Control method, device and equipment for power demand of industrial enterprise and storage medium

CN119378938AInactive Publication Date: 2025-01-28BEIJING SIFANG JIBAO ENG TECH +1
5 Cites 0 Cited by

Patent Information

Application Number
CN202411945401.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-27
Publication Date
2025-01-28
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure CN119378938A_ABST
    Figure CN119378938A_ABST
Patent Text Reader

Abstract

The invention provides an industrial enterprise electricity demand control method and device, equipment and a storage medium, and relates to the technical field of industrial enterprise power grids, and the method comprises the steps: obtaining an electricity control parameter of a target industrial enterprise object; wherein the power utilization control parameters comprise a pre-month plan parameter, an intra-month plan parameter, a day-ahead plan parameter, an intra-day plan parameter and a real-time plan parameter, and the pre-month plan parameter, the intra-month plan parameter, the day-ahead plan parameter, the intra-day plan parameter and the real-time plan parameter refer to parameters fusing actual demands of wind and light power generation and an electric power market; determining a real-time plan optimization target according to the pre-month plan parameter, the intra-month plan parameter, the day-ahead plan parameter, the intra-day plan parameter and the real-time plan parameter; and determining the power demand according to the real-time plan optimization target and the real-time solver corresponding to the real-time plan optimization target. According to the technical scheme, the electricity demand is determined through the real-time plan optimization target determined by the electricity control parameters, and the accuracy of the electricity demand is improved.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Industrial enterprise power utilization load optimizing system

    CN102376026A

  • Load aggregator energy optimization method and device based on spot mode

    CN113807554A

  • Large industrial park grid-connected operation optical storage system planning method suitable for demand charging mode

    CN116797402A

  • Factory integrated energy system optimization operation method for electric power spot market

    CN118114828A

  • Industrial enterprise aggregated user power load management method and device

    CN118316010A