Concrete form load-bearing primary and secondary beam members and method of connection
By using special-shaped welded pipes to make the main and secondary ribs of the template support and the U-shaped hook wire clip connectors, the problem of large spacing at the top of the uprights of the disc-lock steel pipe scaffolding was solved, realizing efficient use of the uprights' load-bearing capacity, reducing material usage and construction costs, and meeting the requirements of green construction.
Patent Information
- Application Number
- CN202411263623.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2044-09-10
AI Technical Summary
In existing technologies, the top of the uprights of disc-lock steel pipe scaffolding lacks high-load-bearing, wide-spacing supporting main and secondary joists, resulting in the uprights' load-bearing capacity not being fully utilized. Furthermore, traditional fasteners use a large amount of steel pipes and timber, leading to low assembly and disassembly efficiency, which is not conducive to green construction.
The template support system, consisting of main and secondary ribs made of special-shaped welded pipes and connected with U-shaped hook spring steel wire clips, has high bending stiffness. The main ribs are lightweight and have a high degree of automation in processing and forming, making them suitable for large-spacing arrangements of uprights in disc-lock steel pipe scaffolding.
It achieves efficient utilization of the load-bearing capacity of the disc-lock steel pipe scaffold uprights, reduces the amount of temporary turnover materials used, improves assembly and disassembly efficiency, meets the requirements of green construction, and has low processing costs, durability and is not easily deformed.
Smart Images

Figure CN118933333B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to a load-bearing primary and secondary ribs at the top of the uprights of a concrete formwork support frame and a connection method thereof, belonging to the field of formwork support systems for cast-in-place concrete construction of structural components in civil engineering. Background Technology
[0002] In civil engineering projects, formwork support for concrete pouring of floor beams and slabs typically uses coupler-type steel pipe scaffolding. Right-angle couplers connect horizontal steel pipes to the uprights at the top, forming the main load-bearing system of the floor slab formwork. 40×90mm timber is laid on top of one or two main horizontal steel pipes as the secondary load-bearing system, and plywood formwork is laid on top of the timber and secured with carpenter's nails. The new generation of formwork support uses disc-lock steel pipe scaffolding with Q355 steel uprights, significantly improving the load-bearing capacity of the uprights. However, the main and secondary load-bearing ribs installed in the adjustable supports at the top of the uprights still use traditional coupler-type steel pipes and timber with low cross-sectional bending stiffness. This directly results in the inability to arrange the uprights of the disc-lock steel pipe scaffolding at large intervals, and the inability to fully utilize the high load-bearing capacity of the uprights. This leads to an excessive amount of disc-lock steel pipe scaffolding used, low erection efficiency, and poor economic performance, becoming a pain point in current domestic construction site formwork support systems. It is well known that foreign modular formwork support systems typically have matching load-bearing primary and secondary beams at the top, mainly consisting of high-strength wooden I-beams and aluminum beams, which can solve the problem of efficient use when the uprights of the formwork support are arranged with large spacing. However, lightweight wooden I-beams are easily sawn, and I-beam-shaped aluminum beams are expensive and prone to deformation due to assembly, disassembly, and collisions. Their application in Chinese construction sites has encountered difficulties adapting to local conditions. Summary of the Invention
[0003] Technical Problem: The purpose of this invention is to address the lack of load-bearing primary and secondary ribs at the top of the support frame in civil engineering construction formwork support systems, which are not compatible with the large-spacing arrangement of high-bearing-capacity uprights of disc-lock steel pipe scaffolding. This invention provides a durable, lightweight, low-cost, and high-flexural-strength load-bearing primary and secondary rib component and connection method for the top of the uprights of concrete formwork support frames. The primary and secondary ribs and connectors of this formwork support system are more durable and less prone to deformation than known tool-type wooden I-beams and aluminum primary and secondary beams. Furthermore, it features a high degree of automation in processing and forming, low weight per linear meter, and good overall economic indicators. This invention solves the pain points of current construction sites where the use of fastener steel pipes and timber as primary and secondary ribs results in large quantities of temporary materials, dense upright spacing, low assembly and disassembly efficiency, and is detrimental to green construction.
