A method for calculating the controlled reserves of a gas well in a heterogeneous reservoir

By obtaining the actual controlled reserves and well test analysis radius of gas wells, and combining the least squares method and probability distribution model, the controlled reserve radius of gas wells in heterogeneous reservoirs is corrected, thus solving the problem of calculation error of controlled reserves of gas wells in heterogeneous reservoirs and realizing high-precision reserve evaluation.

CN119089127BActive Publication Date: 2026-11-20PETROCHINA CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310662841.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-06
Publication Date
2026-11-20
Estimated Expiration
2043-06-06

AI Technical Summary

Technical Problem

In heterogeneous reservoirs, existing technologies struggle to accurately calculate the controlled reserves of gas wells, leading to significant errors in the calculation results. This is especially true in most gas reservoirs in the Sichuan Basin, where permeability varies considerably, making it difficult to quickly determine the controlled radius of gas wells and affecting calculation accuracy.

Method used

By obtaining the controlled reserves of actual gas wells already in production and the controlled radii of gas wells obtained from well test analysis, the relationship curve between the controlled reserves of gas wells and the controlled reserves of gas wells in heterogeneous reservoirs is determined using the least squares method. Then, the controlled radii of gas wells are corrected through regression equations, correlation coefficient tests, significance tests, and probability distribution models. A normal distribution probability model is established to determine the value of the controlled reserves.

Benefits of technology

It improves the accuracy of calculating controlled reserves in gas wells, enabling accurate evaluation of single-well reserves in the early stages of gas well production, reducing calculation errors, and enhancing scientific rigor and accuracy, achieving a calculation probability of over 95%.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119089127B_ABST
    Figure CN119089127B_ABST
Patent Text Reader

Abstract

The application discloses a kind of gas well controlled reserves calculation method of heterogeneous reservoir, belong to oil and gas field development technical field, it is characterized in that, including the following steps: a, obtaining the real gas well controlled reserves G that has been put into production, then according to the gas well controlled radius R obtained by well testing analysis, the function of gas well controlled reserves is obtained;B, according to the least square method, the relationship curve of gas well controlled reserves G and the function of heterogeneous reservoir gas well controlled reserves is determined;C, correlation coefficient test and significance test are carried out on the regression equation;D, a normal distribution probability model is established according to probability distribution principle;E, the value of controlled reserves is judged according to pressure recovery derivative curve.The application effectively corrects the gas well controlled radius of heterogeneous gas reservoir by the real gas well controlled reserves that has been put into production and the gas well controlled radius obtained by well testing analysis, and then the calculation precision of controlled reserves can be improved, which is beneficial to accurately evaluating single well reserves.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of oil and gas field development technology, and in particular to a method for calculating controlled reserves of gas wells in heterogeneous reservoirs. Background Technology

[0002] Currently, the calculation method for controlled reserves of gas wells is mainly based on the reserve calculation formula in the oil and gas industry, i.e., the controlled reserves of gas wells. Equal to the square of the gas well control radius R 2 Multiply by π and by porosity Multiply by reservoir thickness h and gas saturation Specifically: ;in It is time and pressure conductivity coefficient The function. Assume ,but . The control radius R is a function of the gas well's controlled reserves, but it cannot be obtained immediately after the well is put into production; it requires a period of time, after the pressure wave has propagated to the seepage boundary, before it can be determined. Currently, most gas reservoirs in the Sichuan Basin are heterogeneous reservoirs with significant permeability variations. Typically, in heterogeneous reservoirs, the control radius R is obtained from well logging results. The controlled reserves were calculated, and Often does not equal ,in , , These are the gas well porosity, reservoir thickness, and gas saturation interpreted from well logging. These important parameters vary greatly during the testing process, which leads to errors in the calculation results.

