Bridge erecting machine bridge dismantling two-piece beam integral translation device and construction method thereof
By using a bridge stud machine to dismantle the overall translation device of the two beams of the bridge during the bridge removal process, and using support and lifting technology to support square wood and slings, the problem of limited construction space during bridge removal is solved, ensuring the two sides of the bridge The traffic is safe and the bridge deck is smoothly removed.
Patent Information
- Application Number
- CN202411057712.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-12
AI Technical Summary
During the bridge removal process, especially when the bridge with two channels is removed, when it is removed to the part close to the center line, the construction space is limited, which affects the normal passage of the bridge on the other side, making it difficult to cut and remove.
The bridge stairs are used to dismantle the bridge beams and the two beams are integrated. By building the bridge stairs on the bridge deck, red lines are measured and marked, horizontal and vertical cutting is performed to form a "T" shape, and supported by supporting square wood and slings. And lifting, the bridge deck near the center line does not cut but moves across the middle of the bridge pier as a whole, and then cut and dismantle.
It effectively avoids the impact of bridge panels close to the center line on the passage of the other side of the bridge when the bridge is removed, solves the problem of limited construction space, and achieves the safe and smooth demolition of bridge panels.
Smart Images

Figure CN118932892A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge erecting machines, and in particular to a device for integrally translating two beams of a bridge erecting machine for dismantling a bridge, and a construction method thereof. Background Art
[0002] A bridge erection machine refers to a device that dismantles the bridge deck in sections one by one. If one of the two passages of the bridge is still open to traffic and there is a river under the bridge, it will be impossible to use crane cutting and demolition, blasting and other demolition methods that require a large space due to space limitations.
[0003] When some bridges are demolished now, it is necessary to divide the bridge deck on the bridge, and then cut and demolish it piece by piece. However, the existing bridges have two channels. If the bridge of one of the channels is demolished, when the part close to the center line is demolished, the bridge deck is close to the center line of the two channels. Under the condition of not affecting the normal passage of the other bridge channel, its construction space will become smaller, making it difficult to cut and demolish the part of the bridge deck close to the center line. Summary of the invention
[0004] The purpose of the present invention is to provide a device for overall translation of two beams of a bridge erection machine for dismantling a bridge and a construction method thereof, so as to solve the problem that when dismantling a bridge with two channels, when dismantling one of the channels to the center line position, the standing space of the part close to the center line becomes smaller and is restricted because the normal passage of the other channel cannot be affected, thus affecting the construction.
[0005] The embodiments of the present invention are implemented by the following technical solutions:
[0006] The present invention provides an overall translation device for dismantling two beams of a bridge by a bridge erecting machine, comprising a bridge pier, a bridge deck being arranged on the top of the pier, supporting square timbers being connected to both sides of the bottom of the bridge deck, a bridge erecting machine being arranged on the top of the bridge deck, a hoist being connected to the bottom of the bridge erecting machine, and a sling being arranged at the bottom of the hoist.
[0007] Preferably, a plurality of square protrusions are provided at the bottom of the bridge deck.
[0008] Preferably, the supporting square timbers are obliquely supported on both sides of the square protrusions at the bottom of the bridge deck.
[0009] Preferably, the steps are as follows:
[0010] The first step is to build the bridge erection machine on the bridge deck;
[0011] The second step is to measure the surface of the bridge deck, and then mark it with red lines. Then, the bridge deck is first measured and marked in advance, and then cut horizontally and longitudinally with a rope saw, so that the bridge deck part will be separated into an independent part, so that the separated independent part will form a "T" shape, and the two sides of the separated independent part are supported and stabilized by placing supporting square wood;
[0012] The third step is to drill holes on both sides of the separated bridge deck so that holes are formed on the top of the bridge deck near both sides, and then the slings are passed through the holes, and the separated bridge deck is lifted and removed by the crane;
[0013] In the second and third steps, when the bridge deck is divided and removed, the parts of the bridge deck that need to be divided will be numbered in sequence, so that they will be removed in stages along the left and right sides of the bridge;
[0014] The fourth step is to remove the numbered bridge decks on one side in sequence to the center line of the line. The bridge decks at both ends close to the center line are not cut. The entire deck is hoisted and moved horizontally to the middle of the pier, and then supported by connecting supporting square timbers.
