Method for the lamination of sandbags on geomembranes
By using sandbags made of specific materials and flexible lining methods, the problem of lining geomembranes in reservoir construction has been solved, achieving efficient and economical seepage prevention and meeting the long-term seepage prevention requirements of reservoir construction.
Patent Information
- Application Number
- CN202510003219.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-02
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2045-01-02
AI Technical Summary
In existing technologies, geomembranes are difficult to effectively cover in the construction of pumped storage power station reservoirs, especially under the impact of water flow on large reservoir bottoms and different locations, they are easily scratched and construction is difficult, affecting the seepage prevention effect.
Sandbags made of 250g polyester filament woven geotextile and 150g short filament nonwoven geotextile are used. The inner side is lined with woven fabric and the outer side is made of nonwoven fabric. They are sealed with non-elastic nylon rope. Different pressing methods are selected according to different parts of the reservoir, such as point pressing at the bottom of the reservoir, dense bulging and welding of the anchoring trench in the forebay, to ensure effective pressing of the geomembrane.
This improves the service life and seepage prevention effect of geomembranes, reduces construction difficulty and labor costs, and meets the long-term seepage prevention needs of reservoir construction.
Smart Images

Figure CN119706063B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of pumped storage engineering construction technology, and in particular to a sandbag and its method of pressing it onto a geomembrane. Background Technology
[0002] Pumped storage power stations are hydroelectric power stations that use electricity generated during periods of low electricity load to pump water to an upper reservoir and release it to a lower reservoir to generate electricity during periods of high electricity load. They are also known as pumped storage hydroelectric power stations.
[0003] Pumped storage power stations can convert excess electricity during periods of low grid load into high-value electricity during peak periods. They are also suitable for frequency and phase regulation, stabilizing the frequency and voltage of the power system. In addition, they can serve as backup power in case of accidents and improve the efficiency of thermal and nuclear power plants in the system. Although my country started building pumped storage power stations relatively late, due to the late-mover effect, the starting point is relatively high. The technology of several large pumped storage power stations built in recent years has reached the world's advanced level.
[0004] Geomembrane is a geosynthetic seepage control material composed of a plastic film as the impermeable base material and a non-woven fabric. The geomembrane uses the impermeability of the plastic film to block water leakage channels in earthen dams, and its high tensile strength and elongation can withstand water pressure and adapt to dam deformation. Non-woven fabric is a high-molecular short-fiber chemical material that is formed by needle punching or thermal bonding. It has high tensile strength and elongation. When combined with plastic film, it not only increases the tensile strength and puncture resistance of plastic film, but also increases the friction coefficient of the contact surface due to the rough surface of non-woven fabric, which is beneficial to the stability of the composite geomembrane and protective layer. At the same time, the geomembrane has strong stability and is expected to be used for more than 100 years.
[0005] During the construction phase of a pumped-storage power station reservoir, considering the reservoir's service life of 50 to 70 years, the seepage prevention works at the reservoir bottom also need to meet this requirement. Due to the stability of geomembranes, geomembranes are chosen for laying at the reservoir bottom to meet seepage prevention requirements. Conventionally, precast blocks are used for lining the geomembrane; however, these hard blocks can easily scratch the soft geomembrane and are difficult to transport, making them unsuitable for large-area reservoir bottom construction. Therefore, selecting a suitable lining material is crucial for seepage prevention. Furthermore, because the geomembrane experiences varying water flow impacts at different locations, how to properly lining the geomembrane is a key consideration during the design process. Summary of the Invention
[0006] To overcome the above problems, the purpose of this invention is to provide a sandbag and its method of pressing it onto a geomembrane. The outer side of the sandbag is made of non-woven fabric, and the inner side is lined with woven fabric. The combination of woven and non-woven fabrics ensures the performance of the sandbag, prevents sand loss and weight reduction, and meets service life requirements. Furthermore, the sandbag has rounded corners, making it less hard than precast concrete blocks and non-destructive. The method of pressing sandbags onto a geomembrane allows for different pressing methods to be selected based on the construction method of different parts of the reservoir, ensuring effective pressing of the geomembrane and guaranteeing the effective function of seepage prevention in reservoir construction.
