Cyclone dam building dynamic feed pressure automatic regulating device and method of use thereof
By using a dynamic automatic feed pressure adjustment device for hydrocyclone dam construction, and utilizing the principles of inverted U-shaped tubes and communicating vessels, the problems of energy waste and terrain-related construction limitations in hydrocyclone dam construction have been solved, achieving energy conservation, consumption reduction, and simplified construction of hydrocyclone dam construction.
Patent Information
- Application Number
- CN202411121251.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-08-15
AI Technical Summary
Existing hydrocyclone dam construction technology suffers from energy waste and terrain-related construction limitations, especially the high-level stabilizing box technology, which results in high energy consumption, frequent relocation, and large land occupation.
An automatic pressure regulating device for dynamic ore feeding using hydrocyclones is adopted. Utilizing the principle of an inverted U-shaped tube and communicating vessels, the device adjusts the pipeline connection between the pressure stabilizing box and the hydrocyclone to achieve on-demand adjustment of the hydrocyclone dam pressure, thereby reducing the use of high-level pressure stabilizing boxes.
This technology achieves energy conservation and consumption reduction in hydrocyclone dam construction, reduces construction difficulty and cost, reduces the costs of frequent relocation and land acquisition, lowers energy consumption and operational difficulty, and improves the flexibility and efficiency of hydrocyclone dam construction.
Smart Images

Figure CN118874710B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of hydrocyclone dam construction. Background Technology
[0002] After the beneficiation process, the tailings of various metal and non-metal minerals are discharged to tailings ponds for disposal and storage. In the wet tailings pond process, each phase of the sub-dam usually adopts the hydrocyclone dam construction process, in which the tailings are dewatered by the hydrocyclone and piled on the surface of the previous phase sub-dam to form a new phase sub-dam.
[0003] Currently, most mines conventionally use a high-level pressure stabilizing tank feeding process, which has a single pressure regulation method. To meet the process requirements of 1~1.5 bar for hydrocyclone dam construction, the high-level pressure stabilizing tank needs to be about 30m higher than the sub-dam. This process has two obvious drawbacks: 1. Significant energy waste. In the initial stage of relocation of the high-level pressure stabilizing tank, there is a certain amount of elevation margin, which causes the slurry to be pumped to an unnecessary elevation. During the production and transportation process, energy is wasted, and the operating pressure of the pumping station and pipeline system is increased, resulting in greater wear. At the same time, because the elevation of the pressure stabilizing tower is relatively fixed, the pressure of the hydrocyclone dam cannot be adjusted as needed, resulting in unnecessary energy waste.
[0004] 2. Severe terrain and construction limitations. The high-level surge tank technology requires placing the surge tank in a high, fixed position, necessitating the construction of a new tower structure on the dam within the reservoir area, and even requiring additional land acquisition at a higher elevation outside the reservoir area. In either case, this results in more frequent surge tank relocation construction. In extreme cases, it may be impossible to acquire additional land, preventing the elevation of the surge tank from being increased. This situation is more pronounced in tailings dams in their later stages of service, as the elevation of the sub-dams may continue to rise, potentially leaving no suitable high ground to place the surge tank. Summary of the Invention
[0005] The technical problem to be solved by the present invention is: how to solve the drawbacks of conventional processes mentioned in the background art, such as high energy consumption, frequent relocation, and large footprint.
[0006] The technical solution adopted in this invention is: an automatic adjustment device for dynamic ore feeding pressure in hydrocyclone dam construction, comprising a sealed pressure stabilizing box 1, a pressurizing device, an inlet pipe 6, an outlet pipe 7, and a connecting pipe 8. The pressurizing device is an inverted U-shaped pipe 3 fixed to the ground. The top of the inverted U-shaped pipe 3 has an exhaust pipe or exhaust hole 2. The pressure stabilizing box 1 is connected to a slurry pumping station through the inlet pipe 6. The pressure stabilizing box 1 is connected to a hydrocyclone 5 used for dam construction through the outlet pipe 7. The pressure stabilizing box 1 is connected to the left side pipe of the inverted U-shaped pipe 3 through the connecting pipe 8. The right side pipe of the inverted U-shaped pipe 3 has an overflow pipe 4 that is inclined downward or horizontal. The inlet pipe 6 has an inlet pipe stop valve 9. The outlet pipe 7 has an outlet pipe stop valve 11. The connecting pipe 8 has a connecting pipe stop valve 10. The horizontal height difference between any two connection ports of the inlet pipe 6, outlet pipe 7, and connecting pipe 8 on the pressure stabilizing box 1 is less than 1 meter.
