Green building supervision engineering intelligent management system
The intelligent management system for green building supervision projects digitally processes supervision data items and performs local and overall supervision reliability analysis, solving the problem of poor reliability analysis results in existing technologies and realizing dynamic management and reliability improvement of supervision indicators.
CN119539381BActive Publication Date: 2025-10-24JIANGXI GANJIAN ENG CONSTR SUPERVISION CO LTD
Patent Information
- Application Number
- CN202411596863.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-11
- Publication Date
- 2025-10-24
- Estimated Expiration
- 2044-11-11
Smart Images

Figure CN119539381B_ABST
Abstract
The application discloses a kind of green building supervision engineering intelligent management systems, belong to engineering management technical field;For solving the technical problem that green building supervision in existing scheme itself aspect, local supervision reliability analysis effect is not good and overall supervision reliability analysis and management effect is not good;The supervision implementation state corresponding to the several supervision data items associated with all supervision indexes implemented by supervision party is carried out data analysis and digital representation and combination, and supervision implementation supervision table is obtained;According to the supervision implementation supervision table obtained in the early stage processing, the corresponding local supervision reliability data processing and analysis are carried out on different supervision indexes;According to the local supervision reliability processing sequence obtained in the early stage processing, the overall supervision reliability data calculation is carried out on all supervision indexes supervised by supervision party, and the supervision overall abnormal state identifier corresponding to supervision party is obtained, and the supervision of supervision party is dynamically managed adaptively by data analysis on supervision overall abnormal state identifier.
Need to check novelty before this filing date? Find Prior Art
Citation Information
Patent Citations
Data management system and method and computing equipment
CN116151694A
Geotechnical engineering geological investigation system and investigation method thereof
CN118193927A