Generator electrical brake switch maintenance and disassembly complete equipment and method
Patent Information
- Application Number
- CN202410900893.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-11-12
Smart Images

Figure CN118929428A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of generator electrical brake switch maintenance, and in particular to a generator electrical brake switch maintenance and disassembly complete set of equipment and method. Background Art
[0002] During the maintenance of the generator, it is necessary to inspect the internal electrical brake switch, which contains two key components: the arc extinguishing chamber and the operating mechanism. Therefore, during the maintenance of the electrical brake switch, it is necessary to disassemble the internal arc extinguishing chamber and the operating mechanism, and then transport them after disassembly to facilitate subsequent maintenance.
[0003] Among them, multiple sets of arc extinguishing chambers are located inside the electrical brake switch. Due to space limitations, they cannot be easily disassembled, and it is not convenient to transport them after disassembly. Therefore, the disassembly and transportation process is difficult to operate, and there are certain safety hazards, which can easily cause damage to the arc extinguishing chamber.
[0004] In addition, the operating mechanism is mainly installed at the inner bottom of the brake switch control cabinet. After it is disassembled, it needs to be supported by a receiving trolley and then removed from the bottom of the control cabinet. At present, a general mobile trolley is mainly used to assist in disassembly. Since there is a cable pipeline directly below the operating mechanism, the existing mobile trolley cannot be pushed in, and the height of the right bank operating mechanism exceeds the special mobile trolley. Therefore, the conventional mobile trolley cannot realize the disassembly of the operating mechanism.
[0005] Secondly, the entire electrical brake switch equipment is installed in the electrical brake switch room. When the arc extinguishing chamber and operating mechanism need to be inspected and repaired after disassembly, the disassembled arc extinguishing chamber and operating mechanism need to be transported from the inside of the electrical brake switch room to the outside. However, there is a threshold at the entrance and exit of the electrical brake switch room, and its height is about 320mm. When the arc extinguishing chamber is transported by a trolley, due to the restriction of the threshold, the arc extinguishing chamber and the operating mechanism cannot be directly and smoothly transported from the inside of the electrical brake switch room to the outside. Summary of the invention
[0006] The object of the present invention is to provide a complete set of equipment and method for the maintenance and disassembly of a generator electrical brake switch. This complete set of equipment can be used in the maintenance process of the generator brake switch to complete the hoisting and transportation during the disassembly process of the arc extinguishing chamber, and can realize the auxiliary disassembly of the operating mechanism, and synchronously complete the hoisting and transportation of the operating mechanism after disassembly, thereby improving the maintenance efficiency of the generator electrical brake switch and improving the safety of the maintenance operation.
[0007] In order to realize the above-mentioned technical features, the purpose of the present invention is achieved as follows: a complete set of equipment for the maintenance and disassembly of a generator electrical brake switch, comprising a crane support structure installed on the top periphery of the brake switch, the crane support structure being fixed on the basis of the generator chamber; the top rolling support of the crane support structure has a mobile lifting mechanism for lifting the arc extinguishing chamber and the operating mechanism.
[0008] Preferably, it also includes a transfer trolley device for transferring the arc extinguishing chamber and the operating mechanism from the inside of the generator room to the outside after being hoisted and lowered. The transfer trolley device includes a first transfer trolley, which is connected to the second transfer trolley outdoors and spans the threshold. The tops of the first transfer trolley and the second transfer trolley are rollingly supported by a flatbed truck.
[0009] Preferably, it also includes a track bracket structure for assisting in the disassembly of the operating mechanism, one end of the track bracket structure is hoisted on the crossbeam at the bottom of the switch cabinet, and the other end is supported on the top of the switch cabinet platform; the top rolling support of the track bracket structure is provided with a slide trolley, which is used to fix and support the operating mechanism.
[0010] Preferably, the traveling support structure comprises a plurality of uprightly arranged columns, which are fixedly connected by a plurality of horizontal connecting rods and oblique supporting rods; transverse rails are fixedly installed on the top ends of the plurality of columns located on the same side, the mobile lifting mechanism is rollingly supported on the top ends of the transverse rails, and adjacent transverse rails are fixedly connected by connecting plates.
