Coal seam fracturing and permeability increasing method for in-situ pyrolysis development of oil-rich coal
Patent Information
- Application Number
- CN202411384424.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2024-11-26
Smart Images

Figure CN119021655A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mining, and in particular to a method for increasing the permeability of coal seams by causing fracturing. Background Art
[0002] Oil-rich coal contains abundant hydrogen-based structures, and the proportion of tar released during the low-temperature dry distillation process is as high as 7% to 12%. It is a unique coal resource that combines the characteristics of coal, oil and natural gas. The traditional method of pyrolysis conversion of oil-rich coal is ground pyrolysis. The ground pyrolysis method is used to mine oil-rich coal mines, that is, to mine from underground to the ground, and then to send to the pyrolysis equipment after washing and processing, and convert it into tar, coal gas and semi-coke products. In-situ pyrolysis is an emerging way of coal utilization. The coal seam is not mined, but injection wells and production wells are set up for the oil-rich coal reservoir at the same time. The heat carrier is directly injected into the formation through the injection well. The coal seam is heated to release oil and gas products, and then lifted to the ground through the production well for subsequent separation and deep processing.
[0003] Although the use of ground pyrolysis to develop oil-rich coal has the advantages of low development difficulty and easy implementation, its defects are particularly obvious, such as excess semi-coke production capacity, huge dust emissions during coal pretreatment and coking stages, and serious environmental damage. The in-situ pyrolysis method eliminates many steps such as mining, transportation, washing, and crushing, and has the advantages of small footprint and low mining costs, and has received more and more attention in recent years.
[0004] However, the permeability of coalbed methane in my country is usually 0.001×10 -3 ~1.0×10 -3 μm 2 , which belongs to the coal seam with ultra-low permeability. In addition, the underground environment is complex, the fluid flow resistance in the coal seam is large, the heat carriers between coal seams are difficult to connect, the temperature distribution in the heated coal seam is uneven, and the heating efficiency of the heat carrier on the coal seam is low. The low efficiency of in-situ pyrolysis development of oil-rich coal caused by low permeability has become an important problem restricting the development of in-situ pyrolysis technology of oil-rich coal. Therefore, a fracturing method is urgently needed to artificially increase the permeability of coal seams to facilitate the connection of heat carriers between coal seams. Summary of the invention
[0005] Based on this, it is necessary to provide a method for coal seam fracturing and permeability enhancement, which is applied to the in-situ pyrolysis development of oil-rich coal and can efficiently and conveniently achieve coal seam fracturing and improve coal seam permeability.
[0006] The technical solution of the present invention is as follows:
[0007] A method for fracturing and permeability enhancement of coal seams for in-situ pyrolysis development of oil-rich coal, with injection wells as injection fracturing sources and production wells as production fracturing sources, and the fracturing ranges of the injection fracturing sources and the production fracturing sources are set to partially intersect. When developing oil-rich coal reservoirs, injection wells and production wells need to be set up accordingly, and heat carriers are injected into the injection wells. After the heat carriers reach the oil-rich coal reservoirs, the oil-rich coal is thermally decomposed, and the oil and gas products obtained by the decomposition will be collected along the production wells and transported to the ground for further processing on the ground. This means that when using in-situ pyrolysis to develop oil-rich coal reservoirs, at least one injection well and at least one production well must be drilled at the development location. In the present invention, when utilizing the in-situ pyrolysis method to develop the oil and gas resources of the oil-rich coal reservoir, the injection well and the production well are set. The injection well is taken as the injection fracturing source, and all the areas affected by the injection fracturing source and producing permeability changes are recorded as the fracturing range of the injection fracturing source. Then, the fracturing range of the injection fracturing source will generally present a radial distribution form with the injection well as the center and the coal seam permeability gradually decreasing from near to far. The production well is taken as the production fracturing source, and all the areas affected by the production fracturing source and producing permeability changes are recorded as the fracturing range of the production fracturing source. Then, the fracturing range of the production fracturing source will generally present a radial distribution form with the production well as the center and the coal seam permeability gradually decreasing from near to far. According to the size, location, geological exploration conditions and corresponding environmental conditions of the oil-rich coal reservoir, an appropriate size of the fracturing area is designed to ensure that the fracturing range of the injection fracturing source and the fracturing range of the production fracturing source partially intersect and overlap with each other. The permeability of the coal seam within the fracturing range of the injection fracturing source and the production fracturing source is significantly higher than that of the coal seam in the unfractured area. Moreover, since the fracturing range of the injection fracturing source overlaps with the fracturing range of the production fracturing source, the injection well and the production well can be connected through the coal seam cracks. After the heat carrier is injected from the injection well, it contacts the oil-rich coal reservoir. After the oil-rich coal is pyrolyzed, the oil and gas products flow between the high-permeability coal seams and finally escape from the production well. The coal seam fracturing and permeability enhancement method provided in the present invention abandons the traditional in-situ pyrolysis method of setting up an additional horizontal well between the injection well and the production well, and instead effectively connects the injection well and the production well in a dual-source synchronous fracturing manner, thereby greatly reducing the drilling cost. While effectively connecting the injection well and the production well, the permeability of the coal seam is increased, the flow resistance of the heat carrier between the coal seams is reduced, the temperature uniformity of the heated coal seam is improved, and the heating efficiency of the coal seam by the hot fluid is improved.
