New energy automobile axle forming die and application method
Patent Information
- Application Number
- CN202410991594.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2026-10-20
- Estimated Expiration
- 2044-07-23
AI Technical Summary
[0002]车架是汽车中最重要的承载部件,而桥架又是其中的关键零件之一,在汽车上起到重要的承载作用,桥架通常用低合金钢板冲压而成,断面形状一般为槽型,整体窄长并且呈现一定弧度;目前,对于汽车桥架的冲压加工时进行定位的定位模具,由于产品形状呈异形,且槽本身深度会较大,单纯依靠定位针等进行定位难以达到较好的定位效果,需要一种针对桥架加工定位的新能源汽车桥架成型模具及应用方法
[0017]本发明的有益效果在于:工件由机械手夹持并移动放置在第一仿形浮动块和第二仿形浮动块上,由第一仿形浮动块和第二仿形浮动块上的定位靠块和定位针对工件进行粗定位并提供支撑力;合模时,上模下行,上模上的压料板压持工件,并带动第一仿形浮动块和第二仿形浮动块下行,下行到位后工件由第一仿形浮动块、第二仿形浮动块、第一仿形定位块、第二仿形定位块、第三仿形定位块和第四仿形定位块进行进一步定位;同时,第一仿形浮动块和第二仿形浮动块触发控制单元,充放气单元运行对气胀管组件进行充气并保持压力,气胀管组件膨胀对工件的中间段进行定位;开模时,第一仿形浮动块和第二仿形浮动块依靠弹性件作用复位并解除对控制单元的触发状态,充放气单元运行对气胀管组件进行放气;
Smart Images

Figure CN118875152B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of automotive hardware processing technology, and more specifically, to a new energy vehicle bridge forming mold and its application method. Background Technology
[0002] The chassis is the most important load-bearing component in a car, and the bridge is one of its key parts, playing a vital role in load-bearing. Bridges are usually stamped from low-alloy steel plates, with a generally channel-shaped cross-section that is narrow, long, and curved. Currently, the positioning molds used for positioning during the stamping process of automotive bridges are not ideal due to the irregular shape of the product and the considerable depth of the channel itself. Simply relying on positioning pins or similar tools is insufficient to achieve a satisfactory positioning effect. Therefore, a new energy vehicle bridge forming mold and its application method are needed for positioning during bridge processing. Summary of the Invention
[0003] The technical problem to be solved by the present invention is to provide a new energy vehicle bridge forming mold and a method for applying the new energy vehicle bridge forming mold, in view of the above-mentioned defects of the prior art.
[0004] The technical solution adopted by this invention to solve its technical problem is:
[0005] A molding die for a new energy vehicle bridge frame is constructed, comprising a lower die, wherein a first contouring positioning block, a second contouring positioning block, a third contouring positioning block, and a fourth contouring positioning block are sequentially arranged on the lower die; the first and fourth contouring positioning blocks are respectively used for contouring positioning of the two ends of the vehicle bridge frame; the second and third contouring positioning blocks are used for contouring positioning of the middle of the vehicle bridge frame; a first contouring floating block is arranged between the first and second contouring positioning blocks; and a third and fourth contouring positioning block are arranged between... A second contour floating block is provided between the first and second contour floating blocks; positioning blocks and positioning pins are provided on both sides of the upper surface of the first and second contour floating blocks; an air-expanding positioning component is connected between the second and third contour positioning blocks, the air-expanding positioning component includes an air-expanding tube assembly, an air-expanding unit for inflating and deflating the air-expanding tube assembly, and a control unit for triggering the operation of the air-expanding unit. The air-expanding tube assembly is strip-shaped and is composed of multiple segments of air-expanding tubes with adjustable angles. The control unit is triggered by the first and second contour floating blocks together.
[0006] The new energy vehicle bridge forming mold of the present invention includes two adjacent air expansion tubes connected by a hose; a locking screw is fixed on the lower surface of the air expansion tube, and an anti-slip pad is sleeved on the locking screw; the lower mold is provided with an installation chamber for installing the inflation / deflation unit, and the lower end of the locking screw passes through the installation chamber and is sleeved with a locking nut.