[0003] Chinese patent document CN112878987A, published on June 1, 2021, discloses a method for calculating controlled reserves of shale gas wells using production data, characterized by the following: S1. Obtain basic data for the gas well, including static data: matrix bound water saturation, Langmuir volume, Langmuir pressure, matrix porosity, shale density, original reservoir temperature, original reservoir pressure, kerogen density, porosity of adsorbed phase in organic matter, porosity of free gas in organic matter, and TOC content; phase data: pressure and compressibility factor, pressure and gas viscosity; production data: daily gas production, cumulative gas production, and bottom hole flowing pressure. S2. Assuming that the single well controls the reserves, the average formation pressure is calculated using the shale gas reservoir pressure drop equation that considers free gas in fractures. S3. Based on the average formation pressure calculated in step S2, the derivation equation of the shale gas reservoir pressure drop equation considering free gas in fractures is used to fit and regress the gas well production data to calculate the single well controlled reserves. S4. Compare the difference between the assumed single-well controlled reserves in step S2 and the single-well controlled reserves calculated in step S3. If the difference meets the accuracy requirements, stop the calculation, and the assumed single-well controlled reserves are the desired single-well controlled reserves. If not, set the assumed single-well controlled reserves in step S2 equal to the single-well controlled reserves calculated in step S3, and repeat steps S2 to S4.

[0004] This patent document discloses a method for calculating controlled reserves of shale gas wells using production data. It proposes a shale gas reservoir pressure drop equation considering free gas in fractures, assuming a single-well controlled reserve, and using single-well production data to calculate formation pressure, allowing for formation pressure calculation without shutting down the well. Then, using a derived equation, the calculated formation pressure and single-well production data are used to regress and obtain the single-well controlled reserve. Finally, the difference between the assumed single-well controlled reserve and the calculated single-well controlled reserve is compared until the required accuracy is met. A trial-and-error algorithm is used to automatically calculate the single-well controlled reserve, solving the problem of difficulty in measuring average formation pressure. However, this method requires acquiring a large amount of basic gas well data, which is prone to errors, resulting in low accuracy in controlling reserve calculation. Summary of the Invention

[0005] To overcome the shortcomings of the prior art, this invention provides a method for calculating the controlled reserves of gas wells in heterogeneous reservoirs. This invention effectively corrects the controlled reserves of gas wells in heterogeneous gas reservoirs by using the controlled reserves of actual gas wells already in production and the controlled radii of gas wells obtained from well test analysis, thereby improving the accuracy of controlled reserve calculation and facilitating the accurate evaluation of single-well reserves.

[0006] This invention is achieved through the following technical solution: A method for calculating controlled reserves of gas wells in heterogeneous reservoirs, characterized by comprising the following steps: a. Obtain the actual controlled reserves G of the gas wells already in production, then obtain the control radius R of the gas well based on well test analysis, and calculate the function of the controlled reserves of the gas well. ; b. A function for determining the controlled reserves G of gas wells and the controlled reserves of heterogeneous reservoir gas wells using the least squares method. * Relationship curve; Formula 2 The regression coefficient A is solved using Equation 3; Formula 3 Then the regression equation is obtained. Equation 4; Where G is the controlled reserves of the gas well, A is the regression coefficient, and a * This is a function of the controlled reserves of gas wells in heterogeneous reservoirs. This is a function for controlling gas well reserves. To control reserves for different gas wells. This is a function for controlling reserves for different gas wells. The average value of the controlled reserves of the gas well; c. Perform correlation coefficient tests and significance tests on the regression equation; d. Establish a normal distribution probability model based on the principle of probability distribution; e. Determine the value of the control reserve based on the pressure recovery derivative curve.

[0007] In step a, the function for controlling gas well reserves is calculated using Equation 1; Formula 1 in, G is a function of the controlled reserves of the gas well, where G is the controlled reserves of the gas well and R is the controlled radius of the gas well.

[0008] In step c, the correlation coefficient test of the regression equation refers to the correlation coefficient test performed by Equation 5. When r is greater than the critical value, it indicates that the regression equation is reasonable. Formula 5 Where r is the correlation coefficient and G is the controlled reserves of the gas well. This represents the maximum controlled reserves of a gas well. This represents the average controlled reserves of the gas well.

[0009] The threshold value for r is defined as r being greater than 0.361.

