Multi-trajectory continuous motion planning method and device for robot arm and electronic equipment
By calculating the transition arc and constraining the maximum velocity acceleration, the multi-track continuous motion planning of the robotic arm is optimized, which solves the problem of low efficiency of the robotic arm in multi-track motion and achieves smoother motion.
Patent Information
- Application Number
- CN202311593447.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-27
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2043-11-27
AI Technical Summary
Existing robotic arms use the 0-0 method during multi-track continuous motion, resulting in a large number of deceleration processes, which reduces operating efficiency and causes a waste of time and resources.
By setting the maximum speed and acceleration of the robotic arm, calculating the transition arc, start point, and end point, determining the maximum allowable speed and acceleration, and applying constraints on the trajectory, interpolating and calculating the interpolation points, the motion planning of the robotic arm is optimized.
It achieves smoothness in continuous multi-track movements of the robotic arm, reduces deceleration processes, and improves operating efficiency.
Smart Images

Figure CN119217358B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of robotic arm trajectory planning technology, specifically to a method, apparatus, and electronic device for planning continuous multi-trajectory motion of robotic arms. Background Technology
[0002] Currently, when robotic arms operate on multiple trajectories, they often use the 0-0 method, which means starting from zero speed, reducing the speed to zero at the end of one trajectory, and then connecting to the next trajectory. This method involves a large amount of deceleration, which greatly reduces the operating efficiency of the robotic arm and wastes time and resources. Therefore, how to make the robotic arm move faster and more smoothly during continuous movement on multiple trajectories is a problem that needs to be solved. Summary of the Invention
[0003] This invention addresses the problems in the prior art by providing a method, apparatus, and electronic device for multi-trajectory continuous motion planning of robotic arms. The specific technical solutions are as follows:
[0004] On the one hand, this application provides a method for multi-trajectory continuous motion planning of a robotic arm, the specific steps of which are as follows:
[0005] S1, set the maximum speed, maximum acceleration, and waypoints that the robotic arm needs to pass through;
[0006] S2, calculate the transition arc and determine the start and end points of the transition arc;
[0007] S3, determine the maximum permissible speed and maximum permissible acceleration of the robotic arm on the trajectory;
[0008] S4, constrain the trajectory of the robotic arm in the straight line segment and the circular arc segment based on the calculated maximum permissible speed and maximum permissible acceleration;
[0009] S5, interpolate at equal intervals on the trajectory and calculate the interpolation points.
[0010] As a further technical solution of the present invention, the steps of determining the transition arc and the transition start and end points in S2 are as follows:
[0011] S21, Obtain the target waypoints that the robotic arm needs to move. Each pair of adjacent waypoints is connected by a straight line trajectory. If the number of waypoints is no less than 3, a transition arc needs to be added. Proceed to S22.
[0012] S22, select 3 adjacent target waypoints, and in order of priority, designate them as starting point P. i-1 (x i-1 ,y i-1 ,z i-1 ), midpoint P i (x i ,y i ,zi End point P i+1 (x i+1 ,y i+1 ,z i+1 ), where the starting point P i-1 and the midpoint P i The area between them is the first straight line trajectory. The length of the first straight line segment is L1, and the midpoint is P. i and the endpoint P i+1 The area between them is the second straight line trajectory. The length of the second straight line trajectory is L2;
[0013]
[0014]
[0015]
[0016]
[0017] Where x i-1 ,y i-1 ,z i-1 ,x i ,y i ,z i ,x i+1 ,y i+1 ,z i+1 These are the spatial coordinates of the corresponding points;
[0018] S23, will Normalization yields the result from the starting point P. i-1 (x i-1 ,y i-1 ,z i-1 Pointing to the middle point P i (x i ,y i ,z i unit vector Will Normalization yields the result from the intermediate point P. i (x i ,y i ,z i Pointing to the end point P i+1 (x i+1 ,y i+1 ,z i+1 unit vector
[0019]
[0020]
[0021] S24, calculate the central angle θ of the transition arc, based on the central angle θ and the set arc radius R. d Calculate the intermediate point P i To the starting point P of the transition arc s Expected distance L d ;
[0022]
[0023]
[0024] The symbol · represents dot product, and the symbol * represents multiplication.
