Test system and test method for improving first cup performance

By employing a double-layered inner and outer tube design in the filter cartridge, the pure water storage capacity is increased, solving the problem of high TDS value in the first cup of water from reverse osmosis water purifiers and achieving the effect of improving the initial water quality of the water purifier.

CN119330461BActive Publication Date: 2026-11-24FOSHAN XINYAO ENVIRONMENTAL PROTECTION TECHNOLOGY CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411120872.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2026-11-24
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

When existing reverse osmosis water purifiers are shut down, ions in the inlet water channel diffuse through the membrane into the pure water channel, resulting in a higher TDS value in the first cup of water, which affects the initial water quality of drinking water.

Method used

The filter cartridge features a dual-layer structure, consisting of an inner tube and an outer tube. The inner and outer tubes form a first water inlet channel, while the inner tube has a second pure water channel in the middle. The outer tube has a pure water flow channel, which increases the pure water storage capacity and reduces the total dissolved solids inside the filter cartridge. By setting up the pure water flow channel and the second pure water channel, the volume of pure water is increased, the concentration is reduced, and the TDS value of the first cup of water is improved.

Benefits of technology

Without changing the filter element structure, the pure water storage capacity was significantly increased, the total amount of dissolved solids inside the filter element was reduced, the occurrence of forward osmosis was slowed down, the TDS value of the first cup of water was significantly improved, and the quality of the initial drinking water was ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119330461B_ABST
    Figure CN119330461B_ABST
Patent Text Reader

Abstract

This application proposes a testing system and method for improving the performance of the first cup of water. The filter element structure includes: a filter element housing with a raw water inlet, a pure water outlet, and a wastewater outlet at one end; an RO membrane filter element forming a first pure water channel between itself and the inner wall of the filter element housing, one end of which is connected to the pure water outlet, and the wastewater end of the RO membrane filter element is connected to the wastewater outlet; and a central tube assembly having an inner tube and an outer tube connected together, with a first water inlet channel between the inner and outer tubes, one end of which is connected to the raw water inlet, and the other end of which is connected to the water inlet of the RO membrane filter element. A second pure water channel is located in the middle of the inner tube, and a pure water flow channel is located on the outer tube, communicating with the second pure water channel. This application sets the central tube assembly into a double-layer structure, increasing the pure water volume through the second pure water channel and the pure water flow channel, thereby improving the TDS value of the first cup of water.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of water purification equipment, and more particularly to a testing system and testing method for improving the performance of the first cup of water. Background Technology

[0002] With economic development and social progress, people have increasingly higher requirements for drinking water. As a result, many families have equipped themselves with various water purification devices, such as water softeners, ultrafiltration machines, and reverse osmosis water purifiers. The emergence of these various water purification devices has met people's diverse water needs in daily life, simultaneously improving their living standards and the health of their drinking water.

[0003] Currently, the working principle of reverse osmosis water purifiers on the market mainly relies on the fact that the dissolution-diffusion rate of water is much greater than that of ions, thus separating water and ions. That is, the solubility and diffusion rate of water molecules in a solution is generally greater than that of ions. Under pressure, water molecules can pass through the semi-permeable membrane more quickly, while ions are retained in the original solution due to the membrane's selectivity. When the water purifier stops, the TDS values ​​of the raw water and concentrated water in the inlet channel are much higher than the TDS value of the pure water in the first pure water channel. Driven by the concentration gradient, ions in the inlet channel diffuse through the membrane into the first pure water channel, causing the pure water TDS value to rise, resulting in a higher TDS value for the first cup of water. Summary of the Invention

[0004] This application provides a testing system and method for improving the performance of the first glass of water, in order to solve the problems existing in the related technologies. The technical solution is as follows: In a first aspect, embodiments of this application provide a filter element structure, including: The filter cartridge housing has a raw water inlet, a pure water outlet, and a wastewater outlet at one end. An RO membrane filter element is installed inside the filter element housing. A first pure water channel is formed between the RO membrane filter element and the inner wall of the filter element housing. One end of the first pure water channel is connected to the pure water outlet, and the wastewater end of the RO membrane filter element is connected to the wastewater outlet. A central tube assembly is located in the middle of the RO membrane filter element. The central tube assembly has an inner tube and an outer tube connected together. The inner tube is located in the middle of the outer tube. There is a first water inlet channel between the inner tube and the outer tube. One end of the first water inlet channel is connected to the raw water inlet, and the other end of the first water inlet channel is connected to the water inlet of the RO membrane filter element. There is a second pure water channel in the middle of the inner tube. There is a pure water flow channel on the outer tube. The pure water flow channel is connected to the second pure water channel. The other end of the first pure water channel is connected to one end of the second pure water channel.