[0008] Optionally, the fracturing range of the injection fracturing source is not greater than the fracturing range of the production fracturing source. After the heat carrier is injected into the oil-rich coal reservoir through the injection well, the oil-rich structure in the oil-rich coal reservoir is thermally decomposed to produce a large amount of oil and gas products. The heated volume of the oil and gas products is further increased, and the pressure at the oil-rich coal reservoir is further increased, and the efficiency of the oil and gas products escaping toward the production well is faster. As recorded above, all areas affected by the injection fracturing source and resulting in changes in permeability are regarded as the fracturing range of the injection fracturing source, and all areas affected by the production fracturing source and resulting in changes in permeability are regarded as the fracturing range of the production fracturing source. Setting the fracturing range of the injection fracturing source to be not greater than the fracturing range of the production fracturing source means that the high permeability area of the oil-rich coal reservoir near the production well is larger. After the heat carrier is injected into the oil-rich coal reservoir through the injection well, the oil and gas products obtained by pyrolysis of the oil-rich coal after contacting the heat carrier escape toward the production well with less resistance and faster escape speed. Since oil and gas products and heat carriers carry heat during the dissipation process, the temperature of the purged oil-rich coal storage area also increases, and the pyrolysis efficiency of the oil-rich coal reservoir increases accordingly, which greatly shortens the mining cycle and reduces mining costs.
[0009] Optionally, the injection well and the production well are both vertical wells, the injection well penetrates at least one layer of oil-rich coal reservoir, and the production well penetrates at least one layer of oil-rich coal reservoir. Vertical well drilling is convenient and fast, and the drilling cost is also lower, and it can be easily implemented and applied in more and more complex situations.
[0010] Optionally, the fracturing starting point of the injection fracturing source is located in the section where the central axis of the injection well penetrates the oil-rich coal reservoir; the fracturing starting point of the production fracturing source is located in the section where the central axis of the production well penetrates the oil-rich coal reservoir. The injection fracturing source and the production fracturing source are constructed by one or more combinations of hydraulic fracturing devices and shock wave type fracturing devices. The fracturing starting points of the injection fracturing source and the production fracturing source are both set below the ground. After the hydraulic fracturing device and the shock wave type fracturing device are placed at designated positions and the fracturing is started, the coal seam will increase its permeability with the fracturing starting points of the injection fracturing source and the production fracturing source as the center, respectively. From the position close to the fracturing starting point of the injection fracturing source / the fracturing starting point of the production fracturing source to the position far away from the fracturing starting point of the injection fracturing source / the fracturing starting point of the production fracturing source, the permeability of the coal seam presents a distribution from large to small, spherical gradient decreasing, so that when the heat load is high, the coal seam permeability will increase. The body is injected from the injection well, and more high-permeability coal seams will be distributed around the injection well. The heat carrier will quickly dissipate in this area, contacting more oil-rich coal and causing it to pyrolyze and produce oil and gas products. The farther away from the injection well, the lower the permeability of the coal seam. The oil and gas products that are pyrolyzed first and the heat carrier carry heat through the low-permeability area of the coal seam, with a longer residence time and more complete heat exchange. Therefore, more oil-rich coal reservoirs are pyrolyzed in this process, and more oil and gas products are produced. In the process of gradually approaching the production well, the coal seam gradually becomes sparse, the resistance to the escape of oil and gas products becomes smaller again, and finally escapes from the production well.
