Rapid early-strength high-performance asphalt cold patch material at room temperature and preparation method thereof

By using D40 dearamating solvent oil or its mixture as diluents and combined with other ingredients, a fast, early-strength, high-performance asphalt cold feed at room temperature was prepared, which solved the problem of insufficient early strength of the existing technology intercooling feed, and achieved rapid formation of high-strength cold feed at room temperature, and was suitable for repairing busy traffic areas such as highways.

CN119263700BActive Publication Date: 2025-05-09BEIJING UNIV OF CIVIL ENG & ARCHITECTURE +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411611296.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-11-12
Publication Date
2025-05-09
Estimated Expiration
2044-11-12

AI Technical Summary

Technical Problem

In the prior art, the early strength of the cold feed is insufficient at room temperature, resulting in insufficient strength after pit trough repair, making it difficult to meet the needs of busy traffic areas such as highways.

Method used

A quick, early-stress high-performance asphalt cold feed at room temperature is prepared by using D40 dearamating solvent oil or a mixture of D40 and D60 dearamating solvent oil as diluent, combined with matrix asphalt, modifier, anti-flaking agent and other components.

Benefits of technology

It realizes the rapid formation of high-strength cold feed at room temperature, and can complete pit repair and pass quickly in a very short time, reducing the impact on transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119263700B_ABST
    Figure CN119263700B_ABST
Patent Text Reader

Abstract

The invention discloses a kind of high-performance asphalt cold patch material with rapid early strength at room temperature and its preparation method, wherein the mass percentage of each substance in the asphalt cold patch material is 80-86wt% of aggregate, 7.5-11wt% of mineral powder, 0.5-1wt% of cement, 0.5-1wt% of slaked lime, 0.2-0.4wt% of bentonite, 0.2-0.4wt% of lignin fiber, 5-7wt% of asphalt cold patch liquid, and the asphalt cold patch liquid adopts D40 dearomatized solvent oil or a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil as a diluent. The method comprises the following steps: preparing asphalt cold patch liquid; drying aggregate, mineral powder, cement, slaked lime and bentonite; putting aggregate, cement, slaked lime, bentonite and lignin fiber into a mixing pot and stirring; adding asphalt cold patch liquid into a mixing pot and stirring; adding mineral powder into a mixing pot and stirring, i.e. obtaining high-performance asphalt cold patch material with rapid early strength at room temperature. The asphalt cold patch material of the present invention can quickly form strength in a very short time, ensuring rapid passage after the pothole is repaired and minimizing the impact on transportation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of road engineering and environmental protection, and specifically relates to a fast early-strengthening high-performance asphalt cold patch material at room temperature and a preparation method thereof. Background Art

[0002] With the rapid development of urban construction in my country, the traffic volume has increased dramatically, and road construction has developed rapidly, especially the mileage of expressways and second-level and above roads has reached one million kilometers. The extensive road network plays a key role in economic development, regional exchanges and people's lives. With the continuous growth of my country's economic construction, higher requirements will be put forward for the quality, performance, maintenance and transportation efficiency of road construction in the future.

[0003] Potholes are one of the main diseases of asphalt pavements of all grades of highways. They refer to bowl-shaped holes of varying sizes and steep edges on the surface of the pavement. They not only affect the performance and driving comfort of the asphalt pavement, but also shorten the service life of the asphalt pavement. At present, the main methods for repairing potholes are hot patching, warm patching, hot regeneration and cold patching. The application technology of hot patching is relatively mature and has good treatment effects. It is especially suitable for pothole repairs with large engineering volumes. However, hot patching is greatly affected by weather and temperature. During the repair process, a high construction temperature needs to be maintained. The repair process is complicated and is mostly used to repair potholes in summer. In addition, the smoke generated during the repair process will pollute the environment and harm the health of workers. The warm patching method and hot regeneration method have high requirements for new materials, new processes and new equipment. The application technology is not yet mature and is still in the research and development stage. Compared with the above three repair methods, the cold patch method uses cold patch materials. The advantages of cold patch materials in environmental adaptability, repair procedures, material storage and transportation are far greater than those of hot patch materials. In addition, the construction process of the cold patch method is simple and can be constructed all day long. It is not affected by temperature and weather, does not produce high-temperature toxic gases, and is energy-saving and environmentally friendly. Therefore, the cold patch method has become the preferred method for pothole repair.

[0004] The cold patch material used in the cold patch method is also known as cold patch asphalt mixture, which refers to an asphalt mixture that can be mixed and constructed at room temperature or medium and low temperature. At present, cold patch materials mainly include three types: emulsified cold patch material, reactive cold patch material and solvent cold patch material. Emulsified cold patch material, also known as emulsified asphalt cold patch material, is to add an emulsifier to the base asphalt so that it is distributed in the water and flows in the form of tiny particles. Its strength formation mainly depends on the release of asphalt after demulsification. The initial strength of this cold patch material after construction is relatively low, and it takes a period of traffic compaction and demulsification curing to achieve a higher strength. However, there is currently no mature technology that can completely control the demulsification of emulsified asphalt, which makes it impossible to guarantee the storage stability of the cold patch material and the open time after construction. Reactive cold patch material is a resin and a curing agent that can undergo a curing reaction in a short time after mixing, and quickly form strength. However, the current cost of the resin is relatively high, and this cold patch material cannot be widely used. Solvent-based cold patch material, also known as diluted asphalt type cold patch material, is made by adding volatile diluents to the base asphalt to reduce the viscosity. Its strength formation mainly depends on the recovery of asphalt viscosity after the diluent evaporates, and is greatly affected by the type of diluent and natural environmental factors. Currently, the most commonly used diluents are light gasoline and No. 0 diesel, but these substances not only pollute the environment, but also are difficult to completely evaporate, resulting in a unsatisfactory life of the cold patch material. Due to the short service life of the cold patch material, the same pothole will face the problem of potholes appearing again after being repaired.

[0005] The road surface temperature in summer can reach up to 60℃ (the outdoor temperature is usually 32-35℃). When cold patch materials are prepared using only D60 dearomatized solvent oil with a flash point of about 60℃ as a diluent for pothole repair in summer, the early strength improvement is relatively ideal. However, after entering the spring and autumn seasons, the road surface temperature drops below 40℃ (the outdoor temperature is usually 23-25℃, i.e., room temperature). If such cold patch materials are used to repair potholes, the improvement level of early strength will decrease. For highways in busy traffic areas with high road performance requirements, cold patch materials with higher early strength are needed to repair potholes. Therefore, it is urgent to develop a high-performance asphalt cold patch material with rapid early strength at room temperature and its preparation method, so as to explore an environmentally friendly solvent with good solubility in asphalt and a suitable volatilization rate under room temperature conditions, so that the prepared cold patch material can meet the performance requirements of hot-mix asphalt mixtures, have a longer service life at room temperature, and can quickly form strength at room temperature.

[0006] The invention patent with application publication number CN103043962A discloses a mixture for repairing potholes at room temperature on asphalt pavement, and its preparation method and application. The mixture includes, by mass percentage, 5-7% asphalt liquid, 84.5-90% stone, and 0.1-0.5% waste rubber powder, wherein the asphalt liquid includes, by mass percentage, 70-80% modified asphalt, 20-80% diluent, or 52-66% ordinary asphalt, 4-8% polymer, and 30-40% diluent, and the stone is made of 0.075-13.2mm stone mixed according to a certain gradation, and the diluent is selected from one or more of No. 6 solvent oil, No. 120 solvent oil, and No. 200 solvent oil. The technical problem to be solved by this technical solution is how to make the potholes after repair not loose and not peeling, but there is no record on how to quickly increase the time for the cold patch material to form strength, and the final performance of the repair mixture needs to be improved.

[0007] The invention patent with application publication number CN105348827A discloses a solvent-based cold patch asphalt liquid and its preparation process. The cold patch asphalt liquid includes the following substances by weight: 100 parts of petroleum asphalt, 10-15 parts of diluent, 10-15 parts of heavy oil, 10-15 parts of solvent oil, 1-5 parts of tackifier, 1-5 parts of reinforcing agent, 0.2-0.8 parts of surfactant, 0.5-0.8 parts of anti-stripping agent, the diluent is 10# diesel, 0# diesel, -10# diesel or aviation kerosene, and the solvent oil is C1-C 10 A kind of aromatic solvent oil. The technical problem to be solved by this technical solution is how to improve the initial strength and molding strength of cold patch asphalt mixture, but from the test data of the embodiment, the initial strength and molding strength are relatively low, especially the initial strength is only about 2.1KN, which means that the cold patch asphalt mixture takes a long time to form strength, which is not conducive to the repair of potholes on highways. Summary of the invention

[0008] In order to solve the problems existing in the prior art, the present invention provides a high-performance asphalt cold patch material with rapid early strength at room temperature. The mass percentage of each substance in the asphalt cold patch material is as follows: aggregate accounts for 80-86wt%, mineral powder accounts for 7.5-11wt%, cement accounts for 0.5-1wt%, slaked lime accounts for 0.5-1wt%, bentonite accounts for 0.2-0.4wt%, lignin fiber accounts for 0.2-0.4wt%, asphalt cold patch liquid accounts for 5-7wt%, and the ratio of the mass of the asphalt cold patch liquid to the sum of the mass of the aggregate and the mineral powder is 0.055-0.07:1; D40 dearomatized solvent oil or a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil is used as a diluent in the asphalt cold patch liquid.

[0009] Preferably, the aggregate includes nine particle sizes, and the mass percentage of each particle size in the aggregate is: 5-10wt% for particle size 13.2-16mm, 20-30wt% for particle size 9.5-13.2mm, 10-15wt% for particle size 4.75-9.5mm, 10-15wt% for particle size 2.36-4.75mm, 10-15wt% for particle size 1.18-2.36mm, 5-10wt% for particle size 0.6-1.18mm, 5-10wt% for particle size 0.3-0.6mm, 5-10wt% for particle size 0.15-0.3mm, and 3-5wt% for particle size 0.075-0.15mm; the particle size of the mineral powder is less than 0.075mm; and the aggregate and the mineral powder are both limestone.

[0010] In any of the above schemes, it is preferred that the cement is any one or more of silicate cement, aluminate cement, sulphoaluminate cement and ferroaluminate cement; and the bentonite is any one or more of sodium-based bentonite, calcium-based bentonite and magnesium-based bentonite.

[0011] In any of the above schemes, it is preferred that the mass percentages of the substances in the asphalt cold repair liquid are as follows: base asphalt accounts for 65-70wt%, modifier accounts for 2.2-3.0wt%, anti-stripping agent accounts for 0.2-0.8wt%, and diluent accounts for 27-32wt%.