[0007] The new energy vehicle bridge forming mold of the present invention includes an inflation / deflation needle tube inserted inside the locking screw, which is connected to the air expansion tube and the inflation / deflation end of the inflation / deflation unit.
[0008] The new energy vehicle bridge forming mold of the present invention includes a control unit comprising a first distance sensor for detecting the position of the first conforming floating block and a second distance sensor for detecting the position of the second conforming floating block, and controlling the operation of the inflation / deflation unit based on the signals received from the first distance sensor and the second distance sensor.
[0009] The new energy vehicle bridge forming mold of the present invention has a first receiving hole for installing the first distance sensor and a second receiving hole for installing the second distance sensor on the side wall of the mounting chamber.
[0010] The new energy vehicle bridge forming mold of the present invention includes a detachable cover plate on the lower mold to cover the mounting chamber, and a through hole for the locking screw to pass through.
[0011] The new energy vehicle bridge forming mold of the present invention includes a punch seat for lateral punching of the middle section of the workpiece and a side punch that cooperates with the punch seat on the lower mold. The side punch is obliquely slidably disposed on the lower mold. The punch seat is provided with a through hole for the adjacent hose to pass through.
[0012] A method for applying a molding die for a new energy vehicle bridge, wherein the method includes the following steps:
[0013] The workpiece is gripped and moved by the robot and placed on the first and second contour floating blocks. The positioning blocks and positioning objects on the first and second contour floating blocks provide coarse positioning and support for the workpiece.
[0014] When the mold is closed, the upper mold moves downward, the pressure plate on the upper mold holds the workpiece, and drives the first and second contour floating blocks to move downward. After the workpiece is in place, it is further positioned by the first contour floating block, the second contour floating block, the first contour positioning block, the second contour positioning block, the third contour positioning block and the fourth contour positioning block.
[0015] At the same time, the first and second contour floating blocks trigger the control unit, and the inflation and deflation unit operates to inflate the air expansion tube assembly and maintain the pressure. The air expansion tube assembly expands to position the middle section of the workpiece.
[0016] When the mold is opened, the first and second contour floating blocks are reset by the action of the elastic element and the trigger state of the control unit is released. The inflation and deflation unit runs to deflate the air expansion tube assembly.
[0017] The beneficial effects of this invention are as follows: the workpiece is gripped and moved by a robotic arm and placed on the first and second contour floating blocks. The positioning blocks and positioning targets on the first and second contour floating blocks provide coarse positioning and support for the workpiece. When the mold is closed, the upper mold moves downward, the pressure plate on the upper mold holds the workpiece, and drives the first and second contour floating blocks to move downward. After moving to the correct position, the workpiece is further positioned by the first, second, first, second, third, and fourth contour floating blocks. At the same time, the first and second contour floating blocks trigger the control unit, and the inflation / deflation unit operates to inflate the air expansion tube assembly and maintain pressure. The air expansion tube assembly expands to position the middle section of the workpiece. When the mold is opened, the first and second contour floating blocks reset by the action of elastic elements and release the trigger state of the control unit. The inflation / deflation unit operates to deflate the air expansion tube assembly.
[0018] By applying the method of this application, the material is received and positioned by the first and second contour floating blocks during the feeding stage. During the mold closing stage, the first, second, first, second, third, and fourth contour floating blocks are used for further positioning. The air expansion tube assembly is used for inflation positioning and state maintenance. This method can effectively achieve the positioning and processing of long and narrow hardware parts such as automotive bridges. Moreover, the air expansion tube assembly has a certain degree of adaptability and can be applied to the processing of various workpieces. It can effectively reduce mold costs. The air expansion tube assembly can also absorb the lateral stress during product processing to a certain extent, thereby improving the stability of product processing. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the present invention will be further described below in conjunction with the accompanying drawings and embodiments. The drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort:
[0020] Figure 1 This is a schematic diagram of the structure of a new energy vehicle bridge forming mold according to a preferred embodiment of the present invention (the air expansion positioning component is not shown);
[0021] Figure 2 This is a cross-sectional view of the air expansion positioning component assembly of the new energy vehicle bridge forming mold according to a preferred embodiment of the present invention. Detailed Implementation
[0022] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, a clear and complete description will be provided below in conjunction with the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the protection scope of the present invention.
