Optimization control method, device and equipment of power van and storage medium

By analyzing the historical operation data of the power vehicle, using neural network model and the beetle optimization algorithm to predict the output power, the problems of power vehicle control efficiency and grid stability in the grid-connected environment are solved, and the precise control of the power vehicle is achieved and Improved grid stability.

CN118944144AActive Publication Date: 2024-11-12NANJING SUYI IND

Patent Information

Application Number
CN202410989274.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-12
Estimated Expiration
2044-07-23

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively achieve this goal in how to accurately control multiple power vehicles in a grid-connected operating environment to improve the efficiency of grid-connected operation and the stability of the power grid.

Method used

By collecting historical operation data of the power supply vehicle, based on the preset grid load model, state model and environmental factor model, the neural network model is used to predict the output power, and iterative updates are performed in combination with the dung beetle optimization algorithm to determine the target output power to achieve optimization control .

Benefits of technology

Accurate control of power supply vehicles is achieved, the efficiency of grid-connected operation and the stability of the power grid are improved, and the fluctuations in the power grid are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944144A_ABST
    Figure CN118944144A_ABST
Patent Text Reader

Abstract

The invention discloses an optimization control method, device and equipment for a power van and a storage medium. The method comprises the following steps: in response to an optimization control request for a plurality of power supply vehicles in a grid-connected operation environment, determining target power supply vehicles in grid-connected operation, and acquiring historical operation data of each target power supply vehicle in a preset time period; based on a preset power grid load model, a state model and an environmental factor model, according to the historical operation data, determining predicted operation data of each target power supply vehicle; and according to the target neural network model and the predicted operation data, determining target output power corresponding to each target energy vehicle so as to perform optimization control on each target energy vehicle. According to the technical scheme provided by the invention, the operation data of the power supply vehicle can be comprehensively analyzed, so that the accurate output power is predicted by adopting the neural network model, the accurate control on the target energy vehicle is realized, the grid-connected operation efficiency of the power supply vehicle is improved, and the stability of a power grid is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power grids, and in particular to an optimization control method, device, equipment and storage medium for a power supply vehicle. Background Art

[0002] With the increasing popularity of renewable energy and the continuous improvement of the intelligence level of power grids, power supply vehicles, as an innovative means of energy supply, are of great significance in ensuring the safe, stable and efficient operation of the power grid in terms of efficiency and stability of grid-connected operations.

[0003] Therefore, how to conduct a comprehensive analysis of the operating data of the power supply vehicle, so as to use the neural network model to predict the accurate output power, realize precise control of the target energy vehicle, improve the efficiency of the power supply vehicle's grid-connected operation, and enhance the stability of the power grid is an urgent problem to be solved. Summary of the invention

[0004] The present invention provides an optimization control method, device, equipment and storage medium for a power supply vehicle to achieve precise control of a target energy vehicle, improve the efficiency of the power supply vehicle's grid-connected operation, and enhance the stability of the power grid.

[0005] According to one aspect of the present invention, there is provided an optimization control method for a power supply vehicle, comprising:

[0006] In response to the optimization control request for multiple power supply vehicles in the grid-connected operation environment, the target power supply vehicle for grid-connected operation is determined, and the historical operation data of each target power supply vehicle within a preset time period is collected;

[0007] Based on the preset grid load model, state model and environmental factor model, and according to historical operation data, the predicted operation data of each target power supply vehicle is determined;

[0008] According to the target neural network model and the predicted operation data, the target output power corresponding to each target energy vehicle is determined to optimize the control of each target energy vehicle.

[0009] According to another aspect of the present invention, there is provided an optimization control device for a power supply vehicle, comprising:

[0010] The acquisition module is used to respond to the optimization control request for multiple power supply vehicles in the grid-connected operation environment, determine the target power supply vehicle for grid-connected operation, and acquire the historical operation data of each target power supply vehicle within a preset time period;

[0011] A determination module is used to determine the predicted operation data of each target power supply vehicle based on a preset grid load model, a state model and an environmental factor model and according to historical operation data;

[0012] The control module is used to determine the target output power corresponding to each target energy vehicle according to the target neural network model and the predicted operation data, so as to optimize the control of each target energy vehicle.