[0012] In any of the above schemes, it is preferred that the diluent is D40 dearomatized solvent oil; the amount of the diluent added increases with the amount of the modifier added, and within the mass percentage range of the modifier and the diluent, when the amount of the modifier added increases by 0.2wt%, the amount of the diluent added increases by 0.8-1.2wt% accordingly.

[0013] Alternatively, the diluent is a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil, and the mass percentages of the two substances in the diluent are respectively 50-70wt% of D40 dearomatized solvent oil and 30-50wt% of D60 dearomatized solvent oil; the added amount of the diluent increases with the increased added amount of the modifier, and within the mass percentage range of the modifier and the diluent, when the added amount of the modifier increases by 0.2wt%, the added amount of the diluent increases by 0.8-1.2wt% accordingly.

[0014] In any of the above schemes, it is preferred that the base asphalt is No. 70 base asphalt or No. 90 base asphalt; the modifier is SBS modifier or SBR modifier; the anti-stripping agent is a non-amine anti-stripping agent, and the non-amine anti-stripping agent is any one or more of polyphosphoric acid, phosphate ester, and nitrogen-containing complex.

[0015] The D40 dearomatized solvent oil is made from straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run jet fuel as raw materials, and is fractionated after deep desulfurization, dearomatization and hydrogenation refining. It has a distillation range of 150-200°C, a closed cup flash point of 40-50°C, an aromatic content of less than 0.03wt%, a sulfur content of less than 0.2mg / kg, and a saturated hydrocarbon content of more than 99.9%.

[0016] The D60 dearomatized solvent oil is made from straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run jet fuel, and is fractionated after deep desulfurization, dearomatization and hydrogenation refining. The distillation range is 180-230°C, the closed cup flash point is 60-70°C, the aromatic content is less than 0.03wt%, the sulfur content is less than 0.2mg / kg, and the saturated hydrocarbon content is greater than 99.9%.

[0017] The present invention also provides a method for preparing a rapid early-strength high-performance asphalt cold patch material at room temperature, which is used to prepare any of the rapid early-strength high-performance asphalt cold patch materials at room temperature, and comprises the following steps in order:

[0018] Step 1: Prepare asphalt cold make-up liquid according to the design requirements, and put the prepared asphalt cold make-up liquid into an oven for heat preservation and standby use;

[0019] Step 2: Weigh aggregate, mineral powder, cement, slaked lime, bentonite, lignin fiber, and asphalt cold make-up liquid according to design requirements for use;

[0020] Step 3: putting the aggregate, mineral powder, cement, slaked lime and bentonite into an oven for drying. After the drying process is completed, lowering the temperature in the oven to a certain temperature so that the aggregate, mineral powder, cement, slaked lime and bentonite are kept warm at the lowered temperature for standby use;

[0021] Step 4: Heat the mixing pot to a certain temperature, then put the aggregate, cement, slaked lime and bentonite kept warm in the oven into the mixing pot, put the lignin fiber into the mixing pot at the same time, and stir with a stirrer;

[0022] Step 5: Keep the temperature of the mixing pot unchanged, add the asphalt cold make-up liquid kept warm in the oven into the mixing pot, and stir with a stirrer;

[0023] Step 6: Keep the temperature of the mixing pot unchanged, add the mineral powder kept warm in the oven into the mixing pot, and use an agitator to stir it to obtain a fast early-strength high-performance asphalt cold patch material at room temperature.

[0024] Preferably, in step 1, the method for preparing the asphalt cold replenishment fluid comprises the following steps in order:

[0025] Step (1): weigh the base asphalt, modifier, anti-stripping agent and diluent according to the design requirements and set aside;

[0026] Step (2): placing the matrix asphalt in a container, and then placing the container containing the matrix asphalt in an oven for heating at a temperature of 100-120° C. for a heating time of 1-2 h;

[0027] Step (3): After the heating is completed, take out the container containing the base asphalt from the oven, add the modifier into the container, and then place the container containing the base asphalt and the modifier on an induction cooker for heating, stirring while heating until the base asphalt and the modifier are completely blended, the heating temperature is raised to 160-170°C, and the heating time is 15-20 minutes;

[0028] Step (4): placing the container containing the base asphalt and the modifier into an oil bath, and using a high-speed shearing instrument to perform shearing and stirring to obtain modified asphalt, the temperature of the oil bath is 160-170° C., the shearing speed is 5000-6000 r / min, and the shearing and stirring time is 0.5-1 h;

[0029] Step (5): when the diluent is a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil, lowering the temperature of the oil bath to 100-120°C, then adding the D60 dearomatized solvent oil while stirring with a stirrer for 15-20 minutes, so that the modified asphalt and the D60 dearomatized solvent oil are completely blended; further lowering the temperature of the oil bath to 60-80°C, then adding the D40 dearomatized solvent oil while stirring with a stirrer for 15-20 minutes, so that the D40 dearomatized solvent oil is completely blended;

[0030] Alternatively, when the diluent is D40 dearomatized solvent oil, lower the temperature of the oil bath to 60-80°C, then use a stirrer to add D40 dearomatized solvent oil while stirring for 15-20 minutes to allow the modified asphalt to be completely mixed with the D40 dearomatized solvent oil;

[0031] Step (6): Keep the temperature of the oil bath constant, continue stirring with a stirrer, add the anti-stripping agent while stirring, and stir until the anti-stripping agent is completely blended to obtain the asphalt cold repair liquid. The temperature of the oil bath is 60-80°C and the stirring time is 15-20 minutes.

[0032] In any of the above schemes, preferably, in step 1, another method for preparing the asphalt cold replenishment fluid comprises the following steps in chronological order:

[0033] Step A: weigh the base asphalt, modifier, anti-stripping agent and diluent according to the design requirements for use;

[0034] Step B: Put the matrix asphalt into a container, and then put the container containing the matrix asphalt into an oven for heating at a temperature of 100-120° C. for a heating time of 1-2 hours;

[0035] Step C: After the heating is completed, take out the container containing the matrix asphalt from the oven, add the diluent D40 dearomatized solvent oil or a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil into the container, and then put the container containing the matrix asphalt and the diluent into an oil bath, and stir with a stirrer until the matrix asphalt and the diluent are completely melted, the temperature of the oil bath is 60-80°C, and the stirring time is 10-15min;

[0036] Step D: Keep the temperature of the oil bath unchanged, continue stirring with an agitator, add the anti-stripping agent while stirring, until the anti-stripping agent is completely integrated, so as to obtain the diluted base asphalt, the temperature of the oil bath is 60-80°C, and the stirring time is 10-15min; Step E: Keep the temperature of the oil bath unchanged, continue stirring with an agitator, add the modifier while stirring, until the diluted base asphalt and the modifier are completely integrated, and then use a high-speed shear instrument for shear stirring to obtain the asphalt cold replenishment liquid, the temperature of the oil bath is 60-80°C, the stirring time is 20-25min, the shear speed is 5000-6000r / min, and the shear stirring time is 20-30min.

[0037] In any of the above schemes, it is preferred that in step one, the insulation temperature of the asphalt cold make-up liquid is 60-80°C; in step three, the drying temperature is 120-130°C, the drying time is 3-4h, and the temperature in the oven is reduced to 70-90°C, that is, the insulation temperature of the aggregate, mineral powder, cement, slaked lime and bentonite is 70-90°C; in step four, the temperature of the mixing pot is heated to 60-80°C, and the stirring time is 90-120s; in step five, the temperature of the mixing pot is 60-80°C, and the stirring time is 90-120s; in step six, the temperature of the mixing pot is 60-80°C, and the stirring time is 90-120s.

[0038] The oven, induction cooker, mixing pot, oil bath pot, agitator, high-speed shearing instrument, etc. used in the present invention are all conventional equipment in the field, and no special requirements are made on the model and structure of the equipment. SBS is a styrene-butadiene-styrene block copolymer, and SBR is styrene-butadiene rubber. The aggregate includes nine particle sizes, namely, particle size 13.2-16mm, particle size 9.5-13.2mm, particle size 4.75-9.5mm, particle size 2.36-4.75mm, particle size 1.18-2.36mm, particle size 0.6-1.18mm, particle size 0.3-0.6mm, particle size 0.15-0.3mm, and particle size 0.075-0.15mm, i.e., 13.2mm≤particle size<16mm, 9.5mm≤particle size The particle size of the mineral powder is less than 0.075mm, that is, 0mm≤particle size<0.075mm. For each particle size, the material is passed through the upper and lower sieve holes in sequence to obtain a particle size between the upper and lower sieve holes, for example: the particle size is 1.18-2.36mm (1.18mm≤particle size<2.36mm), that is, the material is passed through the 2.36mm sieve hole and the 1.18mm sieve hole in sequence to obtain a particle size between 1.18-2.36mm.

[0039] In the whole preparation process of the asphalt cold patch fluid of the present invention, the selection of each substance in the asphalt cold patch fluid, the mass percentage of each substance, the order of addition of each substance, the process parameters of each step, etc. are very critical. At the same time, in the whole preparation process of the asphalt cold patch material, the selection of each substance in the asphalt cold patch material, the mass percentage of each substance, the order of addition of each substance, the process parameters of each step, etc. are also very critical. Only by synergizing the various formula parameters and process parameters can the expected technical effect of the present invention be achieved.

[0040] The present invention uses D40 dearomatized solvent oil or a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil as a diluent, which is a first in the preparation technology of asphalt cold patch material and is also a key substance in the technical solution of the present invention. The traffic flow on highways is huge. When potholes are damaged on highways and important urban roads, the pothole repair construction must be completed quickly and efficiently to ensure that the potholes can be quickly passed after repair and minimize the impact on transportation.

[0041] The invention adopts D40 dearomatized solvent oil or a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil to replace diesel, light gasoline and aromatic solvent oil as diluents, and is colorless, non-toxic, has very low odor, narrow fraction, strong solubility, good volatility, saturated hydrocarbon content greater than 99.9%, and has good oxidation stability while ensuring good solubility. Under room temperature and natural ventilation conditions, D40 dearomatized solvent oil and D60 dearomatized solvent oil can be used normally without taking special safety and anti-flammability measures, have low contact risk, are safer in production and construction processes, and have very little impact on the atmospheric environment and workers' health.

[0042] D40 dearomatized solvent oil has a good volatilization rate, which can quickly improve the early strength of cold patch materials, complete pothole repairs in a very short time, and quickly open up traffic. It is particularly suitable for emergency repairs of small and medium-sized potholes. D60 dearomatized solvent oil has a moderate volatilization rate and a more complete volatilization degree, which can ensure that the construction site has enough time for full paving and compaction, and form a better combination with the original road surface. D40 dearomatized solvent oil and D60 dearomatized solvent oil have little effect on the performance of asphalt cold patch materials. There is no need to use expensive resins and other materials. Only a small amount of anti-stripping agent can be added to perfectly meet the performance requirements of hot-mix asphalt mixtures, and the production cost is low.