[0011] Preferably, the mobile lifting mechanism includes triangular support frames arranged in parallel, with track wheels installed at both ends of the bottom of the triangular support frames, and the track wheels are rollingly supported on the top of the traveling support structure, and the two ends of the triangular support frames on both sides are fixedly connected by inserted connecting rods, and the top of the triangular support frames is installed with a vertical support rod, and longitudinal tracks are fixed on the top of the vertical support rods on both sides, and longitudinal track wheel frames are rollingly installed on the longitudinal tracks, and a lifting hoist is installed at the bottom of the longitudinal track wheel frame, and the bottom end of the chain of the lifting hoist is connected with a hook, and the hook is hooked and connected to the arc extinguishing chamber through a sling.
[0012] Preferably, a plurality of lifting adjustment holes are processed on the vertical support rod, and the lifting adjustment holes are matched with the pin holes on the top of the triangular support frame through pin shafts.
[0013] Preferably, a limiting roller is provided at the middle portion of the bottom end of the triangular support frame.
[0014] Preferably, the first transfer trolley and the second transfer trolley adopt the same structure, the first transfer trolley includes a transfer body, wheels are installed at the bottom of the transfer body, a transfer track is arranged on the top of the transfer body, the flatbed trolley is rollingly supported on the top of the transfer track, and a handle is installed on the transfer body; after the first transfer trolley and the second transfer trolley are docked, the transfer tracks of the two can be aligned.
[0015] Preferably, the end of the transfer vehicle body is installed with a plug, and the plug is plugged and docked with the end slot of the second transfer vehicle.
[0016] Preferably, the track support structure includes parallel track grooves, the ends of the two track grooves are fixedly connected by a groove-rail connecting plate, one end of the track groove is supported on a clamping seat by a screw and a lifting adjustment nut, the clamping seat is mounted on a crossbeam, and the other end of the track groove is supported on the top of the switch cabinet platform by a lifting mechanism; multiple sets of slide rail trolleys are rollingly supported on the top of the track groove.
[0017] Preferably, the lifting mechanism comprises a hand-cranked lifting top, and a docking sleeve is fixed on the outer wall of the lifting cylinder of the hand-cranked lifting top, and the docking sleeve cooperates with the docking rod through a locking pin.
[0018] Preferably, the slide rail trolley includes arc-shaped brackets arranged in parallel, the lower parts of the arc-shaped brackets are fixedly connected by spacer plates, grooved rail wheels are installed at both ends of the bottom of the arc-shaped brackets, hook rods are fixed at the tops of both ends of the grooved rail wheels, and the operating mechanism after disassembly is fixed on the hook rods by locking with straps.
[0019] A method for inspecting and disassembling a generator electrical brake switch, the method being implemented using a complete set of equipment and comprising the following steps: Step 1: Construction of the vehicle support structure: Arrange and install the crane support structure according to the installation position and size of the arc extinguishing chamber inside the brake switch, and ensure that the crane support structure spans directly above the arc extinguishing chamber and the installation position of the operating mechanism; Step 2, installation of mobile lifting mechanism: The mobile hoisting mechanism is integrally supported and installed on the top of the traveling support structure by means of a hoisting device, and the mobile hoisting mechanism can move smoothly on the top of the traveling support structure; Step 3, hoisting of arc extinguishing chamber: The arc extinguishing chamber is disassembled from the inside of the brake switch. After the disassembly is completed, the arc extinguishing chamber is hoisted by the mobile hoisting mechanism and moved along the top of the traveling support structure; Step 4, transportation of the arc extinguishing chamber: After the arc extinguishing chamber moves to the end, lower the arc extinguishing chamber and place it on the flatbed cart on the top of the first transfer cart, push the first transfer cart and move it to the position of the threshold, then dock and fix the second transfer cart with the first transfer cart, slide the flatbed cart, push the flatbed cart to the second transfer cart, move the second transfer cart, and then move the arc extinguishing chamber to the maintenance station for subsequent maintenance; Step 5, installation of track support structure: After all the arc extinguishing chambers are dismantled, hoisted and transported, one end of the track support structure is hoisted on the beam at the bottom of the switch cabinet, and the other end is supported on the top of the switch cabinet platform, and the slide rail trolley is supported on the top of the track support structure; Step 6, height adjustment of the slide trolley: After the slide trolley is initially placed, push the slide trolley and move it to the bottom of the operating mechanism. Adjust the support height of the track bracket structure so that the slide trolley is supported at the bottom of the operating mechanism. Then, disassemble the operating mechanism and place it on the slide trolley. Push the slide trolley to push the operating mechanism out of the switch cabinet. Step 7, hoisting of the operating mechanism: Operate the mobile hoisting mechanism to make it located directly above the operating mechanism, and then lift the operating mechanism through the mobile hoisting mechanism; Step 8, transfer of operating mechanism: After the operating mechanism is moved into position, it is placed on the flatbed on top of the first transfer trolley, the first transfer trolley is pushed and moved to the position of the threshold, the second transfer trolley is docked and fixed with the first transfer trolley, the flatbed is slid, and the flatbed is pushed to the second transfer trolley, and the second transfer trolley is moved, and then the operating mechanism is moved to the maintenance station for subsequent maintenance; Step 9, reinstall the arc extinguishing chamber and operating mechanism: After the overhaul is completed, the arc extinguishing chamber and the operating mechanism are reinstalled, and the overhaul of the entire generator electrical brake switch is finally completed; Step 10, dismantling of the complete set of equipment.