[0007] The left and right sides of the inverted U-shaped tube 3 are connected and reinforced by a stabilizing tie rod 13.
[0008] A method for using a hydrocyclone dam-building dynamic feed pressure automatic adjustment device involves establishing an inverted U-shaped pipe 3 of appropriate height according to the required dam height of the new phase sub-dam; under normal production conditions, the feed pipe shut-off valve 9, the connecting pipe shut-off valve 10, and the discharge pipe shut-off valve 11 are all in the open state, and the hydrocyclone 5 and the slurry pump station are activated to form the new phase sub-dam on the surface of the previous phase sub-dam; when there is no need for dam building or direct discharge of slurry, the connecting pipe shut-off valve 10 is closed; during different dam building stages, as the dam-building hydrocyclone moves away from the pressure stabilizing box, the friction resistance along the pipeline increases, and the required dam building pressure can be stabilized simply by increasing the delivery pressure of the slurry pump station.
[0009] The height of the inverted U-shaped tube 3 is calculated as follows: Step 1: Reynolds number of pipeline under different working conditions and flow states: Re = ρvd / μ, where ρ is the specific gravity of the slurry, v is the slurry flow velocity in the discharge pipe, d is the pipe diameter of the discharge pipe, and μ is the viscosity of the slurry. Step 2: Calculate the pipe friction coefficient f using the following formula.
[0010] Where ε is the roughness of the pipe inner wall; Step 3: Calculate the friction loss HfL from the outlet pipe connection of the pressure stabilizing box to the farthest end of the hydrocyclone used for dam construction. HfL = f*(l / d)*(v 2 / 2g), where l is the length from the outlet pipe connection of the pressure stabilizing box to the farthest pipe of the hydrocyclone used for dam construction, and g is the local gravitational acceleration.
[0011] Step 4: The height of the inverted U-shaped pipe is the sum of the friction loss HfL along the pipeline from the outlet of the pressure stabilizing box to the farthest end of the hydrocyclone for dam construction and the elevation margin, where the elevation margin is 3-5 meters.
[0012] The beneficial effects of this invention are: This invention ingeniously utilizes the incompressibility, continuous stability and communicating vessel principle of fluid substances to develop a new method and process for automatically adjusting the feed pressure of hydrocyclone dam construction, which truly realizes the "on-demand supply" of pipeline pressure in hydrocyclone dam construction process, and solves the drawbacks of conventional processes such as high energy consumption, frequent relocation and large land occupation.
[0013] The implementation of this invention is not limited by terrain conditions, the construction is simple, and it saves engineering costs caused by frequent relocation construction and potential land acquisition costs; the process is smooth, and the pipeline pressure of the hydrocyclone dam construction process is automatically supplied "on demand", reducing unnecessary energy consumption; the operation is convenient, eliminating the risk of hydrocyclone and pipeline blockage during dam construction, and reducing the difficulty and labor intensity of the operation.
[0014] Calculations show that after implementing this dynamic automatic feed pressure process, the average slurry lifting height can be reduced by 15-20 meters during the tailings transportation and dam construction production cycle, based on a transportation flow rate of 1000 m³ / h. 3 Based on a slurry concentration of 50%, the annual electricity savings are approximately 500,000 yuan. Assuming a service life of 10 years for the tailings dam, the cumulative electricity savings would be 5 million yuan. Furthermore, during the 10-year service period, the number of times the voltage stabilizing tower needs to be relocated can be reduced by at least 2. The engineering construction costs and land acquisition costs are even more substantial. Attached Figure Description
[0015] Figure 1 This is a schematic diagram of the overall structure of the device of the present invention; Among them, 1. pressure stabilizing box, 2. exhaust pipe or exhaust hole, 3. inverted U-shaped pipe, 4. overflow pipe, 5. hydrocyclone, 6. feed pipe, 7. discharge pipe, 8. connecting pipe, 9. feed pipe shut-off valve, 10. connecting pipe shut-off valve, 11. discharge pipe shut-off valve, 12. concrete foundation; 13. stabilizing tie rod. Detailed Implementation
[0016] like Figure 1 As shown, a dynamic automatic feed pressure regulating device for hydrocyclone damming includes a sealed pressure stabilizing tank 1, a pressure boosting device, a feed pipe 6, a discharge pipe 7, and a connecting pipe 8. The biggest difference between this invention and the prior art is the addition of a pressure boosting device. This device adjusts the pressure in the pressure stabilizing tank 1 to meet the requirements, avoiding the need to place the pressure stabilizing tank 1 at a high position and reducing production costs.
