Fabricated industrial factory building reinforced concrete structure
Patent Information
- Application Number
- CN202411613715.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-13
- Publication Date
- 2025-01-03
AI Technical Summary
When the steel-concrete structure of the existing factory is in use, the concrete support surface is insufficient, resulting in insufficient stability at the connection between the steel and concrete, prone to cracks, and vibration of the upper equipment affects the stability of the factory.
A prefabricated industrial factory steel-concrete structure is designed, adopting a combination of steel-concrete main body, reinforcement, first shock absorbing mechanism and second shock absorbing mechanism, and the stability is increased through the design of columns, concrete slabs and concrete slab covers. A shock absorbing mechanism is also installed between the column and the concrete base, the concrete slab and the slab cover to reduce the impact of vibration.
The stability and earthquake resistance of the steel-concrete structure of the factory are improved, ensuring the reliability of concrete connections and the shock absorption effect of the upper mechanical equipment.
Smart Images

Figure CN119243861A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of construction, and in particular relates to a steel-concrete structure of an assembled industrial plant. Background Art
[0002] The steel-concrete structure of a factory building is a common building form that combines the advantages of steel structure and concrete structure. It is widely used in industrial plants, warehouses and large commercial buildings. It has the characteristics of high strength and stability, flexible design, high construction efficiency, good fire resistance and corrosion resistance.
[0003] Existing steel-concrete structures of factories are often directly fixed when in use, resulting in insufficient support surface for concrete, insufficient stability at the connection between steel and concrete, and easy to cause cracks in the concrete due to vibration. At the same time, when the upper equipment of the steel-concrete structure of the factory is working, the vibration generated is also easy to affect the steel-concrete structure of the factory.
[0004] Based on this, a prefabricated steel-concrete structure with shock absorption is designed. Summary of the invention
[0005] In view of the shortcomings of the prior art, the present invention provides a prefabricated steel-concrete structure for industrial plants. The specific technical solution is as follows:
[0006] An assembled industrial plant steel-concrete structure, comprising:
[0007] A steel-concrete main body, the steel-concrete main body comprising a column for vertical support, a concrete base located at the bottom of the column for support, a concrete slab located at the upper end of the column for lateral support, and a concrete slab cover sleeved on the outside of the concrete slab;
[0008] A reinforcement member, wherein the reinforcement member is used to strengthen the connection between the column and the concrete slab;
[0009] a first shock absorbing mechanism, the first shock absorbing mechanism being installed between the column and the concrete base;
[0010] A second shock absorbing mechanism is installed between the concrete slab and the concrete slab cover.
[0011] Preferably, the reinforcement includes a top plate welded to the upper end of the column, and a supporting sleeve welded between the column and the top plate, the lower surface of the concrete slab is formed with a concrete connector by casting, the upper part of the column is welded with a connecting sleeve, the side surface of the connecting sleeve is welded with a cross beam, and the cross beam is used to support the concrete connector.
[0012] Preferably, the concrete connecting member includes a support frame cast on the lower surface of the concrete slab, the upper end of the support frame is formed with a concrete top bar fixed to the lower surface of the concrete slab by casting, the lower end of the support frame is formed with a concrete bottom bar in contact with the crossbeam by casting, and the lower surface of the concrete slab is formed with sixteen concrete side panels by casting, and four concrete side panels form a group, and a group of four concrete side panels are in contact with the outer surface of the support sleeve.
[0013] Preferably, the first shock absorbing mechanism includes a base plate welded to the lower end of the column, a first shock absorber is welded to the lower surface of the base plate, a rubber pad is arranged on the lower surface of the base plate, a limiting groove is provided at the upper end of the concrete base, and the lower end of the rubber pad is installed in the limiting groove, and the lower end of the first shock absorber is welded to the steel bar at the upper end of the concrete base.
[0014] Preferably, there are seven first shock absorbers welded between the base plate and the concrete base in a rubber pad annular array.
[0015] Preferably, the second shock absorbing mechanism includes a second shock absorber welded between the concrete slab and the concrete slab cover, and shock absorbing mechanisms installed at four corners of the concrete slab and the concrete slab cover.
[0016] Preferably, the first shock absorber and the second shock absorber both include a damper and a spring, and two ends of the spring are fixedly welded to two ends of the damper.
