A deep hole blasting method for comprehensively grasping fissure conditions

By setting observation holes at intervals between blasting holes and using borehole inspection instruments and water-based fluorescent tracers, the problem of inaccurate observation of fractures after deep-hole blasting was solved, enabling accurate detection of the fracture propagation range, guiding subsequent construction, reducing maintenance costs of adjacent roadways, and improving safety.

CN118882425BActive Publication Date: 2026-11-20SHANXI JINMEI GRP TECH RESEACH INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410972687.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2026-11-20
Estimated Expiration
2044-07-19

AI Technical Summary

Technical Problem

In existing technologies, the observation of cracks after deep hole blasting is affected by the inspection process and environment, resulting in inaccurate observation of the crack expansion range, which cannot effectively guide on-site construction and poses safety hazards.

Method used

Observation holes are set at intervals between blast holes. Using a borehole sight and water injection for observation, combined with a water-based fluorescent tracer, the crack propagation is observed through ultraviolet fluorescent lamps, providing comprehensive detection results.

Benefits of technology

This enabled accurate understanding of the blasting fracture situation, guiding the next stage of construction, reducing maintenance costs of adjacent roadways, and improving safety and construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118882425B_ABST
    Figure CN118882425B_ABST
Patent Text Reader

Abstract

The present application is a kind of deep hole blasting method for comprehensively grasping fissure conditions, and belongs to the technical field of coal mine blasting mining. The purpose is to provide a kind of blasting method, which can comprehensively detect the blasting effect after blasting, and the detection results can effectively guide the next step of field construction. The technical scheme is as follows: first, fully investigate the geological conditions of the site production; second, set a row of drill holes on the roof strata, including blasting holes and observation holes; third, drill holes with a drilling machine; fourth, use a borehole viewer to observe and record the development of primary fissures in the drill hole; fifth, charge the blasting holes and seal the holes; sixth, blast; seventh, use the borehole viewer to observe and record the expansion of fissures in all observation holes; eighth, water injection observation is carried out on all observation holes; ninth, the above observation results provide reference for the next section of roadway drilling and blasting, and the initial parameters are corrected. The present application is used for hard roof deep hole blasting pressure relief.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a deep-hole blasting method for comprehensively understanding fracture conditions, belonging to the field of coal mine blasting and mining technology. Background Technology

[0002] my country's coal resources are found in diverse forms, with hard roof coal seams accounting for over 30%. In hard roof coal mining faces, due to the support of the coal pillar sidewalls in the retreat roadways and the high-strength support of the roof at the end of the roadway, the roof at the end often cannot collapse in time, easily leading to overhanging at the end. Sudden collapse of the overhanging roof can abruptly expel toxic and harmful gases from the goaf into the coal face, causing safety problems. This is especially true in high-gas mines, where the sudden influx of gas from the goaf into the coal face can cause gas levels to exceed limits, creating safety hazards and severely impacting safe production. Furthermore, the sudden fracture and collapse of the overhanging roof can generate sparks from the collision of falling rocks, potentially inducing an explosion of accumulated gas in the goaf. For multi-roadway working faces, overhanging roofs also increase the transmission of mine pressure from the overlying strata towards the coal pillar, leading to severe deformation of adjacent roadways, increased maintenance workload, and seriously affecting safe and efficient mine production.

[0003] To address roof overhang and improve the maintenance of adjacent roadways, blasting to relieve pressure on the roof is often necessary. Deep-hole blasting offers advantages such as good pre-splitting effect, minimal dynamic disturbance, controlled levels of toxic and harmful gases, and high safety, leading to its increasing use in treating hard roofs. To improve blasting effectiveness, a subset of blast holes is drilled first, and the fracture conditions are observed afterward. The aim is to adjust the parameters for the next blast based on the observed fracture conditions. Currently, fracture assessment involves visually inspecting the blast holes after blasting. However, due to limitations in inspection technology and the working environment, the results are often unsatisfactory due to the influence of water and coal slag, and the extent of fracture propagation cannot be observed. Consequently, the results of fracture inspection cannot effectively guide on-site construction. Summary of the Invention

[0004] To address the shortcomings of existing technologies, the present invention aims to provide a deep-hole blasting method that comprehensively assesses the fracture conditions. Observation holes spaced apart from the blasting holes allow for comprehensive monitoring of the blasting effect after blasting, and the monitoring results can effectively guide subsequent on-site construction.