[0013] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:

[0014] at least one processor; and

[0015] a memory communicatively connected to the at least one processor; wherein,

[0016] The memory stores a computer program that can be executed by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the optimization control method of the power supply vehicle described in any embodiment of the present invention.

[0017] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the optimization control method of a power supply vehicle described in any embodiment of the present invention when executed.

[0018] According to another aspect of the present invention, the present invention further provides a computer program product, the computer program product comprising a computer program, and when the computer program is executed by a processor, the optimization control method of the power supply vehicle of any embodiment of the present invention is implemented.

[0019] The technical solution of the embodiment of the present invention responds to the optimization control request for multiple power supply vehicles in the grid-connected operation environment, determines the target power supply vehicle for grid-connected operation, and collects the historical operation data of each target power supply vehicle within a preset time period; based on the preset power grid load model, state model and environmental factor model, according to the historical operation data, determines the predicted operation data of each target power supply vehicle; according to the target neural network model and the predicted operation data, determines the target output power corresponding to each target energy vehicle, so as to optimize the control of each target energy vehicle. By comprehensively analyzing the operation data of the power supply vehicle, the neural network model is used to predict the accurate output power, which can achieve precise control of the target energy vehicle, improve the efficiency of the grid-connected operation of the power supply vehicle, and enhance the stability of the power grid.

[0020] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0022] Figure 1 is a flow chart of an optimization control method for a power supply vehicle provided in Embodiment 1 of the present invention;

[0023] Figure 2 is a flow chart of an optimization control method for a power supply vehicle provided in Embodiment 2 of the present invention;

[0024] Figure 3 It is a structural block diagram of an optimization control device for a power supply vehicle provided in Embodiment 3 of the present invention;

[0025] Figure 4 It is a schematic diagram of the structure of an electronic device provided in Embodiment 4 of the present invention. DETAILED DESCRIPTION

[0026] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0027] It should be noted that the terms "first", "second", "target", "candidate", "alternative", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices. The acquisition, storage, use, processing, etc. of data in the technical solution of this application comply with the relevant provisions of national laws and regulations.

[0028] Embodiment 1

[0029] Figure 11 is a flow chart of an optimization control method for a power supply vehicle provided in the first embodiment of the present invention; this embodiment is applicable to the case of optimizing the output power of multiple power supply vehicles in a grid-connected environment. The method can be executed by an optimization control device of the power supply vehicle. The optimization control device of the power supply vehicle can be implemented in the form of hardware and / or software. The optimization control device of the power supply vehicle can be configured in an electronic device, such as an electronic device with an optimization control function for a power supply vehicle, and executed by a grid-connected control system, such as Figure 1 As shown, the optimization control method of the power supply vehicle includes:

[0030] S101. In response to an optimization control request for multiple power supply vehicles in a grid-connected operation environment, a target power supply vehicle for grid-connected operation is determined, and historical operation data of each target power supply vehicle within a preset time period is collected.

[0031] Among them, the optimization control request refers to a request for predicting the output power of multiple power supply vehicles in a grid-connected operating environment for optimization control. The target power supply vehicle refers to the power supply vehicle managed under the grid-connected control system. The number of target power supply vehicles can be at least two. The preset time period refers to a preset historical time period, and the preset time period can be, for example, 5 minutes before the current moment. Historical operation data refers to relevant data when each target energy vehicle is operating within a preset time period. The historical operation data may include grid load values, the status of the power supply vehicle, and environmental factors. Environmental factors may include temperature, humidity, wind speed, solar radiation, rainfall, and dust concentration.

[0032] Optionally, when the grid-connected control system detects optimization control requests for multiple power supply vehicles in a grid-connected operating environment, it can determine the power supply vehicle in the grid-connected environment managed by the system as the target power supply vehicle. Furthermore, it can interact with each target power supply vehicle to obtain the historical operating data of each target power supply vehicle within a preset time period, and it can also directly obtain the historical operating data of each target power supply vehicle within a preset time period from a preset storage module.

[0033] S102: Based on a preset grid load model, state model and environmental factor model, and according to historical operation data, the predicted operation data of each target power supply vehicle is determined.

[0034] Among them, the grid load model refers to a preset model for predicting the grid load value of the target power supply vehicle at the next moment, and the grid load value refers to the total load value of the power supply network composed of each target power supply vehicle. The state model refers to a preset model for predicting the power state value of the target power supply vehicle at the next moment. The environmental factor model refers to a preset model for predicting the environmental factor value of the target power supply vehicle at the next moment. The predicted operation data may include the predicted grid load value, the predicted power state value, and the predicted environmental factor vector.