[0023] The preferred embodiment of the new energy vehicle bridge forming mold of the present invention, such as Figure 1 As shown, see also Figure 2 The system includes a lower mold 1, on which a first contouring positioning block 10, a second contouring positioning block 11, a third contouring positioning block 12, and a fourth contouring positioning block 13 are sequentially arranged. The first contouring positioning block 10 and the fourth contouring positioning block 13 are used for contouring positioning of both ends of the vehicle bridge 4, respectively. The second contouring positioning block 11 and the third contouring positioning block 12 are used for contouring positioning of the middle (near the end) of the vehicle bridge 4. A first contouring floating block 14 is arranged between the first contouring positioning block 10 and the second contouring positioning block 11, and a second contouring floating block 15 is arranged between the third contouring positioning block 12 and the fourth contouring positioning block 13. The purpose of this design is that the first contouring floating block 14 is contacted by the first contouring positioning block 10 and the second contouring positioning block 11. The two sides of the workpiece are positioned relatively accurately by relying on the third contour positioning block 12 and the fourth contour positioning block 13 to position the two sides of the workpiece in contact with the second contour floating block 15. Positioning blocks 140 and positioning pins 141 are provided on both sides of the upper surface of the first contour floating block 14 and the second contour floating block 15. An air expansion positioning component 2 is connected between the second contour positioning block 11 and the third contour positioning block 12. The air expansion positioning component 2 includes an air expansion tube component 20, an air inflation / deflation unit 21 for inflating and deflation of the air expansion tube component 20, and a control unit for triggering the operation of the air inflation / deflation unit. The air expansion tube component 20 is strip-shaped and is composed of multiple sections of air expansion tubes 200 with adjustable angles. The control unit is triggered by the first contour floating block 14 and the second contour floating block 15.
[0024] The workpiece is held and moved by the robot arm and placed on the first contour floating block 14 and the second contour floating block 15. The positioning blocks 140 and positioning pins 141 on the first contour floating block 14 and the second contour floating block 15 provide coarse positioning and support for the workpiece.
[0025] When the mold is closed, the upper mold moves downwards. The pressure plate on the upper mold (using a contouring pressure plate) holds the workpiece and drives the first contouring floating block 14 and the second contouring floating block 15 to move downwards. After moving to the correct position, the workpiece is further positioned by the first contouring floating block 14, the second contouring floating block 15, the first contouring positioning block 10, the second contouring positioning block 11, the third contouring positioning block 12, and the fourth contouring positioning block 13.
[0026] At the same time, the first contour floating block 14 and the second contour floating block 15 trigger the control unit, and the inflation and deflation unit 21 operates to inflate the air expansion tube assembly 20 and maintain the pressure. The air expansion tube assembly 20 expands to position the middle section of the workpiece.
[0027] When the mold is opened, the first contour floating block 14 and the second contour floating block 15 are reset and released from the trigger state of the control unit by the action of the elastic element (the spring of the floating block). The inflation and deflation unit 21 runs to deflate the air expansion tube assembly 20.
[0028] By applying the method of this application, the material is received and positioned by the first contour floating block 14 and the second contour floating block 15 during the feeding stage. During the mold closing stage, the first contour floating block 14, the second contour floating block 15, the first contour positioning block 10, the second contour positioning block 11, the third contour positioning block 12, and the fourth contour positioning block 13 are used for further positioning. The air expansion tube assembly 20 is used for inflation positioning and state maintenance. This method can effectively achieve the positioning and processing of long and narrow hardware parts such as automotive bridges. Moreover, the air expansion tube assembly has a certain degree of adaptability and can be used for processing various workpieces. It can effectively reduce mold costs. The air expansion tube assembly can also absorb the lateral stress during product processing to a certain extent, thereby improving the stability of product processing.