[0011] Optionally, the fracturing ranges of the injection fracturing source and the production fracturing source are fan-shaped, hemispherical or spherical. The fracturing radius r' of the injection fracturing source is from the fracturing starting point of the injection fracturing source to the fracturing edge of the injection fracturing source, the fracturing radius r' of the production fracturing source is from the fracturing starting point of the production fracturing source to the fracturing edge of the production fracturing source, the distance between the central axis of the injection well and the central axis of the production well is R, and the sum of r' and r' is set to be not less than R. When a hydraulic fracturing type fracturing device or a shock wave type fracturing device is used to reconstruct coal seam fractures, the fracturing ranges of the injection fracturing source and the production fracturing source are roughly fan-shaped, hemispherical or spherical, and the specific shape of the fracturing range depends on the action direction of the fracturing device.
[0012] Optionally, r`+r``=R and r`<r``. If r`+r``=R, the fracturing range of the injection fracturing source and the fracturing range of the production fracturing source just overlap with each other and cover the area between the injection well and the production well, effectively connecting the injection well and the production well while saving the connection cost as much as possible.
[0013] Optionally, r`+r``=R and r`=r`` are set. Setting r`=r`` is more convenient to implement, and technicians can use the same fracturing source with the same fracturing energy to achieve coal seam fracturing.
[0014] Optionally, r`+r``>R and r`<r`` are set. Setting r`+r``>R can make the fracturing range of the injection fracturing source and the fracturing range of the production fracturing source have more overlapped parts, and the coal seam in the overlapping area has the superimposed influence of the two fracturing sources, and the permeability is higher, and the flow resistance of the decomposition product is smaller, which is conducive to the full pyrolysis of the coal seam and further improves the pyrolysis efficiency.
[0015] Advantages of the technical solution of the present invention: The fracturing and permeability enhancement method of the present invention effectively connects the injection well and the production well by setting up dual-source fracturing and reasonably setting the fracturing range of the injection fracturing source and the production fracturing source, thereby greatly improving the pyrolysis efficiency, shortening the production cycle, and reducing the production cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0017] Figure 1 This is a schematic diagram of the model structure when the “one injection and one mining” model is established using COMSOL software in specific embodiment 1 and specific embodiment 2.
[0018] Figure 2 Schematic diagram of coal seam fracturing for the coal seam fracturing and permeability enhancement method for in-situ pyrolysis of oil-rich coal implemented in specific embodiment 1.
[0019] Figure 3 The model structure when establishing a "one injection and one extraction" model for COMSOL software is as follows: Figure 2 Schematic diagram of temperature distribution at the study section S at 30 days under the coal seam fracturing mode shown.
[0020] Figure 4 This is a schematic diagram of coal seam fracturing for the coal seam fracturing and permeability enhancement method for in-situ pyrolysis of oil-rich coal implemented in specific embodiment 2.
[0021] Figure 5 The model structure when establishing a "one injection and one extraction" model for COMSOL software is as follows: Figure 4 Schematic diagram of temperature distribution at the study section S at 30 days under the coal seam fracturing mode shown.
[0022] Figure 6 Schematic diagram of coal seam fracturing for the coal seam fracturing and permeability enhancement method for in-situ pyrolysis of oil-rich coal implemented in specific embodiment three.
[0023] Figure 7 The model structure when establishing a "one injection and one extraction" model for COMSOL software is as follows: Figure 6 Schematic diagram of temperature distribution at the study section S at 30 days under the coal seam fracturing mode shown.
[0024] Figure 8 Schematic diagram of coal seam fracturing for the coal seam fracturing and permeability enhancement method for in-situ pyrolysis of oil-rich coal implemented in specific embodiment 4.
[0025] Fig. 9 The model structure when establishing a "one injection and one extraction" model for COMSOL software is as follows: Figure 8 Schematic diagram of temperature distribution at the study section S at 30 days under the coal seam fracturing mode shown.
[0026] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0029] In addition, the descriptions of "first", "second", etc. in the present invention are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, "and / or" in the full text includes three solutions. Taking A and / or B as an example, it includes technical solution A, technical solution B, and technical solution that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention. Specific implementation method one:
[0031] See also Figure 1-3 .