[0035] Optionally, the historical grid load values ​​in the historical operation data can be substituted into a preset grid load model to obtain the corresponding predicted grid load values, the historical power state values ​​in the historical operation data can be substituted into a preset state model to obtain the corresponding predicted power state values, the historical environmental factors in the historical operation data can be integrated to generate a historical environmental factor vector and substituted into the preset environmental factor model to obtain the corresponding predicted environmental factor vector, and the predicted operation data can be generated based on the predicted grid load values, predicted power state values ​​and predicted environmental factor vector.

[0036] Exemplarily, the grid load model may be:

[0037]

[0038] Where L(t) represents the grid load value at time t, μ represents the grid load value when there are no other factors affecting it, and φ i The weight coefficient of the load L(ti) at time ti on the load L(t) at the current time t, θ j It represents the weight coefficient of the influence of the random error of the power grid load at time tj on the load at time t, ε(tj) represents the random error value of the power grid load at time tj, p represents the time lag of the historical load data, that is, the influence of the load value at p previous time points on the current load is considered, and q represents the time lag of the past random error, that is, the influence of the random error at q previous time points on the current load is considered.

[0039] Exemplarily, the state model may be:

[0040] S i (t) = S i (t-1)+α·A c (t)-β·A dc (t)+γ·ε(t)

[0041] Among them, S i (t) represents the state value of the power supply vehicle i at time t, α and β represent the efficiency coefficients of charging and discharging respectively, and A c and A dc They represent the charging and discharging power of power supply vehicle i at time t, γ is a parameter for adjusting the influence of random fluctuations of environmental factors on the state of the power supply vehicle, and ε(t) represents the random error value of environmental factors at time t.

[0042] Exemplarily, the environmental factor model may be:

[0043] E(t)=ρ·E(t-1)+ε(t)

[0044] Among them, E(t) and E(t-1) represent the environmental factor vectors at time t and time t-1 respectively. The environmental factors include temperature, humidity, wind speed, solar radiation, rainfall and dust concentration. ρ is the autocorrelation coefficient, which represents the correlation between environmental factors at adjacent time points. ε(t) represents the random error value of the environmental factor at time t.

[0045] S103. Determine the target output power corresponding to each target energy vehicle according to the target neural network model and the predicted operation data, so as to optimize the control of each target energy vehicle.

[0046] Among them, the target neural network refers to a preset network used to evaluate the correlation between the predicted grid load value, the predicted power state value and the predicted environmental factor vector to determine the output power adjustment value. The input of the target neural network is the predicted operation data, and the output is the output power adjustment value.

[0047] Optionally, the predicted operating data can be input into the target neural network model to obtain the output power adjustment value corresponding to each target energy vehicle, and further determine the target output power corresponding to each target energy vehicle based on the historical output power and output power adjustment value of each target energy vehicle to optimize the control of each target energy vehicle.

[0048] Exemplarily, the output-input relationship of the target neural network can be expressed by the following formula:

[0049] y=[L(t),S1(t),S2(t)...,S n (t),E(t)]

[0050] Where, L(t) represents the grid load value at time t, S i (t) represents the state value of the target power supply vehicle i at time t, E(t) represents the environmental factor vector at time t; y represents the output power adjustment value of each target power supply vehicle. Specifically, y=[P1,P2,...,P n ], where P i Represents the output power adjustment value of the i-th target power supply vehicle.

[0051] Optionally, the target output power corresponding to each target energy vehicle is determined according to the target neural network model and the predicted operating data, including: iteratively updating the predicted operating data based on the dung beetle optimization algorithm and the target neural network model until the iteration end condition is met; if it is detected that the iteration end condition is met, determining the target output power corresponding to each target energy vehicle according to the final operating data and the target neural network model.

[0052] Optionally, based on the dung beetle optimization algorithm and the target neural network model, the predicted operation data is iteratively updated until the iteration end condition is met, including: based on the dung beetle optimization algorithm and the target neural network model, according to the predicted operation data, predicting the predicted output power of each target energy vehicle; based on the predicted output power and the predicted operation data, performing individual evaluation of candidate dung beetles based on a preset reward function, and updating the predicted operation data according to the evaluation results; using the updated predicted operation data to iteratively perform prediction operations and evaluation operations until it is detected that the iteration end condition is met.