[0005] In one embodiment, the first water inlet channel extends axially along the central tube assembly, the pure water flow channel extends radially along the outer tube, and there are multiple pure water flow channels, which are spaced apart along the axial direction of the outer tube.

[0006] In one embodiment, the filter element structure further includes: The filter cartridge housing contains the RO membrane filter cartridge installed inside it. The filter cartridge housing has a pure water outlet channel in the middle. One end of the second pure water channel is connected to the pure water outlet channel, and the pure water outlet channel is connected to the first pure water channel.

[0007] In one embodiment, a raw water outlet channel is provided between the filter cartridge housing and the end of the central tube assembly. The raw water outlet channel is connected to the other end of the first water inlet channel, and the first water inlet channel is connected to the water inlet end of the RO membrane filter cartridge through the raw water outlet channel.

[0008] In one embodiment, the filter element structure further includes an inlet end cap and a wastewater end cap. The inlet end cap is installed on the wastewater end of the RO membrane filter element, and the inner wall of the inlet end cap is sealed to the outer peripheral surface of the central tube assembly. The inlet end cap has a second inlet channel, and the raw water inlet communicates with the first inlet channel through the second inlet channel. The wastewater end cap is installed on the wastewater end of the RO membrane filter element, and the inlet end cap is located inside the wastewater end cap. There is a wastewater channel between the inlet end cap and the wastewater end cap, and the wastewater end of the RO membrane filter element communicates with the wastewater outlet through the wastewater channel.

[0009] Secondly, embodiments of this application provide a testing system for improving the performance of the first glass of water, comprising at least: A water inlet pipe, one end of which is connected to an external water source, and a first solenoid valve and a booster pump are provided on the water inlet pipe; As described in any of the above-mentioned filter element structures, the other end of the water inlet pipe is connected to the raw water inlet of the filter element structure, the booster pump is located between the first solenoid valve and the filter element structure, the wastewater outlet of the filter element structure is connected to a wastewater pipe, a wastewater solenoid valve is installed on the wastewater pipe, the pure water outlet of the filter element structure is connected to a pure water outlet pipe, and the pure water outlet pipe is connected to a water purifier faucet. A flushing pipeline is provided, one end of which is connected to the pure water outlet pipeline and the other end of which is connected to the water inlet pipeline. The connection between the flushing pipeline and the water inlet pipeline is located between the first solenoid valve and the booster pump. A second solenoid valve is provided on the flushing pipeline.

[0010] In one embodiment, the testing system further includes: The PPC filter assembly includes a pre-filter and a post-filter. The inlet of the pre-filter is connected to an external water source, and the outlet of the pre-filter is connected to one end of the inlet pipe. The inlet of the post-filter is connected to the pure water outlet pipe, and the outlet of the post-filter is connected to the water purifier faucet.

[0011] In one embodiment, a pressure gauge is installed on the inlet pipe, the pressure gauge being located between the booster pump and the filter element structure; check valves are installed on both the inlet pipe and the flushing pipe; NFC chips are installed on both the filter element structure and the PPC filter element assembly; the testing system also includes a control panel, and the first solenoid valve, the second solenoid valve, the booster pump, and the wastewater solenoid valve are all electrically connected to the control panel.

[0012] Thirdly, embodiments of this application provide a testing method for improving the performance of the first glass of water. This testing method is applied to the testing system described in any of the above claims, and includes the following steps: In water production mode, the first solenoid valve, booster pump and wastewater solenoid valve are opened, and the second solenoid valve is closed. The booster pump and inlet pipe deliver the spiked water to the filter structure. The pure water filtered by the filter structure is discharged through the pure water outlet pipe, and the wastewater filtered by the filter structure is discharged through the wastewater pipe. After the water production mode ends, close the first solenoid valve and open the booster pump, the second solenoid valve and the wastewater solenoid valve. The booster pump draws pure water from the RO membrane filter element through the flushing pipeline to flush the inlet and / or wastewater end of the RO membrane filter element. After rinsing, close the first solenoid valve, the booster pump, the second solenoid valve, and the wastewater solenoid valve to allow the test system to settle. After the settling time, open the water faucet to take the first cup of water for testing.