[0017] Preferably, the shock absorbing mechanism comprises two electromagnets electrically connected to an external power source, and the magnetic poles of the two electromagnets are in opposite directions. The two electromagnets are outer-circularly connected with rubber hoses, and the rubber hoses are in a ring array with twelve in number.
[0018] Preferably, the shock absorbing mechanism also includes an inner fold line tube, an outer fold line tube and a return spring, the axes of the inner fold line tube, the outer fold line tube and the return spring coincide, metal plates are fixed at both ends of the rubber hose, the inner fold line tube, the outer fold line tube and the return spring, rubber pads are bonded to the outer surface of the metal plate, and inner rubber sleeves and outer rubber sleeves are provided on both sides of the rubber hose.
[0019] Preferably, the lower part of the concrete base is integrally formed with side feet.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] 1. The steel-concrete structure of the factory building is composed of a steel-concrete main body, a reinforcement, a first shock-absorbing mechanism and a second shock-absorbing mechanism. The columns and concrete slabs of the steel-concrete main body serve the purpose of vertical and horizontal support, and the reinforcement fixes the columns and concrete slabs, thereby improving the stability of the steel-concrete structure of the factory building. The first shock-absorbing mechanism arranged between the columns and the concrete base allows the bottom of the steel-concrete structure of the factory building to be damped by the first shock-absorbing mechanism, thereby increasing the stability of the steel-concrete structure of the factory building. The second shock-absorbing mechanism arranged between the concrete slab and the concrete slab cover allows the upper structure of the steel-concrete structure of the factory building to be damped by the second shock-absorbing mechanism. At the same time, the second shock-absorbing mechanism also achieves the purpose of damping when the upper mechanical equipment is working.
[0022] 2. The top plate welded at the upper end of the column is reinforced by the supporting sleeve, through the reinforcing member composed of the top plate, the supporting sleeve, the connecting sleeve, the cross beam and the concrete connector, so that the upper end of the column can support the concrete slab through the top plate, and the connecting sleeve welded on the upper part of the column and the cross beam welded on the side surface of the connecting sleeve make it convenient for the cross beam to support the concrete connector cast on the lower surface of the concrete slab, thereby increasing the reliability of the connection between the column and the concrete slab.
[0023] 3. Through the concrete connector composed of a concrete top strip, concrete side panels, a support frame, and a concrete bottom strip, the concrete side panels cast on the lower surface of the concrete slab are in contact with the outer surface of the support sleeve, so that the column limits the concrete slab through the support sleeve and the concrete side panels, and the concrete top strip and support frame cast on the lower surface of the concrete slab, and the concrete bottom strip cast at the lower end of the support frame are supported by the connecting sleeve, thereby increasing the stability of the concrete connector supporting the concrete slab.
[0024] 4. Through the first shock absorbing mechanism composed of the base plate, the first shock absorber, the rubber pad and the limit groove, the limit groove opened at the upper end of the concrete base is used to limit the rubber pad, so that the rubber pad supports the base plate, and the upper end of the first shock absorber is welded to the lower surface of the base plate, and the lower end of the first shock absorber is welded to the steel bar at the upper end of the concrete base, so as to facilitate the first shock absorber and the rubber pad to cooperate to achieve the purpose of shock absorbing the concrete base to the column.
[0025] 5. The second shock-absorbing mechanism composed of the shock-absorbing mechanism and the second shock absorber can cooperate with the shock-absorbing mechanism and the second shock absorber to achieve shock absorption of the upper layer of the steel-concrete structure of the factory building. The shock-absorbing mechanism is composed of a rubber pad, a metal plate, an outer rubber sleeve, an inner rubber sleeve, a rubber hose, an electromagnet, an inner folded-wire tube, an outer folded-wire tube and a reset spring. The reset spring welded between the two metal plates plays a reset role, and the inner folded-wire tube and the outer folded-wire tube fixed between the two metal plates play the purpose of shock absorption. When the two electromagnets are connected to an external power supply, the magnetic poles are opposite, so that the two electromagnets with opposite magnetic poles repel each other, thereby achieving the purpose of shock absorption. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a three-dimensional structural schematic diagram of the present invention;
[0027] Figure 2 It is a schematic diagram of the three-dimensional structure of the present invention;
[0028] Figure 3 It is a schematic diagram of the structure of the column and the concrete base in the present invention;
[0029] Figure 4 for Figure 1 A schematic diagram of the enlarged structure at A in the middle;
[0030] Figure 5 It is a schematic diagram of the three-dimensional structure of the shock absorbing mechanism in the present invention;
[0031] Figure 6 It is a schematic diagram of the cross-sectional structure of the shock absorbing mechanism in the present invention;
[0032] Figure 7 It is a schematic diagram of the structure of the shock absorbing mechanism parts in the present invention.