[0032] Specific reference Figure 1 The COMSOL software was used to model and solve the problem. The simulation adopted a one-injection-one-production well arrangement method, that is, an injection well w1 and a production well w2 were set for the same oil-rich coal reservoir. The heat carrier injected into the injection well was 600°C high-temperature nitrogen, and the heat carrier flow rate of the injection well w1 was 0.6kg / s. The research section S was selected at the oil-rich coal reservoir.
[0033] Specific reference Figure 2-3 In this specific embodiment, a coal seam fracturing and permeability enhancement method for in-situ pyrolysis development of oil-rich coal is provided, wherein the injection well w1 is used as the injection fracturing source w11, and the fracturing range of the injection fracturing source w11 in the study section S is marked as s11; the production well w2 is used as the production fracturing source w21, and the fracturing range of the injection fracturing source w11 in the study section S is marked as s11; the un-fractured coal seam area in the study section S is marked as s0, and the fracturing range s11 of the injection fracturing source w11 and the fracturing range s21 of the production fracturing source w21 are set to overlap each other.
[0034] The fracture radius from the fracture starting point of the injection fracture source w11 to the fracture edge of the injection fracture source w11 is set as r`=5m, the fracture radius from the fracture starting point of the production fracture source w21 to the fracture edge of the production fracture source w21 is set as r``=5m, and the distance between the central axis of the injection well w and the central axis of the production well w2 is set to R=10m.
[0035] In this specific embodiment, the injection well w1 and the production well w2 are both vertical wells. The injection well w1 penetrates a layer of oil-rich coal reservoir, and the production well w2 penetrates a layer of oil-rich coal reservoir.
[0036] In this specific embodiment, the fracturing starting point of the injection fracturing source w11 is located in the section where the central axis of the injection well w1 penetrates the oil-rich coal reservoir; the fracturing starting point of the production fracturing source w21 is located in the section where the central axis of the production well w2 penetrates the oil-rich coal reservoir.
[0037] In this specific embodiment, the injection fracturing source w11 and the production fracturing source w21 are constructed by combining one or more shock wave type fracturing devices.
[0038] Specific reference Figure 1-3 In this specific embodiment, the fracturing ranges of the injection fracturing source w11 and the production fracturing source w21 are both spherical. Specific implementation method 2:
[0040] See also Figure 1 , 4 -5.
[0041] Specific reference Figure 1 The COMSOL software was used to model and solve the problem. The simulation adopted a one-injection-one-production well arrangement method, that is, an injection well w1 and a production well w2 were set for the same oil-rich coal reservoir. The heat carrier injected into the injection well was 600°C high-temperature nitrogen, and the heat carrier flow rate of the injection well w1 was 0.6kg / s. The research section S was selected at the oil-rich coal reservoir.
[0042] Specific reference Figure 4-5 In this specific embodiment, a coal seam fracturing and permeability enhancement method for in-situ pyrolysis development of oil-rich coal is provided, wherein the injection well w1 is used as the injection fracturing source w11, and the fracturing range of the injection fracturing source w11 in the study section S is marked as s11; the production well w2 is used as the production fracturing source w21, and the fracturing range of the injection fracturing source w11 in the study section S is marked as s11; the un-fractured coal seam area in the study section S is marked as s0, and the fracturing range s11 of the injection fracturing source w11 and the fracturing range s21 of the production fracturing source w21 are set to overlap each other.
[0043] The fracture radius from the fracture starting point of the injection fracture source w11 to the fracture edge of the injection fracture source w11 is set as r`=2m, the fracture radius from the fracture starting point of the production fracture source w21 to the fracture edge of the production fracture source w21 is set as r``=8m, and the distance between the central axis of the injection well w and the central axis of the production well w2 is set to R=10m.
[0044] In this specific embodiment, the injection well w1 and the production well w2 are both vertical wells. The injection well w1 penetrates a layer of oil-rich coal reservoir, and the production well w2 penetrates a layer of oil-rich coal reservoir.
[0045] In this specific embodiment, the fracturing starting point of the injection fracturing source w11 is located in the section where the central axis of the injection well w1 penetrates the oil-rich coal reservoir; the fracturing starting point of the production fracturing source w21 is located in the section where the central axis of the production well w2 penetrates the oil-rich coal reservoir.