[0007] The technical solution adopted in this invention is:
[0008] A sandbag is made of 250g polyester filament woven geotextile and 150g staple fiber nonwoven geotextile, with a woven fabric lining on the inside.
[0009] The sandbag has an UV resistance retention rate of ≥90%, a longitudinal tensile strength of ≥65kN / m, and a transverse tensile strength of not less than 0.7 times the longitudinal tensile strength.
[0010] As a further description of the present invention, the actual size of the sandbag can be adjusted. After the sandbag is filled with 30 kg of medium and fine sand, a 5-10 cm gap is left above it for folding and sealing, and a non-elastic nylon rope is used for sealing.
[0011] The method of covering the geomembrane with sandbags as described above includes the following steps:
[0012] S01: Geomembrane covering of the reservoir bottom;
[0013] S02: Geomembrane covering at the bulge;
[0014] S03: Geomembrane covering of the forebay;
[0015] As a further description of the present invention, the reservoir bottom in step S01 consists of an excavation area and a backfill area, with an HDPE geomembrane laid in the excavation area and a TPO geomembrane laid in the backfill area.
[0016] As a further description of the present invention, the sandbags at the bottom of the silo are placed in the required position and flattened, and the air in the sandbags is squeezed out. The large area of the bottom of the silo is covered by a point pressing method with sandbags spaced at 2.5m × 2.5m.
[0017] As a further description of the present invention, the bulges in step S02 are arranged to accommodate the tensile deformation of the geomembrane. They are distributed around the bottom of the reservoir and at the cut-fill boundary. At least three rows of external bulges are arranged by the cushion material so that the geomembrane presents a wavy line at the anchoring edge. The geomembrane at the bulge is densely pressed with sandbags, and three rows are densely laid on the sloping surface of the bulge without the need for nylon rope connection.
[0018] As a further description of the present invention, the forebay in step S03 is the inlet and outlet of the reservoir, which is a three-sided sloping depression, and a TPO geomembrane is laid on it. The geomembrane above the forebay is covered by sandbags in a horizontal and vertical series, with sandbags densely covered horizontally at intervals, and the sandbags are connected end to end with non-elastic nylon ropes.
[0019] As a further description of the present invention, when the geomembrane is pressed over the forebay section, the anchoring method of the anchoring groove is adopted. A strip in the shape of an inverted trapezoid with a depth of 60 cm is dug down above the inlet and outlet of the forebay. 10 cm of reverse filter material is backfilled. Geotextile-geomembrane-geotextile is laid along the bottom edge using the sandwich method. Then, reverse filter material is backfilled parallel to the bottom surface of the reservoir and compacted. The geomembrane is laid on top and laid from the bottom surface of the reservoir.
[0020] As a further description of the present invention, in step S03, the geomembrane of the inclined section of the forebay and the geomembrane of the large surface of the reservoir bottom in step S01 are welded together by means of anchoring grooves.
[0021] As a further description of the present invention, the specific steps for processing the welded joint between the geomembrane in the forebay section and the geomembrane at the bottom of the reservoir are as follows:
[0022] Step 1: Place a 1-meter-wide geomembrane on each of the left and right sides of the junction;
[0023] Step 2: Lay the three-dimensional composite drainage net normally on the subbase;
[0024] Step 3: Lay a geomembrane on top of the three-dimensional composite drainage net;
[0025] The welding process is as follows:
[0026] The upper layer of geotextile embedded in the filter material is hot-air welded to the three-dimensional composite drainage net on the left.
[0027] The geomembrane is then welded to the upper geomembrane layer using a single-track welding process.
[0028] The lower layer of geotextile embedded in the filter material is hot-air welded to the three-dimensional composite drainage net on the right.
[0029] On the right side of the single-rail weld, a suitable position is selected to connect the geomembrane of the forebay slope using double-rail welding.
[0030] The beneficial effects of this invention are:
[0031] This invention relates to a sandbag, which is made of 250g polyester filament woven geotextile and 150g short filament nonwoven geotextile. The inner side of the sandbag is lined with woven fabric, and the outer side is made of nonwoven fabric. The combination of woven and nonwoven fabrics ensures the performance of the sandbag, prevents sand loss and weight reduction, and meets the required service life. At the same time, the sandbag has a rounded corner structure, which is less hard than precast concrete blocks and is not destructive.
