Electric power tunnel water level data storage method and historical data estimation method
CN119179699APending Publication Date: 2024-12-24CHONGQING TAISHAN CABLE CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202411205320.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-12-24
Smart Images

Figure CN119179699A_ABST
Abstract
The invention relates to the field of power cable online monitoring, in particular to a power tunnel water level data storage method and a historical data estimation method. The electric power tunnel water level data storage method comprises the following steps: 1) counting historical water level data of a water level detector; 2) segmenting the water level data to obtain a plurality of sub-data segments; 3) fitting each sub-data segment by using a set function to obtain a formula parameter of the set function; and 4) storing formula parameters and special data. According to the method, a large amount of redundant data is compressed, the storage efficiency is greatly improved, the problems of inquiry lagging and display lagging caused by a large storage amount are effectively solved, meanwhile, historical data can be accurately estimated, and the accuracy of the data is ensured.
Need to check novelty before this filing date? Find Prior Art