[0046] In this specific embodiment, the injection fracturing source w11 and the production fracturing source w21 are constructed by combining one or more shock wave type fracturing devices.
[0047] Specific reference Figure 1 , 4 In this specific embodiment, the fracturing ranges of the injection fracturing source w11 and the production fracturing source w21 are both spherical. Specific implementation method three:
[0049] See also Figure 1 , 6 -7.
[0050] Specific reference Figure 1 The COMSOL software was used to model and solve the problem. The simulation adopted a one-injection-one-production well arrangement method, that is, an injection well w1 and a production well w2 were set for the same oil-rich coal reservoir. The heat carrier injected into the injection well was 600°C high-temperature nitrogen, and the heat carrier flow rate of the injection well w1 was 0.6kg / s. The research section S was selected at the oil-rich coal reservoir.
[0051] Specific reference Figure 6-7 In this specific embodiment, a coal seam fracturing and permeability enhancement method for in-situ pyrolysis development of oil-rich coal is provided, wherein the injection well w1 is used as the injection fracturing source w11, and the fracturing range of the injection fracturing source w11 in the study section S is marked as s11; the production well w2 is used as the production fracturing source w21, and the fracturing range of the injection fracturing source w11 in the study section S is marked as s11; the un-fractured coal seam area in the study section S is marked as s0, and the fracturing range s11 of the injection fracturing source w11 and the fracturing range s21 of the production fracturing source w21 are set to overlap each other.
[0052] The fracture radius from the fracture starting point of the injection fracture source w11 to the fracture edge of the injection fracture source w11 is set to r`=5m, the fracture radius from the fracture starting point of the production fracture source w21 to the fracture edge of the production fracture source w21 is set to r``=7m, and the distance between the central axis of the injection well w and the central axis of the production well w2 is set to R=10m.
[0053] In this specific embodiment, the injection well w1 and the production well w2 are both vertical wells. The injection well w1 penetrates a layer of oil-rich coal reservoir, and the production well w2 penetrates a layer of oil-rich coal reservoir.
[0054] In this specific embodiment, the fracturing starting point of the injection fracturing source w11 is located in the section where the central axis of the injection well w1 penetrates the oil-rich coal reservoir; the fracturing starting point of the production fracturing source w21 is located in the section where the central axis of the production well w2 penetrates the oil-rich coal reservoir.
[0055] In this specific embodiment, the injection fracturing source w11 and the production fracturing source w21 are constructed by combining one or more shock wave type fracturing devices.
[0056] Specific reference Figure 1 , 6 In this specific embodiment, the fracturing ranges of the injection fracturing source w11 and the production fracturing source w21 are both spherical. Specific implementation method four:
[0058] In this specific embodiment, a comparative example different from specific embodiments 1, 2 and 3 is provided as a comparison of implementation effects.
[0059] See also Figure 1 , 8 -9.
[0060] Specific reference Figure 1 The COMSOL software was used to model and solve the problem. The simulation adopted a one-injection-one-production well arrangement method, that is, an injection well w1 and a production well w2 were set for the same oil-rich coal reservoir. The heat carrier injected into the injection well was 600°C high-temperature nitrogen, and the heat carrier flow rate of the injection well w1 was 0.6kg / s. The research section S was selected at the oil-rich coal reservoir.
[0061] Specific reference Figure 8-9In this specific embodiment, a coal seam fracturing and permeability enhancement method for in-situ pyrolysis development of oil-rich coal is provided, wherein the injection well w1 is used as the injection fracturing source w11, and the fracturing range of the injection fracturing source w11 in the study section S is marked as s11; the production well w2 is used as the production fracturing source w21, and the fracturing range of the injection fracturing source w11 in the study section S is marked as s11; the un-fractured coal seam area in the study section S is marked as s0, and the fracturing range s11 of the injection fracturing source w11 and the fracturing range s21 of the production fracturing source w21 are set to overlap each other.
[0062] The fracture radius from the fracture starting point of the injection fracture source w11 to the fracture edge of the injection fracture source w11 is set as r`=2m, the fracture radius from the fracture starting point of the production fracture source w21 to the fracture edge of the production fracture source w21 is set as r``=8m, and the distance between the central axis of the injection well w and the central axis of the production well w2 is set to R=10m.