[0043] In addition, a small amount of slaked lime and lignin fiber are added to the asphalt cold patch. Slaked lime can improve the pore structure of the aggregate surface, and the porous rough covering layer formed by the lime attached to the aggregate surface can promote the microporous adsorption of asphalt and enhance the mechanical adhesion between asphalt and aggregate. Lignin fiber can be distributed in the asphalt mixture in a crisscross manner, and play a reinforcing, stabilizing and viscosity-increasing role, thereby enhancing the adhesion between asphalt and aggregate.

[0044] The rapid early-strength high-performance asphalt cold patch material at room temperature and the preparation method thereof have the following beneficial effects:

[0045] (1) The present invention proposes for the first time to use D40 dearomatized solvent oil or a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil as a diluent, which perfectly replaces the diesel, light gasoline, aromatic solvent oil and other substances used in the traditional preparation of asphalt cold patch materials; D40 dearomatized solvent oil has good solubility in asphalt, and its good volatilization rate can quickly improve the early strength of the cold patch material, complete the pothole repair in a very short time and quickly open traffic; D60 dearomatized solvent oil has good solubility in asphalt, and its appropriate volatilization rate can both meet the construction time requirements and improve the early strength as soon as possible.

[0046] (2) The D40 dearomatized solvent oil and D60 dearomatized solvent oil used in the present invention are highly environmentally friendly and pollution-free excellent solvents. They are colorless, non-toxic, and have very little odor, and can provide workers with a good construction environment. At the same time, the saturated hydrocarbon content of these two dearomatized solvent oils is greater than 99.9%, the aromatic hydrocarbon content is less than 0.03wt%, and the sulfur content is less than 0.2mg / kg, and the impact on the environment is extremely small. The present invention selects 73 kinds of organic volatiles including benzene series, organic halides, aldehydes, ketones, alcohols, esters, alkanes, etc. for content detection. The results show that the contents of 12 kinds of organic volatiles detected are all less than 500μg / ml.

[0047] (3) The asphalt cold patch material prepared by the present invention has excellent comprehensive performance and can perfectly meet the performance requirements of hot-mix asphalt mixture. The molding stability is higher than 10KN, the residual stability of the immersion Marshall test is greater than 85%, the residual strength ratio of the freeze-thaw splitting test is greater than 80%, and the dynamic stability of the rutting test is greater than 2800 times / mm, and has a longer service life.

[0048] (4) The asphalt cold patch material prepared by the present invention can quickly develop strength in a very short period of time (characterized by the initial strength of the asphalt cold patch material) to ensure that the pothole can be quickly passed after repair, thereby minimizing the impact on transportation.

[0049] (5) The asphalt cold patch material prepared by the present invention is suitable for repairing potholes on expressways and primary and secondary roads in spring, summer and autumn. In particular, it can quickly develop strength in spring and autumn (i.e., at room temperature) to ensure rapid passage after the potholes are repaired. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 It is a flow chart of a preferred embodiment of a rapid early-strength high-performance asphalt cold patch material at room temperature and a preparation method thereof according to the present invention;

[0051] Figure 2 for Figure 1 Photographs of AR-2 type anti-stripping agents used in the illustrated examples;

[0052] Figure 3 for Figure 1 A photograph of a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil used in the examples shown;

[0053] Figure 4 for Figure 1 Photos of asphalt cold dressing fluid prepared in the illustrated embodiment;

[0054] Figure 5 for Figure 1 Photos of asphalt cold patch materials prepared in the illustrated embodiments;

[0055] Figure 6A photograph of D40 dearomatized solvent oil used in another preferred embodiment of the rapid early-strength high-performance asphalt cold patch material at room temperature and the preparation method thereof according to the present invention;

[0056] Figure 7 for Figure 6 Photos of asphalt cold dressing fluid prepared in the illustrated embodiment;

[0057] Figure 8 for Figure 6 Photograph of the asphalt cold patch prepared in the illustrated embodiment. DETAILED DESCRIPTION

[0058] In order to further understand the content of the present invention, the present invention will be described in detail below in conjunction with specific embodiments.

[0059] Embodiment 1:

[0060] According to a preferred embodiment of the fast early strength high-performance asphalt cold patch material at room temperature of the present invention, the mass percentage of each substance in the asphalt cold patch material is as follows: aggregate accounts for 83wt%, mineral powder accounts for 8.8wt%, cement accounts for 0.8wt%, slaked lime accounts for 0.8wt%, bentonite accounts for 0.3wt%, lignin fiber accounts for 0.3wt%, asphalt cold patch liquid accounts for 6wt%, and the ratio of the mass of the asphalt cold patch liquid to the sum of the mass of the aggregate and the mineral powder is 0.0654, ensuring that it is within the range of 0.055-0.07:1; a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil is used as a diluent in the asphalt cold patch liquid.

[0061] The aggregate includes nine particle sizes, and the mass percentage of each particle size in the aggregate is as follows: particle size 13.2-16mm accounts for 8wt%, particle size 9.5-13.2mm accounts for 25wt%, particle size 4.75-9.5mm accounts for 13wt%, particle size 2.36-4.75mm accounts for 13wt%, particle size 1.18-2.36mm accounts for 13wt%, particle size 0.6-1.18mm accounts for 8wt%, particle size 0.3-0.6mm accounts for 8wt%, particle size 0.15-0.3mm accounts for 8wt%, and particle size 0.075-0.15mm accounts for 4wt%; the particle size of the mineral powder is less than 0.075mm. The aggregate and the mineral powder are both limestone, the cement is silicate cement, and the bentonite is sodium-based bentonite.

[0062] The mass percentage of each substance in the asphalt cold patching liquid is 70wt% of the base asphalt, 2.2wt% of the modifier, 0.8wt% of the anti-stripping agent, and 27wt% of the diluent. The diluent is a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil, and the mass percentages of the two substances in the diluent are 60wt% of D40 dearomatized solvent oil and 40wt% of D60 dearomatized solvent oil, respectively. The amount of the diluent added increases with the increase in the amount of the modifier added, and in this embodiment, the modifier and the diluent are both the minimum addition amounts.

[0063] The base asphalt is No. 70 base asphalt; the modifier is SBS modifier; the anti-stripping agent is a non-amine anti-stripping agent, and the non-amine anti-stripping agent is a nitrogen-containing complex, which is an AR-2 anti-stripping agent produced by Shenzhen Jinlong Chemical Technology Co., Ltd., and is a liquid. The D40 dearomatized solvent oil is made of straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run jet fuel as raw materials, and is fractionated after deep desulfurization, dearomatization and hydrogenation refining, with a distillation range of 150-200°C, a closed cup flash point of 40-50°C, an aromatic content of less than 0.03wt%, a sulfur content of less than 0.2mg / kg, and a saturated hydrocarbon content of more than 99.9%. The D60 dearomatized solvent oil is made of straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run jet fuel as raw materials, and is fractionated after deep desulfurization, dearomatization, hydrogenation and refining, with a distillation range of 180-230°C, a closed cup flash point of 60-70°C, an aromatic content of less than 0.03wt%, a sulfur content of less than 0.2mg / kg, and a saturated hydrocarbon content of more than 99.9%. Both D40 dearomatized solvent oil and D60 dearomatized solvent oil are produced by Jinan Yuanyang Chemical Co., Ltd.

[0064] like Figure 1 As shown, this embodiment also provides a method for preparing a rapid early-strength high-performance asphalt cold patch material at room temperature, which is used to prepare the rapid early-strength high-performance asphalt cold patch material at room temperature, and includes the following steps in order:

[0065] Step 1: Prepare asphalt cold make-up liquid according to the design requirements, and put the prepared asphalt cold make-up liquid into an oven for heat preservation and standby use;

[0066] Step 2: Weigh aggregate, mineral powder, cement, slaked lime, bentonite, lignin fiber, and asphalt cold make-up liquid according to design requirements for use;

[0067] Step 3: putting the aggregate, mineral powder, cement, slaked lime and bentonite into an oven for drying. After the drying process is completed, lowering the temperature in the oven to a certain temperature so that the aggregate, mineral powder, cement, slaked lime and bentonite are kept warm at the lowered temperature for standby use;

[0068] Step 4: Heat the mixing pot to a certain temperature, then put the aggregate, cement, slaked lime and bentonite kept warm in the oven into the mixing pot, put the lignin fiber into the mixing pot at the same time, and stir with a stirrer;

[0069] Step 5: Keep the temperature of the mixing pot unchanged, add the asphalt cold make-up liquid kept warm in the oven into the mixing pot, and stir with a stirrer;

[0070] Step 6: Keep the temperature of the mixing pot unchanged, add the mineral powder kept warm in the oven into the mixing pot, and use an agitator to stir it to obtain a fast early-strength high-performance asphalt cold patch material at room temperature.

[0071] In step 1, the method for preparing the asphalt cold make-up fluid comprises the following steps in order:

[0072] Step (1): weigh the base asphalt, modifier, anti-stripping agent and diluent according to the design requirements and set aside;

[0073] Step (2): placing the matrix asphalt in a container, and then placing the container containing the matrix asphalt in an oven for heating at a temperature of 110° C. for a heating time of 1.5 h;

[0074] Step (3): After the heating is completed, the container containing the base asphalt is taken out from the oven, the modifier is added into the container, and then the container containing the base asphalt and the modifier is placed on an induction cooker for heating, while stirring and heating until the base asphalt and the modifier are completely mixed, the heating temperature is raised to 165°C, and the heating time is 18 minutes;

[0075] Step (4): placing the container containing the base asphalt and the modifier into an oil bath, and using a high-speed shearing instrument to perform shearing and stirring to obtain modified asphalt, the temperature of the oil bath is 165° C., the shearing speed is 5500 r / min, and the shearing and stirring time is 0.8 h;

[0076] Step (5): When the diluent is a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil, the temperature of the oil bath is lowered to 110°C, and then the D60 dearomatized solvent oil is added while stirring with a stirrer for 18 minutes, so that the modified asphalt and the D60 dearomatized solvent oil are completely blended; the temperature of the oil bath is further lowered to 70°C, and then the D40 dearomatized solvent oil is added while stirring with a stirrer for 18 minutes, so that the D40 dearomatized solvent oil is completely blended; Step (6): Keep the temperature of the oil bath unchanged, continue stirring with a stirrer, add the anti-stripping agent while stirring, and stir until the anti-stripping agent is completely blended, so as to obtain the asphalt cold make-up liquid, the temperature of the oil bath is 70°C, and the stirring time is 18 minutes.

