Pile tube and method for forming foundation pile
By introducing partitions and closure devices into the pile pipe, the problem of uneven bottom of the drill holes is solved, and the media isolation and external filling control of the pile pipe are realized, and the load bearing capacity and filling efficiency of the foundation pile are improved.
Patent Information
- Application Number
- CN202380038005.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-09-16
- Filing Date
- 2023-09-06
- Publication Date
- 2024-12-13
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the case of uneven bottom of the drill hole, the hardened medium is prone to seep into the pile pipe, resulting in a decrease in the load-bearing capacity of the foundation pile and low filling efficiency, and the inability to effectively control the filling of the medium.
Pile pipes with partitions are designed. The partitions divide the internal space into lower sections and upper sections. The isolation and connection of the two sections are controlled through a closure device to prevent media penetration, and the medium is supplied with sealing elements and pipelines to ensure that Fill control.
Effectively prevent hardened media from penetrateing into the pile pipe, reduce media consumption, ensure the load-bearing capacity of foundation piles, and achieve controllable filling and diversified use.
Smart Images

Figure CN119137328A_ABST
Abstract
Citation Information
Patent Citations
System and method for producing a foundation for a building in water
EP2930275A1
Underwater foundation
US20100296875A1
Upending and lifting tool
WO2021180515A1