[0029] Preferably, two adjacent air expansion tubes 200 are connected by a flexible hose 201; a locking screw 202 is fixed on the lower surface of the air expansion tube 200, and an anti-slip pad 203 is sleeved on the locking screw 202; an installation chamber 16 for installing the inflation / deflation unit is provided on the lower mold 1, and the lower end of the locking screw 202 passes through the installation chamber 16 and is sleeved with a locking nut 17; an inflation / deflation needle tube 204 passes through the inside of the locking screw 202, and the inflation / deflation needle tube 204 connects the air expansion tube and the inflation / deflation end of the inflation / deflation unit; using this... This design allows for quick adjustment of the orientation of the air expansion tube 200 through the cooperation of the locking nut 17 and the locking screw 202. The anti-slip pad 203 is used to prevent the locking screw 202 from loosening. The inflation / deflation needle tube 204 can easily inflate and deflate the air expansion tube 200. The structure is reasonable and compact, occupying little space. Furthermore, the lower mold 1 is provided with a detachable cover plate 18 for the sealing chamber 16. The cover plate 18 is provided with a through hole 180 for the locking screw 202 to pass through, making debugging and maintenance more convenient.
[0030] Preferably, the control unit includes a first distance sensor 220 for detecting the position of the first contour floating block 14 and a second distance sensor 221 for detecting the position of the second contour floating block 15, and controls the operation of the inflation / deflation unit 21 based on the signals received from the first distance sensor 220 and the second distance sensor 221; the side wall of the mounting chamber 16 is provided with a first receiving hole for mounting the first distance sensor and a second receiving hole for mounting the second distance sensor; the structure is simple, the control is convenient, and it does not affect the normal mold opening and closing operation.
[0031] Preferably, the lower die 1 is provided with a punching seat 19 for lateral punching of the middle section of the workpiece and a side punch 3 that cooperates with the punching seat. The side punch 3 is obliquely slidably disposed on the lower die 1. The punching seat 19 is provided with a through hole 190 for the adjacent hose to pass through. This facilitates lateral punching. It should be noted that this component is an optional component and can be provided as needed.
[0032] A method for applying a molding die for a new energy vehicle bridge, using the molding die for a new energy vehicle bridge as described above, wherein the method includes the following steps:
[0033] The workpiece is gripped and moved by the robot and placed on the first and second contour floating blocks. The positioning blocks and positioning objects on the first and second contour floating blocks provide coarse positioning and support for the workpiece.
[0034] When the mold is closed, the upper mold moves downward, the pressure plate on the upper mold holds the workpiece, and drives the first and second contour floating blocks to move downward. After the workpiece is in place, it is further positioned by the first contour floating block, the second contour floating block, the first contour positioning block, the second contour positioning block, the third contour positioning block and the fourth contour positioning block.
[0035] At the same time, the first and second contour floating blocks trigger the control unit, and the inflation and deflation unit operates to inflate the air expansion tube assembly and maintain the pressure. The air expansion tube assembly expands to position the middle section of the workpiece.
[0036] When the mold is opened, the first and second contour floating blocks are reset by the action of the elastic element and the trigger state of the control unit is released. The inflation and deflation unit runs to deflate the air expansion tube assembly.
[0037] By applying the method of this application, the material is received and positioned by the first and second contour floating blocks during the feeding stage. During the mold closing stage, the first, second, first, second, third, and fourth contour floating blocks are used for further positioning. The air expansion tube assembly is used for inflation positioning and state maintenance. This method can effectively achieve the positioning and processing of long and narrow hardware parts such as automotive bridges. Moreover, the air expansion tube assembly has a certain degree of adaptability and can be applied to the processing of various workpieces. It can effectively reduce mold costs. The air expansion tube assembly can also absorb the lateral stress during product processing to a certain extent, thereby improving the stability of product processing.
[0038] It should be understood that those skilled in the art can make improvements or modifications based on the above description, and all such improvements and modifications should fall within the protection scope of the appended claims.