[0013] In one embodiment, during water production and rinsing, the voltage of the booster pump is adjusted so that the working pressure of the test system is 0.55~0.75MPa.

[0014] The advantages or beneficial effects of the above technical solutions include at least the following: The filter element structure of this application embodiment includes a filter element housing, an RO membrane filter element, and a central tube assembly. The central tube assembly has an inner tube and an outer tube connected together. A first water inlet channel is provided between the inner and outer tubes. A second pure water channel is located in the middle of the inner tube. A pure water flow channel is provided on the outer tube, communicating with the second pure water channel. The other end of the first pure water channel is connected to one end of the second pure water channel. In use, tap water entering through the raw water inlet passes through the first water inlet channel and then enters the RO membrane filter element through the inlet end for filtration. The filtered pure water flows through the pure water flow channel into the second pure water channel, then from the second pure water channel into the first pure water channel, and finally exits from the pure water outlet. Filtered wastewater is exited through the wastewater outlet.

[0015] In this embodiment, the central tube assembly is configured as a double-layer structure, and the second pure water channel is located inside the first inlet channel. The addition of the second pure water channel and the pure water flow path increases the volume of pure water, significantly increasing the volume of pure water stored in the filter element structure during settling. This greatly reduces the volume of the inlet and wastewater ends while maintaining the overall volume of the filter element structure, thereby reducing the total amount of dissolved solids inside the filter element structure. Since concentration is the ratio of solute mass (total dissolved solids) to solvent volume (pure water volume), the TDS value of the pure water is reduced, achieving the effect of lowering the TDS value of pure water during settling and improving the TDS value of the first cup of water. The large amount of pure water stored within the filter element structure can be used to rinse the RO membrane filter element, mitigating the occurrence of forward osmosis and further improving the TDS value of the first cup of water.

[0016] The above overview is for illustrative purposes only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments, and features described above, further aspects, embodiments, and features of this application will become readily apparent from the accompanying drawings and the following detailed description. Attached Figure Description

[0017] In the accompanying drawings, unless otherwise specified, the same reference numerals throughout the various drawings denote the same or similar parts or elements. These drawings are not necessarily drawn to scale. It should be understood that these drawings depict only some embodiments disclosed in this application and should not be construed as limiting the scope of this application.

[0018] Figure 1 This is a cross-sectional view of the filter element structure; Figure 2 This is another cross-sectional view of the filter element structure; Figure 3 This is a structural diagram of the central tube assembly; Figure 4 This is a cross-sectional view of the central tube assembly; Figure 5A structural diagram of the testing system for improving the performance of the first cup of water; Explanation of reference numerals in the attached figures: 1. Filter cartridge housing; 101. Raw water inlet; 102. Pure water outlet; 103. Wastewater outlet; 2. RO membrane filter cartridge; 3. First pure water channel; 4. Central tube assembly; 401. Inner tube; 402. Outer tube; 403. First water inlet channel; 404. Second pure water channel; 405. Pure water flow channel; 5. Filter cartridge housing; 501. Pure water outlet channel; 502. Water outlet column; 503. First sealing groove; 504. First sealing ring; 505. Raw water outlet channel; 6. Water inlet end cap; 601. Second water inlet channel; 602. Second sealing groove; 603. Second sealing ring 7. Third sealing groove; 604. Third sealing ring; 605. Wastewater end cap; 701. Wastewater channel; 702. Installation groove; 703. Fourth sealing groove; 704. Fourth sealing ring; 104. Filter cartridge canister; 105. Filter cartridge cover; 8. Inlet pipe; 9. First solenoid valve; 10. Booster pump; 11. Wastewater pipe; 12. Wastewater solenoid valve; 13. Pure water outlet pipe; 14. Purified water faucet; 15. Flushing pipe; 16. Second solenoid valve; 17. Pre-filter; 18. Post-filter; 19. Pressure gauge; 20. Check valve; 21. Control panel; 22. Three-way valve. Detailed Implementation

[0019] In the following description, only certain exemplary embodiments are briefly described. As those skilled in the art will recognize, the described embodiments can be modified in various ways without departing from the spirit or scope of this application. Therefore, the drawings and description are considered to be exemplary in nature and not restrictive.