[0077] In step one, the insulation temperature of the asphalt cold make-up liquid is 70°C; in step three, the drying temperature is 125°C, the drying time is 3.5h, and the temperature in the oven is reduced to 80°C, that is, the insulation temperature of the aggregate, mineral powder, cement, slaked lime, and bentonite is 80°C; in step four, the temperature of the mixing pot is heated to 70°C, and the stirring time is 105s; in step five, the temperature of the mixing pot is 70°C, and the stirring time is 105s; in step six, the temperature of the mixing pot is 70°C, and the stirring time is 105s.

[0078] In this embodiment, the content of organic volatiles in the D40 dearomatized solvent oil and the D60 dearomatized solvent oil used is detected, and the test results are shown in Table 1. Since no environmental protection standard for road asphalt cold patch materials has been formulated at present, GC-MS (gas chromatography-mass spectrometry) is used after comprehensive consideration, and 73 representative organic volatiles that are irritating to the human body, even toxic and flammable and explosive are selected for content detection, including benzene series, organic halides, aldehydes, ketones, alcohols, esters, alkanes, etc. It can be seen from the test data that among the 73 organic volatiles listed, only 12 are contained in D40 dearomatized solvent oil and D60 dearomatized solvent oil, and the content of each organic volatile is less than 500μg / ml, which is extremely low.

[0079] Table 1 Test results of volatile organic matter content in D40 dearomatized solvent oil and D60 dearomatized solvent oil

[0080]

[0081]

[0082] In this embodiment, the AR-2 anti-stripping agent used is as follows Figure 2 As shown, the mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil used is as follows Figure 3 As shown, the final prepared asphalt cold patching fluid is as follows Figure 4 As shown, the final prepared asphalt cold patch material is as follows Figure 5 shown.

[0083] The oven, induction cooker, mixing pot, oil bath pot, stirrer, high-speed shearing instrument, etc. used in this embodiment are all conventional equipment in the field, and no special requirements are made on the model and structure of the equipment. SBS is a styrene-butadiene-styrene block copolymer. The aggregate includes nine particle sizes, namely, particle size 13.2-16mm, particle size 9.5-13.2mm, particle size 4.75-9.5mm, particle size 2.36-4.75mm, particle size 1.18-2.36mm, particle size 0.6-1.18mm, particle size 0.3-0.6mm, particle size 0.15-0.3mm, particle size 0.075-0.15mm, that is, 13.2mm≤particle size<16mm, 9.5mm≤particle size The particle size of the mineral powder is less than 0.075mm, that is, 0mm≤particle size<0.075mm. For each particle size, the material is passed through the upper and lower sieve holes in sequence to obtain a particle size between the upper and lower sieve holes, for example: the particle size is 1.18-2.36mm (1.18mm≤particle size<2.36mm), that is, the material is passed through the 2.36mm sieve hole and the 1.18mm sieve hole in sequence to obtain a particle size between 1.18-2.36mm.

[0084] This embodiment uses a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil as a diluent, which is the first in the preparation technology of asphalt cold patch material and is also a key substance in the technical solution of this embodiment. The traffic flow on highways is huge. When potholes are damaged on highways and important urban roads, the pothole repair construction must be completed quickly and efficiently to ensure that the potholes can be quickly passed after repair and minimize the impact on transportation.

[0085] This embodiment uses a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil to replace diesel, light gasoline, and aromatic solvent oil as a diluent. While ensuring good solubility, it is colorless, non-toxic, has very low odor, narrow fractions, strong solubility, good volatility, and a saturated hydrocarbon content of more than 99.9%, and has good oxidation stability. Under room temperature and natural ventilation conditions, these two solvent oils can be used normally without taking special safety and fire prevention measures, have low contact risk, are safer in production and construction processes, and have minimal impact on the atmospheric environment and workers' health. D40 dearomatized solvent oil has a good volatilization rate, which can quickly improve the early strength of the cold patch material, complete the pothole repair in a very short time and quickly open up to traffic; D60 dearomatized solvent oil has a moderate volatilization rate and a more complete volatilization degree, which can ensure that the construction site has enough time for sufficient paving and compaction, and form a better combination with the original road surface; these two solvent oils have little effect on the performance of asphalt cold patch materials, and there is no need to use expensive resins and other materials. Only a small amount of anti-stripping agent is needed to perfectly meet the performance requirements of hot mix asphalt mixtures, and the production cost is low.

[0086] In addition, a small amount of slaked lime and lignin fiber are added to the asphalt cold patch. Slaked lime can improve the pore structure of the aggregate surface, and the porous rough covering layer formed by the lime attached to the aggregate surface can promote the microporous adsorption of asphalt and enhance the mechanical adhesion between asphalt and aggregate. Lignin fiber can be distributed in the asphalt mixture in a crisscross manner, and play a reinforcing, stabilizing and viscosity-increasing role, thereby enhancing the adhesion between asphalt and aggregate.

[0087] The fast early-strength high-performance asphalt cold patch material and its preparation method at room temperature in this embodiment have the following beneficial effects: (1) For the first time, a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil is proposed as a diluent, which perfectly replaces the diesel, light gasoline, aromatic solvent oil and other substances used in the traditional preparation of asphalt cold patch material; D40 dearomatized solvent oil has good solubility for asphalt, and the good volatilization rate can quickly improve the early strength of the cold patch material, complete the pothole repair in a very short time and quickly open the traffic; D60 dearomatized solvent oil has good solubility for asphalt, and the appropriate volatilization rate can not only meet the construction time requirements but also improve the early strength as soon as possible. (2) The D40 dearomatized solvent oil and D60 dearomatized solvent oil used are highly environmentally friendly and pollution-free excellent solvents, which are colorless, non-toxic, and have very little odor, and can provide a good construction environment for workers; at the same time, the saturated hydrocarbon content of these two dearomatized solvent oils is greater than 99.9%, the aromatic hydrocarbon content is less than 0.03wt%, and the sulfur content is less than 0.2mg / kg, which has very little impact on the environment. (3) The prepared asphalt cold patch material has excellent comprehensive performance and can perfectly meet the performance requirements of hot mix asphalt mixture. (4) The prepared asphalt cold patch material can quickly form strength in a very short time to ensure that the potholes can be quickly passed after repair, minimizing the impact on transportation, especially in spring and autumn (that is, at room temperature), it can quickly form strength to ensure that the potholes can be quickly passed after repair.

[0088] Embodiment 2:

[0089] According to another preferred embodiment of the rapid early-strength high-performance asphalt cold patch material at room temperature and its preparation method, its material ratio, preparation process, equipment used, technical principles, beneficial effects, etc. are basically the same as those of the first embodiment, except that:

[0090] The mass percentage of each substance in the asphalt cold patch material is as follows: 85wt% of aggregate, 7.5wt% of mineral powder, 1wt% of cement, 0.5wt% of slaked lime, 0.3wt% of bentonite, 0.2wt% of lignin fiber, and 5.5wt% of asphalt cold patch liquid. The ratio of the mass of the asphalt cold patch liquid to the sum of the masses of the aggregate and the mineral powder is 0.0595, ensuring that it is within the range of 0.055-0.07:1. A mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil is used as a diluent in the asphalt cold patch liquid.

[0091] The aggregate includes nine particle sizes, and the mass percentage of each particle size in the aggregate is: particle size 13.2-16mm accounts for 10wt%, particle size 9.5-13.2mm accounts for 20wt%, particle size 4.75-9.5mm accounts for 10wt%, particle size 2.36-4.75mm accounts for 15wt%, particle size 1.18-2.36mm accounts for 15wt%, particle size 0.6-1.18mm accounts for 10wt%, particle size 0.3-0.6mm accounts for 10wt%, particle size 0.15-0.3mm accounts for 5wt%, and particle size 0.075-0.15mm accounts for 5wt%; the particle size of the mineral powder is less than 0.075mm. The aggregate and the mineral powder are both limestone, the cement is silicate cement, and the bentonite is sodium-based bentonite.

[0092] The mass percentage of each substance in the asphalt cold patching liquid is 69wt% of the base asphalt, 2.4wt% of the modifier, 0.8wt% of the anti-stripping agent, and 27.8wt% of the diluent. The diluent is a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil, and the mass percentages of the two substances in the diluent are 70wt% of D40 dearomatized solvent oil and 30wt% of D60 dearomatized solvent oil, respectively. The amount of the diluent added increases with the increase in the amount of the modifier added. Within the mass percentage range of the modifier and the diluent, when the amount of the modifier added increases by 0.2wt%, the amount of the diluent added increases by 0.8wt% accordingly, ensuring that it is within the range of 0.8-1.2wt%.

[0093] The base asphalt is No. 70 base asphalt; the modifier is SBS modifier; the anti-stripping agent is a non-amine anti-stripping agent, and the non-amine anti-stripping agent is a nitrogen-containing complex, which is an AR-2 anti-stripping agent produced by Shenzhen Jinlong Chemical Technology Co., Ltd., and is a liquid. The D40 dearomatized solvent oil is made of straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run jet fuel as raw materials, and is fractionated after deep desulfurization, dearomatization and hydrogenation refining, with a distillation range of 150-200°C, a closed cup flash point of 40-50°C, an aromatic content of less than 0.03wt%, a sulfur content of less than 0.2mg / kg, and a saturated hydrocarbon content of more than 99.9%. The D60 dearomatized solvent oil is made of straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run jet fuel as raw materials, and is fractionated after deep desulfurization, dearomatization, hydrogenation and refining, with a distillation range of 180-230°C, a closed cup flash point of 60-70°C, an aromatic content of less than 0.03wt%, a sulfur content of less than 0.2mg / kg, and a saturated hydrocarbon content of more than 99.9%. Both D40 dearomatized solvent oil and D60 dearomatized solvent oil are produced by Jinan Yuanyang Chemical Co., Ltd.

[0094] In step 1, the method for preparing the asphalt cold make-up fluid comprises the following steps in order:

[0095] Step (1): weigh the base asphalt, modifier, anti-stripping agent and diluent according to the design requirements and set aside;

[0096] Step (2): placing the matrix asphalt in a container, and then placing the container containing the matrix asphalt in an oven for heating at a temperature of 100° C. for a heating time of 2 h;

[0097] Step (3): After the heating is completed, take out the container containing the base asphalt from the oven, add the modifier into the container, and then place the container containing the base asphalt and the modifier on an induction cooker for heating, stirring while heating until the base asphalt and the modifier are completely mixed, the heating temperature is raised to 160° C., and the heating time is 20 min;

[0098] Step (4): placing the container containing the base asphalt and the modifier into an oil bath, and using a high-speed shearing instrument to perform shearing and stirring to obtain modified asphalt, the temperature of the oil bath is 160° C., the shearing speed is 5000 r / min, and the shearing and stirring time is 1 h;

[0099] Step (5): When the diluent is a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil, the temperature of the oil bath is lowered to 100°C, and then the D60 dearomatized solvent oil is added while stirring with a stirrer for 20 minutes, so that the modified asphalt and the D60 dearomatized solvent oil are completely blended; the temperature of the oil bath is further lowered to 60°C, and then the D40 dearomatized solvent oil is added while stirring with a stirrer for 20 minutes, so that the D40 dearomatized solvent oil is completely blended; Step (6): Keep the temperature of the oil bath unchanged, continue to stir with a stirrer, add the anti-stripping agent while stirring, and stir until the anti-stripping agent is completely blended, so as to obtain the asphalt cold replenishment liquid, the temperature of the oil bath is 60°C, and the stirring time is 20 minutes.