[0010] In step c, the significance test refers to testing the significance of the regression coefficient A using Equation 6 to determine the gas well controlled reserves G and the function a of heterogeneous reservoir gas well controlled reserves. * Are the assumptions between them reasonable? If the value is greater than the critical value, then the controlled reserves G of the gas well and the controlled reserves a of the heterogeneous reservoir gas well are determined by the function a. * The assumptions between them are reasonable; Formula 6 in, The significance test coefficient is... This is a function for controlling gas well reserves. This represents the maximum controlled reserves of a gas well. To control reserves for different gas wells. This is a function for controlling reserves for different gas wells. The average value of the controlled reserves of the gas well. This represents the number of samples.

[0011] The Greater than the critical value means Greater than 2.0484.

[0012] In step d, the normal distribution probability model is determined by Equation 7; Formula 7 in, For the integral of the normal distribution function of the heterogeneous reservoir, The expected value of a normal distribution. Standard deviation Take 2.8, Let a be the value of pi. * This is a function of the controlled reserves of gas wells in heterogeneous reservoirs. This is the derivative of the function controlling reserves in heterogeneous reservoir gas wells.

[0013] In step e, the determination of the controlled reserve value includes two states: the physical properties of the gas well in the far-well area are improving and the physical properties of the gas well in the far-well area are deteriorating.

[0014] When the physical properties of the gas well's far-wellbore region improve, the pressure derivative value decreases, therefore a > a. * The controlled reserves of the gas well are 0.8315a. * +5.32.

[0015] When the physical properties of the gas well deteriorate in the far-well zone, the pressure derivative value increases, then a < a * The controlled reserves of the gas well are 0.8315a. * -5.32.

[0016] The beneficial effects of this invention are mainly reflected in the following aspects: 1. This invention, "a) obtains the actual controlled reserves G of a gas well already in production, then obtains the gas well control radius R based on well test analysis, and calculates a function of the gas well controlled reserves." b. Functions for determining the controlled reserves G of gas wells and the controlled reserves of heterogeneous reservoir gas wells using the least squares method. * The relationship curve; c. Perform correlation coefficient test and significance test on the regression equation; d. Establish a normal distribution probability model based on the probability distribution principle; e. Determine the value of controlled reserves based on the pressure recovery derivative curve. Compared with the existing technology, the control radius of gas wells obtained by controlling reserves of real gas wells that have been put into production and well test analysis can effectively correct the control radius of gas wells in heterogeneous gas reservoirs, thereby improving the calculation accuracy of controlled reserves and facilitating the accurate evaluation of single-well reserves.

[0017] 2. This invention solves the problem that the calculation of controlled reserves in gas wells depends on the lag in the calculation of the gas well control radius R. It can calculate the controlled reserves in the early stage of gas well production. At the same time, it can solve the problem of calculation error of controlled reserves caused by the uneven distribution of reservoir physical parameters in heterogeneous reservoirs.

[0018] 3. This invention, by introducing probability theory and well test instability analysis derivative curves, can accurately solve for the control reserves in the early stage of production, and can control the probability to over 95%, greatly improving the scientific nature and accuracy of the calculation. Attached Figure Description

[0019] The present invention will now be further described in detail with reference to the accompanying drawings and specific embodiments: Figure 1 This is a flowchart of the present invention; Figure 2 This is a least-squares relationship diagram for sample gas wells in the Carboniferous system. Detailed Implementation

[0020] Example 1 See Figure 1 A method for calculating controlled reserves of gas wells in heterogeneous reservoirs includes the following steps: a. Obtain the actual controlled reserves G of the gas wells already in production, then obtain the control radius R of the gas well based on well test analysis, and calculate the function of the controlled reserves of the gas well. ; b. A function for determining the controlled reserves G of gas wells and the controlled reserves of heterogeneous reservoir gas wells using the least squares method. * Relationship curve; Formula 2 The regression coefficient A is solved using Equation 3; Formula 3 Then the regression equation is obtained. Equation 4; Where G is the controlled reserves of the gas well, A is the regression coefficient, and a * This is a function of the controlled reserves of gas wells in heterogeneous reservoirs. This is a function for controlling gas well reserves. To control reserves for different gas wells. This is a function for controlling reserves for different gas wells. The average value of the controlled reserves of the gas well; c. Perform correlation coefficient tests and significance tests on the regression equation; d. Establish a normal distribution probability model based on the principle of probability distribution; e. Determine the value of the control reserve based on the pressure recovery derivative curve.