[0063] In this specific embodiment, the injection well w1 and the production well w2 are both vertical wells. The injection well w1 penetrates a layer of oil-rich coal reservoir, and the production well w2 penetrates a layer of oil-rich coal reservoir.
[0064] In this specific embodiment, the fracturing starting point of the injection fracturing source w11 is located in the section where the central axis of the injection well w1 penetrates the oil-rich coal reservoir; the fracturing starting point of the production fracturing source w21 is located in the section where the central axis of the production well w2 penetrates the oil-rich coal reservoir.
[0065] In this specific embodiment, the injection fracturing source w11 and the production fracturing source w21 are constructed by combining one or more shock wave type fracturing devices.
[0066] The implementation effect of this specific implementation method (see Fig. 9 ) and specific implementation method - implementation effect (see Figure 3 ), Specific implementation method II Implementation effect (see Figure 5 ) and specific implementation method three implementation effects (see Figure 7 ) comparison clearly shows that when the fracturing radius of the injection fracturing source is set smaller than the fracturing radius of the production fracturing source, the temperature field distribution in the oil-rich coal reservoir is generally more uniform and the area of the low-temperature zone is generally smaller.
[0067] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. All equivalent structural changes made using the contents of the present invention's specification and drawings, or directly / indirectly applied in other related technical fields, are included in the patent protection scope of the present invention.
Claims
1. A method for increasing the permeability of coal seams by in-situ pyrolysis of oil-rich coal, characterized in that: The injection well is used as the injection fracturing source, and the production well is used as the production fracturing source. The fracturing range of the injection fracturing source and the fracturing range of the production fracturing source are set to partially overlap.
2. The method for in-situ pyrolysis development of oil-rich coal for fracturing and permeability enhancement of coal seams according to claim 1, characterized in that: The fracturing range of the production fracturing source is greater than or equal to the fracturing range of the injection fracturing source.
3. The method for in-situ pyrolysis development of oil-rich coal for fracturing and permeability enhancement of coal seams according to claim 2, characterized in that: The injection well and the production well are both vertical wells. The injection well penetrates at least one layer of oil-rich coal reservoir, and the production well penetrates at least one layer of oil-rich coal reservoir.
4. The method for in-situ pyrolysis development of oil-rich coal for fracturing and permeability enhancement of coal seams according to claim 3, characterized in that: The fracturing starting point of the injection fracturing source is located in the section where the central axis of the injection well penetrates the oil-rich coal reservoir; the fracturing starting point of the production fracturing source is located in the section where the central axis of the production well penetrates the oil-rich coal reservoir.
5. The method for in-situ pyrolysis development of oil-rich coal for fracturing and permeability enhancement of coal seams according to claim 4, characterized in that: The injection fracturing source and the production fracturing source are constructed by combining one or more of a hydraulic fracturing device and a shock wave fracturing device.
6. The method for in-situ pyrolysis development of oil-rich coal for fracturing and permeability enhancement of coal seams according to claim 5, characterized in that: The fracturing ranges of the injection fracturing source and the production fracturing source are fan-shaped, hemispherical or spherical.
7. The method for in-situ pyrolysis development of oil-rich coal for fracturing and permeability enhancement of coal seams according to claim 6, characterized in that: The distance from the fracturing starting point of the injection fracturing source to the fracturing edge of the injection fracturing source is denoted as the fracturing radius r` of the injection fracturing source, the distance from the fracturing starting point of the production fracturing source to the fracturing edge of the production fracturing source is denoted as the fracturing radius r`` of the production fracturing source, the distance between the central axis of the injection well and the central axis of the production well is denoted as R, and the sum of r` and r`` is set to be not less than R.
8. The method for increasing the fracturing and permeability of coal seams for in-situ pyrolysis development of oil-rich coal according to claim 7, characterized in that: Set r`+r``=R and r`<r``.
9. The method for in-situ pyrolysis development of oil-rich coal for fracturing and permeability enhancement of coal seams according to claim 7, characterized in that: Set r`+r``=R and r`=r``.
10. The method for in-situ pyrolysis development of oil-rich coal for fracturing and permeability enhancement of coal seams according to claim 7, characterized in that: Set r`+r``>R and r`<r``.