[0100] In step one, the insulation temperature of the asphalt cold make-up liquid is 60°C; in step three, the drying temperature is 120°C, the drying time is 4h, and the temperature in the oven is reduced to 70°C, that is, the insulation temperature of the aggregate, mineral powder, cement, slaked lime, and bentonite is 70°C; in step four, the temperature of the mixing pot is heated to 60°C, and the stirring time is 120s; in step five, the temperature of the mixing pot is 60°C, and the stirring time is 120s; in step six, the temperature of the mixing pot is 60°C, and the stirring time is 120s.

[0101] Embodiment three:

[0102] According to another preferred embodiment of the rapid early-strength high-performance asphalt cold patch material at room temperature and its preparation method, its material ratio, preparation process, equipment used, technical principles, beneficial effects, etc. are basically the same as those of the first embodiment, except that:

[0103] The mass percentage of each substance in the asphalt cold patch material is 81wt% for aggregate, 11wt% for mineral powder, 0.5wt% for cement, 0.5wt% for slaked lime, 0.2wt% for bentonite, 0.3wt% for lignin fiber, and 6.5wt% for asphalt cold patch liquid. The ratio of the mass of the asphalt cold patch liquid to the sum of the mass of the aggregate and the mineral powder is 0.07, ensuring that it is within the range of 0.055-0.07:1. A mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil is used as a diluent in the asphalt cold patch liquid.

[0104] The aggregate includes nine particle sizes, and the mass percentage of each particle size in the aggregate is: particle size 13.2-16mm accounts for 5wt%, particle size 9.5-13.2mm accounts for 30wt%, particle size 4.75-9.5mm accounts for 15wt%, particle size 2.36-4.75mm accounts for 10wt%, particle size 1.18-2.36mm accounts for 10wt%, particle size 0.6-1.18mm accounts for 5wt%, particle size 0.3-0.6mm accounts for 10wt%, particle size 0.15-0.3mm accounts for 10wt%, and particle size 0.075-0.15mm accounts for 5wt%; the particle size of the mineral powder is less than 0.075mm. The aggregate and the mineral powder are both limestone, the cement is silicate cement, and the bentonite is sodium-based bentonite.

[0105] The mass percentage of each substance in the asphalt cold patching liquid is 68wt% of the base asphalt, 2.6wt% of the modifier, 0.6wt% of the anti-stripping agent, and 28.8wt% of the diluent. The diluent is a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil, and the mass percentages of the two substances in the diluent are 50wt% of D40 dearomatized solvent oil and 50wt% of D60 dearomatized solvent oil, respectively. The amount of the diluent added increases with the increase in the amount of the modifier added. Within the mass percentage range of the modifier and the diluent, when the amount of the modifier added increases by 0.2wt%, the amount of the diluent added increases by 1wt% accordingly, ensuring that it is within the range of 0.8-1.2wt%.

[0106] The matrix asphalt is No. 70 matrix asphalt; the modifier is SBS modifier; the anti-stripping agent is a non-amine anti-stripping agent, and the non-amine anti-stripping agent is polyphosphoric acid. The D40 dearomatized solvent oil is made of straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run aviation kerosene as raw materials, and is fractionated after deep desulfurization, dearomatization and hydrorefining, with a distillation range of 150-200°C, a closed cup flash point of 40-50°C, an aromatic content of less than 0.03wt%, a sulfur content of less than 0.2mg / kg, and a saturated hydrocarbon content of greater than 99.9%. The D60 dearomatized solvent oil is made of straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run aviation kerosene as raw materials, and is fractionated after deep desulfurization, dearomatization and hydrorefining, with a distillation range of 180-230°C, a closed cup flash point of 60-70°C, an aromatic content of less than 0.03wt%, a sulfur content of less than 0.2mg / kg, and a saturated hydrocarbon content of greater than 99.9%. D40 dearomatized solvent oil and D60 dearomatized solvent oil are both produced by Jinan Yuanyang Chemical Co., Ltd.

[0107] In step 1, the method for preparing the asphalt cold make-up fluid comprises the following steps in order:

[0108] Step (1): weigh the base asphalt, modifier, anti-stripping agent and diluent according to the design requirements and set aside;

[0109] Step (2): placing the matrix asphalt in a container, and then placing the container containing the matrix asphalt in an oven for heating at a temperature of 120° C. for a heating time of 1 h;

[0110] Step (3): After the heating is completed, take out the container containing the base asphalt from the oven, add the modifier into the container, and then place the container containing the base asphalt and the modifier on an induction cooker for heating, stirring while heating until the base asphalt and the modifier are completely mixed, the heating temperature is raised to 170°C, and the heating time is 15 minutes;

[0111] Step (4): placing the container containing the base asphalt and the modifier into an oil bath, and using a high-speed shearing instrument to perform shearing and stirring to obtain modified asphalt, the temperature of the oil bath is 170° C., the shearing speed is 6000 r / min, and the shearing and stirring time is 0.5 h;

[0112] Step (5): When the diluent is a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil, the temperature of the oil bath is lowered to 120°C, and then the D60 dearomatized solvent oil is added while stirring with a stirrer for 15 minutes, so that the modified asphalt and the D60 dearomatized solvent oil are completely blended; the temperature of the oil bath is further lowered to 80°C, and then the D40 dearomatized solvent oil is added while stirring with a stirrer for 15 minutes, so that the D40 dearomatized solvent oil is completely blended; Step (6): Keep the temperature of the oil bath unchanged, continue to stir with a stirrer, add the anti-stripping agent while stirring, and stir until the anti-stripping agent is completely blended, so as to obtain the asphalt cold make-up liquid, the temperature of the oil bath is 80°C, and the stirring time is 15 minutes.

[0113] In step one, the insulation temperature of the asphalt cold make-up liquid is 80°C; in step three, the drying temperature is 130°C, the drying time is 3h, and the temperature in the oven is reduced to 90°C, that is, the insulation temperature of the aggregate, mineral powder, cement, slaked lime, and bentonite is 90°C; in step four, the temperature of the mixing pot is heated to 80°C, and the stirring time is 90s; in step five, the temperature of the mixing pot is 80°C, and the stirring time is 90s; in step six, the temperature of the mixing pot is 80°C, and the stirring time is 90s.

[0114] Embodiment 4:

[0115] According to another preferred embodiment of the rapid early-strength high-performance asphalt cold patch material at room temperature and its preparation method, its material ratio, preparation process, equipment used, technical principles, beneficial effects, etc. are basically the same as those of the first embodiment, except that:

[0116] The mass percentage of each substance in the asphalt cold patch material is as follows: 82wt% of aggregate, 9wt% of mineral powder, 1wt% of cement, 1wt% of slaked lime, 0.4wt% of bentonite, 0.4wt% of lignin fiber, and 6.2wt% of asphalt cold patch liquid. The ratio of the mass of the asphalt cold patch liquid to the sum of the mass of the aggregate and the mineral powder is 0.068, ensuring that it is within the range of 0.055-0.07:1. D40 dearomatized solvent oil is used as a diluent in the asphalt cold patch liquid.

[0117] The aggregate includes nine particle sizes, and the mass percentage of each particle size in the aggregate is: particle size 13.2-16mm accounts for 9wt%, particle size 9.5-13.2mm accounts for 28wt%, particle size 4.75-9.5mm accounts for 14wt%, particle size 2.36-4.75mm accounts for 14wt%, particle size 1.18-2.36mm accounts for 14wt%, particle size 0.6-1.18mm accounts for 6wt%, particle size 0.3-0.6mm accounts for 6wt%, particle size 0.15-0.3mm accounts for 6wt%, and particle size 0.075-0.15mm accounts for 3wt%; the particle size of the mineral powder is less than 0.075mm. The aggregate and the mineral powder are both limestone, the cement is silicate cement, and the bentonite is sodium-based bentonite.

[0118] The mass percentage of each substance in the asphalt cold patching liquid is 70wt% of the base asphalt, 2.2wt% of the modifier, 0.8wt% of the anti-stripping agent, and 27wt% of the diluent. The diluent is D40 dearomatized solvent oil, and the amount of the diluent increases with the amount of the modifier. In this embodiment, the modifier and the diluent are both the minimum addition amounts.

[0119] The base asphalt is No. 70 base asphalt; the modifier is SBS modifier; the anti-stripping agent is a non-amine anti-stripping agent, and the non-amine anti-stripping agent is a nitrogen-containing complex, which is an AR-2 anti-stripping agent produced by Shenzhen Jinlong Chemical Technology Co., Ltd. and is a liquid. The D40 dearomatized solvent oil is made of straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run jet fuel as raw materials, and is fractionated after deep desulfurization, dearomatization and hydrogenation refining. The distillation range is 150-200°C, the closed cup flash point is 40-50°C, the aromatic content is less than 0.03wt%, the sulfur content is less than 0.2mg / kg, and the saturated hydrocarbon content is greater than 99.9%. D40 dearomatized solvent oil is produced by Jinan Yuanyang Chemical Co., Ltd.

[0120] In step 1, the method for preparing the asphalt cold make-up fluid comprises the following steps in order:

[0121] Step (1): weigh the base asphalt, modifier, anti-stripping agent and diluent according to the design requirements and set aside;

[0122] Step (2): placing the matrix asphalt in a container, and then placing the container containing the matrix asphalt in an oven for heating at a temperature of 110° C. for a heating time of 1.5 h;

[0123] Step (3): After the heating is completed, the container containing the base asphalt is taken out from the oven, the modifier is added into the container, and then the container containing the base asphalt and the modifier is placed on an induction cooker for heating, while stirring and heating until the base asphalt and the modifier are completely mixed, the heating temperature is raised to 165°C, and the heating time is 18 minutes;

[0124] Step (4): placing the container containing the base asphalt and the modifier into an oil bath, and using a high-speed shearing instrument to perform shearing and stirring to obtain modified asphalt, the temperature of the oil bath is 165° C., the shearing speed is 5500 r / min, and the shearing and stirring time is 0.8 h;

[0125] Step (5): When the diluent is D40 dearomatized solvent oil, lower the temperature of the oil bath to 70° C., then add the D40 dearomatized solvent oil while stirring with a stirrer for 18 minutes to allow the modified asphalt and the D40 dearomatized solvent oil to be completely mixed;

[0126] Step (6): Keep the temperature of the oil bath constant, continue stirring with a stirrer, add the anti-stripping agent while stirring, and stir until the anti-stripping agent is completely integrated to obtain the asphalt cold repair liquid. The temperature of the oil bath is 70°C and the stirring time is 18 minutes.