[0021] This embodiment is the most basic implementation method. By controlling the reserves of actual gas wells that have been put into production and obtaining the control radius of gas wells from well test analysis, the control radius of gas wells in heterogeneous gas reservoirs can be effectively corrected, thereby improving the calculation accuracy of controlled reserves and facilitating the accurate evaluation of single-well reserves.

[0022] Example 2 See Figure 1 A method for calculating controlled reserves of gas wells in heterogeneous reservoirs includes the following steps: a. Obtain the actual controlled reserves G of the gas wells already in production, then obtain the control radius R of the gas well based on well test analysis, and calculate the function of the controlled reserves of the gas well. ; b. A function for determining the controlled reserves G of gas wells and the controlled reserves of heterogeneous reservoir gas wells using the least squares method. * Relationship curve; Formula 2 The regression coefficient A is solved using Equation 3; Formula 3 Then the regression equation is obtained. Equation 4; Where G is the controlled reserves of the gas well, A is the regression coefficient, and a * This is a function of the controlled reserves of gas wells in heterogeneous reservoirs. This is a function for controlling gas well reserves. To control reserves for different gas wells. This is a function for controlling reserves for different gas wells. The average value of the controlled reserves of the gas well; c. Perform correlation coefficient tests and significance tests on the regression equation; d. Establish a normal distribution probability model based on the principle of probability distribution; e. Determine the value of the control reserve based on the pressure recovery derivative curve.

[0023] In step a, the function for controlling gas well reserves is calculated using Equation 1; Formula 1 in, G is a function of the controlled reserves of the gas well, where G is the controlled reserves of the gas well and R is the controlled radius of the gas well.

[0024] In step c, the correlation coefficient test of the regression equation refers to the correlation coefficient test performed by Equation 5. When r is greater than the critical value, it indicates that the regression equation is reasonable. Formula 5 Where r is the correlation coefficient and G is the controlled reserves of the gas well. This represents the maximum controlled reserves of a gas well. This represents the average controlled reserves of the gas well.

[0025] Furthermore, in step c, the significance test refers to testing the significance of the regression coefficient A using Equation 6 to determine the gas well controlled reserves G and the function a of heterogeneous reservoir gas well controlled reserves. * Are the assumptions between them reasonable? If the value is greater than the critical value of 2.0484, then the function a for determining the controlled reserves G of the gas well and the controlled reserves a of the heterogeneous reservoir gas well is used. * The assumptions between them are reasonable; Formula 6 in, The significance test coefficient is... This is a function for controlling gas well reserves. This represents the maximum controlled reserves of a gas well. To control reserves for different gas wells. This is a function for controlling reserves for different gas wells. The average value of the controlled reserves of the gas well. This represents the number of samples.

[0026] This embodiment is a preferred implementation method, which solves the problem that the solution of controlled reserves of gas wells depends on the lag in the solution of the gas well control radius R. It can solve the controlled reserves in the early stage of gas well production, and at the same time, it can solve the problem of control reserve calculation error caused by the uneven distribution of reservoir physical parameters in heterogeneous reservoirs.