[0053] Among them, the Dung Beetle Optimizer (DBO) refers to a preset optimization algorithm used to determine the optimal operating data. The predicted output power refers to the power that is ultimately used to instruct each target energy vehicle to adjust the power to achieve optimized control. The reward function refers to a preset function used to evaluate the quality of each candidate dung beetle individual. The prediction operation refers to the operation of using the target neural network to predict the predicted output power corresponding to each predicted operating data, and the evaluation operation refers to the operation of determining the evaluation value based on the preset reward function.

[0054] Optionally, the predicted operating data of the target energy vehicle can be divided into multiple groups, and each group of predicted operating data of the target energy vehicle can be determined as the corresponding candidate dung beetle individuals. For each candidate dung beetle individual, a process of predicting the predicted output power and evaluating based on the reward function is performed, and then iterated to determine the optimal dung beetle individual from the candidate dung beetle individuals.

[0055] Optionally, based on the dung beetle optimization algorithm and the target neural network model, the predicted output power of each target energy vehicle is predicted according to the predicted operation data, including: based on the dung beetle optimization algorithm, the predicted operation data of each group of target energy vehicles is determined as the corresponding candidate dung beetle individuals; for each candidate dung beetle individual, based on the target neural network model, the corresponding candidate adjustment value is determined, and the candidate output power is determined according to the candidate adjustment value and the historical output power of each target energy vehicle; based on a preset reward function and a preset sorting algorithm, the optimal dung beetle individual is determined from the candidate dung beetle individuals according to the candidate output power and the predicted operation data, and the candidate output power corresponding to the optimal dung beetle individual is determined as the predicted output power.

[0056] The candidate adjustment value refers to the power adjustment value corresponding to the candidate dung beetle individual. The preset sorting algorithm may be, for example, a non-dominated sorting algorithm.

[0057] Optionally, for each candidate dung beetle individual, the corresponding predicted operation data can be input into the target neural network model to obtain the corresponding candidate adjustment value, and the sum of the candidate adjustment value and the historical output power of each target energy vehicle can be determined as the candidate output power.

[0058] Optionally, based on a preset reward function and a preset sorting algorithm, the optimal dung beetle individual is determined from the candidate dung beetle individuals according to the candidate output power and the predicted operating data, including: based on a preset reward function, determining the evaluation value corresponding to each candidate dung beetle individual according to the candidate output power and the predicted operating data; based on a preset sorting algorithm, sorting the candidate dung beetle individuals according to the evaluation value to obtain a sorting result, and determining the optimal dung beetle individual from the candidate dung beetle individuals according to the sorting result.

[0059] Exemplarily, the reward function can be expressed by the following formula:

[0060]

[0061] Among them, λ1, λ2 and λ3 are the grid load weight coefficient, output power weight coefficient and state weight coefficient respectively, L(t) represents the grid load at time t, OP i (t) represents the output power of the i-th power supply vehicle at time t, Indicates the matching degree between the output power of the power supply vehicle and the load of the power grid. The smaller the value, the closer the output power of the power supply vehicle is to the actual load demand of the power grid. It represents the standard deviation between the grid load and the output power of all power supply vehicles. A smaller standard deviation means a lower grid load volatility. i (t) represents the state value of power car i at time t, represents the ideal state value of power car i, Indicates the gap between the state of the power supply vehicle and the ideal state. The smaller the value, the closer the state of the power supply vehicle is to the ideal state and the more stable the state of the power supply vehicle is.

[0062] Exemplarily, a certain number of candidate dung beetle individuals can be randomly generated, each candidate dung beetle individual represents a candidate solution, that is, a possible adjustment value, and these adjustment values ​​are represented by the parameters of the target neural network; for each dung beetle individual, based on the current environmental model, interaction is performed to perform a series of grid-connected operations, specifically including: in a simulated environment, the dung beetle individual performs a grid-connected operation according to the adjustment value output by its neural network model, and after each operation, the changes in the grid load, the power supply vehicle state and the environmental factors are recorded, and the performance of each dung beetle individual on different optimization objectives is calculated according to a predefined reward function to determine an evaluation value; according to the characteristics of multi-objective optimization problems, a non-dominated sorting algorithm is used to sort the dung beetle individuals according to their performance and assign them to solution sets of different levels, and the optimization objectives of the sorting process mainly include the response effect of the power supply vehicle grid-connected operation on the grid load, the volatility of the grid load and the stability of the power supply vehicle state; finally, according to the non-dominated sorting results, the position of the dung beetle individual is updated through operations such as mutation, crossover, and bootstrapping, that is, the target neural network model parameters corresponding to each dung beetle individual are updated.