[0020] The present invention has the following beneficial effects: 1. The complete set of equipment of the present invention can be used in the maintenance process of the generator brake switch to complete the hoisting and transportation during the arc extinguishing chamber disassembly process, and can realize the auxiliary disassembly of the operating mechanism, and synchronously complete the hoisting and transportation of the operating mechanism after disassembly, thereby improving the efficiency of the generator electrical brake switch maintenance and improving the safety of the maintenance operation.
[0021] 2. The above-mentioned crane support structure can provide mobile support for the mobile hoisting mechanism, thereby facilitating the subsequent lateral movement of the mobile hoisting mechanism, thereby realizing the lateral movement of the arc extinguishing chamber and the operating mechanism.
[0022] 3. The mobile hoisting mechanism mentioned above can be used to carry out subsequent hoisting operations on the arc extinguishing chamber and the operating mechanism, thereby assisting in their disassembly.
[0023] 4. The lifting adjustment hole can be used to adjust the support height of the vertical support rod to meet the requirements of different installation heights.
[0024] 5. The first transfer trolley and the second transfer trolley can effectively overcome the limitation of the threshold, so that the arc extinguishing chamber and the operating mechanism located indoors can be conveniently transferred outdoors.
[0025] 6. The above structure ensures the stability of the two after docking, ensures that the transfer tracks of the two can be aligned and docked, and further ensures that the flatbed truck can move smoothly from the first transfer cart to the second transfer cart.
[0026] 7. The above-mentioned rail bracket structure can effectively support the slide rail trolley, thereby overcoming the problem that the traditional transfer trolley cannot be directly set at the bottom of the switch cabinet platform for disassembly and acceptance of the operating mechanism.
[0027] 8. The coverage of the track support structure can be adjusted by manually cranking the jack. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 This is a three-dimensional structural diagram of the present invention from the first viewing angle.
[0029] Figure 2 This is a three-dimensional structural diagram from the second viewing angle of the present invention.
[0030] Figure 3 This is a three-dimensional structural diagram from the first perspective of the present invention after removing the switch cabinet.
[0031] Figure 4 For the present invention Figure 3 A partial view of the location of the operating mechanism after removing the switch cabinet.
[0032] Figure 5 It is a three-dimensional diagram of the overall first-angle view of the crane support structure and the mobile lifting mechanism of the present invention.
[0033] Figure 6 It is a three-dimensional diagram of the overall second viewing angle of the crane support structure and the mobile hoisting mechanism of the present invention.
[0034] Figure 7 This is a three-dimensional diagram of the overall first-angle view of the mobile lifting mechanism of the present invention.
[0035] Figure 8 This is a three-dimensional diagram of the overall second viewing angle of the mobile lifting mechanism of the present invention.
[0036] Fig. 9 This is a three-dimensional image from the first perspective of the first transfer trolley and the second transfer trolley of the present invention.
[0037] Fig.10 This is a three-dimensional image from a second perspective of the first transfer trolley and the second transfer trolley of the present invention.
[0038] Fig.11 This is a three-dimensional diagram of the track support structure of the present invention from the first perspective.
[0039] Fig.12 This is a three-dimensional diagram of the track support structure of the present invention from a second viewing angle.
[0040] Fig.13 This is a three-dimensional image of the slide trolley from the first perspective of the present invention.
[0041] Fig.14 This is a three-dimensional image of the slide trolley from the second viewing angle of the present invention.
[0042] Fig.15 This is a three-dimensional diagram of the card holder of the present invention from the first perspective.
