the second fixing block 5 are disposed on the tile body 1, and the first fixing block 4 and the second fixing block 5 are located on adjacent sides of the tile body 1; the first covering member 7 and the second covering member 8 are disposed on the tile body 1 and located on adjacent sides of the tile body 1, and the first covering member 7 is located on the opposite side of the first fixing block 4, and the second covering member 8 is located on the opposite side of the second fixing block 5; the protruding strip 11 is disposed on the tile body 1 and forms a drainage ditch 9; the tile body 1 is provided with a frustum-shaped groove and a drainage groove 10, the adjusting brick 2 is slidably disposed on the tile body 1, and the adjusting brick 2 is provided with a rectangular drainage hole 12; the rectangular drainage hole 12 is connected to the drainage groove 10 on the tile body 1; the adjusting brick 2 is provided with a limiting member, the tile body 1 is provided with a sliding groove, and the limiting member is slidably disposed on the tile body 1 and located in the sliding groove;
[0031] The limiting slider 16 is set on the movable brick 3, and the adjusting brick 2 is provided with a limiting groove 13. The limiting slider 16 is slidably set on the adjusting brick 2 and located in the limiting groove 13. The fixing member 14 is slidably set on the adjusting brick 2, and the return spring 15 is set on the fixing member 14 and abuts against the movable brick 3. The protrusion 17 is set on the movable brick 3, and the number of protrusions 17 is multiple and evenly distributed.
[0032] In an optional embodiment, the sliding groove on the tile body 1 has an arc-shaped sliding groove. After the adjusting tile 2 rotates, the limiting member on the adjusting tile 2 slides into the arc-shaped sliding groove and locks the adjusting tile 2 onto the tile body 1, preventing the return spring 15 from lifting the adjusting tile 2.
[0033] In an optional embodiment, a covering block 6 is also included. The covering block 6 is disposed on the tile body 1 and is attached to the first fixing block 4 and the second fixing block 5 respectively to prevent rainwater from directly eroding the foundation.
[0034] In an optional embodiment, the first fixing block 4 and the second fixing block 5 are at the same height, the first covering member 7 and the second covering member 8 are at the same height, and the top end of the first fixing block 4 and the bottom end of the first covering member 7 are at the same height, so that the first covering member 7 and the second covering member 8 can press down on the first fixing block 4 and the second fixing block 5, prevent the single tile body 1 from protruding, reduce the number of pedestrian tripping incidents, and make it safer.
[0035] In an optional embodiment, the tile body 1 is provided with four sets of drainage channels 10, and the four sets of drainage channels 10 are arranged in a circular array on the tile body 1.
[0036] In an optional embodiment, the adjusting brick 2 is provided with four sets of limiting grooves 13, and the limiting grooves 13 are arranged in a ring array on the adjusting brick 2 and located in the middle of adjacent rectangular drainage holes 12.
[0037] In an optional embodiment, the fixing member 14 is provided with a cylindrical groove, and the reset spring 15 is slidably disposed on the fixing member 14 and located in the cylindrical groove to prevent the reset spring 15 from sliding and deforming laterally.
[0038] In an optional embodiment, the return spring 15 is provided with an anti-corrosion sleeve, and the return spring 15 is a stainless steel spring, which is corrosion resistant and extends service life.
[0039] This invention also proposes a method for using anti-slip and drainage paving bricks for garden construction management, including the following specific steps;
[0040] S1. When starting to lay the bricks, first prepare the foundation to make the ground level, then lay the brick body 1 on the foundation, and then press the brick body 1 against the first fixing block 4 and the second fixing block 5 by the first covering piece 7 and the second covering piece 8 on the adjacent brick body 1 to prevent the brick body 1 from loosening.
[0041] S2. Then, place the return spring 15 into the cylindrical groove on the fixing member 14, and place the fixing member 14 into the frustum groove of the main body 1 of the floor tile.
[0042] S3. Slide the movable brick 3 onto the adjusting brick 2 via the limiting slider 16, then slide the adjusting brick 2 onto the floor tile body 1 and slide the fixing piece 14 onto the adjusting brick 2, so that the return spring 15 abuts against the movable brick 3.
[0043] S4. Rotate the adjusting brick 2 so that the limiting piece on the adjusting brick 2 slides into the arc-shaped groove on the tile body 1, and fix the adjusting brick 2 on the tile body 1 to complete the installation.
[0044] In this invention, the first cover 7 and the second cover 8 on the main body of the floor tile press down on the first fixing block 4 and the second fixing block 5 on the adjacent main bodies of the floor tile, making the main body of the floor tile 1 more stable and less prone to tilting, effectively preventing pedestrians from tripping and making it safer and more reliable. At the same time, it prevents rainwater from washing away the foundation, causing the foundation to become pitted and easily damaged. On the other hand, when snow accumulates and blocks the drainage ditch or when there is a large amount of rainwater, stepping on the movable brick 3 and squeezing the return spring 15 causes the movable brick 3 to descend, making the rectangular drainage hole 12 on the adjusting brick 2 connect with the drainage groove 10 on the main body of the floor tile 1, thus accelerating drainage. When the return spring 15 returns to its original position and pushes the movable brick 3 to return to its original position, the movable brick 3 pushes out the ice block blocking the drainage ditch 9, accelerating the melting speed of the ice block and the flow of ice water, preventing the accumulation of ice water to thaw and block the drainage outlet on the main body of the floor tile 1, resulting in good drainage effect.