[0004] Technical solution: The present invention provides a primary and secondary rib component for supporting the top concrete formwork, comprising a primary formwork support rib, a secondary formwork support rib, a connector, a formwork support upright, and an adjustable support; wherein, the upper top of the formwork support upright is provided with an adjustable support, the groove on the adjustable support is embedded in the horizontally arranged primary formwork support rib, the horizontally arranged secondary formwork support rib is arranged above the horizontally arranged primary formwork support rib, the primary formwork support rib and the secondary formwork support rib are arranged crosswise and connected by a connector.
[0005] The template support main rib is a special-shaped welded pipe, with longitudinal stiffening rib grooves on both sides of the web plate. A row of large circular holes is located at the center line of the side. A row of circular buckle holes is provided on the upper and lower sides of the large circular holes. A groove is provided on the top surface of the template support main rib, and plywood strips are provided in the groove.
[0006] The main support rib of the template is made of a 2-2.2mm thick galvanized aluminum-magnesium steel sheet of not less than Q355 strength, or a regular thin sheet that is pressed and hot-dip galvanized to form a large-section, high-strength bending stiffness EI value special welded pipe; the top surface of the main support rib of the template is provided with a pressed groove, and a 30mm wide and 12-15mm thick plywood strip is provided in the groove and fixed with self-tapping screws.
[0007] The self-weight of the main support beam of the template is controlled within 7 kg per linear meter, and the flexural stiffness EI value of the cross section is within 400 kNm. 2 Based on the above technical parameters that meet the desired arrangement of large spacing of 1200-1800mm under the allowable bearing capacity of the template support uprights, the cross-section of the special-shaped welded pipe with a width of 60mm, a height of 140mm, and a wall thickness of 2-2.2mm is selected through comparison and optimization.
[0008] On the web plates of the two sides of the main support beam of the template, two longitudinal stiffening ribs with a width of 10-15 mm and an inward indentation of 2-4 mm are symmetrically pressed at a position 20 mm away from the top and bottom surfaces. Large circular holes with a diameter of 50-60 mm and a uniform spacing of 150 mm are symmetrically punched in the middle of the web plates on both sides to facilitate the insertion of scaffolding steel pipes with a diameter of 48 mm. Circular buckle holes with a diameter of about 18 mm and a uniform spacing of 150 mm are punched at the top and bottom. These circular buckle holes are staggered with the large circular holes.
[0009] The template support secondary rib is a special-shaped welded pipe with long holes on both sides along its length and a groove on the top surface, with plywood strips inside the groove.
[0010] The secondary support rib of the template has a self-weight of 4 kg per meter and a cross-sectional bending stiffness EI value of 90 kNm. 2 The above technical parameters meet the requirements of a large-spacing arrangement of secondary formwork supports with a span of 1200-1800mm, arranged at intervals of 200-400mm under the formwork panel, under the allowable bearing capacity of the formwork support uprights.
[0011] The secondary rib of the template support has a cross-sectional width of 50mm, a height of 80mm, and a wall thickness of 2-2.2mm. On both sides of the secondary rib of the template support, long strip holes with a width of 16-18mm and a length of 60mm are symmetrically punched in the middle of the web plate with a height of 80mm. These holes are used to insert connectors for connecting the main and secondary ribs and to insert tie rods when used as back ribs of the wall template.
[0012] The connector is a U-shaped hook spring steel wire clip. The connector is made by bending a spring steel wire with a diameter of 2.5 to 3.5 mm into a U-shaped hook. When in use, the connector is passed through the long strip hole in the middle of the secondary rib of the template support, and the two legs of the connector are straddled in a figure-eight shape to hook the evenly distributed circular buckle holes on the main rib of the template support.
[0013] The method for connecting primary and secondary ribs for bearing the load of top concrete formwork according to the present invention includes the following steps:
[0014] Step 1: Based on the floor height and plan dimensions of the concrete beam and slab structure of the construction object, and according to the floor slab thickness and beam cross-section dimensions, plan the plan and elevation layout of the uprights of the disc-lock steel pipe scaffold formwork support.