[0033] Figure numerals: 1. column; 2. concrete base; 3. side foot; 4. bottom plate; 5. first shock absorber; 6. rubber pad; 7. limit groove; 8. top plate; 9. support sleeve; 10. concrete slab; 11. connecting sleeve; 12. crossbeam; 13. concrete top strip; 14. concrete side plate; 15. support frame; 16. concrete bottom strip; 17. concrete slab cover; 18. shock absorbing mechanism; 181. rubber pad; 182. metal plate; 183. outer rubber sleeve; 184. inner rubber sleeve; 185. rubber hose; 186. electromagnet; 187. inner fold line tube; 188. outer fold line tube; 189. reset spring; 19. second shock absorber. DETAILED DESCRIPTION
[0034] The technical solutions in the embodiments of the present invention are described below.
[0035] See also Figure 1-7 The present invention provides a technical solution: a prefabricated industrial plant steel-concrete structure, comprising:
[0036] The steel-concrete main body includes a column 1 for vertical support, a concrete base 2 located at the bottom of the column 1 for support, a concrete slab 10 located at the upper end of the column 1 for lateral support, and a concrete slab cover 17 sleeved on the outside of the concrete slab 10;
[0037] A reinforcement member, which is used to strengthen the connection between the column 1 and the concrete slab 10;
[0038] A first shock absorbing mechanism, the first shock absorbing mechanism is installed between the column 1 and the concrete base 2;
[0039] The second shock absorbing mechanism is installed between the concrete slab 10 and the concrete slab cover 17 .
[0040] In this embodiment, the steel-concrete structure of the factory building is composed of a steel-concrete main body, a reinforcement, a first shock-absorbing mechanism and a second shock-absorbing mechanism. The columns 1 and the concrete slab 10 of the steel-concrete main body serve the purpose of vertical and horizontal support, and the reinforcement fixes the columns 1 and the concrete slab 10, thereby improving the stability of the steel-concrete structure of the factory building. The first shock-absorbing mechanism arranged between the columns 1 and the concrete base 2 allows the bottom of the steel-concrete structure of the factory building to be damped by the first shock-absorbing mechanism, thereby increasing the stability of the steel-concrete structure of the factory building. The second shock-absorbing mechanism arranged between the concrete slab 10 and the concrete slab cover 17 allows the upper structure of the steel-concrete structure of the factory building to be damped by the second shock-absorbing mechanism. At the same time, the second shock-absorbing mechanism also achieves the purpose of damping when the upper mechanical equipment is working.
[0041] Specifically, the reinforcement member includes a top plate 8 welded to the upper end of the column 1, and a support sleeve 9 welded between the column 1 and the top plate 8. The lower surface of the concrete slab 10 is cast with a concrete connector. The upper part of the column 1 is welded with a connecting sleeve 11. The side surface of the connecting sleeve 11 is welded with a crossbeam 12, and the crossbeam 12 is used to support the concrete connector. In this embodiment, the reinforcement member composed of the top plate 8, the support sleeve 9, the connecting sleeve 11, the crossbeam 12 and the concrete connector is used. The top plate 8 welded to the upper end of the column 1 is reinforced by the support sleeve 9, so that the upper end of the column 1 supports the concrete slab 10 through the top plate 8. The connecting sleeve 11 welded to the upper part of the column 1 and the crossbeam 12 welded to the side surface of the connecting sleeve 11 facilitate the crossbeam 12 to support the concrete connector cast on the lower surface of the concrete slab 10, thereby increasing the reliability of the connection between the column 1 and the concrete slab 10.
