Auxiliary method and system for intelligent overhaul workload planning

CN118982336APending Publication Date: 2024-11-19CNNC NUCLEAR POWER OPERATION MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410949450.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-19

Smart Images

  • Figure CN118982336A_ABST
    Figure CN118982336A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of nuclear power overhaul, and aims to solve the problem that the PM workload of overhaul cannot be accurately predicted and reasonably planned. The invention provides an auxiliary method for intelligent overhaul workload planning. The method comprises the following steps: calling overhaul PM project data and overhaul PM project man-hour data; calculating the daily average prediction quantity of the PM in a single overhaul, and performing project planning optimization on the overhaul with the unreasonable daily average prediction quantity of the PM; the PM project prediction number of single overhaul is counted according to professions, and project planning optimization is conducted on overhaul with the large difference between the project number and the average value of the PM prediction number of future overhaul in the whole life period; counting a single overhaul PM project prediction number according to a period, and carrying out project planning optimization on overhaul of which the difference between the project number and the average value of the whole-life future overhaul PM prediction number is too large; and carrying out statistics on single overhaul prediction working hours, and carrying out project planning optimization on overhaul of which the difference between the prediction working hours and the PM average prediction working hours of future overhaul in the whole life period is too large.