[0015] Step 2: Based on the thickness of the concrete slab to be poured in the construction area, select 15mm thick plywood formwork panels and secondary formwork support ribs. Calculate the spacing L1 of the secondary formwork support ribs under the specified deflection control value according to the flexural stiffness value of the formwork panel section; calculate the span L2 of the secondary formwork support ribs under the specified deflection control value according to the flexural stiffness value of the formwork support ribs section.
[0016] Step 3: Based on the load value of the floor slab formwork within the span area of the secondary formwork support, calculate the span value L3 of the main formwork support under the specified deflection value according to the cross-sectional bending stiffness value of the main formwork support, and then normalize it to the modulus value of the horizontal bar of the support, and determine the arrangement spacing of the formwork support uprights in the span direction of the main formwork support.
[0017] Step 4: Complete the installation of the main formwork support ribs and secondary formwork support ribs at the top of the formwork support uprights. Connect the main formwork support ribs and secondary formwork support ribs with U-shaped hook spring steel wire clips. Finally, lay plywood formwork panels on the top surface of the secondary formwork support ribs and fix the formwork panels directly to the plywood strips embedded in the top of the secondary formwork support ribs with carpenter nails to complete the installation of the entire floor slab formwork project.
[0018] Beneficial Effects: Based on the standard load capacity of approximately 40kN for the Q355 steel standard 48×3.2mm pipe uprights of the disc-lock steel pipe scaffold, the required cross-sectional bending stiffness of the main and secondary ribs below the top template panel of the scaffold, matching the high load-bearing capacity of the uprights, was calculated using reverse thinking. Considering the work intensity and safety of workers laying the main and secondary ribs, reasonable cross-sectional dimensions of the special-shaped steel pipe main and secondary ribs were calculated. This effectively solved the problem of fixing the plywood template panel to the special-shaped welded pipe main and secondary ribs with carpenter's nails. It also solved the problem of assembly line processing of special-shaped welded pipes, resulting in lighter line weight and safer installation and dismantling of the main and secondary ribs. Furthermore, the use of galvanized aluminum-magnesium thin plates for direct high-frequency welding solved the problem of easy corrosion in harsh construction environments, achieving the beneficial effects of economical and efficient processing. The main and secondary beams and connectors of this template support system are more durable and less prone to deformation than the commonly known tool-type wooden I-beams and aluminum main and secondary beams. They are also highly automated in processing and forming, lightweight per linear meter, and have good overall economic indicators. This system can solve the pain points of current construction sites where the use of fastener steel pipes and timber as main and secondary beams results in large amounts of temporary turnover materials, dense spacing of uprights, low assembly and disassembly efficiency, and is not conducive to green construction. Attached Figure Description
[0019] Figure 1 ; Schematic diagram of the overall assembly of the lower unit frame of the disc-lock type steel pipe formwork support frame, the main and secondary ribs at the top of the uprights, and the formwork panel;
[0020] Figure 2 ;Schematic diagram of the main support beam of the template;
[0021] Figure 3 ;Schematic diagram of the secondary rib structure supporting the template;
[0022] Figure 4 ; Schematic diagram of U-shaped spring steel wire clips used to fix the main and secondary ribs.
[0023] The diagram includes: 1. Main support rib of template support; 2. Secondary support rib of template support; 3. Connector; 4. Upright pole of template support; 5. Adjustable support; 6. Groove; 7. Plywood strip; 8. Upper surface of plywood strip; 9. Self-tapping screw; 10. Longitudinal stiffening rib groove; 11. Large circular hole; 12. Circular buckle hole; 13. Long strip hole; 14. Template panel. Detailed Implementation
[0024] This invention discloses a load-bearing primary and secondary rib components and connection method for the top of the uprights of a concrete formwork support frame. The method involves pressing and high-frequency welding galvanized aluminum-magnesium oxide sheet (with a strength greater than Q355) into a shaped welded pipe with the required cross-sectional bending stiffness on an automated forming line. The welded pipe does not require hot-dip galvanizing. Alternatively, a 2-2.2mm thick sheet (with a strength greater than Q355) can be pressed and high-frequency welded into a shaped welded pipe with the required cross-sectional bending stiffness on an automated forming line, followed by hot-dip galvanizing.