[0005] To achieve the above objectives, the present invention adopts the following technical solution: a deep-hole blasting method for comprehensively understanding the fracture situation, comprising the following steps:

[0006] The first step is to conduct a thorough investigation of the on-site production geological conditions, systematically collect information on the mining and roadway layout of adjacent working faces, the development of roof strata and their various physical and mechanical properties, etc., to provide a basis for setting drilling parameters;

[0007] The second step is to select a roadway of 80-150m in length, and set a row of boreholes along the roadway direction on the roof rock layer at a distance of 700-1500mm from the side wall of the roadway coal pillar. The boreholes are spaced 1-3m apart and include blasting holes and observation holes, which are set at intervals.

[0008] The third step is to drill holes using a drilling rig;

[0009] The fourth step is to use a borehole inspection instrument to observe and record the development of the original fractures in each borehole, and at the same time, to understand the situation of borehole collapse, and to re-drill boreholes with collapse.

[0010] Fifth, all blasting holes are loaded with explosive charges using shaped charge tubes, which are inserted into the blasting holes in one go, and the holes are sealed with stemming clay.

[0011] The sixth step is to detonate the blasting holes;

[0012] Step 7: After the fumes and other harmful gases have dissipated, use a borehole inspection instrument to observe and record the crack propagation in all observation holes.

[0013] The eighth step is to inject water into all observation holes and mix water-based fluorescent tracers into the water. After the water injection is completed, use ultraviolet fluorescent lamps to observe the water seepage from the roof of the tunnel, determine the expansion of cracks in the blast holes, and understand the range of crack expansion in the holes.

[0014] The ninth step involves using the observation results from steps four, seven, and eight above to provide a reference for the drilling parameters and the spacing of the blasting hole observation holes in the next section of the roadway. If the results meet expectations, drilling and blasting will proceed in the next section of the roadway. If there are deviations from expectations, the drilling parameters and the spacing of the blasting hole observation holes will be corrected before drilling and blasting in the next section of the roadway can proceed.

[0015] Preferably, in the second step, the interval between the blasting holes and the observation holes is as follows: every 3 or 4 blasting holes form a group, and one observation hole is set between two groups of blasting holes. The observation hole is not filled with explosives.

[0016] Preferably, the diameter of the borehole in the second step is 40-80mm, and the depth is 3-5 times the mining height.

[0017] Preferably, the diameter of the drilled hole is 60 mm.

[0018] Preferably, in the second step, the drilling direction is as follows: in the roadway cross-section diagram, the angle α between the borehole and the vertical direction is 0°-15° towards the goaf; in the roadway centerline cross-section diagram, the angle β between the borehole and the horizontal direction is 60°-75°.

[0019] Preferably, in the fifth step, the charging method is a non-coupled continuous charging, and the sealing hole length is 1 / 3 to 1 / 2 of the blast hole depth.

[0020] Preferably, the blasting shaped charge tube used in the fifth step is a C-type shaped charge tube.

[0021] Preferably, in the sixth step, when blasting the blasting holes, the blasting is carried out in groups, with two groups of blasting holes being detonated at once.

[0022] Preferably, the method for performing water injection observations at the observation well in the eighth step is as follows:

[0023] A capsule sealer is installed inside the observation well. Water is injected into the capsule sealer, which then seals the observation well tightly against the well wall. Then, 3-5 MPa high-pressure water mixed with water-based fluorescent tracer is injected into the observation well for at least 20 minutes.

[0024] Preferably, the method for water injection observation of the observation hole in the eighth step further includes: determining the key observation location based on the observation results of the seventh step, installing a straddle-type expansion packer at the key observation location, first injecting water into the straddle-type expansion packer to seal the hole, and then injecting 3-5 MPa high-pressure water mixed with water-based fluorescent tracer into the packer section for at least 20 minutes.

[0025] Compared with the prior art, the present invention has the following beneficial effects.

[0026] 1. This invention solves the problem of overhang at the end by deep-hole blasting pressure relief, while protecting adjacent roadways and reducing the maintenance costs of adjacent roadways.

[0027] 2. In this invention, an observation hole is set between the two sets of blasting holes. The observation hole is not filled with explosives. After blasting, the condition of the cracks and the range of crack propagation in the observation hole are observed by drilling sight and water injection, so as to obtain more comprehensive test results and provide effective guidance for the next step of on-site blasting.

[0028] 3. In this invention, during water injection observation, a water-based fluorescent tracer is mixed into the water. The water seepage in the blasting cracks on the roadway roof can be easily observed with an ultraviolet fluorescent lamp, which can be clearly distinguished from the water spraying in the mine, making the detection of the crack expansion range after blasting more accurate. Attached Figure Description

[0029] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings used in the embodiments will be briefly introduced below.