[0020] Example 1: like Figures 1 to 4As shown, this application provides a filter element structure, including: a filter element housing 1, one end of which has a raw water inlet 101, a pure water outlet 102, and a wastewater outlet 103; an RO membrane filter element 2, installed inside the filter element housing 1, with a first pure water channel 3 formed between the RO membrane filter element 2 and the inner wall of the filter element housing 1, one end of the first pure water channel 3 being connected to the pure water outlet 102, and the wastewater end of the RO membrane filter element 2 being connected to the wastewater outlet 103; and a central tube assembly 4, located in the middle of the RO membrane filter element 2, the central tube assembly 4 having a connected inner tube 401 and... The outer tube 402 and the inner tube 401 are located in the middle of the outer tube 402. There is a first water inlet channel 403 between the inner tube 401 and the outer tube 402. One end of the first water inlet channel 403 is connected to the raw water inlet 101, and the other end of the first water inlet channel 403 is connected to the water inlet of the RO membrane filter element 2. There is a second pure water channel 404 in the middle of the inner tube 401. There is a pure water flow channel 405 on the outer tube 402. The pure water flow channel 405 is connected to the second pure water channel 404. The other end of the first pure water channel 403 is connected to one end of the second pure water channel 404.

[0021] In use, the filter structure of this embodiment allows raw water entering through the raw water inlet 101 to pass through the first inlet channel 403 and then enter the RO membrane from the inlet end of the RO membrane filter element 2 for filtration. The filtered pure water then enters the second pure water channel 404 through the pure water flow channel 405, and then enters the first pure water channel 3 from the second pure water channel 404. Finally, the pure water is output from the pure water outlet 102, while the filtered wastewater is output from the wastewater outlet 103. In this embodiment, the central tube assembly 4 is configured as a double-layer structure. The addition of the second pure water channel 404 and pure water flow channel 405 increases the volume of pure water, significantly increasing the volume of pure water stored in the filter element structure during settling. While maintaining the overall volume of the filter element structure, this greatly reduces the volume at the inlet and wastewater ends, thereby reducing the total amount of dissolved solids inside the filter element structure. Since concentration is the ratio of solute mass (total dissolved solids) to solvent volume (pure water volume), this reduces the TDS value of the pure water, achieving the effect of reducing the TDS value of pure water during settling and improving the TDS value of the first cup of water. The large amount of pure water stored within the filter element structure can be used to rinse the RO membrane filter element 2, mitigating the forward osmosis phenomenon and further improving the TDS value of the first cup of water.

[0022] In one embodiment, the first water inlet channel 403 extends axially along the central tube assembly 4, and the pure water flow channel 405 extends radially along the outer tube 402. There are multiple pure water flow channels 405, spaced apart along the axial direction of the outer tube 402. Preferably, two rows of pure water flow channels 405 may be provided on the outer tube 402, with the two rows of pure water flow channels 405 arranged opposite to each other on the outer tube 402.

[0023] The number of first water inlet channels 403 in this application embodiment can be one, two, three or more. Preferably, the number of first water inlet channels 403 is four, and the four first water inlet channels 403 are arranged at intervals along the circumference of the inner tube 401.

[0024] To achieve communication between the second pure water channel 404 and the first pure water channel 3, the filter element structure also includes a filter element housing 5, with the RO membrane filter element 2 installed inside the filter element housing 5. The filter element housing 5 has a pure water outlet channel 501 in its middle section. One end of the second pure water channel 404 communicates with the pure water outlet channel 501, which in turn communicates with the first pure water channel 3. Pure water entering the second pure water channel 404 can enter the first pure water channel 3 through the pure water outlet channel 501, and then exit through the pure water outlet 102.

[0025] To prevent filtered pure water from directly entering the first pure water channel 3, a sealed connection is made between the outer peripheral surface of the RO membrane filter element 2 and the inner wall of the filter element housing 5. Preferably, AB glue is used to seal between the outer peripheral surface of the RO membrane filter element 2 and the inner wall of the filter element housing 5.

[0026] In one embodiment, a water outlet column 502 is provided at the center of the filter cartridge housing 5. The water outlet column 502 is sealed to the inner wall of the inner tube 401, and the pure water outlet channel 501 is located inside the water outlet column 502. In order to achieve a sealed connection between the water outlet column 502 and the inner wall of the inner tube 401, a first sealing groove 503 can be provided on the outer circumferential surface of the water outlet column 502, and a first sealing ring 504 is installed in the first sealing groove 503. The first sealing groove 503 is sealed to the inner wall of the inner tube 401 through the first sealing ring 504.