[0063] Among them, the non-dominated sorting algorithm is a commonly used method in multi-objective optimization problems. Its purpose is to sort candidate solutions according to the non-dominated relationship of multiple objectives to identify one or more solution sets (called Pareto frontier or Pareto frontier solution set) that perform well on all objectives and have no absolute advantage over each other, that is, any solution that is better on a certain objective will become worse on other objectives.

[0064] Exemplarily, according to the characteristics of the multi-objective optimization problem, a non-dominated sorting algorithm is used to sort the dung beetle individuals according to their performance and assign them to solution sets of different levels, including the following steps S33-1 to S33-7:

[0065] S33-1, create an empty list F for storing Pareto frontiers at all levels, initialize the dominated count n to 0 for each dung beetle individual p, and initialize the dominated individual set Sp;

[0066] S33-2, for each pair of dung beetle individuals p and q, compare their performance on each optimization goal. If p dominates q, add q to Sp, otherwise increase the dominated count n by 1;

[0067] S33-3, add all dung beetle individuals p whose dominated count n is 0 to the first-level Pareto frontier F1;

[0068] S33-4, initialize i=1, when Fi is not empty, initialize the empty list Q;

[0069] S33-5, for each individual p in Fi, for each individual q it dominates, the dominated count n is reduced by 1. If the dominated count n of individual q is 0 after the reduction, q is added to Q;

[0070] S33-6, add 1 to the value of i and use Q as the new Pareto frontier Fi of the i-th level;

[0071] S33-7, repeat S33-5 to S33-6 until all dung beetle individuals are graded.

[0072] Exemplarily, according to the non-dominated sorting result, the individual positions of dung beetles are updated through operations such as mutation, crossover, and guidance, including the following steps S34-1 to S34-3:

[0073] S34-1, for the first-level Pareto frontier individuals, fine-tune the parameters of these individuals and exchange some parameters with other first-level Pareto frontier individuals;

[0074] S34-2, for the secondary Pareto frontier individuals, one or more dung beetle individuals with the best performance are selected from the first-level Pareto frontier, and the neural network model parameters of the secondary Pareto frontier individuals are adjusted to make them close to the parameters of the selected first-level frontier individuals;

[0075] S34-3, for the Pareto frontier individuals at level three and below, the parameters of these individuals are significantly adjusted, the worst performing individuals are eliminated and new individuals are regenerated.

[0076] Optionally, if it is detected that the iteration end condition is met, the target output power corresponding to each target energy vehicle is determined based on the final operating data and the target neural network model, including: if it is detected that the iteration end condition is met, the final operating data is input into the target neural network model to obtain the target adjustment value of the output power of each target power vehicle; based on the target adjustment amount, the target output power of each target energy vehicle is determined, and based on the target output power, each target energy vehicle is optimized and controlled.

[0077] The final running data refers to the latest predicted running data. The iteration end condition may be reaching the maximum training generation or reaching the convergence accuracy requirement.

[0078] Optionally, the sum of the target adjustment value and the historical output power of each target energy vehicle can be determined as the target output power of each target energy vehicle, and each target energy vehicle can be controlled to perform grid-connected operation to achieve the corresponding target output power, thereby achieving optimized control of each target energy vehicle.

[0079] The technical solution of the embodiment of the present invention responds to the optimization control request for multiple power supply vehicles in the grid-connected operation environment, determines the target power supply vehicle for grid-connected operation, and collects the historical operation data of each target power supply vehicle within a preset time period; based on the preset power grid load model, state model and environmental factor model, according to the historical operation data, determines the predicted operation data of each target power supply vehicle; according to the target neural network model and the predicted operation data, determines the target output power corresponding to each target energy vehicle, so as to optimize the control of each target energy vehicle. By comprehensively analyzing the operation data of the power supply vehicle, the neural network model is used to predict the accurate output power, which can achieve precise control of the target energy vehicle, improve the efficiency of the grid-connected operation of the power supply vehicle, and enhance the stability and reliability of the power grid.