[0030] Figure 1 This is a schematic diagram of the spacing between blasting holes and observation holes in a tunnel cross-section.

[0031] Figure 2 This is a cross-sectional view of the tunnel.

[0032] Figure 3 This is a schematic diagram illustrating the sealing and water injection of the observation hole using a capsule sealing device in this invention.

[0033] Figure 4 This is a schematic diagram of the capsule sealing device used in this invention.

[0034] Figure 5 This is a schematic diagram illustrating the use of a straddle-type expansion packer to seal and inject water into the observation hole in this invention.

[0035] Figure 6 This is a schematic diagram of the structure of the straddle-type expansion packer used in this invention.

[0036] Figure 7 This is a cross-sectional view of the C-shaped energy-concentrating tube used in this invention.

[0037] In the diagram: 1 is the blast hole, 2 is the observation hole, 3 is the capsule sealing device, 31 is the first capsule, 32 is the first internal water injection pipe, 33 is the first high-pressure water injection pipe, 4 is the straddle-type expansion packer, 41 is the second capsule, 42 is the second internal water injection pipe, 43 is the second high-pressure water injection pipe, 5 is the roadway roof, 6 is the roadway floor, and 7 is the coal pillar sidewall. Detailed Implementation

[0038] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0039] The present invention provides the following embodiments.

[0040] Example 1

[0041] This invention provides a deep-hole blasting method for comprehensively understanding fracture conditions, comprising the following steps:

[0042] The first step is to conduct a thorough investigation of the on-site production geological conditions, systematically collect information on the mining and roadway layout of adjacent working faces, the development of roof strata and their various physical and mechanical properties, etc., to provide a basis for setting drilling parameters;

[0043] The second step is to take an 80m long roadway and set a row of boreholes along the roadway direction on the roof rock layer at a distance of 700mm from the sidewall 7 of the roadway coal pillar. The boreholes are spaced 1m apart. The boreholes include blasting holes 1 and observation holes 2. Every 3 blasting holes 1 form a group, and an observation hole 2 is set between two groups of blasting holes 1. No explosives are loaded in the observation hole 2.

[0044] The borehole diameter is 40mm, and the hole depth is 3 times the mining height. Figure 1 , Figure 2 As shown, the direction of the borehole is as follows: In the cross-sectional view of the roadway, the angle α between the borehole and the vertical direction is 15° towards the goaf; in the centerline cross-sectional view of the roadway, the angle β between the borehole and the horizontal direction is 60°.

[0045] The third step is to drill holes using a drilling rig;

[0046] The fourth step is to use a borehole inspection instrument to observe and record the development of the original fractures in each borehole, and at the same time, to understand the situation of borehole collapse, and to re-drill boreholes with collapse.

[0047] Step 5, all blast holes 1 are treated as follows: Figure 7 The C-shaped shaped charge tube shown is used for decoupled continuous charging and is inserted into the blast hole 1 in one go. The hole is then sealed with stemming material, and the sealing length is 1 / 3 of the depth of the blast hole 1.

[0048] Step 6: Detonate the blasting holes 1 in groups, detonating two groups of blasting holes 1 at once;

[0049] Step 7: After the fumes and other harmful gases have dissipated, use a borehole inspection instrument to observe and record the crack propagation in all observation holes 2.

[0050] Step 8: Water injection observation is carried out on all observation holes 2. Water-based fluorescent tracer is mixed into the water. After the water injection is completed, the water seepage from the roof of the tunnel is observed by ultraviolet fluorescent lamp to determine the expansion of the cracks in the blast hole 1 and to understand the range of crack expansion in the hole.

[0051] like Figure 3 As shown, the water injection observation is specifically as follows: a capsule sealing device 3 is installed in the observation hole 2, water is injected into the capsule sealing device 3, the capsule sealing device 3 is tightly attached to the hole wall to seal the observation hole 2, and then 3-5 MPa high-pressure water mixed with water-based fluorescent tracer is injected into the observation hole 2 for at least 20 minutes.

[0052] like Figure 4 As shown, the capsule sealing device 3 includes a first capsule body 31, a first internal water injection pipe 32 and a first high-pressure water injection pipe 33. The first internal water injection pipe 32 is inserted into the first capsule body 31 and the water outlet is located inside the first capsule body 31. The first high-pressure water injection pipe 33 passes through the first capsule body 31 and the water outlet is at the other end of the first capsule body 31.