[0027] To connect the first inlet channel 403 with the inlet end of the RO membrane filter element 2, a raw water outlet channel 505 is provided between the filter element housing 5 and the end of the central tube assembly 4. The raw water outlet channel 505 is connected to the other end of the first inlet channel 403, and the first inlet channel 403 is connected to the inlet end of the RO membrane filter element 2 through the raw water outlet channel 505. Tap water entering the first inlet channel 403 enters the inlet end of the RO membrane filter element 2 through the raw water outlet channel 505, thereby being filtered by the RO membrane.

[0028] To allow tap water to enter, the filter element structure also includes an inlet end cap 6. The inlet end cap 6 is installed on the wastewater end of the RO membrane filter element 2, and its inner wall is sealed to the outer circumferential surface of the central tube assembly 4. The inlet end cap 6 has a second inlet channel 601, through which the raw water inlet 101 communicates with the first inlet channel 403. Tap water entering through the raw water inlet 101 first enters the second inlet channel 601 and then enters the first inlet channel 403.

[0029] To achieve a sealed connection between the inner wall of the inlet cap 6 and the outer circumferential surface of the central tube assembly 4, a second sealing groove 602 is provided on the outer circumferential surface of the outer tube 402. A second sealing ring 603 is installed in the second sealing groove 602, and the second sealing groove 602 is sealed to the inner wall of the inlet cap 6 through the second sealing ring 603. The second sealing groove 602 and the second sealing ring 603 prevent tap water from entering the RO membrane filter element 2 through the gap between the outer tube 402 and the inlet cap 6.

[0030] In one embodiment, the outer peripheral surface of the water inlet cap 6 is sealed to the inner wall of the raw water inlet 101. To achieve a sealed connection between the outer peripheral surface of the water inlet cap 6 and the inner wall of the raw water inlet 101, a third sealing groove 604 is provided on the outer peripheral surface of the water inlet cap 6, and a third sealing ring 605 is installed in the third sealing groove 604. The third sealing groove 604 is sealed to the inner wall of the raw water inlet 101 through the third sealing ring 605.

[0031] The filter element structure also includes a wastewater end cap 7, which is installed on the wastewater end of the RO membrane filter element 2, and the inlet end cap 6 is located inside the wastewater end cap 7. A wastewater channel 701 is provided between the inlet end cap 6 and the wastewater end cap 7, and the wastewater end of the RO membrane filter element 2 is connected to the wastewater outlet 103 through the wastewater channel 701. An installation groove 702 is provided on the wastewater end cap 7, and the filter element housing 5 is inserted into the installation groove 702. The filter element housing 5 and the installation groove 702 are sealed with AB glue.

[0032] In one embodiment, a fourth sealing groove 703 is provided on the outer peripheral surface of the wastewater end cap 7, and a fourth sealing ring 704 is installed in the fourth sealing groove 703. The outer peripheral surface of the wastewater end cap 7 is sealed to the filter cartridge body 1 through the fourth sealing ring 704.

[0033] The filter cartridge body 1 of this application embodiment includes a filter cartridge 104 and a filter cover 105. The filter cartridge 104 and the filter cover 105 are detachably connected. The raw water inlet 101, the pure water outlet 102 and the wastewater outlet 103 are all provided on the filter cartridge 104.

[0034] In the assembly of the filter element structure of this embodiment, the RO membrane is first rolled using the central tube assembly 4 to obtain the combination of the RO membrane filter element 2 and the central tube assembly 4. Next, a first sealing ring 504 is installed on the outlet column 502 of the filter element housing 5, and the RO membrane filter element 2, the central tube assembly 4, and the filter element housing 5 are assembled together. AB glue is used to seal the pre-reserved adhesive area between the filter element housing 5 and the RO membrane filter element 2. Then, a second sealing ring 603 is installed on the outer circumferential surface of the outer tube 402, and a third sealing ring 605 is installed on the inlet end cap 6. The inlet end cap 6 is then assembled. After the inlet end cap 6 is assembled, a fourth sealing ring 704 is installed on the wastewater end cap 7, and the wastewater end cap 7 is assembled. AB glue is applied between the wastewater end cap 7 and the filter element housing 5 for sealing. Finally, the filter element canister 104 is assembled, and the filter element cover 105 is screwed on.

[0035] In use, the filter element structure of this embodiment allows tap water to enter the second inlet channel 601 of the inlet end cover 6 through the raw water inlet 101, and then enter the first inlet channel 403. After passing through the first inlet channel 403, the tap water enters the inlet end of the RO membrane filter element 2 through the raw water outlet channel 505 for filtration. The filtered pure water enters the second pure water channel 404 through the pure water flow channel 405, then enters the first pure water channel 3 through the pure water outlet channel 501, and finally exits from the pure water outlet 102. The generated wastewater enters the wastewater end of the RO membrane filter element 2 and is discharged through the wastewater channel 701 into the wastewater outlet 103.