[0080] Embodiment 2

[0081] Figure 2 It is a flow chart of an optimization control method for a power supply vehicle provided in the second embodiment of the present invention; based on the above embodiment, this embodiment provides a preferred example of realizing the optimization control of the power supply vehicle by using a neural network model, a dung beetle optimization algorithm and a preset reward function.

[0082] like Figure 2 As shown, the method includes the following process:

[0083] S201. In response to an optimization control request for multiple power supply vehicles in a grid-connected operation environment, a target power supply vehicle for grid-connected operation is determined, and historical operation data of each target power supply vehicle within a preset time period is collected.

[0084] S202: Based on a preset grid load model, state model and environmental factor model, and according to historical operation data, the predicted operation data of each target power supply vehicle is determined.

[0085] S203, based on the dung beetle optimization algorithm and the target neural network model, according to the predicted operation data, predict the predicted output power of each target energy vehicle.

[0086] S204: According to the predicted output power and the predicted operation data, the candidate dung beetle individuals are evaluated based on a preset reward function, and the predicted operation data is updated according to the evaluation results.

[0087] S205. Iteratively perform prediction operations and evaluation operations using the updated prediction operation data until it is detected that an iteration end condition is met.

[0088] S206. If it is detected that the iteration end condition is met, the final operation data is input into the target neural network model to obtain the target adjustment value of the output power of each target power supply vehicle.

[0089] S207. Determine the target output power of each target energy vehicle according to the target adjustment amount, and optimize and control each target energy vehicle according to the target output power.

[0090] The technical solution of the present invention, by constructing an operating environment model of the power grid and the power supply vehicle, can comprehensively consider multiple factors such as the power grid load, the status of the power supply vehicle and environmental factors, effectively reduce power grid fluctuations, and at the same time predict the changes in the power grid load through a deep learning neural network, and determine the optimization strategy of the power supply vehicle in combination with the dung beetle optimization algorithm, which can improve the grid connection efficiency and power grid stability, and help promote the improvement of the level of power grid intelligence.

[0091] Embodiment 3

[0092] Figure 3: is a structural block diagram of an optimization control device for a power supply vehicle provided in the third embodiment of the present invention; this embodiment can be applied to the case of optimizing the output power of multiple power supply vehicles in a grid-connected environment. The optimization control device for a power supply vehicle provided in the embodiment of the present invention can execute the optimization control method for a power supply vehicle provided in any embodiment of the present invention, and has functional modules and beneficial effects corresponding to the execution method; the optimization control device for a power supply vehicle can be implemented in the form of hardware and / or software, and configured in an electronic device having the optimization control function of a power supply vehicle, such as Figure 3 As shown, the optimization control device of the power supply vehicle specifically includes:

[0093] The acquisition module 301 is used to respond to the optimization control request for multiple power supply vehicles in the grid-connected operation environment, determine the target power supply vehicle for grid-connected operation, and acquire the historical operation data of each target power supply vehicle within a preset time period;

[0094] A determination module 302 is used to determine the predicted operation data of each target power supply vehicle based on a preset grid load model, a state model and an environmental factor model and according to historical operation data;

[0095] The control module 303 is used to determine the target output power corresponding to each target energy vehicle according to the target neural network model and the predicted operation data, so as to optimize the control of each target energy vehicle.

[0096] The technical solution of the embodiment of the present invention responds to the optimization control request for multiple power supply vehicles in the grid-connected operation environment, determines the target power supply vehicle for grid-connected operation, and collects the historical operation data of each target power supply vehicle within a preset time period; based on the preset power grid load model, state model and environmental factor model, according to the historical operation data, determines the predicted operation data of each target power supply vehicle; according to the target neural network model and the predicted operation data, determines the target output power corresponding to each target energy vehicle, so as to optimize the control of each target energy vehicle. By comprehensively analyzing the operation data of the power supply vehicle, the neural network model is used to predict the accurate output power, which can achieve precise control of the target energy vehicle, improve the efficiency of the grid-connected operation of the power supply vehicle, and enhance the stability of the power grid.