[0053] The ninth step is to use the observation results of the fourth, seventh and eighth steps above as a reference for the drilling parameters of the next section of the roadway and the interval of the blasting hole 1 and the observation hole 2. If the results meet the expectations, the drilling and blasting of the next section of the roadway will be carried out. If there is a deviation from the expectations, the drilling parameters and the interval of the blasting hole 1 and the observation hole 2 will be corrected before the drilling and blasting of the next section of the roadway is carried out.

[0054] After adjusting the spacing between blasting holes 1 and observation holes 2, it can be: every 2 blasting holes 1 form a group, with 1 observation hole 2 set between the two groups of blasting holes 1, or every 4 blasting holes 1 form a group, with 1 observation hole 2 set between the two groups of blasting holes 1.

[0055] Example 2

[0056] This invention provides a deep-hole blasting method for comprehensively understanding fracture conditions, comprising the following steps:

[0057] The first step is to conduct a thorough investigation of the on-site production geological conditions, systematically collect information on the mining and roadway layout of adjacent working faces, the development of roof strata and their various physical and mechanical properties, etc., to provide a basis for setting drilling parameters;

[0058] The second step involves selecting a 100m long roadway and, at a distance of 1500mm from the sidewall 7 of the roadway's coal pillar, setting a row of boreholes along the roadway direction with a spacing of 2m. These boreholes include blasting holes (1) and observation holes (2). Figure 1 As shown, every four blasting holes 1 form a group, and an observation hole 2 is set between two groups of blasting holes 1. The observation hole 2 is not filled with explosives.

[0059] The borehole diameter is 60mm, and the hole depth is 4 times the mining height. Figure 1 , Figure 2 As shown, the direction of the borehole is as follows: In the cross-sectional view of the roadway, the angle α between the borehole and the vertical direction is 0° towards the goaf; in the centerline cross-sectional view of the roadway, the angle β between the borehole and the horizontal direction is 70°.

[0060] The third step is to drill holes using a drilling rig;

[0061] The fourth step is to use a borehole inspection instrument to observe and record the development of the original fractures in each borehole, and at the same time, to understand the situation of borehole collapse, and to re-drill boreholes with collapse.

[0062] Step 5, all blast holes 1 are treated as follows: Figure 7 The C-shaped shaped charge tube shown is used for decoupled continuous charging and is inserted into the blast hole 1 in one go. The hole is then sealed with stemming material, and the sealing length is 1 / 3 of the depth of the blast hole 1.

[0063] Step 6: Detonate the blasting holes 1 in groups, detonating two groups of blasting holes 1 at once;

[0064] Step 7: After the fumes and other harmful gases have dissipated, use a borehole inspection instrument to observe and record the crack propagation in all observation holes 2.

[0065] Step 8: Water injection observation is carried out on all observation holes 2. Water-based fluorescent tracer is mixed into the water. After the water injection is completed, the water seepage from the roof of the tunnel is observed by ultraviolet fluorescent lamp to determine the expansion of the cracks in the blast hole 1 and to understand the range of crack expansion in the hole.

[0066] like Figure 3 As shown, the water injection observation is specifically as follows: a capsule sealing device 3 is installed in the observation hole 2, water is injected into the capsule sealing device 3, the capsule sealing device 3 is tightly attached to the hole wall to seal the observation hole 2, and then 3-5 MPa high-pressure water mixed with water-based fluorescent tracer is injected into the observation hole 2 for at least 20 minutes.

[0067] The structure of capsule sealer 3 is the same as in Embodiment 1;

[0068] like Figure 5 As shown, the water injection observation also includes: based on the observation results of step seven, determining the key observation location, installing the straddle expansion packer 4 at the key observation location, first injecting water into the straddle expansion packer 4 to seal the hole, and then injecting 3-5 MPa high-pressure water mixed with water-based fluorescent tracer into the packer section for at least 20 minutes.

[0069] like Figure 6 As shown, the straddle-type expansion packer 4 includes two second bladders 41, a second internal water injection pipe 42, and a second high-pressure water injection pipe 43. The two second bladders 41 are located in a straight line. The second internal water injection pipe 42 passes through one second bladder 41 and enters the other second bladder 42. The water outlet is located inside the two second bladders 41. The second high-pressure water injection pipe 43 passes through one second bladder 42 and connects to the other second bladder 42. Multiple water outlets are evenly distributed on the pipe between the two second bladders 41.