[0025] S25, generally speaking, the transition arc cannot replace more than half of the adjacent straight line segment; compare L d , and Take the minimum value among the three as the intermediate point P. i To the starting point P of the transition arc s The actual distance l, and the actual radius R of the transition arc. o ;
[0026]
[0027]
[0028] S26, Calculate the midpoint P i To the center P o The distance L, and the direction vector from the midpoint to the center of the circle. Then the coordinates P of the center of the circle can be calculated. o (x o ,y o ,z o );
[0029]
[0030]
[0031]
[0032] S27, according to the center P o Midpoint P i Unit vector and Calculate the direction vectors x and y, where the direction of x is the center P of the circle. o Pointing to the starting point P of the transition arc s The direction of y is perpendicular to x;
[0033]
[0034]
[0035] S28, based on the center P o Given direction vectors x and y, calculate the starting point P of the transition arc. s and the end point P of the transition arc e Location;
[0036] P s =P o +R o *x
[0037] P e =P o +R o *(x*cosθ+y*sinθ).
[0038] As a further technical solution of the present invention, the calculation method for the maximum permissible speed and maximum permissible acceleration of the robotic arm on the trajectory in S3 depends on the following formula:
[0039]
[0040]
[0041]
[0042]
[0043]
[0044] Where s is the length of the trajectory currently traversed by the robotic arm, the corresponding position is q, f(s) is a function of the position q at trajectory length s, and the maximum allowable acceleration of the robotic arm is a. m The maximum permissible speed of the robotic arm is v m f'(s) and f'(s) are the slope and curvature of the function f(s) at point s, respectively. and These are the velocity and acceleration along the trajectory, respectively. and For the speed and acceleration of the robotic arm in space, It is the maximum permissible speed of the trajectory obtained from the speed constraint. It is the maximum allowable acceleration of the trajectory obtained from acceleration constraints. The minimum allowable acceleration of the trajectory obtained from the acceleration constraints It is the maximum permissible speed of the trajectory under speed constraints. It is the maximum permissible velocity of the trajectory under acceleration constraints. It is by and The maximum permissible speed of the obtained trajectory.
[0045] As a further technical solution of the present invention, the method for constraining the trajectory of the robotic arm in the straight segment and the circular segment based on the maximum permissible speed and the maximum permissible acceleration in S4 is as follows:
[0046] S41, Set the starting point of the path s = 0, initial velocity Plan the robotic arm's trajectory from the starting point;
[0047] S42, determine the maximum permissible velocity and the maximum and minimum permissible acceleration on the first straight segment, because the slope f'(s) remains constant on the straight line, and the curvature f'(s) is 0, as detailed below:
[0048]
[0049]
[0050]
[0051]
[0052]
[0053] S43, from the starting point Perform forward integration to calculate the velocity and position of the subsequent trajectory. Then keep Until s≥l1, that is, the trajectory passes through the starting point P of the transition arc. s ;
[0054]
[0055]
[0056] in The velocity s at the next moment is obtained by forward integration. after The position at the next moment is obtained by forward integration, and Δt is the time interval.
[0057] S44, Calculate the starting point P of the transition arc. s Maximum permissible speed at the location and Determine the new From the starting point P of the transition arc s Begin, let With minimum acceleration Perform reverse integration until it intersects with the trajectory of forward integration, then replace the portion of the trajectory after the intersection point with the trajectory of reverse integration.
[0058]
[0059]
[0060] in The velocity s at the previous moment is obtained by inverse integration. before The position at the previous moment is obtained by inverse integration;
[0061] S45, on the arc segment, perform forward and backward integration using the same method to determine the trajectory on the arc segment; because the slope f'(s) and curvature f'(s) on the arc are not fixed, it is necessary to calculate the trajectory at each integration step. and
[0062] S46. On the second straight segment, perform forward integration and backward integration in the same way to determine the trajectory on the second straight segment.
[0063] S47, calculate the interpolation points on the trajectory with a period of Δt.
[0064] Secondly, this application provides a multi-track continuous motion planning device for robotic arms, which applies the above-mentioned multi-track continuous motion planning method for robotic arms, including:
[0065] The receiving module is used to receive control information sent by the processor;
[0066] The sending module sends robotic arm information to the processor;
[0067] The conversion module converts the received control information into control signals for the robotic arm joints.
[0068] The control module controls the movement of the robotic arm based on control signals.
[0069] Thirdly, this application provides an electronic device for multi-track continuous motion planning of a robotic arm, comprising: a memory, a processor, a controller, and a communication interface, wherein the memory, processor, controller, and communication interface are electrically connected to a bus, and the processor is used to execute the above-described multi-track continuous motion planning method for a robotic arm.
