Green building supervision engineering intelligent management system

The intelligent management system for green building supervision projects digitally processes supervision data items and performs local and overall supervision reliability analysis, solving the problem of poor reliability analysis results in existing technologies and realizing dynamic management and reliability improvement of supervision indicators.

CN119539381BActive Publication Date: 2025-10-24JIANGXI GANJIAN ENG CONSTR SUPERVISION CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411596863.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-11-11
Publication Date
2025-10-24
Estimated Expiration
2044-11-11

Smart Images

  • Figure CN119539381B_ABST
    Figure CN119539381B_ABST
Patent Text Reader

Abstract

The application discloses a kind of green building supervision engineering intelligent management systems, belong to engineering management technical field;For solving the technical problem that green building supervision in existing scheme itself aspect, local supervision reliability analysis effect is not good and overall supervision reliability analysis and management effect is not good;The supervision implementation state corresponding to the several supervision data items associated with all supervision indexes implemented by supervision party is carried out data analysis and digital representation and combination, and supervision implementation supervision table is obtained;According to the supervision implementation supervision table obtained in the early stage processing, the corresponding local supervision reliability data processing and analysis are carried out on different supervision indexes;According to the local supervision reliability processing sequence obtained in the early stage processing, the overall supervision reliability data calculation is carried out on all supervision indexes supervised by supervision party, and the supervision overall abnormal state identifier corresponding to supervision party is obtained, and the supervision of supervision party is dynamically managed adaptively by data analysis on supervision overall abnormal state identifier.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Data management system and method and computing equipment

    CN116151694A

  • Geotechnical engineering geological investigation system and investigation method thereof

    CN118193927A