Claims
1. A type of anti-slip and drainage paving brick for garden construction and management, characterized in that, It includes the main body of the floor tile (1), the adjusting tile (2), the movable tile (3), the first fixing block (4), the second fixing block (5), the first covering part (7), the second covering part (8), the drainage ditch (9), the protrusion (11), the fixing part (14), the reset spring (15), the limiting slider (16), and the protrusion (17); The first fixing block (4) and the second fixing block (5) are disposed on the tile body (1), and the first fixing block (4) and the second fixing block (5) are located on adjacent sides of the tile body (1); the first covering piece (7) and the second covering piece (8) are disposed on the tile body (1) and located on adjacent sides of the tile body (1), and the first covering piece (7) is located on the opposite side of the first fixing block (4), and the second covering piece (8) is located on the opposite side of the second fixing block (5); the protruding strip (11) is disposed on... A drainage ditch (9) is formed on the main body of the floor tile (1); a frustum-shaped groove and a drainage ditch (10) are provided on the main body of the floor tile (1), and an adjusting brick (2) is slidably set on the main body of the floor tile (1), and a rectangular drainage hole (12) is provided on the adjusting brick (2); the rectangular drainage hole (12) is connected to the drainage ditch (10) on the main body of the floor tile (1); a limiting member is provided on the adjusting brick (2), and a sliding groove is provided on the main body of the floor tile (1), and the limiting member is slidably set on the main body of the floor tile (1) and located in the sliding groove; The limiting slider (16) is set on the movable brick (3), and the adjusting brick (2) is provided with a limiting groove (13). The limiting slider (16) is slidably set on the adjusting brick (2) and located in the limiting groove (13); the fixing part (14) is slidably set on the adjusting brick (2), and the return spring (15) is set on the fixing part (14) and abuts against the movable brick (3); the protrusions (17) are set on the movable brick (3), and the number of protrusions (17) is multiple and equidistantly distributed.
2. The anti-slip and drainage paving brick for garden construction management according to claim 1, characterized in that, The groove on the main body of the floor tile (1) is an arc-shaped groove. After the adjusting tile (2) rotates, the limiting piece on the adjusting tile (2) slides into the arc-shaped groove and fastens the adjusting tile (2) onto the main body of the floor tile (1).
3. The anti-slip and drainage paving brick for garden construction management according to claim 1, characterized in that, It also includes a covering block (6), which is set on the main body of the floor tile (1) and is attached to the first fixing block (4) and the second fixing block (5) respectively.
4. The anti-slip and drainage paving brick for garden construction management according to claim 1, characterized in that, The first fixing block (4) and the second fixing block (5) are at the same height, the first covering part (7) and the second covering part (8) are at the same height, and the top end of the first fixing block (4) and the bottom end of the first covering part (7) are at the same height.
5. The anti-slip and drainage paving brick for garden construction management according to claim 1, characterized in that, The main body of the floor tile (1) is provided with four sets of drainage channels (10), and the four sets of drainage channels (10) are arranged in a ring on the main body of the floor tile (1).
6. The anti-slip and drainage paving brick for garden construction management according to claim 1, characterized in that, The adjusting brick (2) is provided with four sets of limiting slide grooves (13), and the limiting slide grooves (13) are arranged in a ring on the adjusting brick (2) and located in the middle of the adjacent rectangular drainage holes (12).
7. The anti-slip and drainage paving brick for garden construction management according to claim 1, characterized in that, The fixing member (14) is provided with a cylindrical groove, and the reset spring (15) is slidably disposed on the fixing member (14) and located in the cylindrical groove.
8. The anti-slip and drainage paving brick for garden construction management according to claim 1, characterized in that, The return spring (15) is provided with an anti-corrosion sleeve, and the return spring (15) is a stainless steel spring.
9. The method of using anti-slip and drainage paving bricks for garden construction management according to any one of claims 1-8, characterized in that, The specific steps include the following: S1. When starting to lay the bricks, first prepare the foundation to make the ground level, then lay the brick body (1) on the foundation, and then press the brick body (1) against the first fixing block (4) and the second fixing block (5) by the first covering piece (7) and the second covering piece (8) on the adjacent brick body (1); to prevent the brick body (1) from loosening. S2. Then, place the return spring (15) into the cylindrical groove on the fixing part (14) and place the fixing part (14) into the frustum groove of the floor tile body (1); S3. Slide the movable brick (3) onto the adjusting brick (2) via the limiting slider (16), then slide the adjusting brick (2) onto the floor tile body (1) and slide the fixing piece (14) onto the adjusting brick (2) so that the return spring (15) abuts against the movable brick (3). S4. Rotate the adjusting brick (2) so that the limiting piece on the adjusting brick (2) slides into the arc-shaped groove on the tile body (1) and fix the adjusting brick (2) on the tile body (1) to complete the installation.
Citation Information
Patent Citations
Garden construction management is with anti -skidding drainage ceramic tile
CN207331407U
Rotary self-water-absorption floor tile
CN111041933A
Municipal road water permeable brick
CN115233511A