[0070] The beneficial effects of this invention are as follows:
[0071] 1. This invention achieves a smooth arc motion during the turning process of the robotic arm by pre-calculating the transition arc and changing the running trajectory of the robotic arm. This is different from the traditional 0-0 motion mode, reduces a lot of deceleration process, and improves the operating efficiency of the robotic arm.
[0072] 2. This invention constrains the speed and acceleration of the robotic arm at each point during its movement, and calculates the maximum allowable speed at the next point by integrating the maximum acceleration, so that the robotic arm can operate at the maximum speed within the constraint range. Attached Figure Description
[0073] Figure 1 A schematic diagram of the process structure of the multi-trajectory continuous motion planning method for a robotic arm is shown.
[0074] Figure 2 A schematic diagram of the circular arc transition path is shown;
[0075] Figure 3 A schematic diagram of the trajectory change structure on the circular arc transition path is shown;
[0076] Figure 4 A schematic diagram of the robotic arm speed planning structure in Example 1 is shown;
[0077] Figure 5 A schematic diagram of the trajectory structure of the robotic arm in Example 1 is shown;
[0078] Figure 6 A schematic diagram of the electronic device is shown. Detailed Implementation
[0079] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below in conjunction with the embodiments.
[0080] Currently, when robotic arms operate on multiple trajectories, they often use the 0-0 method, which means starting from zero speed, reducing the speed to zero at the end of one trajectory, and then connecting to the next trajectory. This method involves a large amount of deceleration, which greatly reduces the operating efficiency of the robotic arm and wastes time and resources. Therefore, how to make the robotic arm move faster and more smoothly during continuous movement on multiple trajectories is a problem that needs to be solved.
[0081] Based on the aforementioned technical problems, this application provides a method for multi-path continuous motion planning for robotic arms. Figure 1 A schematic diagram of the process structure of a multi-trajectory continuous motion planning method for a robotic arm is shown. Figure 1 The multi-trajectory continuous motion planning method for this robotic arm has the following specific steps:
[0082] S1, set the maximum speed, maximum acceleration, and waypoints that the robotic arm needs to pass through;
[0083] S2, calculate the transition arc and determine the start and end points of the transition arc;
[0084] S3, determine the maximum permissible speed and maximum permissible acceleration of the robotic arm on the trajectory;
[0085] S4, constrain the trajectory of the robotic arm in the straight line segment and the circular arc segment based on the calculated maximum permissible speed and maximum permissible acceleration;
[0086] S5, interpolate at equal intervals on the trajectory and calculate the interpolation points.
[0087] Figure 2 A schematic diagram of the circular arc transition path is shown; Figure 3 A schematic diagram of the trajectory change structure on the circular arc transition path is shown; Figure 2 and Figure 3 In step S2, the steps for determining the transition arc, the start point, and the end point of the transition are as follows:
[0088] S21, Obtain the target waypoints that the robotic arm needs to move. Each pair of adjacent waypoints is connected by a straight line trajectory. If the number of waypoints is no less than 3, a transition arc needs to be added. Proceed to S22.
[0089] S22, select 3 adjacent target waypoints, and in order of priority, designate them as starting point P. i-1 (x i-1 ,y i-1 ,z i-1 ), midpoint P i (x i ,y i ,z i End point P i+1 (x i+1 ,y i+1 ,z i+1 ), where the starting point P i-1 and the midpoint P i The area between them is the first straight line trajectory. The length of the first straight line segment is L1, and the midpoint is P. i and the endpoint P i+1 The area between them is the second straight line trajectory. The length of the second straight line trajectory is L2;
[0090]
[0091]
[0092]
[0093]
[0094] Where x i-1 ,y i-1 ,z i-1 ,x i ,y i ,z i ,xi+1 ,y i+1 ,z i+1 These are the spatial coordinates of the corresponding points;
[0095] S23, will Normalization yields the result from the starting point P. i-1 (x i-1 ,y i-1 ,z i-1 Pointing to the middle point P i (x i ,y i ,z i unit vector Will Normalization yields the result from the intermediate point P. i (x i ,y i ,z i Pointing to the end point P i+1 (x i+1 ,y i+1 ,z i+1 unit vector
[0096]
[0097]
[0098] S24, calculate the central angle θ of the transition arc, based on the central angle θ and the set arc radius R. d Calculate the intermediate point P i To the starting point P of the transition arc s Expected distance L d ;
[0099]
[0100]
[0101] The symbol · represents dot product, and the symbol * represents multiplication.
