Pile driver automatic positioning method and system based on Beidou navigation

Through Beidou navigation technology, the pile driver is automatically positioned, and the precise alignment of the pile hammer and pile points is achieved in combination with the construction drawing data, which solves the problem of inaccurate positioning of the pile driver in the existing technology, and improves the construction efficiency and degree of automation.

CN119087480APending Publication Date: 2024-12-06CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1
0 Cites 0 Cited by

Patent Information

Application Number
CN202410913857.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-12-06

Smart Images

  • Figure CN119087480A_ABST
    Figure CN119087480A_ABST
Patent Text Reader

Abstract

The invention provides a pile driver automatic positioning method and system based on Beidou navigation, and the method comprises the steps: obtaining satellite data through a receiver, and obtaining a first position coordinate of a pile driver; transferring the first position coordinate from the geodetic coordinate system to an engineering coordinate system to obtain a second position coordinate; determining a pile center coordinate of the pile hammer based on the second position coordinate and a receiver position coordinate of the receiver in the vehicle body coordinate system; acquiring pile point data, and constructing a moving line based on the pile center coordinates and the pile point data, so that the pile center of the pile hammer is aligned with the pile point; and when the pile center and the pile point are aligned, the top face height of the pile hammer is continuously obtained, and piling is completed. Automatic positioning of the pile driver is achieved based on Beidou navigation, then construction route planning is completed automatically and intelligently, one-time accurate alignment piling can be achieved, and the construction efficiency is improved; and on the basis of automatic positioning, the piling depth can be automatically monitored, the construction efficiency is further improved, and the intelligent degree is improved.
Need to check novelty before this filing date? Find Prior Art