[0043] Fig.16 This is a three-dimensional diagram of the card holder of the present invention from a second viewing angle.
[0044] In the figure: a crane support structure 1, a mobile hoisting mechanism 2, a generator room 3, a first transfer trolley 4, a flatbed trolley 5, a threshold 6, a second transfer trolley 7, a brake switch 8, an arc extinguishing chamber 9, a switch cabinet 10, an operating mechanism 11, a track support structure 12, a switch cabinet platform 13, a crossbeam 14, and a slide rail trolley 15; Column 101, horizontal connecting rod 102, transverse track 103, oblique support rod 104, connecting plate 105; Connecting rod 201, track wheel 202, triangular support frame 203, vertical support rod 204, lifting adjustment hole 205, pin 206, longitudinal track 207, longitudinal track wheel frame 208, hoisting hoist 209, chain 210, hook 211, limit roller 212; Handle 401, wheel 402, transfer vehicle body 403, transfer track 404, plug 405; The base 1201, the screw rod 1202, the lifting adjustment nut 1203, the track groove 1204, the track connecting plate 1205, the hand-cranked jack 1206, the docking sleeve 1207, the locking pin 1208, and the docking rod 1209; Arc-shaped bracket 1501 , grooved track wheel 1502 , binding belt 1503 , hook rod 1504 , and spacer plate 1505 . DETAILED DESCRIPTION
[0045] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments.
[0046] Embodiment 1: See also Figure 1-16 , a generator electrical brake switch maintenance and disassembly equipment, including a traveling support structure 1 installed on the top periphery of the brake switch 8, the traveling support structure 1 is fixed on the basis of the generator room 3; the top of the traveling support structure 1 is rollingly supported with a mobile lifting mechanism 2 for lifting the arc extinguishing chamber 9 and the operating mechanism 11; it also includes a transfer trolley device for transferring the arc extinguishing chamber 9 and the operating mechanism 11 from the inside of the generator room 3 to the outside after being lifted and lowered, the transfer trolley device includes a first transfer trolley 4, the first transfer trolley 4 is connected to the second transfer trolley 7 outdoors, and spans the threshold 6, the top of the first transfer trolley 4 and the second transfer trolley 7 are rollingly supported with a flatbed trolley 5; it also includes a track support structure 12 for auxiliary disassembly of the operating mechanism 11, one end of the track support structure 12 is hoisted on the crossbeam 14 at the bottom of the switch cabinet 10, and the other end is supported on the top of the switch cabinet platform 13; the top of the track support structure 12 is rollingly supported with a slide trolley 15, and the slide trolley 15 is used to fix and support the operating mechanism 11. By adopting the complete set of equipment of the present invention, it can be used in the process of overhauling the generator brake switch, complete the hoisting and transportation during the arc extinguishing chamber disassembly process, and can realize the auxiliary disassembly of the operating mechanism, and synchronously complete the hoisting and transportation of the operating mechanism after disassembly, thereby improving the efficiency of the generator electrical brake switch maintenance and improving the safety of the maintenance operation.
[0047] Furthermore, the crane support structure 1 includes a plurality of upright columns 101, and the columns 101 are fixedly connected by a plurality of horizontal connecting rods 102 and oblique supporting rods 104; a transverse track 103 is fixedly installed on the top of the plurality of columns 101 on the same side, and the mobile hoisting mechanism 2 is rolling supported on the top of the transverse track 103, and adjacent transverse tracks 103 are fixedly connected by connecting plates 105. By adopting the above-mentioned crane support structure 1, it is possible to provide mobile support for the mobile hoisting mechanism 2, thereby facilitating the subsequent transverse movement of the mobile hoisting mechanism 2, and thus realizing the transverse movement of the arc extinguishing chamber 9 and the operating mechanism 11. Moreover, the support strength and stability are guaranteed by this crane support structure 1.
[0048] Furthermore, the mobile hoisting mechanism 2 includes parallel triangular support frames 203, with track wheels 202 installed at both ends of the bottom of the triangular support frames 203, and the track wheels 202 are rollingly supported on the top of the traveling support structure 1, and the two ends of the triangular support frames 203 on both sides are fixedly connected by plugged connecting rods 201, and the top of the triangular support frames 203 is installed with vertical support rods 204, and the tops of the vertical support rods 204 on both sides are fixed with longitudinal tracks 207, and longitudinal track wheel frames 208 are rollingly installed on the longitudinal tracks 207, and a hoisting hoist 209 is installed at the bottom of the longitudinal track wheel frame 208, and the bottom end of the chain 210 of the hoisting hoist 209 is connected with a hook 211, and the hook 211 is hooked and connected to the arc extinguishing chamber 9 through a sling. The mobile hoisting mechanism 2 can realize the subsequent hoisting operation of the arc extinguishing chamber 9 and the operating mechanism 11, thereby assisting their disassembly. During operation, the track wheel 202 can move laterally along the top of the traveling support structure 1 , and after moving into position, it is lifted by the hoisting hoist 209 .