[0027] Example 3 See Figure 1 A method for calculating controlled reserves of gas wells in heterogeneous reservoirs includes the following steps: a. Obtain the actual controlled reserves G of the gas wells already in production, then obtain the control radius R of the gas well based on well test analysis, and calculate the function of the controlled reserves of the gas well. ; b. A function for determining the controlled reserves G of gas wells and the controlled reserves of heterogeneous reservoir gas wells using the least squares method. * Relationship curve; Formula 2 The regression coefficient A is solved using Equation 3; Formula 3 Then the regression equation is obtained. Equation 4; Where G is the controlled reserves of the gas well, A is the regression coefficient, and a * This is a function of the controlled reserves of gas wells in heterogeneous reservoirs. This is a function for controlling gas well reserves. To control reserves for different gas wells. This is a function for controlling reserves for different gas wells. The average value of the controlled reserves of the gas well; c. Perform correlation coefficient tests and significance tests on the regression equation; d. Establish a normal distribution probability model based on the principle of probability distribution; e. Determine the value of the control reserve based on the pressure recovery derivative curve.

[0028] In step a, the function for controlling gas well reserves is calculated using Equation 1; Formula 1 in, G is a function of the controlled reserves of the gas well, where G is the controlled reserves of the gas well and R is the controlled radius of the gas well.

[0029] In step c, the correlation coefficient test of the regression equation refers to the correlation coefficient test performed by Equation 5. When r is greater than the critical value, it indicates that the regression equation is reasonable. Formula 5 Where r is the correlation coefficient and G is the controlled reserves of the gas well. This represents the maximum controlled reserves of a gas well. This represents the average controlled reserves of the gas well.

[0030] In step c, the significance test refers to testing the significance of the regression coefficient A using Equation 6 to determine the gas well controlled reserves G and the function a of heterogeneous reservoir gas well controlled reserves. * Are the assumptions between them reasonable? If the value is greater than the critical value of 2.0484, then the function a for determining the controlled reserves G of the gas well and the controlled reserves a of the heterogeneous reservoir gas well is used. * The assumptions between them are reasonable; Formula 6 in, The significance test coefficient is... This is a function for controlling gas well reserves. This represents the maximum controlled reserves of a gas well. To control reserves for different gas wells. This is a function for controlling reserves for different gas wells. The average value of the controlled reserves of the gas well. This represents the number of samples.

[0031] Furthermore, in step d, the normal distribution probability model is determined by Equation 7; Formula 7 in, For the integral of the normal distribution function of the heterogeneous reservoir, The expected value of a normal distribution. Standard deviation Take 2.8, Let a be the value of pi. * This is a function of the controlled reserves of gas wells in heterogeneous reservoirs. This is the derivative of the function controlling reserves in heterogeneous reservoir gas wells.

[0032] Furthermore, in step e, determining the controlled reserve value specifically means that when the physical properties of the gas well's far-wellbore area improve, the pressure derivative value decreases, then a > a. * The controlled reserves of the gas well are 0.8315a. * +5.32; When the physical properties of the gas well deteriorate in the far-well zone, the pressure derivative value increases, then a < a * The controlled reserves of the gas well are 0.8315a. * -5.32.

[0033] This embodiment is the optimal implementation method. By introducing probability theory and well test instability analysis derivative curves, the controlled reserves in the early stage of production can be solved more accurately, and the control probability can reach more than 95%, which greatly improves the scientificity and accuracy of the calculation.

[0034] The invention will now be illustrated using a specific block of the Carboniferous system in the eastern Sichuan Basin as an example: See Figure 2 The Carboniferous system is a fractured and porous carbonate reservoir with well-developed microfractures and strong heterogeneity, as shown in Table 1. Table 1 is a table of controlled reserves calculation parameters for gas wells in heterogeneous reservoir blocks.

[0035] Table 1

[0036] According to Equation 5, the correlation coefficient r = 0.7052 is obtained. With degrees of freedom n-2, n being the number of samples 27 and a significance level of 0.05, r = 0.7052, which is greater than the critical value of 0.361.

[0037] The significance test coefficient is calculated according to Equation 6. =7.26, A value greater than 2.0484 indicates the function a for determining the controlled reserves G of a gas well and the controlled reserves a of a gas well in a heterogeneous reservoir. * The assumptions between them are reasonable.

[0038] It is evident that the calculation method of this invention can improve the accuracy of controlled reserves calculation, which is beneficial for accurately evaluating the reserves of a single well.