[0070] The ninth step is to use the observation results of the fourth, seventh and eighth steps above as a reference for the drilling parameters of the next section of the roadway and the interval of the blasting hole 1 and the observation hole 2. If the results meet the expectations, the drilling and blasting of the next section of the roadway will be carried out. If there is a deviation from the expectations, the drilling parameters and the interval of the blasting hole 1 and the observation hole 2 will be corrected before the drilling and blasting of the next section of the roadway is carried out.

[0071] After adjusting the spacing between blasting holes 1 and observation holes 2, it can be: every 3 blasting holes 1 form a group, with 1 observation hole 2 set between two groups of blasting holes 1, or every 5 blasting holes 1 form a group, with 1 observation hole 2 set between two groups of blasting holes 1.

[0072] Example 3

[0073] This invention discloses a deep-hole blasting method for comprehensively understanding fracture conditions, characterized by comprising the following steps:

[0074] The first step is to conduct a thorough investigation of the on-site production geological conditions, systematically collect information on the mining and roadway layout of adjacent working faces, the development of roof strata and their various physical and mechanical properties, etc., to provide a basis for setting drilling parameters;

[0075] The second step is to take a 150m long roadway and set a row of boreholes along the roadway direction on the roof rock layer at a distance of 1000mm from the side wall 7 of the roadway coal pillar. The boreholes are spaced 3m apart and include blasting holes 1 and observation holes 2. Every 4 blasting holes 1 form a group, and an observation hole 2 is set between two groups of blasting holes 1. No explosives are loaded in the observation hole 2.

[0076] The borehole diameter is 80mm, and the hole depth is 5 times the mining height. Figure 1 , Figure 2 As shown, the direction of the borehole is as follows: In the cross-sectional view of the roadway, the angle α between the borehole and the vertical direction is 10° towards the goaf; in the centerline cross-sectional view of the roadway, the angle β between the borehole and the horizontal direction is 75°.

[0077] The third step is to drill holes using a drilling rig;

[0078] The fourth step is to use a borehole inspection instrument to observe and record the development of the original fractures in each borehole, and at the same time, to understand the situation of borehole collapse, and to re-drill boreholes with collapse.

[0079] Step 5, all blast holes 1 are treated as follows: Figure 7 The C-shaped shaped charge tube shown is used for decoupled continuous charging and is inserted into the blast hole 1 in one go. The hole is then sealed with stemming material, and the sealing length is 1 / 2 of the depth of the blast hole 1.

[0080] Step 6: Detonate the blasting holes 1 in groups, detonating two groups of blasting holes 1 at once;

[0081] Step 7: After the fumes and other harmful gases have dissipated, use a borehole inspection instrument to observe and record the crack propagation in all observation holes 2.

[0082] Step 8: Water injection observation is carried out on all observation holes 2. Water-based fluorescent tracer is mixed into the water. After the water injection is completed, the water seepage from the roof of the tunnel is observed by ultraviolet fluorescent lamp to determine the expansion of the cracks in the blast hole 1 and to understand the range of crack expansion in the hole.

[0083] like Figure 3 As shown, the water injection observation is specifically as follows: a capsule sealing device 3 is installed in the observation hole 2, water is injected into the capsule sealing device 3, the capsule sealing device 3 is tightly attached to the hole wall to seal the observation hole 2, and then 3-5 MPa high-pressure water mixed with water-based fluorescent tracer is injected into the observation hole 2 for at least 20 minutes.

[0084] The structure of capsule sealer 3 is the same as in Embodiment 1;

[0085] like Figure 5 As shown, the water injection observation also includes: based on the observation results of step seven, determining the key observation location, installing the straddle expansion packer 4 at the key observation location, first injecting water into the straddle expansion packer 4 to seal the hole, and then injecting 3-5 MPa high-pressure water mixed with water-based fluorescent tracer into the packer section for at least 20 minutes.

[0086] The structure of the straddle-type expansion packer 4 is the same as that in Embodiment 2.

[0087] The ninth step is to use the observation results of the fourth, seventh and eighth steps above as a reference for the drilling parameters of the next section of the roadway and the interval of the blasting hole 1 and the observation hole 2. If the results meet the expectations, the drilling and blasting of the next section of the roadway will be carried out. If there is a deviation from the expectations, the drilling parameters and the interval of the blasting hole 1 and the observation hole 2 will be corrected before the drilling and blasting of the next section of the roadway is carried out.