[0049] Furthermore, the vertical support rod 204 is processed with a plurality of lifting adjustment holes 205, and the lifting adjustment holes 205 are matched with the pin holes at the top of the triangular support frame 203 through the pin shaft 206. The lifting adjustment holes 205 facilitate the adjustment of the support height of the vertical support rod 204, thereby meeting the requirements of different installation heights.
[0050] Furthermore, a limiting roller 212 is provided at the middle part of the bottom end of the triangular support frame 203. The limiting roller 212 ensures the safety of the movement of the mobile hoisting mechanism 2.
[0051] Furthermore, the first transfer trolley 4 and the second transfer trolley 7 adopt the same structure, the first transfer trolley 4 comprises a transfer body 403, wheels 402 are installed at the bottom of the transfer body 403, a transfer track 404 is arranged at the top of the transfer body 403, the flatbed trolley 5 is supported by rolling on the top of the transfer track 404, and a handle 401 is installed on the transfer body 403; after the first transfer trolley 4 and the second transfer trolley 7 are docked, the transfer tracks 404 of the two can be aligned. The first transfer trolley 4 and the second transfer trolley 7 can effectively overcome the limitation of the threshold 6, so that the arc extinguishing chamber 9 and the operating mechanism 11 located indoors can be conveniently transferred outdoors. During specific use, the flatbed cart 5 is first pushed to the top of the first transfer cart 4, and then the disassembled arc extinguishing chamber 9 and the operating mechanism 11 are placed on the top of the flatbed cart 5, and then the first transfer cart 4 is moved, and the arc extinguishing chamber 9 and the operating mechanism 11 are pushed to the threshold through the first transfer cart 4, and then the flatbed cart 5 is slid to move it to the top of the second transfer cart 7, and then the entire second transfer cart 7 is pushed to move and transfer the arc extinguishing chamber 9 and the operating mechanism 11 on its top.
[0052] Furthermore, the end of the transfer vehicle body 403 is equipped with a plug 405, which is plugged and docked with the end slot 701 of the second transfer vehicle 7. The above structure ensures the stability of the two after docking, ensures that the transfer tracks 404 of the two can be aligned and docked, and further ensures that the flatbed vehicle 5 can move smoothly from the first transfer vehicle 4 to the second transfer vehicle 7.
[0053] Furthermore, the track support structure 12 includes track grooves 1204 arranged in parallel, the ends of the two track grooves 1204 are fixedly connected by a groove-rail connecting plate 1205, one end of the track groove 1204 is supported on the clamping seat 1201 through a screw rod 1202 and a lifting adjustment nut 1203, the clamping seat 1201 is clamped on the crossbeam 14, and the other end of the track groove 1204 is supported on the top of the switch cabinet platform 13 through a lifting mechanism; multiple groups of slide rail trolleys 15 are rollingly supported on the top of the track groove 1204. The above-mentioned track support structure 12 can effectively support the slide rail trolley 15. Thus, the problem that the traditional transfer trolley cannot be directly set at the bottom of the switch cabinet platform 13 to disassemble and undertake the operating mechanism 11 is overcome. During the working process, the slide rail trolley 15 is slidably supported on the top of the track support structure 12, and then the operating mechanism 11 is supported by the slide rail trolley 15. Moreover, the screw rod 1202 can be installed through the base 1201 with the help of the crossbeam 14, and the support height of the track groove 1204 can be adjusted by adjusting the threaded transmission cooperation between the nut 1203 and the screw rod 1202 through lifting and lowering.
[0054] Further, the lifting mechanism includes a hand-cranked top 1206, and a docking sleeve 1207 is fixed on the outer wall of the lifting cylinder of the hand-cranked top 1206, and the docking sleeve 1207 cooperates with the docking rod 1209 through a locking pin 1208. The coverage of the track support structure 12 can be adjusted by the hand-cranked top 1206.