[0017] The pressurization device is an inverted U-shaped pipe 3 fixed to the ground. Using an inverted U-shaped pipe 3 as a pressurization device has two advantages: firstly, the stability is strong after both branch pipes are fixed through the concrete foundation 12; secondly, compared with pressurization through a single pipe, the inner diameter of the inverted U-shaped pipe 3 is reduced by half or more. In this embodiment, the inner diameter of the inverted U-shaped pipe 3 is selected as 80cm.
[0018] The top of the inverted U-shaped tube 3 has an exhaust pipe or exhaust hole 2. The purpose of the exhaust pipe or exhaust hole 2 is to exhaust air so that the pressure of the slurry in the inverted U-shaped tube 3 can be balanced with the pressure in the pressure stabilizing box 1, thereby enabling the construction of an inverted U-shaped tube 3 at a suitable height according to the pressure requirements in the pressure stabilizing box 1.
[0019] The pressure stabilizing box 1 is connected to the slurry pumping station through the feed pipe 6. The pressure stabilizing box 1 is connected to the hydrocyclone 5 used for dam construction through the discharge pipe 7. The pressure stabilizing box 1 is connected to the left side pipe of the inverted U-shaped pipe 3 through the connecting pipe 8. The right side pipe of the inverted U-shaped pipe 3 has an overflow pipe 4 that is inclined downward or horizontal.
[0020] The feed pipe 6 has a feed pipe shut-off valve 9, the discharge pipe 7 has a discharge pipe shut-off valve 11, and the connecting pipe 8 has a connecting pipe shut-off valve 10. The horizontal height difference between any two connection ports of the feed pipe 6, discharge pipe 7, and connecting pipe 8 on the pressure stabilizing box 1 is less than 1 meter. In one embodiment, the openings of the feed pipe 6, discharge pipe 7, and connecting pipe 8 are at the same horizontal height.
[0021] The left and right sides of the inverted U-shaped tube 3 are connected and reinforced by a stabilizing tie rod 13.
[0022] A method for using a hydrocyclone dam-building dynamic feed pressure automatic adjustment device involves establishing an inverted U-shaped pipe 3 of appropriate height according to the required dam height of the new phase sub-dam, extending from the top of the inverted U-shaped pipe 3 to the opening of a pipe. Under normal production conditions, the feed pipe shut-off valve 9, the connecting pipe shut-off valve 10, and the discharge pipe shut-off valve 11 are all open, and the hydrocyclone 5 and the slurry pump station are activated to form the new phase sub-dam on the surface of the previous phase sub-dam. When dam-building is not required or slurry is directly discharged, the connecting pipe shut-off valve 10 is closed. During different dam-building stages, as the dam-building hydrocyclone moves away from the pressure stabilizing box, the friction resistance along the pipeline increases, and the required dam-building pressure can be stabilized simply by increasing the slurry pump station's delivery pressure.
[0023] The required height of the inverted U-shaped tube 3 is calculated as follows: Step 1: Reynolds number of pipeline under different working conditions and flow states: Re = ρvd / μ, where ρ is the specific gravity of the slurry, v is the slurry flow velocity in the discharge pipe, d is the pipe diameter of the discharge pipe, and μ is the viscosity of the slurry. Step 2: Calculate the pipe friction coefficient f using the following formula.
[0024] Where ε is the roughness of the inner wall of the pipe; where ρ is the specific gravity of the slurry, v is the slurry flow velocity of the discharge pipe, d is the pipe diameter of the discharge pipe, and μ is the viscosity of the slurry, all of which are known quantities.
[0025] Step 3: Calculate the friction loss HfL from the outlet pipe connection of the pressure stabilizing box to the farthest end of the hydrocyclone used for dam construction. HfL = f*(l / d)*(v 2 / 2g), where l is the length from the outlet pipe connection of the pressure stabilizing box to the farthest pipe of the hydrocyclone used for dam construction, and g is the local gravitational acceleration.
[0026] Step 4: The height of the inverted U-shaped pipe is the sum of the friction loss HfL along the pipeline from the outlet of the pressure stabilizing box to the farthest end of the hydrocyclone for dam construction and the elevation margin, where the elevation margin is 3-5 meters.