[0036] In this embodiment, the central tube assembly 4 is configured as a double-layer structure, and the first water inlet channel 403 and the pure water flow channel 405 are arranged in a cross pattern, increasing the volume of pure water. This significantly increases the volume of the pure water end during settling, while greatly reducing the volumes of the water inlet and concentrated water ends. Based on the formula concentration = solute / solvent, a decrease in solute and an increase in solvent leads to a corresponding decrease in concentration, thereby reducing the TDS value of the pure water during settling.

[0037] Example 2: The following describes this embodiment in detail with reference to the first embodiment: like Figure 5As shown, this application provides a testing system for improving the performance of the first cup of water, comprising at least: an inlet pipe 8, one end of which is connected to an external water source, and a first solenoid valve 9 and a booster pump 10 on the inlet pipe 8; a filter element structure as described in Embodiment 1, the other end of the inlet pipe 8 being connected to the raw water inlet 101 of the filter element structure, the booster pump 10 being located between the first solenoid valve 9 and the filter element structure, the wastewater outlet 103 of the filter element structure being connected to a wastewater pipe 11, a wastewater solenoid valve 12 being installed on the wastewater pipe 11, and a pure water outlet 102 of the filter element structure being connected to a pure water outlet pipe 13, the pure water outlet pipe 13 being connected to a water purifier faucet 14; and a rinsing pipe 15, one end of which is connected to the pure water outlet pipe 13, the other end of which is connected to the inlet pipe 8, the connection between the rinsing pipe 15 and the inlet pipe 8 being located between the first solenoid valve 9 and the booster pump 10, and a second solenoid valve 16 being installed on the rinsing pipe 15.

[0038] In one embodiment, the testing system further includes a PPC filter assembly, comprising a pre-filter 17 and a post-filter 18. The inlet of the pre-filter 17 is connected to an external water source, and the outlet of the pre-filter 17 is connected to one end of the inlet pipe 8. The inlet of the post-filter 18 is connected to a pure water outlet pipe 13, and the outlet of the post-filter 18 is connected to a water purifier faucet 14.

[0039] In one embodiment, a pressure gauge 19 is installed on the inlet pipe 8, located between the booster pump 10 and the filter element structure. Check valves 20 are installed on both the inlet pipe 8 and the flushing pipe 15, and NFC chips are installed on both the filter element structure and the PPC filter element assembly. The testing system also includes a control panel 21, to which the first solenoid valve 9, the second solenoid valve 16, the booster pump 10, and the wastewater solenoid valve 12 are electrically connected.

[0040] In order to connect the flushing pipe 15 with the pure water outlet pipe 13 and the inlet pipe 8, a three-way valve 22 is installed on both the pure water outlet pipe 13 and the inlet pipe 8. The flushing pipe 15 is connected to the pure water outlet pipe 13 through the three-way valve 22 on the pure water outlet pipe 13. Similarly, the flushing pipe 15 is connected to the inlet pipe 8 through the three-way valve 22 on the inlet pipe 8.

[0041] In the water production process of the test system for improving the performance of the first cup of water according to this application embodiment, the first solenoid valve 9, the booster pump 10, and the wastewater solenoid valve 12 are opened, while the second solenoid valve 16 is closed. Tap water is first delivered to the pre-filter cartridge 17 for filtration. The filtered pure water is then delivered to the filter cartridge structure for filtration through the booster pump 10. The filtered pure water is then delivered to the post-filter cartridge 18 for filtration through the pure water outlet pipe 13. Finally, the filtered pure water is delivered to the water purifier faucet 14 to dispense pure water. After water production stops, a flushing mode can be activated. The first solenoid valve 9 is closed, and the second solenoid valve 16, the booster pump 10, and the wastewater solenoid valve 12 are opened. The booster pump 10 draws pure water from the filter cartridge structure to flush the inlet and / or wastewater ends, thereby draining the residual pure water and tap water from the filter cartridge structure and replacing it with pure water. After rinsing, close the first solenoid valve 9, the second solenoid valve 16, the booster pump 10, and the wastewater solenoid valve 12, allowing the entire test system to stand still for 1-48 hours. Then, open the water faucet 14 to take the first cup of water for testing, thereby detecting the TDS value of the first cup of water.