[0055] Furthermore, the rail trolley 15 comprises arc brackets 1501 arranged in parallel, the lower parts of the arc brackets 1501 are fixedly connected by a spacer plate 1505, grooved rail wheels 1502 are installed at both ends of the bottom of the arc bracket 1501, hook rods 1504 are fixed at the top of both ends of the grooved rail wheels 1502, and the hook rods 1504 are locked and fixed by a strap 1503 to the disassembled operating mechanism 11. The rail trolley 15 can achieve stable and reliable support for the operating mechanism 11.
[0056] Embodiment 2: A method for inspecting and disassembling a generator electrical brake switch, the method being implemented using a complete set of equipment and comprising the following steps: Step 1, construction of the vehicle support structure 1: According to the installation position and size of the arc extinguishing chamber 9 inside the brake switch 8, the traveling support structure 1 is arranged and installed, and it is ensured that the traveling support structure 1 spans over the arc extinguishing chamber 9 and the installation position of the operating mechanism 11; Step 2, installation of mobile hoisting mechanism 2: The mobile hoisting mechanism 2 is integrally supported and installed on the top of the traveling support structure 1 by means of a hoisting device, and the mobile hoisting mechanism 2 can move smoothly on the top of the traveling support structure 1; Step 3, hoisting of arc extinguishing chamber 9: The arc extinguishing chamber 9 is disassembled from the inside of the brake switch 8. After the disassembly is completed, the arc extinguishing chamber 9 is hoisted by the mobile hoisting mechanism 2 and moved along the top of the traveling support structure 1; Step 4, transportation of the arc extinguishing chamber 9: After the arc extinguishing chamber 9 is moved to the end, the arc extinguishing chamber 9 is lowered and placed on the flatbed trolley 5 on the top of the first transfer trolley 4, the first transfer trolley 4 is pushed and moved to the position of the threshold 6, and then the second transfer trolley 7 is docked and fixed with the first transfer trolley 4, the flatbed trolley 5 is slid, and the flatbed trolley 5 is pushed to the second transfer trolley 7, and then the second transfer trolley 7 is moved, and then the arc extinguishing chamber 9 is moved to the maintenance station for subsequent maintenance; Step 5, installation of the track support structure 12: After all the arc extinguishing chambers 9 are disassembled, hoisted and transported, one end of the track support structure 12 is hoisted on the crossbeam 14 at the bottom of the switch cabinet 10, and the other end is supported on the top of the switch cabinet platform 13, and the slide rail trolley 15 is supported on the top of the track support structure 12; Step 6, height adjustment of the slide trolley 15: After the slide rail trolley 15 is initially placed, push the slide rail trolley 15 and move it to the bottom of the operating mechanism 11, and adjust the support height of the track support structure 12 so that the slide rail trolley 15 is supported at the bottom of the operating mechanism 11. Then, the operating mechanism 11 is disassembled and placed on the slide rail trolley 15, and the slide rail trolley 15 is pushed to push the operating mechanism 11 out of the switch cabinet 10; Step 7, hoisting of the operating mechanism 11: Operate the mobile hoisting mechanism 2 to make it located directly above the operating mechanism 11, and then lift the operating mechanism 11 by the mobile hoisting mechanism 2; Step 8, transport of operating mechanism 11: After the operating mechanism 11 is moved to the position, it is placed on the flatbed trolley 5 on top of the first transfer trolley 4, the first transfer trolley 4 is pushed and moved to the position of the threshold 6, and then the second transfer trolley 7 is docked and fixed with the first transfer trolley 4, the flatbed trolley 5 is slid, and the flatbed trolley 5 is pushed to the second transfer trolley 7, and then the second transfer trolley 7 is moved, and then the operating mechanism 11 is moved to the maintenance station for subsequent maintenance; Step 9, reinstallation of the arc extinguishing chamber 9 and the operating mechanism 11: After the overhaul is completed, the arc extinguishing chamber 9 and the operating mechanism 11 are reinstalled, thereby finally completing the overhaul of the entire generator electrical brake switch; Step 10, dismantling of the complete set of equipment.