[0042] Specifically, the concrete connecting part includes a support frame 15 cast on the lower surface of the concrete slab 10, the upper end of the support frame 15 is cast with a concrete top bar 13 fixed to the lower surface of the concrete slab 10, the lower end of the support frame 15 is cast with a concrete bottom bar 16 in contact with the crossbeam 12, and the lower surface of the concrete slab 10 is cast with sixteen concrete side panels 14, four concrete side panels 14 form a group, and a group of four concrete side panels 14 are in contact with the outer surface of the support sleeve 9. In this embodiment, through the concrete connector composed of a concrete top strip 13, a concrete side plate 14, a support frame 15, and a concrete bottom strip 16, the concrete side plate 14 cast on the lower surface of the concrete slab 10 contacts the outer surface of the support sleeve 9, so that the column 1 limits the concrete slab 10 through the support sleeve 9 and the concrete side plate 14, and the concrete top strip 13 and the support frame 15 cast on the lower surface of the concrete slab 10, and the concrete bottom strip 16 cast at the lower end of the support frame 15 are supported by the connecting sleeve 11, thereby increasing the stability of the concrete connector supporting the concrete slab 10.
[0043] Specifically, the first shock absorbing mechanism includes a bottom plate 4 welded to the lower end of the column 1, a first shock absorber 5 is welded to the lower surface of the bottom plate 4, a rubber pad 6 is arranged on the lower surface of the bottom plate 4, a limiting groove 7 is provided at the upper end of the concrete base 2, and the lower end of the rubber pad 6 is installed in the limiting groove 7, the lower end of the first shock absorber 5 is welded to the steel bar at the upper end of the concrete base 2, and there are seven first shock absorbers 5 welded between the bottom plate 4 and the concrete base 2 in a circular array with respect to the rubber pad 6. In this embodiment, through the first shock absorbing mechanism composed of the bottom plate 4, the first shock absorber 5, the rubber pad 6 and the limiting groove 7, the limiting groove 7 provided at the upper end of the concrete base 2 is used for limiting the rubber pad 6, so as to facilitate the rubber pad 6 to support the bottom plate 4, and the upper end of the first shock absorber 5 is welded to the lower surface of the bottom plate 4, and the lower end of the first shock absorber 5 is welded to the steel bar at the upper end of the concrete base 2, so as to facilitate the first shock absorber 5 and the rubber pad 6 to cooperate to achieve the purpose of shock reduction of the concrete base 2 to the column 1.
[0044] Specifically, the second shock absorbing mechanism includes a second shock absorber 19 welded between the concrete slab 10 and the concrete slab cover 17, and shock absorbing mechanisms 18 installed at four corners of the concrete slab 10 and the concrete slab cover 17. In this embodiment, the second shock absorbing mechanism composed of the shock absorbing mechanism 18 and the second shock absorber 19 facilitates the cooperation of the shock absorbing mechanism 18 and the second shock absorber 19 to achieve shock absorption of the upper layer of the steel-concrete structure of the factory building.
[0045] Specifically, the first shock absorber 5 and the second shock absorber 19 both include a damper and a spring, and the two ends of the spring are welded and fixed to the two ends of the damper. In this embodiment, the damper and the spring of the first shock absorber 5 and the second shock absorber 19 cooperate to perform shock absorption.
[0046] Specifically, the shock absorbing mechanism 18 includes two electromagnets 186 electrically connected to an external power supply, and the magnetic poles of the two electromagnets 186 are in opposite directions. The two electromagnets 186 are outer-circularly connected with a rubber hose 185, and there are twelve rubber hoses 185 in a circular array. The shock absorbing mechanism 18 also includes an inner fold line tube 187, an outer fold line tube 188 and a reset spring 189. The axes of the inner fold line tube 187, the outer fold line tube 188 and the reset spring 189 coincide. Metal plates 182 are fixed at both ends of the rubber hose 185, the inner fold line tube 187, the outer fold line tube 188 and the reset spring 189, and a rubber pad 181 is bonded to the outer surface of the metal plate 182. Inner rubber sleeves 184 and outer rubber sleeves 183 are arranged on both sides of the rubber hose 185. In this embodiment, the shock absorbing mechanism 18 is composed of a rubber pad 181, a metal plate 182, an outer rubber sleeve 183, an inner rubber sleeve 184, a rubber hose 185, an electromagnet 186, an inner fold line tube 187, an outer fold line tube 188 and a reset spring 189. The reset spring 189 welded between the two metal plates 182 plays a reset role, and the inner fold line tube 187 and the outer fold line tube 188 fixed between the two metal plates 182 play the purpose of shock absorption. When the two electromagnets 186 are connected to an external power supply, the magnetic poles are opposite, so that the two electromagnets 186 with opposite magnetic poles repel each other, thereby achieving the purpose of shock absorption.