[0042] The PPC filter element assembly in this application embodiment is an existing product, and there is no improvement to the structure of the PPC filter element assembly. The control method and control principle of the control panel 21 are both existing technologies.

[0043] Example 3: The following describes this embodiment in detail with reference to Embodiment 1 and Embodiment 2: Thirdly, this application provides a test method for improving the performance of the first cup of water. This test method is applied to the test system described in the second embodiment. The test method includes the following steps: preparing spiked water; in water production mode, opening the first solenoid valve 9, the booster pump 10, and the wastewater solenoid valve 12; closing the second solenoid valve 16; supplying spiked water to the filter element structure through the booster pump 10 and the inlet pipe 8; the pure water filtered by the filter element structure is discharged through the pure water outlet pipe 13; and the wastewater filtered by the filter element structure is discharged through the wastewater outlet pipe 13. Pipe 11 discharges; after the water production mode ends, the first solenoid valve 9 is closed, and the booster pump 10, the second solenoid valve 16 and the wastewater solenoid valve 12 are opened. The booster pump 10 draws pure water from the RO membrane filter element 2 of the filter element structure through the flushing pipe 15 to flush the inlet and / or wastewater end of the RO membrane filter element 2; after flushing, the first solenoid valve 9, the booster pump 10, the second solenoid valve 16 and the wastewater solenoid valve 12 are closed, so that the test system is in a static state. After the static time is over, the water faucet 14 is opened to take the first cup of water for testing.

[0044] In one embodiment, during water production and rinsing, the voltage of the booster pump 10 is adjusted to make the working pressure of the test system 0.55~0.75MPa. By controlling the voltage of the booster pump 10 (12-36V), the working pressure of the test system is made consistent with the working pressure of the actual reverse osmosis water purifier, and the working pressure is controlled at 0.55~0.75MPa.

[0045] Among them, spiked water is water with added spiking substances mentioned in GB34914 standard, such as calcium chloride dihydrate, magnesium sulfate hexahydrate, sodium chloride, and sodium bicarbonate, to simulate the water quality of different tap water in different regions. The spiking concentration of spiked water is 150~500ppm.

[0046] During rinsing, the rinsing time is 10-20 seconds, the rinsing water volume is 175 ml to 800 ml, and the TDS value of the purified water used for rinsing is 750-1000 mg / L. After rinsing, the test system needs to be left to stand for 1-48 hours. In one embodiment, a buzzer can be installed on the test system to remind users after the standing time has ended.

[0047] This embodiment uses a large amount of pure water stored in the filter element structure to flush the RO membrane filter element 2, replacing the spiked water and wastewater with pure water, which greatly reduces the occurrence of forward osmosis and lowers the TDS value of the pure water during the settling process. Since different substances can be added to the spiked water to simulate water quality in different regions, the TDS value of the first cup of water under different water quality conditions can be tested.

[0048] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of this application. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of those different embodiments or examples.

[0049] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this application, "a plurality of" means two or more, unless otherwise explicitly specified.

[0050] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any person skilled in the art can easily conceive of various variations or substitutions within the technical scope disclosed in this application, and these should all be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