[0015] The fifth step is to move the bridge deck near the center line to the middle of the pier without cutting it, and then support the bottom of the bridge deck in two directions with supporting square timbers, and then cut and dismantle and hoist it in sequence.
[0016] The technical solution of the embodiment of the present invention has at least the following advantages and beneficial effects:
[0017] 1. Through the construction method of the device, when the bridge deck on the bridge is cut and removed one by one, the part close to the center line can be removed without affecting the normal passage of the bridge on the other side of the center line. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0019] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0020] Figure 2 It is a state schematic diagram of the bridge erecting machine of the present invention;
[0021] Figure 3 It is a schematic diagram of the state of the bridge deck of the present invention;
[0022] Figure 4 It is a side overall schematic diagram of the present invention;
[0023] Icons: bridge pier 1, bridge deck 2, supporting square timber 201, bridge erection machine 3, hoist 301, sling 302. DETAILED DESCRIPTION
[0024] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0025] Combine the following Figures 1 to 4 The present invention is described in detail.
[0026] A device for overall translation of two beams of a bridge-erecting machine for dismantling a bridge comprises a bridge pier 1, a bridge deck 2 is arranged on the top of the pier 1, supporting square timbers 201 are connected to both sides of the bottom of the bridge deck 2, a bridge-erecting machine 3 is arranged on the top of the bridge deck 2, a hoist 301 is connected to the bottom of the bridge-erecting machine 3, a sling 302 is arranged at the bottom of the hoist 301, a plurality of square protrusions are arranged at the bottom of the bridge deck 2, and the supporting square timbers 201 are obliquely supported on both sides of the square protrusions at the bottom of the bridge deck 2.
[0027] Further, the steps are as follows;
[0028] The first step is to build the bridge erection machine 3 on the bridge deck 2;
[0029] The second step is to measure the surface of the bridge deck 2 and then mark it with a red line. Then, the bridge deck 2 is first measured and marked in advance and then cut horizontally and longitudinally by a rope saw, so that the bridge deck 2 is separated into an independent part, so that the separated independent part forms a "T" shape, and the two sides of the separated independent part are supported and stabilized by placing supporting square timbers 201;
[0030] The third step is to drill holes on both sides of the separated independent bridge deck 2 so that holes are formed near both sides of the top of the bridge deck 2, and then pass the sling 302 through the holes, and then use the hoist 301 to lift and remove the separated bridge deck 2;
[0031] In the second and third steps, when the bridge deck 2 is divided and removed, the parts of the bridge deck 2 that need to be divided will be numbered in sequence, so that they will be removed in stages along the left and right sides of the bridge;
[0032] The fourth step is to remove the numbered bridge panels 2 on one side to the center line of the line in sequence, without cutting the bridge panels 2 at both ends close to the center line, hoist the entire panel and move it horizontally to the middle of the pier 1, and then connect the supporting square timbers 201 to support it.
[0033] The fifth step is to move the bridge deck 2 near the center line to the middle of the pier 1 without cutting, and then support the bottom of the bridge deck 2 in two directions through supporting square timbers 201, and then cut and dismantle and hoist them in sequence.
[0034] First, the bridge erection machine 3 is set on the bridge deck 2, and then the red lines are marked on the bridge deck 2 as required. Then, the bridge deck 2 is cut horizontally and then longitudinally by a rope saw to separate part of the bridge deck 2. Before cutting, support square timbers 201 are placed on both sides of the bottom bulge to support it and prevent it from tipping over due to the bulge support at the bottom. After cutting, holes are punched on both sides of the segmented bridge deck 2 to allow the sling 302 to pass through, so as to lift and remove the segmented bridge deck 2.
[0035] At the same time, when the bridge deck 2 is marked in advance, the bridge deck 2 will also be numbered in turn, and marked in turn along the left and right sides of the bridge to the center line, and then cut, hoisted and dismantled in turn according to the numbers, cutting and dismantling one piece at a time.
[0036] Then, when the bridge deck 2 is dismantled to the center line of the bridge road, the bridge deck 2 near the center line is not cut, but is drilled and hoisted as a whole, and then it is first moved horizontally to the middle, and then supported by the supporting square timber 201, and then cut, so that the part of the bridge deck 2 near the center line is difficult to construct due to the position restriction, which will inevitably affect the normal traffic of the bridge on the other side of the center line. When the bridge deck 2 near the center line is moved horizontally and cut, the problem of construction position restriction can be effectively avoided. At the same time, the entire bridge deck 2 after cutting will not be pressed toward the center and broken during hoisting, because the bottom of the bridge deck 2 itself is set by a protrusion, and the center part is a cavity setting with low strength. If the entire bridge deck 2 is axially transported, it is easy to break and be damaged due to excessive force due to the long stroke.
