Multi-source three-dimensional compliance verification method and system for power grid development implementation project

CN119444142AInactive Publication Date: 2025-02-14湖南省湘电试验研究院有限公司 +3
-1 Cites -1 Cited by

Patent Information

Application Number
CN202510038342.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-10
Publication Date
2025-02-14
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure CN119444142A_ABST
    Figure CN119444142A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power grid project management, and provides a power grid development implementation project multi-source three-dimensional compliance verification method and system, and the method comprises the steps: obtaining a verification mode selected by a user and uploaded project data; generating a project information full aerial view based on the project data; determining key points of compliance verification according to the verification mode and the latest management system file, and generating a multi-source compliance verification scheme; according to a multi-source compliance verification scheme, carrying out compliance verification on the project information full aerial view; and obtaining a compliance verification result, and generating a compliance analysis report. According to the method and the system, the problems that a large amount of manpower and material resources are needed and the workload is large in repetition at present for review of power grid development implementation projects can be effectively solved, meanwhile, the verification method and the verification system do not depend on the technical level and the careful degree of reviews any more, and omissions and errors caused by human factors are completely eradicated.
Need to check novelty before this filing date? Find Prior Art