Claims

1. A test system for improving the performance of the first cup of water, characterized in that, At least comprising: water inlet pipeline, one end of the water inlet pipeline is connected with external water source, the water inlet pipeline is provided with first electromagnetic valve and booster pump; filter core structure, the filter core structure comprises: filter core barrel, one end of the filter core barrel has raw water inlet, pure water outlet and waste water outlet; RO membrane filter core, installed in the filter core barrel, the RO membrane filter core and the inner wall of the filter core barrel form a first pure water channel, one end of the first pure water channel is connected with the pure water outlet, the waste water end of the RO membrane filter core is connected with the waste water outlet; center tube assembly, located in the middle of the RO membrane filter core, the center tube assembly has connected inner layer tube and outer layer tube, the inner layer tube is located in the middle of the outer layer tube, the inner layer tube and the outer layer tube have a plurality of first water inlet channels, one end of the first water inlet channel is communicated with the raw water inlet, the other end of the first water inlet channel is communicated with the water inlet end of the RO membrane filter core, the middle of the inner layer tube has a second pure water channel, the outer layer tube has a pure water flow channel, the pure water flow channel is communicated with the second pure water channel, the other end of the first pure water channel is communicated with one end of the second pure water channel; The first water inlet channel extends along the axial direction of the center tube assembly, the pure water flow channel extends along the radial direction of the outer layer tube, the number of pure water flow channels is multiple, and multiple pure water flow channels are arranged in the axial direction of the outer layer tube; Two rows of pure water flow channels are arranged on the outer layer tube, and the two rows of pure water flow channels are arranged opposite on the outer layer tube; Filter core shell, the RO membrane filter core is installed in the filter core shell, the middle of the filter core shell has a pure water outlet channel, one end of the second pure water channel is communicated with the pure water outlet channel, and the pure water outlet channel is communicated with the first pure water channel; The filter core shell and the end of the center tube assembly have a raw water outlet channel, the raw water outlet channel is communicated with the other end of the first water inlet channel, and the first water inlet channel is communicated with the water inlet end of the RO membrane filter core through the raw water outlet channel; The filter core structure further comprises a water inlet end cover and a waste water end cover, the water inlet end cover is installed on the waste water end of the RO membrane filter core, and the inner wall of the water inlet end cover is sealingly connected with the outer peripheral surface of the center tube assembly, the water inlet end cover has a second water inlet channel, and the raw water inlet is communicated with the first water inlet channel through the second water inlet channel; The waste water end cover is installed on the waste water end of the RO membrane filter core, and the water inlet end cover is located in the interior of the waste water end cover, the water inlet end cover and the waste water end cover have a waste water channel, and the waste water end of the RO membrane filter core is communicated with the waste water outlet through the waste water channel; The other end of the water inlet pipeline is communicated with the raw water inlet of the filter core structure, the booster pump is located between the first electromagnetic valve and the filter core structure, the waste water outlet of the filter core structure is connected with a waste water pipe, the waste water pipe is provided with a waste water electromagnetic valve, the pure water outlet of the filter core structure is connected with a pure water outlet pipe, and the pure water outlet pipe is communicated with a water faucet. A flushing pipeline, one end of the flushing pipeline is communicated with the pure water outlet pipe, the other end of the flushing pipeline is communicated with the water inlet pipeline, the connection between the flushing pipeline and the water inlet pipeline is located between the first electromagnetic valve and the booster pump, and a second electromagnetic valve is arranged on the flushing pipeline.

2. The test system for improving the first cup performance according to claim 1, wherein, The test system further comprises: The PPC filter core assembly comprises a front filter core and a rear filter core, the water inlet end of the front filter core is communicated with the external water source, and the water outlet end of the front filter core is communicated with one end of the water inlet pipeline; the water inlet end of the rear filter core is communicated with the pure water outlet pipe, and the water outlet end of the rear filter core is communicated with the clean water faucet.

3. The test system for improving the first cup performance according to claim 2, wherein, A pressure gauge is arranged on the water inlet pipeline, the pressure gauge is located between the booster pump and the filter core structure, and a check valve is arranged on each of the water inlet pipeline and the flushing pipeline; an NFC chip is arranged on each of the filter core structure and the PPC filter core assembly; the test system further comprises a control panel, and the first electromagnetic valve, the second electromagnetic valve, the booster pump and the waste water electromagnetic valve are electrically connected with the control panel.

4. Test method for improving the first cup performance, characterized in that The test method adopts the test system according to any one of claims 1 to 3, and comprises the following steps: The test method adopts the test system according to any one of claims 1 to 3, and comprises the following steps: After the water preparation mode ends, the first electromagnetic valve is closed, the booster pump, the second electromagnetic valve and the waste water electromagnetic valve are opened, the booster pump draws pure water in the RO membrane filter core of the filter core structure through the flushing pipeline, and the water inlet end and / or the waste water end of the RO membrane filter core are flushed; After the flushing ends, the first electromagnetic valve, the booster pump, the second electromagnetic valve and the waste water electromagnetic valve are closed, so that the test system is in a stationary state, and the clean water faucet is opened to take the first cup of water for testing after the stationary time ends.

5. The test method for improving the first cup performance according to claim 4, characterized in that, During the water preparation mode and the flushing, the voltage of the booster pump is adjusted, so that the working pressure of the test system is 0.55-0.75 MPa.

Citation Information

Patent Citations

  • Reverse osmosis filter element and water purifier

    CN114146569A

  • Lateral flow type reverse osmosis filter element assembly

    CN209438389U

  • Large-flux water guide structure and filter element with same

    CN213493002U

  • Backflow water flushing waterway system and drinking water equipment

    CN219079179U