Claims
1. A complete set of equipment for repairing and disassembling a generator electrical brake switch, characterized in that: It comprises a traveling support structure (1) installed on the outer periphery of the top of the brake switch (8), the traveling support structure (1) being fixed on the foundation of the generator chamber (3); the top rolling support of the traveling support structure (1) has a movable hoisting mechanism (2) for hoisting the arc extinguishing chamber (9) and the operating mechanism (11); It also includes a transfer trolley device for transferring the arc extinguishing chamber (9) and the operating mechanism (11) from the inside of the generator room (3) to the outside after being hoisted and lowered. The transfer trolley device includes a first transfer trolley (4). The first transfer trolley (4) is connected to a second transfer trolley (7) outdoors and straddles the threshold (6). The tops of the first transfer trolley (4) and the second transfer trolley (7) are rollingly supported by a flatbed trolley (5). It also includes a track support structure (12) for assisting in the disassembly of the operating mechanism (11); one end of the track support structure (12) is hoisted on a crossbeam (14) at the bottom of the switch cabinet (10), and the other end is supported on the top of the switch cabinet platform (13); the top of the track support structure (12) is rollingly supported by a slide rail trolley (15), and the slide rail trolley (15) is used to fix and support the operating mechanism (11).
2. According to claim 1, a generator electrical brake switch maintenance and disassembly equipment set, characterized in that: The vehicle support structure (1) comprises a plurality of upright columns (101), wherein the columns (101) are fixedly connected to each other via a plurality of horizontal connecting rods (102) and oblique supporting rods (104); a transverse track (103) is fixedly mounted on the top of the plurality of columns (101) located on the same side, the mobile hoisting mechanism (2) is rollingly supported on the top of the transverse track (103), and adjacent transverse tracks (103) are fixedly connected to each other via a connecting plate (105).
3. According to claim 1, a generator electrical brake switch maintenance and disassembly equipment set is characterized by: The mobile hoisting mechanism (2) comprises triangular support frames (203) arranged in parallel, track wheels (202) being installed at both ends of the bottom of the triangular support frames (203), the track wheels (202) being rollingly supported on the top of the traveling support structure (1), the two ends of the triangular support frames (203) located on both sides being fixedly connected via inserted connecting rods (201), the top of the triangular support frames (203) being installed with vertical support rods (204), the tops of the vertical support rods (204) on both sides being fixed with longitudinal tracks (207), longitudinal track wheel frames (208) being rollingly installed on the longitudinal tracks (207), a hoisting hoist (209) being installed at the bottom of the longitudinal track wheel frame (208), a hoisting hoist (209) being connected to a hook (211) at the bottom end of a chain (210) of the hoisting hoist (209), and the hook (211) being hooked and connected to the arc extinguishing chamber (9) via a sling.
4. According to claim 3, a complete set of equipment for repairing and disassembling a generator electrical brake switch, characterized in that: The vertical support rod (204) is machined with a plurality of lifting adjustment holes (205), and the lifting adjustment holes (205) are matched with the pin holes at the top of the triangular support frame (203) through the pin shafts (206); A limiting roller (212) is provided at the middle portion of the bottom end of the triangular support frame (203).
5. According to claim 1, a complete set of equipment for repairing and disassembling a generator electrical brake switch, characterized in that: The first transfer trolley (4) and the second transfer trolley (7) have the same structure. The first transfer trolley (4) comprises a transfer body (403). Wheels (402) are installed at the bottom of the transfer body (403). A transfer track (404) is arranged at the top of the transfer body (403). The flatbed vehicle (5) is supported by rolling on the top of the transfer track (404). A handle (401) is installed on the transfer body (403). After the first transfer trolley (4) and the second transfer trolley (7) are docked, the transfer tracks (404) of the two can be aligned.
6. A complete set of equipment for repairing and disassembling a generator electrical brake switch according to claim 5, characterized in that: The end of the transfer vehicle body (403) is provided with a plug (405), and the plug (405) is plugged and docked with the end slot (701) of the second transfer vehicle (7).
7. According to claim 1, a generator electrical brake switch maintenance and disassembly equipment set is characterized by: The track support structure (12) comprises track grooves (1204) arranged in parallel, the ends of the two track grooves (1204) being fixedly connected via a groove-rail connecting plate (1205), one end of the track groove (1204) being supported on a clamping seat (1201) via a screw rod (1202) and a lifting adjustment nut (1203), the clamping seat (1201) being clamped on a crossbeam (14), and the other end of the track groove (1204) being supported on the top of the switch cabinet platform (13) via a lifting mechanism; a plurality of sets of slide rail trolleys (15) are rollingly supported on the top of the track grooves (1204).