[0127] In step one, the insulation temperature of the asphalt cold make-up liquid is 70°C; in step three, the drying temperature is 125°C, the drying time is 3.5h, and the temperature in the oven is reduced to 80°C, that is, the insulation temperature of the aggregate, mineral powder, cement, slaked lime, and bentonite is 80°C; in step four, the temperature of the mixing pot is heated to 70°C, and the stirring time is 105s; in step five, the temperature of the mixing pot is 70°C, and the stirring time is 105s; in step six, the temperature of the mixing pot is 70°C, and the stirring time is 105s.

[0128] In this embodiment, the D40 dearomatized solvent oil used is as follows Figure 6 As shown, the final prepared asphalt cold patching fluid is as follows Figure 7 As shown, the final prepared asphalt cold patch material is as follows Figure 8 shown.

[0129] Embodiment five:

[0130] According to another preferred embodiment of the rapid early-strength high-performance asphalt cold patch material at room temperature and its preparation method, its material ratio, preparation process, equipment used, technical principles, beneficial effects, etc. are basically the same as those of the first embodiment, except that:

[0131] The mass percentage of each substance in the asphalt cold patch material is 84wt% for aggregate, 8wt% for mineral powder, 1wt% for cement, 1wt% for slaked lime, 0.4wt% for bentonite, 0.4wt% for lignin fiber, and 5.2wt% for asphalt cold patch liquid. The ratio of the mass of the asphalt cold patch liquid to the sum of the mass of the aggregate and the mineral powder is 0.0565, ensuring that it is within the range of 0.055-0.07:1. D40 dearomatized solvent oil is used as a diluent in the asphalt cold patch liquid.

[0132] The aggregate includes nine particle sizes, and the mass percentage of each particle size in the aggregate is as follows: particle size 13.2-16mm accounts for 8wt%, particle size 9.5-13.2mm accounts for 25wt%, particle size 4.75-9.5mm accounts for 13wt%, particle size 2.36-4.75mm accounts for 12wt%, particle size 1.18-2.36mm accounts for 12wt%, particle size 0.6-1.18mm accounts for 6wt%, particle size 0.3-0.6mm accounts for 9wt%, particle size 0.15-0.3mm accounts for 9wt%, and particle size 0.075-0.15mm accounts for 6wt%; the particle size of the mineral powder is less than 0.075mm. The aggregate and the mineral powder are both limestone, the cement is silicate cement, and the bentonite is sodium-based bentonite.

[0133] The mass percentage of each substance in the asphalt cold patching liquid is 67wt% of the base asphalt, 2.8wt% of the modifier, 0.2wt% of the anti-stripping agent, and 30wt% of the diluent. The diluent is D40 dearomatized solvent oil, and the amount of the diluent increases with the amount of the modifier. Within the mass percentage range of the modifier and the diluent, when the amount of the modifier increases by 0.2wt%, the amount of the diluent increases by 1wt% accordingly, ensuring that it is within the range of 0.8-1.2wt%.

[0134] The base asphalt is No. 70 base asphalt; the modifier is SBS modifier; the anti-stripping agent is a non-amine anti-stripping agent, and the non-amine anti-stripping agent is a nitrogen-containing complex, which is an AR-2 anti-stripping agent produced by Shenzhen Jinlong Chemical Technology Co., Ltd. and is a liquid. The D40 dearomatized solvent oil is made of straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run jet fuel as raw materials, and is fractionated after deep desulfurization, dearomatization and hydrogenation refining. The distillation range is 150-200°C, the closed cup flash point is 40-50°C, the aromatic content is less than 0.03wt%, the sulfur content is less than 0.2mg / kg, and the saturated hydrocarbon content is greater than 99.9%. D40 dearomatized solvent oil is produced by Jinan Yuanyang Chemical Co., Ltd.

[0135] In step 1, the method for preparing the asphalt cold make-up fluid comprises the following steps in order:

[0136] Step (1): weigh the base asphalt, modifier, anti-stripping agent and diluent according to the design requirements and set aside;

[0137] Step (2): placing the matrix asphalt in a container, and then placing the container containing the matrix asphalt in an oven for heating at a temperature of 100° C. for a heating time of 2 h;

[0138] Step (3): After the heating is completed, take out the container containing the base asphalt from the oven, add the modifier into the container, and then place the container containing the base asphalt and the modifier on an induction cooker for heating, stirring while heating until the base asphalt and the modifier are completely mixed, the heating temperature is raised to 160° C., and the heating time is 20 min;

[0139] Step (4): placing the container containing the base asphalt and the modifier into an oil bath, and using a high-speed shearing instrument to perform shearing and stirring to obtain modified asphalt, the temperature of the oil bath is 160° C., the shearing speed is 5000 r / min, and the shearing and stirring time is 1 h;

[0140] Step (5): When the diluent is D40 dearomatized solvent oil, lower the temperature of the oil bath to 60° C., then add the D40 dearomatized solvent oil while stirring with a stirrer for 20 min to allow the modified asphalt and the D40 dearomatized solvent oil to be completely mixed;

[0141] Step (6): Keep the temperature of the oil bath constant, continue stirring with a stirrer, add the anti-stripping agent while stirring, and stir until the anti-stripping agent is completely integrated to obtain the asphalt cold repair liquid. The temperature of the oil bath is 60°C and the stirring time is 20 minutes.

[0142] In step one, the insulation temperature of the asphalt cold make-up liquid is 60°C; in step three, the drying temperature is 120°C, the drying time is 4h, and the temperature in the oven is reduced to 70°C, that is, the insulation temperature of the aggregate, mineral powder, cement, slaked lime, and bentonite is 70°C; in step four, the temperature of the mixing pot is heated to 60°C, and the stirring time is 120s; in step five, the temperature of the mixing pot is 60°C, and the stirring time is 120s; in step six, the temperature of the mixing pot is 60°C, and the stirring time is 120s.

[0143] Embodiment six:

[0144] According to another preferred embodiment of the rapid early-strength high-performance asphalt cold patch material at room temperature and its preparation method, its material ratio, preparation process, equipment used, technical principles, beneficial effects, etc. are basically the same as those of the first embodiment, except that:

[0145] The mass percentage of each substance in the asphalt cold patch material is 83wt% for aggregate, 9wt% for mineral powder, 0.8wt% for cement, 0.8wt% for slaked lime, 0.4wt% for bentonite, 0.4wt% for lignin fiber, and 5.6wt% for asphalt cold patch liquid. The ratio of the mass of the asphalt cold patch liquid to the sum of the mass of the aggregate and the mineral powder is 0.061, ensuring that it is within the range of 0.055-0.07:1. D40 dearomatized solvent oil is used as a diluent in the asphalt cold patch liquid.

[0146] The aggregate includes nine particle sizes, and the mass percentage of each particle size in the aggregate is: particle size 13.2-16mm accounts for 9wt%, particle size 9.5-13.2mm accounts for 28wt%, particle size 4.75-9.5mm accounts for 14wt%, particle size 2.36-4.75mm accounts for 13wt%, particle size 1.18-2.36mm accounts for 13wt%, particle size 0.6-1.18mm accounts for 8wt%, particle size 0.3-0.6mm accounts for 5wt%, particle size 0.15-0.3mm accounts for 6wt%, and particle size 0.075-0.15mm accounts for 4wt%; the particle size of the mineral powder is less than 0.075mm. The aggregate and the mineral powder are both limestone, the cement is silicate cement, and the bentonite is sodium-based bentonite.

[0147] The mass percentage of each substance in the asphalt cold patching liquid is 65wt% of base asphalt, 3.0wt% of modifier, 0.8wt% of anti-stripping agent, and 31.2wt% of diluent. The diluent is D40 dearomatized solvent oil, and the amount of the diluent increases with the amount of the modifier. Within the mass percentage range of the modifier and the diluent, when the amount of the modifier increases by 0.2wt%, the amount of the diluent increases by 1.2wt% accordingly, ensuring that it is within the range of 0.8-1.2wt%.

[0148] The base asphalt is No. 70 base asphalt; the modifier is SBS modifier; the anti-stripping agent is a non-amine anti-stripping agent, and the non-amine anti-stripping agent is a phosphate ester. The D40 dearomatized solvent oil is made of straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run jet fuel as raw materials, and is fractionated after deep desulfurization, dearomatization and hydrogenation refining. The distillation range is 150-200°C, the closed cup flash point is 40-50°C, the aromatic content is less than 0.03wt%, the sulfur content is less than 0.2mg / kg, and the saturated hydrocarbon content is greater than 99.9%. D40 dearomatized solvent oil is produced by Jinan Yuanyang Chemical Co., Ltd.

[0149] In step 1, the method for preparing the asphalt cold make-up fluid comprises the following steps in order:

[0150] Step (1): weigh the base asphalt, modifier, anti-stripping agent and diluent according to the design requirements and set aside;

[0151] Step (2): placing the matrix asphalt in a container, and then placing the container containing the matrix asphalt in an oven for heating at a temperature of 120° C. for a heating time of 1 h;

[0152] Step (3): After the heating is completed, take out the container containing the base asphalt from the oven, add the modifier into the container, and then place the container containing the base asphalt and the modifier on an induction cooker for heating, stirring while heating until the base asphalt and the modifier are completely mixed, the heating temperature is raised to 170°C, and the heating time is 15 minutes;

[0153] Step (4): placing the container containing the base asphalt and the modifier into an oil bath, and using a high-speed shearing instrument to perform shearing and stirring to obtain modified asphalt, the temperature of the oil bath is 170° C., the shearing speed is 6000 r / min, and the shearing and stirring time is 0.5 h;

[0154] Step (5): When the diluent is D40 dearomatized solvent oil, lower the temperature of the oil bath to 80° C., then add the D40 dearomatized solvent oil while stirring with a stirrer for 15 minutes to allow the modified asphalt and the D40 dearomatized solvent oil to be completely mixed;

[0155] Step (6): Keep the temperature of the oil bath constant, continue stirring with a stirrer, add the anti-stripping agent while stirring, and stir until the anti-stripping agent is completely integrated to obtain the asphalt cold repair liquid. The temperature of the oil bath is 80°C and the stirring time is 15 minutes.