[0025] The present invention provides a main and secondary support structure for supporting the top concrete formwork, comprising a main formwork support 1, a secondary formwork support 2, a connector 3, a formwork support upright 4, and an adjustable support 5. The upper top of the formwork support upright 4 is provided with an adjustable support 5, and the groove on the adjustable support 5 is embedded in the horizontally arranged main formwork support 1. The horizontally arranged secondary formwork support 2 is arranged above the horizontally arranged main formwork support 1. The main formwork support 1 and the secondary formwork support 2 are arranged crosswise and connected by the connector 3.
[0026] For the main support rib 1 of the formwork, considering the usage conditions of the formwork support during concrete pouring, calculations and analysis show that, to efficiently utilize the load-bearing capacity of the disc-lock steel pipe scaffold uprights, for standard 48mm diameter uprights, pouring a conventional 400mm thick basement roof slab, with plywood secondary rib spacing of 300-400mm and secondary rib span of 1800mm, the main rib is also 1800mm. The control deflection value of the main beam is calculated as 1 / 400 based on the standard load value, and the required bending stiffness EI value of the main beam section is calculated in reverse. The requirement is EI > 325kNm. 2 The main cross-section of the irregular welded pipe of this invention is 60mm wide and 140mm high. With a steel pipe wall thickness of 2mm, its design bending stiffness value EI reaches 400kNm. 2 The above can meet the requirement of greater than 325kNm 2 The requirements are met, and the line weight is around 6.5kg.
[0027] The template support main rib 1 is a special-shaped welded pipe. The web plates on both sides are provided with longitudinal stiffening rib grooves 10. A row of large circular holes 11 are located at the center line of the side. A row of circular buckle holes 12 are provided on the upper and lower sides of the large circular holes 11. A groove 6 is provided on the top surface of the template support main rib 1. Plywood strips 7 are provided in the groove 6.
[0028] The template support main rib 1 is made of a 2-2.2mm thick galvanized aluminum-magnesium steel sheet with a strength not lower than Q355, or a regular thin sheet that is pressed and hot-dip galvanized to form a large-section, high-strength bending stiffness EI value special welded pipe; the top surface of the template support main rib 1 is provided with a pressed groove 6, and a 30mm wide and 12-15mm thick plywood strip 7 is provided in the groove and fixed with self-tapping screws 9.
[0029] The self-weight of the main support beam 1 of the template is controlled within 7 kg per linear meter, and the bending stiffness EI value of the cross section is within 400 kNm. 2 Based on the above technical parameters that meet the desired arrangement of large spacing of 1200-1800mm under the allowable bearing capacity of the template support uprights 4, the cross-section of the special-shaped welded pipe is selected with a width of 60mm, a height of 140mm, and a wall thickness of 2-2.2mm.
[0030] On the web plates of the two sides of the main support rib 1, two longitudinal stiffening rib grooves 10, each 10-15 mm wide and recessed 2-4 mm inward, are symmetrically pressed at a position 20 mm from the top and bottom surfaces. Large circular holes 11, with a diameter of 50-60 mm and a spacing of 150 mm, are symmetrically punched in the middle of the web plates on both sides to facilitate the insertion of scaffolding steel pipes with a diameter of 48 mm. Circular buckle holes 12, with a diameter of about 18 mm and a spacing of 150 mm, are punched at the top and bottom. These circular buckle holes 12 are staggered from the large circular holes 11.