Claims

1. A method for calculating controlled reserves of gas wells in heterogeneous reservoirs, characterized in that, Includes the following steps: a. Obtain the actual controlled reserves G of the gas wells already in production, then obtain the control radius R of the gas well based on well test analysis, and calculate the function of the controlled reserves of the gas well. ; b. A function for determining the controlled reserves G of gas wells and the controlled reserves of heterogeneous reservoir gas wells using the least squares method. Relationship curve; Formula 2 The regression coefficient A is solved using Equation 3; Formula 3 Then the regression equation is obtained. Equation 4; Where G represents the controlled reserves of the gas well, and A is the regression coefficient. This is a function of the controlled reserves of gas wells in heterogeneous reservoirs. This is a function for controlling gas well reserves. To control reserves for different gas wells. This is a function for controlling reserves for different gas wells. The average value of the controlled reserves of the gas well; c. Perform correlation coefficient tests and significance tests on the regression equation; d. Establish a normal distribution probability model based on the principle of probability distribution; e. Determine the value of the control reserve based on the pressure recovery derivative curve; In step d, the normal distribution probability model is determined by Equation 7; Formula 7 in, For the integral of the normal distribution function of the heterogeneous reservoir, The expected value of a normal distribution. Standard deviation Take 2.8, Pi This is a function of the controlled reserves of gas wells in heterogeneous reservoirs. This is the derivative of the function controlling reserves in heterogeneous reservoir gas wells; In step e, the determination of the controlled reserve value includes two states: the physical properties of the gas well's far-well area are improving and the physical properties of the gas well's far-well area are deteriorating. When the physical properties of the gas well's far-wellbore area improve, the pressure derivative value decreases. > The controlled reserves of the gas well are 0.8315. +5.32; When the physical properties of the gas well deteriorate in the far-well zone, the pressure derivative value increases. < The controlled reserves of the gas well are 0.8315. -5.

32.

2. The method for calculating controlled reserves of gas wells in heterogeneous reservoirs according to claim 1, characterized in that: In step a, the function for controlling gas well reserves is calculated using Equation 1; Formula 1 in, G is a function of the controlled reserves of the gas well, where G is the controlled reserves of the gas well and R is the controlled radius of the gas well.

3. The method for calculating controlled reserves of gas wells in heterogeneous reservoirs according to claim 1, characterized in that: In step c, the correlation coefficient test of the regression equation refers to the correlation coefficient test performed by Equation 5. When r is greater than the critical value, it indicates that the regression equation is reasonable. Formula 5 Where r is the correlation coefficient and G is the controlled reserves of the gas well. This represents the maximum controlled reserves of a gas well. This represents the average controlled reserves of the gas well.

4. The method for calculating controlled reserves of gas wells in heterogeneous reservoirs according to claim 3, characterized in that: The threshold value for r is defined as r being greater than 0.

361.

5. The method for calculating controlled reserves of gas wells in heterogeneous reservoirs according to claim 1, characterized in that: In step c, the significance test refers to testing the significance of the regression coefficient A using Equation 6 to determine the gas well controlled reserves G and the function of heterogeneous reservoir gas well controlled reserves. Are the assumptions between them reasonable? If the value is greater than the critical value, then the controlled reserves G of the gas well and the controlled reserves of the heterogeneous reservoir gas well are determined by the function. The assumptions between them are reasonable; Formula 6 in, Here, A is the significance test coefficient, and A is the regression coefficient. This represents the maximum controlled reserves of a gas well. To control reserves for different gas wells. This is a function for controlling reserves for different gas wells. The average value of the controlled reserves of the gas well. This represents the number of samples.

6. The method for calculating controlled reserves of gas wells in heterogeneous reservoirs according to claim 5, characterized in that: The Greater than the critical value means Greater than 2.0484.

Citation Information

Patent Citations

  • Method for calculating controlled reserves of shale gas well by using production data

    CN112878987A

  • Discrete numerical well-testing analysis method and system for fracture-cavity-type carbonate oil reservoir

    CN109138974A

  • Method and device for determining reasonable yield of gas well of heterogeneous gas reservoir

    CN115075807A