Claims
1. A molding die for a new energy vehicle bridge frame, comprising a lower die, characterized in that, The lower mold is sequentially provided with a first contouring positioning block, a second contouring positioning block, a third contouring positioning block, and a fourth contouring positioning block; the first and fourth contouring positioning blocks are used for contouring positioning of both ends of the vehicle bridge frame; the second and third contouring positioning blocks are used for contouring positioning of the middle of the vehicle bridge frame; a first contouring floating block is provided between the first and second contouring positioning blocks, and a second contouring floating block is provided between the third and fourth contouring positioning blocks; positioning blocks and positioning pins are provided on both sides of the upper surface of the first and second contouring floating blocks; an air-expanding positioning assembly is connected between the second and third contouring positioning blocks, the air-expanding positioning assembly includes an air-expanding tube assembly, an air-expanding unit for inflating and deflating the air-expanding tube assembly, and a control unit for triggering the operation of the air-expanding unit; the air-expanding tube assembly is strip-shaped and composed of multiple segments of air-expanding tubes with adjustable angles; the control unit is triggered by the first and second contouring floating blocks.
2. The new energy vehicle bridge forming mold according to claim 1, characterized in that, The two adjacent air expansion tubes are connected by a hose; a locking screw is fixed on the lower surface of the air expansion tube, and an anti-slip pad is fitted on the locking screw; the lower mold is provided with an installation chamber for installing the inflation / deflation unit, and the lower end of the locking screw passes through the installation chamber and is fitted with a locking nut.
3. The new energy vehicle bridge forming mold according to claim 2, characterized in that, The locking screw is equipped with an inflation / deflation needle tube, which is connected to the air expansion tube and the inflation / deflation end of the inflation / deflation unit.
4. The new energy vehicle bridge forming mold according to claim 2, characterized in that, The control unit includes a first distance sensor for detecting the position of the first contour floating block and a second distance sensor for detecting the position of the second contour floating block, and controls the operation of the inflation / deflation unit based on the signals received from the first distance sensor and the second distance sensor.
5. The new energy vehicle bridge forming mold according to claim 4, characterized in that, The side wall of the installation chamber is provided with a first receiving hole for installing the first distance sensor and a second receiving hole for installing the second distance sensor.
6. The new energy vehicle bridge forming mold according to claim 2, characterized in that, The lower mold is provided with a detachable cover plate that seals the mounting chamber, and the cover plate is provided with a through hole for the locking screw to pass through.
7. The new energy vehicle bridge forming mold according to claim 2, characterized in that, The lower die is provided with a punching seat for lateral punching of the middle section of the workpiece and a lateral punch that cooperates with the punching seat. The lateral punch is obliquely slidably disposed on the lower die. The punching seat is provided with a through hole for the adjacent hose to pass through.
8. A method for applying a new energy vehicle bridge forming mold, wherein the new energy vehicle bridge forming mold as described in any one of claims 1-7 is used, characterized in that, The method includes the following steps: The workpiece is gripped and moved by the robot and placed on the first and second contour floating blocks. The positioning blocks and positioning objects on the first and second contour floating blocks provide coarse positioning and support for the workpiece. When the mold is closed, the upper mold moves downward, the pressure plate on the upper mold holds the workpiece, and drives the first and second contour floating blocks to move downward. After the workpiece is in place, it is further positioned by the first contour floating block, the second contour floating block, the first contour positioning block, the second contour positioning block, the third contour positioning block and the fourth contour positioning block. At the same time, the first and second contour floating blocks trigger the control unit, and the inflation and deflation unit operates to inflate the air expansion tube assembly and maintain the pressure. The air expansion tube assembly expands to position the middle section of the workpiece. When the mold is opened, the first and second contour floating blocks are reset by the action of the elastic element and the trigger state of the control unit is released. The inflation and deflation unit runs to deflate the air expansion tube assembly.
Citation Information
Patent Citations
Automatic disassembling and assembling equipment for balance block matched in drive axle finish machining procedure
CN112719852A
Automobile drive axle axle housing body forming die
CN205763386U