[0031] For the secondary joist 2 supporting the formwork, when pouring a standard 400mm thick basement roof slab, the spacing between the secondary beams in the plywood substructure is 300-400mm, and the span of the secondary joist is 1800mm. Calculate the control deflection value of the secondary joist (1 / 400) based on the standard load value, and then back-calculate the required stiffness EI value of the secondary joist. The required EI value is > 65kNm. 2 The secondary rib section of the irregular welded pipe of this invention has a width of 50mm and a height of 80mm. With a steel pipe wall thickness of 2mm, its section bending stiffness (EI) reaches 93kNm. 2 It can meet the requirement of greater than 65kNm 2 The requirements are met, and the weight of the line is only about 4kg.
[0032] The template support secondary rib 2 is a special-shaped welded pipe with elongated holes 13 on both sides along the length direction and a groove 6 on the top surface. The groove 6 contains plywood strips 7.
[0033] The template support secondary rib 2 has a self-weight of 4 kg per linear meter and a cross-sectional bending stiffness EI value of 90 kNm. 2 The above technical parameters meet the requirements of the formwork support secondary beams 2 arranged at intervals of 200-400mm under the formwork panel 14 with a large spacing of 1200-1800mm, which can meet the allowable bearing capacity of the formwork support uprights 4.
[0034] The template support secondary rib 2 is selected with a cross-sectional width of 50mm, a height of 80mm, and a wall thickness of 2-2.2mm for the special-shaped welded pipe. On both sides of the template support secondary rib 2, long strip holes 13 with a width of 16-18mm and a length of 60mm are symmetrically punched in the middle of the web plate with a height of 80mm. These holes are used for inserting the connector 3 for connecting the main and secondary ribs and for inserting tie rods when used as the back rib of the wall template.
[0035] The top surface of the main and secondary rectangular welded pipes is pressed with grooves 30mm wide and 12-15mm deep. 12mm or 15mm thick plywood template strips are embedded in these grooves and fixed to the pipe using countersunk screws spaced 300-600mm apart, which penetrate the groove walls. When laying the plywood template panels on the construction site, they can be directly fixed to the plywood strips using carpenter's nails.
[0036] The connector 3 is a U-shaped hook spring steel wire clip. The connector 3 is made of spring steel wire with a diameter of 2.5 to 3.5 mm bent into a U-shaped hook shape. When in use, the connector 3 is passed through the long strip hole 13 in the middle of the secondary rib 2 of the template support, and the two legs of the connector 3 are straddled in a figure-eight shape to hook the circular buckle holes 12 evenly distributed on the main rib 1 of the template support.
[0037] The method for connecting primary and secondary rib members for bearing the load of top concrete formwork, as invented in this invention, includes the following steps:
[0038] Step 1: Based on the floor height and plan dimensions of the concrete beam and slab structure of the construction object, and according to the floor slab thickness and beam cross-section dimensions, plan the plan and elevation layout of the uprights 4 of the disc-lock steel pipe scaffold formwork support;
[0039] Step 2: Based on the thickness of the concrete slab to be poured in the construction area, select 15mm thick plywood formwork panel 14 and formwork support secondary ribs 2. Calculate the spacing L1 of the formwork support secondary ribs 2 under the specified deflection control value based on the flexural stiffness value of the formwork panel 14. Calculate the span L2 of the formwork support secondary ribs 2 under the specified deflection control value based on the flexural stiffness value of the formwork support secondary ribs 2.
[0040] Step 3: Based on the load value of the floor slab formwork within the span area of the secondary formwork support 2, calculate the span value L3 of the main formwork support 1 under the specified deflection value according to the cross-sectional bending stiffness value of the main formwork support 1, and also normalize it to the modulus value of the horizontal bar of the support, and determine the arrangement spacing of the formwork support uprights 4 in the span direction of the main formwork support 1.
[0041] Step 4: Complete the installation of the main formwork support rib 1 and the secondary formwork support rib 2 at the top of the formwork support pole 4. The main formwork support rib 1 and the secondary formwork support rib 2 are connected by U-shaped hook spring steel wire clip connectors 3. Finally, lay the plywood formwork panel 14 on the top surface of the secondary formwork support rib 2 and fix the formwork panel 14 directly to the plywood strip 7 embedded in the top of the secondary formwork support rib 2 with carpenter nails to complete the installation of the entire floor slab formwork project.