[0102] S25, generally speaking, the transition arc cannot replace more than half of the adjacent straight line segment; compare L d , and Take the minimum value among the three as the intermediate point P. i To the starting point P of the transition arc s The actual distance l, and the actual radius R of the transition arc. o ;
[0103]
[0104]
[0105] S26, Calculate the midpoint P i To the center P o The distance L, and the direction vector from the midpoint to the center of the circle. Then the coordinates P of the center of the circle can be calculated. o (x o ,y o ,z o );
[0106]
[0107]
[0108]
[0109] S27, based on the center P o Midpoint P i Unit vector and Calculate the direction vectors x and y, where the direction of x is the center P of the circle. o Pointing to the starting point P of the transition arc s The direction of y is perpendicular to x;
[0110]
[0111]
[0112] S28, based on the center P o Given direction vectors x and y, calculate the starting point P of the transition arc. s and the end point P of the transition arc e The location.
[0113] P s =P o +R o *x
[0114] P e =P o +R o *(x*cosθ+y*sinθ)
[0115] The calculation methods for the maximum permissible speed and maximum permissible acceleration of the robotic arm on the trajectory in S3 are as follows:
[0116] S31, let the length of the trajectory currently traversed by the robotic arm be s, and the corresponding position be q. Then there exists a function f(s), and the position q at the trajectory length s is given by the function f(s):
[0117] q=f(s)0≤s≤s f
[0118] s f =l1+l o +l2
[0119] l1=||P s -P i-1 ||
[0120] l o =R o *θ
[0121] l2=||P i+1 -P e ||
[0122] Where s f l1 is the total length of the trajectory, and l1 is the starting point P. i-1 To the starting point P of the transition arc s The length of the straight line segment, l o l1 is the length of the transition arc, and l2 is the endpoint P of the transition arc. e To the destination P i+1 The length of the straight line segment;
[0123] S32, according to the above formula, we can know the velocity and acceleration when the trajectory length is s;
[0124]
[0125]
[0126] Where f'(s) and f''(s) are the slope and curvature of the function f(s) at s, respectively. and Let be the velocity and acceleration on the trajectory, respectively, and d and dt be the derivatives with respect to time.
[0127] S33, Set the maximum permissible speed of the robotic arm to v m You can get and The constraint relationship, The speed of the robotic arm in space:
[0128]
[0129]
[0130]
[0131]
[0132] S34, Set the maximum allowable acceleration of the robotic arm to a. m You can get and The constraint relationship, The acceleration of the robotic arm in space:
[0133]
[0134]
[0135] This requires a categorized discussion:
[0136] ①f′(s)>0:
[0137]
[0138]
[0139] ②f′(s)<0:
[0140]
[0141]
[0142] ③f′(s)=0, f″(s)≠0:
[0143]
[0144]
[0145]
[0146]
[0147] S35, therefore the maximum permissible speed of the robotic arm on the trajectory. and maximum permissible acceleration for:
[0148]
[0149]
[0150]
[0151]
[0152]
[0153] in, It is the maximum permissible speed of the trajectory under speed constraints. It is the maximum permissible velocity of the trajectory under acceleration constraints. It is by and The maximum permissible speed of the obtained trajectory, It is the maximum allowable acceleration of the trajectory obtained from acceleration constraints. The minimum allowable acceleration of the trajectory obtained by acceleration constraints.
[0154] The constraint method for the robot arm's trajectory on straight and circular segments based on the maximum permissible speed and maximum permissible acceleration in S4 is as follows:
[0155] S41, Set the starting point of the path s = 0, initial velocity Plan the robotic arm's trajectory from the starting point;
[0156] S42, determine the maximum permissible velocity and the maximum and minimum permissible acceleration on the first straight segment, because the slope f'(s) remains constant on the straight line, and the curvature f'(s) is 0, as detailed below:
[0157]
[0158]
[0159]
[0160]
[0161]
[0162] S43, from the starting point Perform forward integration to calculate the velocity and position of the subsequent trajectory. Then keep Until s≥l1, that is, the trajectory passes through the starting point P of the transition arc. s ;
[0163]
[0164]
[0165] in The velocity s at the next moment is obtained by forward integration. after The position at the next moment is obtained by forward integration, and Δt is the time interval.