[0156] In step one, the insulation temperature of the asphalt cold make-up liquid is 80°C; in step three, the drying temperature is 130°C, the drying time is 3h, and the temperature in the oven is reduced to 90°C, that is, the insulation temperature of the aggregate, mineral powder, cement, slaked lime, and bentonite is 90°C; in step four, the temperature of the mixing pot is heated to 80°C, and the stirring time is 90s; in step five, the temperature of the mixing pot is 80°C, and the stirring time is 90s; in step six, the temperature of the mixing pot is 80°C, and the stirring time is 90s.

[0157] In the above-mentioned embodiments 1 to 6, the asphalt cold patch liquid can adopt another preparation method, that is, another preparation method of the asphalt cold patch liquid includes the following steps in order: step A, weighing the base asphalt, modifier, anti-stripping agent, and diluent according to the design requirements for use; step B, putting the base asphalt into a container, and then putting the container containing the base asphalt into an oven for heating, the heating temperature is 100-120°C, and the heating time is 1-2h; step C, after the heating is completed, taking out the container containing the base asphalt from the oven, adding the diluent D40 dearomatized solvent oil or a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil into the container, and then putting the container containing the base asphalt and the diluent into an oil bath, and using a stirrer to stir until the base asphalt and the diluent are mixed. The agent is completely melted, the temperature of the oil bath pot is 60-80℃, and the stirring time is 10-15min; step D, keep the temperature of the oil bath pot unchanged, use a stirrer to continue stirring, add the anti-stripping agent while stirring, until the anti-stripping agent is completely fused, that is, obtain the diluted matrix asphalt, the temperature of the oil bath pot is 60-80℃, and the stirring time is 10-15min; step E, keep the temperature of the oil bath pot unchanged, use a stirrer to continue stirring, add the modifier while stirring, until the diluted matrix asphalt and the modifier are completely melted, and then use a high-speed shearing instrument for shearing and stirring, that is, obtain the asphalt cold repair liquid, the temperature of the oil bath pot is 60-80℃, the stirring time is 20-25min, the shear speed is 5000-6000r / min, and the shearing and stirring time is 20-30min. In another preparation method of asphalt cold repair liquid, it is necessary to ensure that each process parameter is within the required range to achieve the expected technical effect.

[0158] The cold patch asphalt mixtures prepared in the above six embodiments were respectively subjected to performance tests such as initial stability, molding stability, water stability and dynamic stability, and the test equipment, test environment, test conditions, sample shape and size used were all the same.

[0159] 1. Initial stability and molding stability test

[0160] Weigh 980g of asphalt cold patch material (the actual mass is based on the control specimen height of 63.5±1.5mm) and put it into the test mold. Compact it 50 times on both sides and place it upright at room temperature for 2h before demoulding. After curing the specimen in a water tank at 25±1℃ for 30min, measure the Marshall stability of the specimen, which is the initial stability. The test results are shown in Table 2.

[0161] Weigh 1100g of asphalt cold patch material (the actual mass is based on the control specimen height of 63.5±1.5mm) and put it into the test mold, and compact it on both sides 50 times. Place the specimen together with the test mold in an oven at 105±5℃ in a side-up manner for 24 hours, take it out and compact it on both sides 25 times, then place the specimen together with the test mold upright at room temperature for 24 hours before demolding. After curing the specimen in a water tank at 60±1℃ for 30 minutes, measure the Marshall stability of the specimen, which is the molding stability. The test results are shown in Table 2.

[0162] Table 2 Test results of initial stability and forming stability of asphalt cold patch material

[0163] Example Outdoor 32-35℃ initial strength (KN) Outdoor 23-25℃ initial strength (KN) Forming stability (KN) Embodiment 1 14.50 7.95 13.13 Embodiment 2 14.96 7.68 12.88 Embodiment 3 16.89 9.77 13.85 Embodiment 4 9.88 6.72 12.43 Embodiment 5 9.25 6.41 12.59 Embodiment 6 9.70 6.33 12.66

[0164] 2. Water stability test

[0165] Weigh 1100g of asphalt cold patch material (the actual mass is based on the specimen height of 63.5±1.5mm) and put it into the test mold, and compact it on both sides 50 times. Place the specimen and the test mold in an oven at 105±5℃ in a side-up manner for 24 hours, take it out and compact it on both sides 25 times, and then place the specimen and the test mold upright at room temperature for 24 hours before demolding.

[0166] The specimens were randomly divided into two groups, with no less than four specimens in each group. One group of specimens was kept in a constant temperature water bath at 60°C for 60 minutes and then subjected to the Marshall test. The other group of specimens was kept in a constant temperature water bath at 60°C for 48 hours and then subjected to the Marshall test. The ratio of the two groups was the residual stability ratio. The test results are shown in Table 3.

[0167] Table 3 Test results of water-residual stability of asphalt cold patch material

[0168] Example Average molding stability (KN) Average stability after immersion in water for 48 hours (KN) Residual stability after immersion in water (%) Embodiment 1 13.13 12.08 92% Embodiment 2 12.88 11.85 92% Embodiment 3 13.85 12.60 91% Embodiment 4 12.43 11.19 90% Embodiment 5 12.59 11.33 90% Embodiment 6 12.66 11.27 89%

[0169] The specimens were randomly divided into two groups, with no less than four specimens in each group. The first group of specimens was placed on a platform and stored at room temperature for later use. The second group of specimens was placed in a vacuum dryer, the water inlet hose was closed, and the vacuum pump was started to make the vacuum degree of the dryer reach 98.3kPa (730mmHg) or above, and maintained for 15 minutes. Then the water inlet hose was opened, and the cold water flow entered by negative pressure made the specimens completely immersed in water. After immersion in water for 15 minutes, the normal pressure was restored. The second group of specimens was taken out and placed in a plastic bag, and about 10mL of water was added. The bag was tied tightly, and the specimens were placed in a constant temperature refrigerator with a freezing temperature of -18℃±2℃ for 16±1h. After taking out the specimens, they were immediately placed in a constant temperature water tank at 60±0.5℃, soaked for 3 minutes, and then the plastic bag was removed, and the temperature was kept for 24±0.5h. All the specimens of the first and second groups were immersed in a constant temperature water bath at a temperature of 25±0.5℃ and kept warm for 2h±10min. The test results of the first group of specimens were splitting strength, and the test results of the second group of specimens were freeze-thaw cycle splitting strength. The ratio of the test results of the second group to the first group was the freeze-thaw splitting tensile strength ratio. The test results are shown in Table 4.

[0170] Table 4 Splitting strength and freeze-thaw cycle splitting strength test results of asphalt cold patch

[0171] Example Average splitting strength (MPa) Average splitting strength after freeze-thaw cycles (MPa) Freeze-thaw splitting strength ratio (%) Embodiment 1 0.48 0.57 84% Embodiment 2 0.47 0.56 84% Embodiment 3 0.47 0.57 82% Embodiment 4 0.43 0.53 82% Embodiment 5 0.44 0.54 82% Embodiment 6 0.43 0.53 81%

[0172] 3. Dynamic stability test

[0173] Use a test mold with a length of 300mm×width of 300mm×thickness of 50mm. Use a small shovel to slightly mix all the mixed asphalt cold patch materials, and then evenly put them into the test mold in a circle from the edge to the center in sequence. The middle part should be slightly higher than the surroundings. Before molding, preheat the rolling wheel to about 80℃, then place the test mold containing the asphalt cold patch material on the platform of the wheel roller, gently put down the rolling wheel, and adjust the total load to 9KN (linear load 300N / cm); start the wheel roller, roll two round trips (4 times) and then stop; unload the load, lift the rolling wheel, turn the direction of the test piece, and then add the same load to continue rolling until the surface of the test piece is flush with the top edge of the test mold; after rolling, quickly place the test piece in an electric blast drying oven at 60℃ to dry to constant weight.

[0174] The specimen and the test mold are placed in a constant temperature room that has reached the test temperature of 60±1℃, and kept warm for 5-12h. After the insulation is completed, the specimen and the test mold are moved to the test bench of the wheel rutting test machine, and the test wheel is in the center of the specimen, and its running direction is consistent with the rolling or driving direction of the specimen. The test temperature is 60℃ and the wheel pressure is 0.7MPa; the rutting deformation automatic recorder is turned on, and the test machine is started, and the test wheel is moved back and forth for about 1h, and the rutting test is completed. The test results are shown in Table 5.

[0175] Table 5 Dynamic stability test results of asphalt cold patch material

[0176] Example Dynamic stability (times / mm) Embodiment 1 5984 Embodiment 2 6050 Embodiment 3 6160 Embodiment 4 5849 Embodiment 5 5995 Embodiment 6 5845

[0177] It can be seen from the test results of Tables 2-5 that the asphalt cold patch prepared in the above embodiment has excellent comprehensive performance and can meet the performance requirements of hot-mix asphalt mixture. According to the requirements of "Technical Specifications for Highway Asphalt Pavement Construction" (JTGF40-2004): the Marshall stability of hot-mix asphalt mixtures for expressways and first-class highways is not less than 8KN, the residual stability of the water-immersed Marshall test is not less than 80%, the residual strength ratio of the freeze-thaw splitting test is not less than 75%, and the dynamic stability in the hot summer zone is not less than 2800 times / mm. In addition, from the initial strength test results, the initial strength at 32-35℃ outdoors (close to the summer temperature) is not less than 9.2KN, and the initial strength at 23-25℃ outdoors (close to the spring and autumn temperature) is not less than 6.3KN, which shows that the asphalt cold patch can quickly form strength in a very short time, which helps to quickly open the road after repairing the potholes and minimize the impact on transportation.

[0178] The AR-2 anti-stripping agent used in the above examples was purchased from Shenzhen Jinlong Chemical Technology Co., Ltd., D40 dearomatized solvent oil and D60 dearomatized solvent oil were purchased from Jinan Yuanyang Chemical Co., Ltd., aggregate, mineral powder, cement, slaked lime, bentonite, matrix asphalt, SBS modifier, SBR modifier, and lignin fiber were purchased from Beijing Municipal Road and Bridge Building Materials Group Co., Ltd., and polyphosphoric acid and phosphate ester were purchased from Aladdin Reagent Co., Ltd.

[0179] Special note: The technical solution of the present invention involves many parameters, and the synergistic effects between the various parameters need to be comprehensively considered to obtain the beneficial effects and significant progress of the present invention. Moreover, the value ranges of the various parameters in the technical solution are obtained after a large number of experiments. For each parameter and the combination of each parameter, the inventor has recorded a large amount of experimental data. Due to space limitations, the specific experimental data will not be disclosed here.