[0037] The following is a specific implementation process of the present invention. First, the bridge erection machine 3 is set on the bridge deck 2. Then, the red line is marked on the bridge deck 2 as required. Then, the bridge deck 2 is cut horizontally and then cut longitudinally by a rope saw to separate part of the bridge deck 2. Before cutting, support square timbers 201 are placed on both sides of the bottom convex block to support it and prevent it from tipping over easily due to the convex block support at the bottom. After cutting, holes are punched on both sides of the segmented bridge deck 2 to allow the sling 302 to pass through, so as to lift and remove the segmented bridge deck 2. At the same time, when the bridge deck 2 is marked in advance, the bridge deck 2 will also be numbered in turn, and marked in turn along the left and right widths of the bridge to the center line, and then cut, lift and remove in turn according to the numbers, cutting and removing one piece at a time, and then when it is removed to the point close to the center line of the bridge road. At that time, the bridge deck 2 near the center line is not cut, but is drilled and hoisted as a whole, and then it is first moved horizontally to the middle part, and then supported by the supporting square timber 201, and then cut, so that the part of the bridge deck 2 near the center line is difficult to construct due to the position restriction when constructing the bridge deck 2 near the center line, which will inevitably affect the normal traffic of the bridge on the other side of the center line. When the bridge deck 2 near the center line is moved horizontally and cut, the problem of construction position restriction can be effectively avoided. At the same time, the entire bridge deck 2 after cutting will not be pressed toward the center and broken during hoisting, because the bottom of the bridge deck 2 itself is set by a protrusion, and the center part is a cavity setting with low strength. If the entire bridge deck 2 is axially transported, it is easy to break and be damaged due to excessive force due to the long stroke.
[0038] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A device for overall translation of two beams of a bridge-erecting machine for dismantling a bridge, comprising a bridge pier (1), a bridge deck (2) being arranged on the top of the bridge pier (1), supporting square timbers (201) being connected to both sides of the bottom of the bridge deck (2), a bridge-erecting machine (3) being arranged on the top of the bridge deck (2), a hoist (301) being connected to the bottom of the bridge-erecting machine (3), and a sling (302) being arranged at the bottom of the hoist (301).
2. The device for overall translation of two beams of a bridge erection machine for dismantling a bridge according to claim 1 is characterized in that: A plurality of square protrusions are arranged at the bottom of the bridge deck (2).
3. The device for overall translation of two beams of a bridge erection machine for dismantling a bridge according to claim 1 is characterized in that: The supporting square timber (201) is tiltedly supported on both sides of the square protrusion at the bottom of the bridge deck (2).
4. A construction method for the overall translation device of two-piece beams of a bridge erecting machine for dismantling a bridge based on any of claims 1 to 3, the steps of which are as follows; The first step is to build a bridge erection machine (3) on the bridge deck (2); The second step is to measure the surface of the bridge deck (2) and then mark it with a red line. Then, the bridge deck (2) measured and marked in advance is first cut horizontally with a rope saw, and then cut longitudinally, so that the bridge deck (2) is separated into an independent part, so that the separated independent part forms a "T" shape, and the two sides of the separated independent part are supported and stabilized by placing supporting square wood (201); The third step is to drill holes on both sides of the separated independent bridge deck (2) so that holes are formed near both sides of the top of the bridge deck (2), and then the slings (302) are passed through the holes, and then the separated bridge deck (2) is lifted and removed by the lifting device (301); In the second and third steps, when the bridge deck (2) is divided and removed, the parts of the bridge deck (2) that need to be divided are numbered in sequence, so that they will be removed in stages along the left and right sides of the bridge; In the fourth step, when the numbered bridge panels (2) on one side are removed in sequence to the center line of the line, the bridge panels (2) at both ends close to the center line are not cut, and the entirety is hoisted and moved horizontally to the middle of the pier (1), and then supported by connecting the supporting square timbers (201). The fifth step is to move the bridge deck (2) near the center line to the middle of the bridge pier (1) without cutting, and then support the bottom of the bridge deck (2) in two directions through supporting square timbers (201), and then cut and dismantle and hoist them in sequence.