[0047] Specifically, the lower part of the concrete base 2 is integrally formed with a side foot 3. In this embodiment, the side foot 3 is used to increase the contact area between the concrete base 2 and the foundation.
[0048] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A prefabricated steel-concrete structure of an industrial plant, characterized in that: include: A steel-concrete main body, the steel-concrete main body comprising a column (1) for vertical support, a concrete base (2) located at the bottom of the column (1) for support, a concrete slab (10) located at the upper end of the column (1) for lateral support, and a concrete slab cover (17) sleeved on the outside of the concrete slab (10); A reinforcement member, the reinforcement member being used to strengthen the connection between the column (1) and the concrete slab (10); A first shock absorbing mechanism, the first shock absorbing mechanism being installed between the column (1) and the concrete base (2); A second shock absorbing mechanism is installed between the concrete slab (10) and the concrete slab cover (17).
2. The assembled steel-concrete structure of industrial plant according to claim 1 is characterized by: The reinforcement comprises a top plate (8) welded to the upper end of the column (1), and a support sleeve (9) welded between the column (1) and the top plate (8); a concrete connector is formed on the lower surface of the concrete slab (10) by casting; a connecting sleeve (11) is welded to the upper part of the column (1); a crossbeam (12) is welded to the side surface of the connecting sleeve (11), and the crossbeam (12) is used to support the concrete connector.
3. The steel-concrete structure of an assembled industrial plant according to claim 2 is characterized by: The concrete connector comprises a support frame (15) cast on the lower surface of a concrete slab (10); a concrete top strip (13) fixed to the lower surface of the concrete slab (10) is cast on the upper end of the support frame (15); a concrete bottom strip (16) in contact with the crossbeam (12) is cast on the lower end of the support frame (15); sixteen concrete side panels (14) are cast on the lower surface of the concrete slab (10), four concrete side panels (14) form a group, and a group of four concrete side panels (14) are in contact with the outer surface of the support sleeve (9).
4. The assembled steel-concrete structure of industrial plant according to claim 1 is characterized by: The first shock absorbing mechanism comprises a bottom plate (4) welded to the lower end of the column (1), a first shock absorber (5) is welded to the lower surface of the bottom plate (4), a rubber pad (6) is arranged on the lower surface of the bottom plate (4), a limiting groove (7) is provided at the upper end of the concrete base (2), and the lower end of the rubber pad (6) is installed in the limiting groove (7), and the lower end of the first shock absorber (5) is welded to the steel bar at the upper end of the concrete base (2).
5. The steel-concrete structure of an assembled industrial plant according to claim 4 is characterized by: There are seven first shock absorbers (5) welded between the bottom plate (4) and the concrete base (2) in a circular array with respect to the rubber pads (6).
6. The steel-concrete structure of an assembled industrial plant according to claim 5 is characterized by: The second shock absorbing mechanism comprises a second shock absorber (19) welded between the concrete slab (10) and the concrete slab cover (17), and shock absorbing mechanisms (18) installed at four corners of the concrete slab (10) and the concrete slab cover (17).
7. The steel-concrete structure of an assembled industrial plant according to claim 6 is characterized by: The first shock absorber (5) and the second shock absorber (19) both comprise a damper and a spring, and two ends of the spring are fixedly welded to two ends of the damper.
8. The steel-concrete structure of a prefabricated industrial plant according to claim 6 is characterized by: The shock absorbing mechanism (18) comprises two electromagnets (186) electrically connected to an external power source, and the magnetic poles of the two electromagnets (186) are in opposite directions. The two electromagnets (186) are outer-circularly connected with rubber hoses (185), and the rubber hoses (185) are in a circular array of twelve.
9. The steel-concrete structure of an assembled industrial plant according to claim 8 is characterized by: The shock absorbing mechanism (18) further comprises an inner fold line tube (187), an outer fold line tube (188) and a return spring (189); the axes of the inner fold line tube (187), the outer fold line tube (188) and the return spring (189) coincide with each other; metal plates (182) are fixed to both ends of the rubber hose (185), the inner fold line tube (187), the outer fold line tube (188) and the return spring (189); a rubber pad (181) is bonded to the outer surface of the metal plate (182); and inner rubber sleeves (184) and outer rubber sleeves (183) are arranged on both sides of the rubber hose (185).
10. The steel-concrete structure of an assembled industrial plant according to claim 1 is characterized by: The lower part of the concrete base (2) is integrally formed with side feet (3).