[0097] Furthermore, the control module 303 may include:

[0098] An iteration unit, used for iteratively updating the prediction operation data based on the dung beetle optimization algorithm and the target neural network model until an iteration end condition is met;

[0099] The determination unit is used to determine the target output power corresponding to each target energy vehicle based on the final operating data and the target neural network model if it is detected that the iteration end condition is met.

[0100] Furthermore, the iteration unit may include:

[0101] A prediction subunit, used to predict the predicted output power of each target energy vehicle based on the predicted operation data based on the dung beetle optimization algorithm and the target neural network model;

[0102] An evaluation subunit, used to evaluate individual candidate dung beetles based on the predicted output power and the predicted operation data and a preset reward function, and to update the predicted operation data according to the evaluation result;

[0103] The detection subunit is used to iteratively perform prediction operations and evaluation operations using the updated prediction operation data until it is detected that an iteration end condition is met.

[0104] Furthermore, the prediction subunit is specifically used for:

[0105] Based on the dung beetle optimization algorithm, the predicted operation data of each group of target energy vehicles is determined as the corresponding candidate dung beetle individuals;

[0106] For each candidate dung beetle individual, a corresponding candidate adjustment value is determined based on the target neural network model, and a candidate output power is determined based on the candidate adjustment value and the historical output power of each target energy vehicle;

[0107] Based on a preset reward function and a preset sorting algorithm, the optimal dung beetle individual is determined from the candidate dung beetle individuals according to the candidate output powers and the predicted operating data, and the candidate output power corresponding to the optimal dung beetle individual is determined as the predicted output power.

[0108] Furthermore, the prediction subunit is specifically used for:

[0109] Based on the preset reward function, the evaluation value corresponding to each candidate dung beetle individual is determined according to the candidate output power and the predicted operation data;

[0110] Based on a preset sorting algorithm, the candidate dung beetle individuals are sorted according to the evaluation values ​​to obtain a sorting result, and according to the sorting result, the optimal dung beetle individual is determined from the candidate dung beetle individuals.

[0111] Furthermore, the determination unit is specifically used for:

[0112] If it is detected that the iteration end condition is met, the final operation data is input into the target neural network model to obtain the target adjustment value of the output power of each target power supply vehicle;

[0113] According to the target adjustment amount, the target output power of each target energy vehicle is determined, and according to the target output power, each target energy vehicle is optimized and controlled.

[0114] Embodiment 4

[0115] Figure 4 It is a schematic diagram of the structure of an electronic device provided in Embodiment 4 of the present invention. Figure 4 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.

[0116] like Figure 4 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.

[0117] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0118] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as the optimization control method of the power supply vehicle.

[0119] In some embodiments, the optimization control method of the power supply vehicle can be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program can be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the optimization control method of the power supply vehicle described above can be performed. Alternatively, in other embodiments, the processor 11 can be configured to execute the optimization control method of the power supply vehicle in any other appropriate manner (for example, by means of firmware).

[0120] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), system-on-chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0121] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0122] In the context of the present invention, a computer readable storage medium may be a tangible medium that may contain or store a computer program for use by or in conjunction with an instruction execution system, device, or equipment. A computer readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. Alternatively, a computer readable storage medium may be a machine readable signal medium. A more specific example of a machine readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0123] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).

[0124] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.

[0125] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.

[0126] In one embodiment, the embodiment of the present invention also includes a computer program product, the computer program product includes a computer program, and the computer program implements the optimization control method of the power supply vehicle of any embodiment of the present invention when executed by the processor. In the process of implementation, the computer program product can be written in one or more programming languages ​​or a combination thereof to perform the computer program code of the present invention, and the programming language includes an object-oriented programming language, such as Java, Smalltalk, C++, and also includes a conventional procedural programming language, such as "C" language or similar programming language. The program code can be executed completely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on the remote computer, or completely on the remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet). It should be understood that the various forms of the process shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially, or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document is not limited here. The above specific implementation methods do not constitute limitations on the scope of protection of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. An optimization control method for a power supply vehicle, characterized in that: include: In response to the optimization control request for multiple power supply vehicles in the grid-connected operation environment, the target power supply vehicle for grid-connected operation is determined, and the historical operation data of each target power supply vehicle within a preset time period is collected; Based on the preset grid load model, state model and environmental factor model, and according to historical operation data, the predicted operation data of each target power supply vehicle is determined; According to the target neural network model and the predicted operation data, the target output power corresponding to each target energy vehicle is determined to optimize the control of each target energy vehicle.