[0042] Furthermore, based on the standard 15mm thickness of the plywood template 14 at the construction site, the secondary rib 2 of the template support is used as the support point of the template panel. The spacing L1 of the secondary rib 2 under load conditions is calculated according to the cross-sectional stiffness EI value of the template panel.
[0043] Furthermore, based on the EI value of the cross-sectional stiffness of the 50×80×2 secondary rib of the steel pipe with embedded plywood strip 7 on the irregular welded top surface, and according to the laying spacing L1 of the secondary rib 2 supporting the template, the span L2 of the secondary rib under load (i.e. the spacing of the main rib 1 supporting the template) is calculated.
[0044] Furthermore, based on the EI value of the cross-sectional stiffness of the main rib of the template support 60×140×2 steel pipe with plywood strip 7 embedded in the top of the irregular welded steel pipe, and according to the calculated span L2 of the secondary rib of the template support, the span L3 of the main rib under load is calculated.
[0045] Furthermore, the secondary support rib 2 of the template support is orthogonally placed on the top surface of the main support rib 1 of the template support. At the intersection of the secondary support rib 2 and the main support rib 1, one leg of the stamped U-shaped spring steel wire clip connector 3 is inserted into the elongated hole 13 in the middle of the side wall of the secondary support rib, and the two legs of the U-shaped spring steel wire clip 3 are symmetrically straddled on both sides of the secondary support rib 2 of the template support. The hooks at the ends of the legs are respectively inserted into the evenly distributed circular buckle holes 12 on the upper side wall of the main support rib to achieve fixation between the main and secondary supports.
Claims
1. A primary and secondary rib member for bearing the load of top concrete formwork, characterized in that... The main and secondary rib components include a template support main rib (1), a template support secondary rib (2), a connector (3), a template support upright (4), and an adjustable support (5); wherein, the upper top of the template support upright (4) is provided with an adjustable support (5), the groove on the adjustable support (5) is embedded in the horizontally arranged template support main rib (1), the horizontally arranged template support secondary rib (2) is arranged above the horizontally arranged template support main rib (1), the template support main rib (1) and the template support secondary rib (2) are arranged crosswise and connected by a connector (3); The template support main rib (1) is a special-shaped welded pipe. The web plates on both sides are provided with longitudinal stiffening rib grooves (10). A row of large circular holes (11) are located at the center line of the side. A row of circular buckle holes (12) are provided on the upper and lower sides of the large circular holes (11). A groove (6) is provided on the top surface of the template support main rib (1). Plywood strips (7) are provided in the groove (6). The template support secondary rib (2) is a special-shaped welded pipe with long holes (13) on both sides along the length direction and a groove (6) on the top surface. Plywood strips (7) are provided in the groove (6). The connector (3) is a U-shaped hook spring steel wire clip. The connector (3) is made of spring steel wire with a diameter of 2.5 to 3.5 mm bent into a U-shaped hook shape. When in use, the connector (3) is passed through the long hole (13) in the middle of the template support secondary rib (2), and the two legs of the connector (3) are hooked into the circular buckle holes (12) evenly distributed on the template support main rib (1) in a figure-eight straddle shape.
2. The primary and secondary rib members for bearing the load of the top concrete formwork according to claim 1, characterized in that... The template support main rib (1) is made of a thin plate of galvanized aluminum-magnesium steel with a strength of not less than 2-2.2 mm, or a thin plate of ordinary steel, which is hot-dip galvanized and processed into a special-shaped welded pipe with a large cross section and a high bending stiffness EI value; the top surface of the template support main rib (1) is provided with a pressed groove (6), and a plywood strip (7) with a width of 30 mm and a thickness of 12-15 mm is provided in the groove and fixed with self-tapping screws (9).