[0088] After adjusting the spacing between the blasting holes 1 and the observation holes 2, it can be: every 3 blasting holes 1 form a group, with one observation hole 2 set between two groups of blasting holes 1, or every 5 blasting holes 1 form a group, with one observation hole 2 set between two groups of blasting holes 1.

[0089] The above description is merely a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. A deep-hole blasting method for comprehensively understanding fracture conditions, characterized in that... Includes the following steps: The first step is to conduct a thorough investigation of the on-site production geological conditions, systematically collect information on the mining and roadway layout of adjacent working faces, the development of roof strata and their various physical and mechanical properties, etc., to provide a basis for setting drilling parameters; The second step is to take an 80-150m long roadway and set a row of boreholes along the roadway direction on the roof rock layer at a distance of 700-1500mm from the side wall (7) of the roadway coal pillar. The borehole spacing is 1-3m. The boreholes include blasting holes (1) and observation holes (2). The blasting holes (1) and observation holes (2) are set at intervals. Every 3 or 4 blasting holes (1) form a group. One observation hole (2) is set between two groups of blasting holes (1). No explosives are loaded in the observation hole (2). The third step is to drill holes using a drilling rig; The fourth step is to use a borehole inspection instrument to observe and record the development of the original fractures in each borehole, and at the same time, to understand the situation of borehole collapse, and to re-drill boreholes with collapse. Fifth step: all blasting holes (1) are loaded with explosive charges using shaped charge tubes, which are inserted into the blasting holes (1) in one go, and the holes are sealed with stemming clay; Step 6: Detonate the blast hole (1); Step 7: After the fumes and other harmful gases have dissipated, use a borehole inspection instrument to observe and record the crack propagation in all observation holes (2); Step 8: Perform water injection observation on all observation holes (2): Install capsule sealing device (3) in observation hole (2), inject water into capsule sealing device (3), seal observation hole (2) tightly against hole wall, and then inject 3-5MPa high-pressure water mixed with water-based fluorescent tracer into observation hole (2) for at least 20 minutes; Water injection observation also includes: based on the observation results of step seven, determine the key observation location, install a straddle expansion packer (4) at the key observation location, first inject water into the straddle expansion packer (4) to seal the hole, and then inject 3-5MPa high-pressure water mixed with water-based fluorescent tracer into the packer section for at least 20 minutes. After the water injection is completed, observe the water seepage from the roof of the roadway by irradiating it with ultraviolet fluorescent lamps, determine the expansion of the cracks in the blast hole (1), and understand the range of crack expansion in the hole; The ninth step is to use the observation results of the fourth, seventh and eighth steps above as a reference for the drilling parameters of the next section of the roadway and the interval of the blasting hole (1) and the observation hole (2). If the results meet the expectations, the drilling and blasting of the next section of the roadway will be carried out. If there is a deviation from the expectations, the drilling parameters and the interval of the blasting hole (1) and the observation hole (2) will be corrected before the drilling and blasting of the next section of the roadway is carried out.

2. The deep-hole blasting method for comprehensively understanding fracture conditions according to claim 1, characterized in that: In the second step, the diameter of the drilled hole is 40-80mm, and the hole depth is 3-5 times the mining height.

3. The deep-hole blasting method for comprehensively understanding fracture conditions according to claim 2, characterized in that: The diameter of the drilled hole is 60 mm.

4. The deep-hole blasting method for comprehensively understanding fracture conditions according to claim 1, characterized in that: In the second step, the drilling direction is as follows: in the tunnel cross-section diagram, the angle α between the borehole and the vertical direction is 0°-15° towards the goaf; in the tunnel centerline cross-section diagram, the angle β between the borehole and the horizontal direction is 60°-75°.

5. The deep-hole blasting method for comprehensively understanding fracture conditions according to claim 1, characterized in that: In the fifth step, the charging method is non-coupled continuous charging, and the sealing hole length is 1 / 3 to 1 / 2 of the depth of the blast hole (1).

6. A deep-hole blasting method for comprehensively understanding fracture conditions according to claim 1 or 5, characterized in that: The explosive shaped charge tube used in the fifth step is a C-type shaped charge tube.

7. The deep-hole blasting method for comprehensively understanding fracture conditions according to claim 1, characterized in that: In the sixth step, when blasting the blasting hole (1), the blasting is carried out in groups, and two groups of blasting holes (1) are detonated at one time.

Citation Information

Patent Citations

  • Deep-hole blasting construction technology in fractured rocks

    CN102200415A

  • Visual testing device and method for researching interactive influence of grouting and fracture morphology