2. The method according to claim 1, characterized in that According to the target neural network model and predicted operation data, the target output power corresponding to each target energy vehicle is determined, including: Based on the dung beetle optimization algorithm and the target neural network model, the predicted operation data is iteratively updated until the iteration end condition is met; If it is detected that the iteration end condition is met, the target output power corresponding to each target energy vehicle is determined based on the final operating data and the target neural network model.

3. The method according to claim 2, characterized in that Based on the dung beetle optimization algorithm and the target neural network model, the predicted operation data is iteratively updated until the iteration end conditions are met, including: Based on the dung beetle optimization algorithm and the target neural network model, the predicted output power of each target energy vehicle is predicted according to the predicted operation data; According to the predicted output power and the predicted operation data, the candidate dung beetle individuals are evaluated based on a preset reward function, and the predicted operation data is updated according to the evaluation results; The updated prediction operation data is used to iteratively perform prediction operations and evaluation operations until it is detected that the iteration end condition is met.

4. The method according to claim 3, characterized in that The method of predicting the output power of each target energy vehicle based on the dung beetle optimization algorithm and the target neural network model according to the predicted operation data includes: Based on the dung beetle optimization algorithm, the predicted operation data of each group of target energy vehicles is determined as the corresponding candidate dung beetle individuals; For each candidate dung beetle individual, a corresponding candidate adjustment value is determined based on the target neural network model, and a candidate output power is determined based on the candidate adjustment value and the historical output power of each target energy vehicle; Based on a preset reward function and a preset sorting algorithm, the optimal dung beetle individual is determined from the candidate dung beetle individuals according to the candidate output powers and the predicted operating data, and the candidate output power corresponding to the optimal dung beetle individual is determined as the predicted output power.

5. The method according to claim 4, characterized in that Based on a preset reward function and a preset sorting algorithm, the optimal dung beetle individual is determined from the candidate dung beetle individuals according to the candidate output power and the predicted operation data, including: Based on the preset reward function, the evaluation value corresponding to each candidate dung beetle individual is determined according to the candidate output power and the predicted operation data; Based on a preset sorting algorithm, the candidate dung beetle individuals are sorted according to the evaluation values ​​to obtain a sorting result, and according to the sorting result, the optimal dung beetle individual is determined from the candidate dung beetle individuals.

6. The method according to claim 2, characterized in that If it is detected that the iteration end condition is met, the target output power corresponding to each target energy vehicle is determined according to the final operation data and the target neural network model, including: If it is detected that the iteration end condition is met, the final operation data is input into the target neural network model to obtain the target adjustment value of the output power of each target power supply vehicle; According to the target adjustment amount, the target output power of each target energy vehicle is determined, and according to the target output power, each target energy vehicle is optimized and controlled.

7. An optimization control device for a power supply vehicle, characterized in that: include: The acquisition module is used to respond to the optimization control request for multiple power supply vehicles in the grid-connected operation environment, determine the target power supply vehicle for grid-connected operation, and acquire the historical operation data of each target power supply vehicle within a preset time period; A determination module is used to determine the predicted operation data of each target power supply vehicle based on a preset grid load model, a state model and an environmental factor model and according to historical operation data; The control module is used to determine the target output power corresponding to each target energy vehicle according to the target neural network model and the predicted operation data, so as to optimize the control of each target energy vehicle.

8. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executed by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the optimization control method for the power supply vehicle according to any one of claims 1-6.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the optimization control method for the power supply vehicle according to any one of claims 1 to 6 when executed.

10. A computer program product, characterized in that The computer program product comprises a computer program, and when the computer program is executed by a processor, the computer program implements the optimization control method of the power supply vehicle according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Wind power integration real-time scheduling method and device based on model prediction and control

    CN105048499A

  • Offshore new energy grid-connected and dispatching operation management and control method and system

    CN115940273A

  • Management method and system for accessing distributed energy to power distribution network

    CN118137589A

  • Data processing method and system of charging management platform

    CN118333338A

Cited By

  • Self-adaptive power supply vehicle parallel operation and grid connection method

    CN119171524A