3. The primary and secondary rib members for bearing the load of the top concrete formwork according to claim 2, characterized in that... The main support beam (1) of the template has a self-weight controlled within 7 kg per meter and a cross-sectional bending stiffness EI value of 400 kNm. 2 The above can meet the expected technical parameters of 1200-1800mm large spacing arrangement of the template support uprights (4) under the allowable bearing capacity. In comparison, the cross-section width of the special welded pipe is 60mm, the height is 140mm, and the wall thickness is 2-2.2mm.
4. The primary and secondary rib members for bearing the load of the top concrete formwork according to claim 3, characterized in that... On the web plates of the two sides of the main support rib (1), two longitudinal stiffening rib grooves (10) with a width of 10-15mm and an inward indentation of 2-4mm are symmetrically pressed at a position 20mm away from the top and bottom surfaces. Large circular holes (11) with a diameter of 50-60mm and a uniform spacing of 150mm are symmetrically punched in the middle of the web plates on both sides to facilitate the insertion of scaffold steel pipes with a diameter of 48mm. Circular buckle holes (12) with a diameter of 18mm and a uniform spacing of 150mm are punched on the upper and lower parts. The circular buckle holes (12) are staggered from the large circular holes (11).
5. The primary and secondary rib members for bearing the load of the top concrete formwork according to claim 1, characterized in that... The template support secondary rib (2) has a self-weight of 4 kg per meter and a cross-sectional bending stiffness EI value of 90 kNm. 2 The above are the technical parameters that can meet the requirements of the template support secondary beams (2) arranged at intervals of 200-400mm under the template panel (14) under the allowable bearing capacity of the template support uprights (4) and the large spacing of the span of the secondary beams (2) is 1200-1800mm.
6. The primary and secondary rib members for bearing the load of the top concrete formwork according to claim 5, characterized in that... The template support secondary rib (2) is made of a special-shaped welded pipe with a cross-sectional width of 50mm, a height of 80mm, and a wall thickness of 2-2.2mm. On both sides of the template support secondary rib (2), long strip holes (13) with a width of 16-18mm and a length of 60mm are symmetrically punched in the middle of the web plate with a height of 80mm. These holes are used to insert the connecting piece (3) for connecting the main and secondary ribs and to insert the tie rod when used as the back rib of the wall template.
7. A method for connecting primary and secondary ribs for bearing the load of top concrete formwork as described in claim 1, characterized in that... Includes the following steps: Step 1: Based on the concrete beam and slab structure floor height and plan dimensions of the construction object, and according to the floor slab thickness and beam cross-section dimensions, plan the plan and elevation layout of the uprights (4) of the disc-lock steel pipe scaffold formwork support; Step 2: Based on the thickness of the concrete slab in the construction area, select 15mm thick plywood formwork panels (14) and secondary formwork support ribs (2). Calculate the spacing L1 of the secondary formwork support ribs (2) under the specified deflection control value based on the cross-sectional bending stiffness value of the formwork panels (14); calculate the span L2 of the secondary formwork support ribs (2) under the specified deflection control value based on the cross-sectional bending stiffness value of the secondary formwork support ribs (2). Step 3: Based on the load value of the floor slab formwork within the span area of the secondary formwork support (2), calculate the span value L3 of the main formwork support (1) under the specified deflection value according to the cross-sectional bending stiffness value of the main formwork support (1), and also normalize it to the modulus value of the horizontal bar of the support, and determine the arrangement spacing of the formwork support uprights (4) in the span direction of the main formwork support (1). Step 4: Complete the installation of the main formwork support rib (1) and the secondary formwork support rib (2) at the top of the formwork support pole (4). The main formwork support rib (1) and the secondary formwork support rib (2) are connected by U-shaped hook spring steel wire clip connectors (3). Finally, plywood formwork panels (14) are laid on the top surface of the secondary formwork support rib (2), and the formwork panels (14) are directly fixed to the plywood strips (7) embedded in the top of the secondary formwork support rib (2) with carpenter nails to complete the installation of the entire floor slab formwork project.
Citation Information
Patent Citations
Monitoring system for monitoring axial force of disc buckle type high formwork vertical rod