[0166] S44, Calculate the starting point P of the transition arc. s Maximum permissible speed at the location and Determine the new From the starting point P of the transition arc s Begin, let With minimum acceleration Perform reverse integration until it intersects with the trajectory of forward integration, then replace the portion of the trajectory after the intersection point with the trajectory of reverse integration.
[0167]
[0168]
[0169] in The velocity s at the previous moment is obtained by inverse integration. before The position at the previous moment is obtained by inverse integration;
[0170] S45, on the arc segment, perform forward and backward integration using the same method to determine the trajectory on the arc segment; because the slope f'(s) and curvature f'(s) on the arc are not fixed, it is necessary to calculate the trajectory at each integration step. and
[0171] S46. On the second straight segment, perform forward integration and backward integration in the same way to determine the trajectory on the second straight segment.
[0172] S47, calculate the interpolation points on the trajectory with a period of Δt.
[0173] Example 1: Figure 4 A schematic diagram of the robotic arm speed planning structure in Example 1 is shown; Figure 5 A schematic diagram of the trajectory structure of the robotic arm in Example 1 is shown; Figure 4 and Figure 5 middle:
[0174] Set the maximum allowable speed v of the robotic arm m =0.6 m / s², maximum permissible acceleration a m =0.8m / s 2 The radius of the transition arc is set to 0.5m, the starting point P1 is (0,0,0), and it passes through waypoints P2 (1,1,1) and P3 (0,1,3).
[0175] Example 2
[0176] To complement Embodiment 1, this embodiment provides a multi-trajectory continuous motion planning device for a robotic arm, comprising:
[0177] The receiving module is used to receive control information sent by the processor;
[0178] The sending module sends robotic arm information to the processor;
[0179] The conversion module converts the received control information into control signals for the robotic arm joints.
[0180] The control module controls the movement of the robotic arm based on control signals; for example, acceleration or braking.
[0181] Example 3
[0182] To complement Embodiment 1, this embodiment provides an electronic device for multi-track continuous motion planning of a robotic arm. Figure 6 A schematic diagram of the electronic device is shown; Figure 6 The robotic arm's multi-track continuous motion planning electronic device includes: a memory, a processor, a controller, and a communication interface, wherein the memory, processor, controller, and communication interface are electrically connected to a bus.
[0183] The memory should be a non-volatile, computer-readable storage medium executable by the processor for storing computer programs. The memory can be separate from other electronic devices and accessed by the processor via a bus interface; or it can be integrated into the processor and accessed directly by the processor. Typical memory includes, but is not limited to, various media capable of storing program code, such as USB flash drives, external hard drives, read-only memory, random access memory, magnetic disks, or optical disks.
[0184] A processor can be considered as a processing module that executes a computer program stored in the controller, and that the computer program, when run by the processor, is capable of performing all or part of the steps of the method described in this invention. Simultaneously, the processor should have the ability to send control information to the controller or receive information sent by the controller.
[0185] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it.
Claims
1. A method for planning continuous motion along multiple trajectories of a robotic arm, characterized in that, The specific steps are as follows: S1, set the maximum speed, maximum acceleration, and waypoints that the robotic arm needs to pass through; S2, calculate the transition arc and determine the start and end points of the transition arc; S3, determine the maximum permissible speed and maximum permissible acceleration of the robotic arm on the trajectory; S4, constrain the trajectory of the robotic arm in the straight line segment and the circular arc segment based on the calculated maximum permissible speed and maximum permissible acceleration; S5, interpolate at equal intervals on the trajectory and calculate the interpolation points; The steps for determining the transition arc, the start point, and the end point of the transition in S2 are as follows: S21, Obtain the target waypoints that the robotic arm needs to move. Each pair of adjacent waypoints is connected by a straight line trajectory. If the number of waypoints is no less than 3, a transition arc needs to be added. Proceed to S22. S22, select 3 adjacent target waypoints, and use them as starting points in sequence. Midpoint End point , where the starting point and midpoint The area between them is the first straight line trajectory. The length of the first straight line trajectory is Midpoint and end point The area between them is the second straight line trajectory. The length of the second straight line trajectory is ; in These are the spatial coordinates of the corresponding points; S23, will Normalization, to obtain from the starting point Pointing to the middle point unit vector ,Will Normalization, obtaining from the midpoint Point to the end point unit vector ; S24, Calculate the central angle of the transition arc. According to the central angle and the set arc radius Calculate the midpoint To the starting