[0180] It is not difficult for those skilled in the art to understand that the room temperature fast early strength high performance asphalt cold patch material and its preparation method of the present invention include the invention content and specific implementation part of the above-mentioned invention specification and any combination of the parts shown in the drawings. Due to the limited space and to make the specification concise, the schemes composed of these combinations are not described one by one. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A high-performance asphalt cold patch material with rapid early strength at room temperature, characterized in that: The mass percentage of each substance in the asphalt cold patch material is 80-86wt% of aggregate, 7.5-11wt% of mineral powder, 0.5-1wt% of cement, 0.5-1wt% of slaked lime, 0.2-0.4wt% of bentonite, 0.2-0.4wt% of lignin fiber, and 5-7wt% of asphalt cold patch liquid, and the ratio of the mass of the asphalt cold patch liquid to the sum of the mass of the aggregate and the mineral powder is 0.055-0.07:1; D40 dearomatized solvent oil or a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil is used as a diluent in the asphalt cold patch liquid; The mass percentage of each substance in the asphalt cold repair liquid is as follows: base asphalt accounts for 65-70wt%, modifier accounts for 2.2-3.0wt%, anti-stripping agent accounts for 0.2-0.8wt%, and diluent accounts for 27-32wt%; When the diluent is D40 dearomatized solvent oil, the amount of the diluent added increases with the amount of the modifier added. Within the mass percentage range of the modifier and the diluent, when the amount of the modifier added increases by 0.2wt%, the amount of the diluent added increases by 0.8-1.2wt% accordingly. When the diluent is a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil, the mass percentages of the two substances in the diluent are 50-70wt% of D40 dearomatized solvent oil and 30-50wt% of D60 dearomatized solvent oil; the amount of the diluent added increases with the increase in the amount of the modifier added, and within the mass percentage range of the modifier and the diluent, when the amount of the modifier added increases by 0.2wt%, the amount of the diluent added increases by 0.8-1.2wt% accordingly; The method for preparing the asphalt cold replenishment fluid comprises the following steps in order: Step (1): weigh the base asphalt, modifier, anti-stripping agent and diluent according to the design requirements and set aside; Step (2): placing the matrix asphalt in a container, and then placing the container containing the matrix asphalt in an oven for heating at a temperature of 100-120° C. for a heating time of 1-2 h; Step (3): After the heating is completed, the container containing the base asphalt is taken out from the oven, the modifier is added into the container, and then the container containing the base asphalt and the modifier is placed on an induction cooker for heating, while stirring and heating until the base asphalt and the modifier are completely mixed, the heating temperature is raised to 160-170°C, and the heating time is 15-20 minutes; Step (4): placing the container containing the base asphalt and the modifier into an oil bath, and using a high-speed shearing device to perform shearing and stirring to obtain modified asphalt, the temperature of the oil bath is 160-170°C, the shearing speed is 5000-6000 r / min, and the shearing and stirring time is 0.5-1h; Step (5): when the diluent is a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil, lower the temperature of the oil bath to 100-120°C, then use a stirrer to add D60 dearomatized solvent oil while stirring for 15-20 minutes, so that the modified asphalt and D60 dearomatized solvent oil are completely blended; further lower the temperature of the oil bath to 60-80°C, then use a stirrer to add D40 dearomatized solvent oil while stirring for 15-20 minutes, so that the D40 dearomatized solvent oil is completely blended; or, when the diluent is D40 dearomatized solvent oil, lower the temperature of the oil bath to 60-80°C, then use a stirrer to add D40 dearomatized solvent oil while stirring for 15-20 minutes, so that the modified asphalt and D40 dearomatized solvent oil are completely blended; Step (6): Keep the temperature of the oil bath constant, continue stirring with a stirrer, add the anti-stripping agent while stirring, and stir until the anti-stripping agent is completely blended, so as to obtain the asphalt cold patching liquid. The temperature of the oil bath is 60-80°C, and the stirring time is 15-20 minutes; Or another method for preparing the asphalt cold replenishment fluid, comprising the following steps in chronological order: Step A: weigh the base asphalt, modifier, anti-stripping agent and diluent according to the design requirements for use; Step B: Put the matrix asphalt into a container, and then put the container containing the matrix asphalt into an oven for heating at a temperature of 100-120° C. for a heating time of 1-2 hours; Step C: After the heating is completed, take out the container containing the matrix asphalt from the oven, add the diluent D40 dearomatized solvent oil or a mixture of D40 dearomatized solvent oil and D60 dearomatized solvent oil into the container, and then put the container containing the matrix asphalt and the diluent into an oil bath, and stir with a stirrer until the matrix asphalt and the diluent are completely melted, the temperature of the oil bath is 60-80°C, and the stirring time is 10-15min; Step D: Keep the temperature of the oil bath constant, continue stirring with a stirrer, and add the anti-stripping agent while stirring until the anti-stripping agent is completely integrated to obtain the diluted matrix asphalt. The temperature of the oil bath is 60-80°C, and the stirring time is 10-15 minutes; Step E: Keep the temperature of the oil bath unchanged, continue stirring with a stirrer, and add the modifier while stirring until the diluted base asphalt and the modifier are completely mixed, and then use a high-speed shear instrument to shear and stir to obtain the asphalt cold makeup liquid. The temperature of the oil bath is 60-80°C, the stirring time is 20-25min, the shear speed is 5000-6000r / min, and the shear stirring time is 20-30min.

2. The rapid early-strength high-performance asphalt cold patch material at room temperature according to claim 1, characterized in that: The aggregate includes nine particle sizes, and the mass percentage of each particle size in the aggregate is: 13.2mm≤particle size<16mm accounts for 5-10wt%, 9.5mm≤particle size<13.2mm accounts for 20-30wt%, 4.75mm≤particle size<9.5mm accounts for 10-15wt%, 2.36mm≤particle size<4.75mm accounts for 10-15wt%, 1.18mm≤particle size<2.36mm accounts for 10-15wt%, 0.6mm≤particle size<1.18mm accounts for 5-10wt%, 0.3mm≤particle size<0.6mm accounts for 5-10wt%, 0.15mm≤particle size<0.3mm accounts for 5-10wt%, 0.075mm≤particle size<0.15mm accounts for 3-5wt%; the particle size of the mineral powder is less than 0.075mm; the aggregate and the mineral powder are both limestone.

3. The rapid early-strength high-performance asphalt cold patch material at room temperature according to claim 2, characterized in that: The cement is any one or more of silicate cement, aluminate cement, sulphoaluminate cement and ferroaluminate cement; the bentonite is any one or more of sodium-based bentonite, calcium-based bentonite and magnesium-based bentonite.

4. The rapid early-strength high-performance asphalt cold patch material at room temperature according to claim 3, characterized in that: The base asphalt is No. 70 base asphalt or No. 90 base asphalt; the modifier is SBS modifier or SBR modifier; the anti-stripping agent is a non-amine anti-stripping agent, and the non-amine anti-stripping agent is any one or more of polyphosphoric acid, phosphate ester, and nitrogen-containing complex; the D40 dearomatized solvent oil is made of straight-run distillate oil, hydrocracked distillate oil or low-sulfur straight-run aviation kerosene as raw materials, and is fractionated after deep desulfurization, dearomatization, hydrogenation and refining, with a distillation range of 150-200°C and a closed cup flash point of 40 -50℃, the aromatic content is less than 0.03wt%, the sulfur content is less than 0.2mg / kg, and the saturated hydrocarbon content is greater than 99.9%; the D60 dearomatized solvent oil is made from straight-run distillate oil, hydrocracking distillate oil or low-sulfur straight-run jet fuel, and is fractionated after deep desulfurization, dearomatization and hydrogenation refining, with a distillation range of 180-230℃, a closed cup flash point of 60-70℃, an aromatic content of less than 0.03wt%, a sulfur content of less than 0.2mg / kg, and a saturated hydrocarbon content of greater than 99.9%.

5. A method for preparing a rapid early-strength high-performance asphalt cold patch material at room temperature, characterized in that: The method for preparing the high-performance asphalt cold patch material with rapid early strength at room temperature according to any one of claims 1 to 4 comprises the following steps in chronological order: Step 1: Prepare asphalt cold make-up liquid according to the design requirements, and put the prepared asphalt cold make-up liquid into an oven for heat preservation and standby use; Step 2: Weigh aggregate, mineral powder, cement, slaked lime, bentonite, lignin fiber, and asphalt cold make-up liquid according to design requirements for use; Step 3: putting the aggregate, mineral powder, cement, slaked lime and bentonite into an oven for drying. After the drying process is completed, lowering the temperature in the oven to a certain temperature so that the aggregate, mineral powder, cement, slaked lime and bentonite are kept warm at the lowered temperature for standby use; Step 4: Heat the mixing pot to a certain temperature, then put the aggregate, cement, slaked lime and bentonite kept warm in the oven into the mixing pot, put the lignin fiber into the mixing pot at the same time, and stir with a stirrer; Step 5: Keep the temperature of the mixing pot unchanged, add the asphalt cold make-up liquid kept warm in the oven into the mixing pot, and stir with a stirrer; Step 6: Keep the temperature of the mixing pot unchanged, add the mineral powder kept warm in the oven into the mixing pot, and use an agitator to stir it to obtain a fast early-strength high-performance asphalt cold patch material at room temperature.

6. The method for preparing the rapid early-strength high-performance asphalt cold patch material at room temperature according to claim 5, characterized in that: In step 1, the insulation temperature of the asphalt cold make-up fluid is 60-80°C.

7. The method for preparing the rapid early-strength high-performance asphalt cold patch material at room temperature according to claim 6, characterized in that: In step three, the drying temperature is 120-130°C, the drying time is 3-4h, and the temperature in the oven is reduced to 70-90°C, that is, the insulation temperature of the aggregate, mineral powder, cement, slaked lime, and bentonite is 70-90°C.

8. The method for preparing the rapid early-strength high-performance asphalt cold patch material at room temperature according to claim 7, characterized in that: In step 4, the temperature of the mixing pot is heated to 60-80°C, and the stirring time is 90-120s.

9. The method for preparing the rapid early-strength high-performance asphalt cold patch material at room temperature according to claim 8, characterized in that: In step 5, the temperature of the mixing pot is 60-80°C and the stirring time is 90-120s.

10. The method for preparing the rapid early-strength high-performance asphalt cold patch material at room temperature according to claim 9, characterized in that: In step six, the temperature of the mixing pot is 60-80°C and the stirring time is 90-120s.

Citation Information

Patent Citations

  • Mixture for normal-temperature repairing of asphalt pavement pits, and preparation method and application thereof

    CN103043962A

  • Solvent-type cold-patch asphalt liquid and preparation technology therefor

    CN105348827A

  • High-strength cold filling asphalt mixture and preparation method thereof

    CN108793831A

  • Toughening type epoxy asphalt cold patch material and preparation method thereof

    CN116854405A