8. The complete set of equipment for repairing and disassembling the generator electrical brake switch according to claim 7, characterized in that: The lifting mechanism comprises a hand-cranked lifting top (1206), a docking sleeve (1207) being fixed on the outer wall of the lifting cylinder of the hand-cranked lifting top (1206), and the docking sleeve (1207) being matched with a docking rod (1209) via a locking latch (1208).
9. The complete set of equipment for repairing and disassembling the generator electrical brake switch according to claim 7, characterized in that: The slide rail trolley (15) comprises arc-shaped brackets (1501) arranged in parallel, the lower parts of the arc-shaped brackets (1501) are fixedly connected via a spacer plate (1505), grooved rail wheels (1502) are installed at both ends of the bottom of the arc-shaped bracket (1501), hook rods (1504) are fixed at the tops of both ends of the grooved rail wheels (1502), and the hook rods (1504) are locked and fixed by a binding belt (1503) to the disassembled operating mechanism (11).
10. A method for inspecting and disassembling a generator electrical brake switch, characterized in that: The method is implemented by using the complete set of equipment according to any one of claims 1 to 9, and comprises the following steps: Step 1, construction of the vehicle support structure (1): Arrange and install the traveling support structure (1) according to the installation position and size of the arc extinguishing chamber (9) inside the brake switch (8), and ensure that the traveling support structure (1) spans over the arc extinguishing chamber (9) and directly above the installation position of the operating mechanism (11); Step 2, installation of mobile lifting mechanism (2): The mobile hoisting mechanism (2) is integrally supported and installed on the top of the traveling support structure (1) by means of a hoisting device, and the mobile hoisting mechanism (2) is enabled to move smoothly on the top of the traveling support structure (1); Step 3, hoisting of the arc extinguishing chamber (9): The arc extinguishing chamber (9) is disassembled from the inside of the brake switch (8). After the disassembly is completed, the arc extinguishing chamber (9) is hoisted by the mobile hoisting mechanism (2) and moved along the top of the traveling support structure (1); Step 4, transportation of the arc extinguishing chamber (9): After the arc extinguishing chamber (9) is moved to the end, the arc extinguishing chamber (9) is lowered and placed on the flatbed cart (5) on top of the first transfer cart (4), the first transfer cart (4) is pushed and moved to the position of the threshold (6), the second transfer cart (7) is docked and fixed with the first transfer cart (4), the flatbed cart (5) is slid, and the flatbed cart (5) is pushed to the second transfer cart (7), and the second transfer cart (7) is moved, and the arc extinguishing chamber (9) is moved to the maintenance station for subsequent maintenance; Step 5, installation of the track support structure (12): After all the arc extinguishing chambers (9) have been disassembled, hoisted and transported, one end of the track support structure (12) is hoisted on the crossbeam (14) at the bottom of the switch cabinet (10), and the other end is supported on the top of the switch cabinet platform (13), and the slide rail trolley (15) is supported on the top of the track support structure (12); Step 6, height adjustment of the slide trolley (15): After the slide trolley (15) is initially placed, the slide trolley (15) is pushed and moved to the position directly below the operating mechanism (11), and the support height of the track support structure (12) is adjusted so that the slide trolley (15) is supported at the bottom of the operating mechanism (11). Then, the operating mechanism (11) is disassembled and placed on the slide trolley (15), and the slide trolley (15) is pushed to push the operating mechanism (11) out of the switch cabinet (10); Step 7, hoisting of the operating mechanism (11): Operating the mobile lifting mechanism (2) so that it is located directly above the operating mechanism (11), and then lifting the operating mechanism (11) by the mobile lifting mechanism (2); Step 8, transfer of the operating mechanism (11): After the operating mechanism (11) is moved into position, it is placed on the flatbed car (5) on top of the first transfer trolley (4), the first transfer trolley (4) is pushed and moved to the position of the threshold (6), the second transfer trolley (7) is docked and fixed with the first transfer trolley (4), the flatbed car (5) is slid, and the flatbed car (5) is pushed onto the second transfer trolley (7), and the second transfer trolley (7) is moved, and the operating mechanism (11) is moved to the maintenance station for subsequent maintenance; Step 9, reinstallation of the arc extinguishing chamber (9) and the operating mechanism (11): After the overhaul is completed, the arc extinguishing chamber (9) and the operating mechanism (11) are reinstalled, thereby finally completing the overhaul of the entire generator electrical brake switch; Step 10, dismantling of the complete set of equipment.