point of the transition arc Expected distance ; Among the symbols Dot product operation, symbol Indicates multiplication operation; S25, generally speaking, a transition arc cannot replace more than half of an adjacent straight line segment; comparison , and Take the minimum value among the three as the midpoint. To the starting point of the transition arc actual distance And calculate the actual radius of the transition arc. ; S26, Calculate the midpoint To the center distance and the direction vector from the midpoint to the center of the circle. Then the coordinates of the center of the circle can be calculated. ; S27, according to the center Midpoint Unit vector and Calculate the direction vector and ,in The direction is the center of the circle Pointing to the starting point of the transition arc , direction and vertical; S28, according to the center Direction vector and Calculate the starting point of the transition arc. and the end point of the transition arc Location; 。 2. The multi-trajectory continuous motion planning method for a robotic arm according to claim 1, characterized in that, The calculation method for the maximum permissible speed and maximum permissible acceleration of the robotic arm on the trajectory in S3 relies on the following formula: in This represents the length of the trajectory currently traversed by the robotic arm, and the corresponding position is... , Trajectory length Location The function is given by the maximum allowable acceleration of the robotic arm. The maximum permissible speed of the robotic arm is , and functions respectively exist The slope and curvature at that point and These are the velocity and acceleration along the trajectory, respectively. and For the speed and acceleration of the robotic arm in space, It is the maximum permissible speed of the trajectory obtained from the speed constraint. It is the maximum allowable acceleration of the trajectory obtained from acceleration constraints. The minimum allowable acceleration of the trajectory obtained from the acceleration constraints It is the maximum permissible speed of the trajectory under speed constraints. It is the maximum permissible velocity of the trajectory under acceleration constraints. It is by and The maximum permissible speed of the obtained trajectory.
3. The multi-trajectory continuous motion planning method for a robotic arm according to claim 1, characterized in that, The constraint method for the robot arm's trajectory on straight and circular segments based on the maximum permissible speed and maximum permissible acceleration in S4 is as follows: S41, Set the starting point of the path. initial velocity The trajectory of the robotic arm is planned from the starting point; S42, determine the maximum permissible velocity and the maximum and minimum permissible acceleration on the first straight segment, because the slope of the straight line... Unchanged, curvature The value is 0, as detailed below: S43, from the starting point Perform forward integration to calculate the velocity and position of the subsequent trajectory. Then keep ,until That is, the trajectory passes through the starting point of the transition arc. ; in The velocity at the next moment is obtained by forward integration. The position at the next moment is obtained by forward integration. The interval time; S44, Calculate the starting point of the transition arc. Maximum permissible speed at the location and Determine the new From the starting point of the transition arc Begin, let With minimum acceleration Perform reverse integration until it intersects with the trajectory of forward integration, then replace the portion of the trajectory after the intersection point with the trajectory of reverse integration. in The velocity at the previous moment is obtained by inverse integration. The position at the previous moment is obtained by inverse integration; S45, on the arc segment, perform forward and backward integration using the same method to determine the trajectory on the arc segment; because the slope on the arc... and curvature It is not fixed, so it is necessary to calculate it at each step of the integration. , and ; S46. On the second straight segment, perform forward integration and backward integration in the same way to determine the trajectory on the second straight segment. S47, on the trajectory at intervals Calculate the interpolation points for the period.
4. A robotic arm multi-track continuous motion planning device, employing the robotic arm multi-track continuous motion planning method as described in any one of claims 1-3, characterized in that, include: The receiving module is used to receive control information sent by the processor; The sending module sends robotic arm information to the processor; The conversion module converts the received control information into control signals for the robotic arm joints. The control module controls the movement of the robotic arm based on control signals.
5. Electronic equipment for multi-track continuous motion planning of robotic arms, including: The system comprises a memory, a processor, a controller, and a communication interface, wherein the memory, processor, controller, and communication interface are electrically connected to a bus, characterized in that: the processor is used to execute the multi-track continuous motion planning method for a robotic arm as described in any one of claims 1-3.
Citation Information
Patent Citations
Mechanical arm multi-target trajectory obstacle avoidance planning method based on improved MOABC algorithm
CN115570563A
Method of and apparatus for robot tip trajectory control
US5740327A