[0027] In one embodiment, taking the tailings dam construction process of an iron ore mine as an example, the transportation and dam construction process parameters are as follows: The slurry pumping station has a delivery flow rate of 630 m³ / h. 3 The parameters are as follows: slurry concentration (45-52%), slurry specific gravity (1.4-1.6), slurry pump station outlet pressure (3.9 MPa), slurry pump station elevation (1350 m), slurry cross-country pipeline length (from the outlet pipe connection of the pressure stabilizing box to the farthest end of the hydrocyclone used for dam construction) (7.9 km), outlet pipe diameter (φ325 m), pipe inner wall roughness (known), tailings main dam elevation (1410 m), pressure stabilizing box platform elevation (1425 m), dam construction length (1.5 km), hydrocyclone dam construction pressure (1.3-1.5 bar). Based on the final calculations, the height of the booster pipe (height of the inverted U-shaped pipe) was selected as 25 m. The above process has been operating continuously and efficiently for over one year.
Claims
1. An automatic adjustment device for dynamic feed pressure in hydrocyclone dam construction, characterized in that: The system includes a sealed pressure stabilizing tank (1), a pressurizing device, a feed pipe (6), a discharge pipe (7), and a connecting pipe (8). The pressurizing device is an inverted U-shaped pipe (3) fixed to the ground. The top of the inverted U-shaped pipe (3) has an exhaust pipe or exhaust hole (2). The pressure stabilizing tank (1) is connected to a slurry pumping station through the feed pipe (6). The pressure stabilizing tank (1) is connected to a hydrocyclone (5) used for dam construction through the discharge pipe (7). The pressure stabilizing tank (1) is connected to the connecting pipe (8). The left side of the inverted U-shaped pipe (3) is connected to the right side of the inverted U-shaped pipe (3), and an overflow pipe (4) is provided on the right side of the inverted U-shaped pipe (3) that is inclined downward or horizontal. The feed pipe (6) has a feed pipe stop valve (9), the discharge pipe (7) has a discharge pipe stop valve (11), and the connecting pipe (8) has a connecting pipe stop valve (10). The horizontal height difference between any two connection ports of the feed pipe (6), discharge pipe (7), and connecting pipe (8) on the pressure stabilizing box (1) is less than 1 meter.
2. The automatic adjustment device for dynamic feed pressure in hydrocyclone damming according to claim 1, characterized in that: The left and right sides of the inverted U-shaped tube (3) are reinforced by a stabilizing tie rod (13).
3. A method of using the hydrocyclone dam-building dynamic feed pressure automatic adjustment device as described in claim 1, characterized in that: According to the required dam height of the new phase sub-dam, an inverted U-shaped pipe (3) of appropriate height is built; under normal production conditions, the feed pipe stop valve (9), the connecting pipe stop valve (10), and the discharge pipe stop valve (11) are all in the open state, and the hydrocyclone (5) and the slurry pump station are turned on to form the new phase sub-dam on the surface of the previous phase sub-dam; when there is no need to build a dam or direct discharge of slurry, the connecting pipe stop valve (10) is closed; at different dam construction periods, as the dam construction hydrocyclone moves away from the pressure stabilizing box, the friction resistance of the pipeline increases, and the required dam construction pressure can be stabilized by simply increasing the slurry pump station delivery pressure.
4. The method of using the automatic adjustment device for dynamic feed pressure in hydrocyclone dam construction according to claim 3, characterized in that: The height of the inverted U-shaped tube (3) is calculated as follows: Step 1: Reynolds number of pipeline under different working conditions and flow states: Re = ρvd / μ, where ρ is the specific gravity of the slurry, v is the slurry flow velocity in the discharge pipe, d is the pipe diameter of the discharge pipe, and μ is the viscosity of the slurry. Step 2: Calculate the pipe friction coefficient f using the following formula. , where ε is the roughness of the pipe inner wall; Step 3: Calculate the friction loss HfL from the outlet pipe connection of the pressure stabilizing box to the farthest end of the hydrocyclone used for dam construction. HfL = f*(l / d)*(v 2 / 2g), where l is the length from the outlet pipe connection of the pressure stabilizing box to the farthest pipe of the hydrocyclone used for dam construction, and g is the local gravitational acceleration; Step 4: The height of the inverted U-shaped pipe (3) is the sum of the friction loss HfL from the outlet pipe connection of the pressure stabilizing box to the farthest pipe of the hydrocyclone for dam construction and the elevation margin, wherein the elevation margin is 3-5 meters.
Citation Information
Patent Citations
Sludge suction and backwashing device of horizontal flow sedimentation tank
CN212395987U
Device for controlling tailing cyclone classification coarse sand yield
CN221108548U