[0032] This invention relates to a sandbag, which is filled with 30 kg of medium-fine sand, and then has a 5-10 cm fold seal at the top. The 5-10 cm fold seal distance ensures that the sandbag is effectively sealed. At the same time, a non-elastic nylon rope is used for sealing. The nylon rope has good impact resistance, wear resistance, corrosion resistance, and high strength, which can ensure the sealing performance of the sandbag and meet the service life requirements.
[0033] This invention uses a method of pressing sandbags onto a geomembrane. The method comprises S01: geomembrane pressing at the bottom of the reservoir; S02: geomembrane pressing at the bulges; and S03: geomembrane pressing at the forebay. This method follows a construction approach from easy to difficult, first laying and pressing the entire large surface, then the bulges, and finally constructing the forebay, ensuring construction quality and improving work efficiency.
[0034] This invention employs a method of pressing sandbags onto the geomembrane. At the bottom of the reservoir, sandbags are pressed at intervals; on the sloping section of the forebay, sandbags are connected horizontally and vertically, densely covering the geomembrane at regular intervals, and then connected at the ends with non-elastic nylon ropes; at bulges, the geomembrane is densely pressed with sandbags, with three rows densely laid on the sloping surface of the bulge, where no nylon rope connection is required. Different pressing methods are selected according to the construction methods of different parts of the reservoir, effectively pressing the geomembrane and saving labor costs, ensuring the effective pressing of the geomembrane and guaranteeing the effective function of the seepage prevention project in reservoir construction.
[0035] This invention uses a method of pressing sandbags onto the geomembrane, and anchors the geomembrane using anchoring grooves above the inlet and outlet of the forebay. This ensures safe construction of the geomembrane on the slope from top to bottom, while also ensuring the firmness of the geomembrane welding under the impact of water flow at that location. Attached Figure Description
[0036] Figure 1 This is a plan view of the geomembrane sandbag cladding method for the geomembrane cladding method proposed in this invention.
[0037] Figure 2This is a typical cross-sectional view of the forebay anchoring trench for the method of pressing sandbags onto the geomembrane proposed in this invention.
[0038] Explanation of reference numerals in the attached figures
[0039] 1. Reservoir bottom; 2. Bulge and sandbags covering the bulge; 3. Anchoring trench; 4. Forebay; 5. Inlet and outlet; 6. Sandbags; 7. Forebay sandbag strips; 8. Geomembrane; 9. Three-dimensional composite drainage net; 10. Filter media; 11. Subbase material; 12. Geotextile; 13. Geomembrane; 14. Geotextile; 15. Single-track weld; 16. Double-track weld. Detailed Implementation
[0040] The specific embodiments of the present invention are described below with reference to the accompanying drawings and examples:
[0041] It should be noted that the structures, proportions, sizes, etc. illustrated in the accompanying drawings of this specification are only used to complement the content disclosed in the specification, so that those skilled in the art can understand and read them, and are not intended to limit the conditions under which the present invention can be implemented. Any modifications to the structure, changes in the proportions, or adjustments to the size, without affecting the effects and objectives that the present invention can produce, should still fall within the scope of the technical content disclosed in the present invention.
[0042] Furthermore, the terms such as "upper," "lower," "left," "right," "middle," and "one" used in this specification are merely for clarity of description and are not intended to limit the scope of the invention. Any changes or adjustments to their relative relationships, without substantially altering the technical content, should also be considered within the scope of the invention.
[0043] like Figures 1-2 As shown, it illustrates a specific embodiment of the present invention:
[0044] Example 1
[0045] A sandbag is made of 250g polyester filament woven geotextile and 150g staple fiber nonwoven geotextile, with a woven fabric lining on the inside.
[0046] The sandbag has an UV resistance retention rate of ≥90%, a longitudinal tensile strength of ≥65kN / m, and a transverse tensile strength of not less than 0.7 times the longitudinal tensile strength.
[0047] In this embodiment, the sandbag is made of 250g polyester filament woven geotextile and 150g short filament nonwoven geotextile. The inner side of the sandbag is lined with woven fabric, and the outer side is made of nonwoven fabric. The combination of woven and nonwoven fabrics ensures the performance of the sandbag, prevents sand loss and weight reduction, and meets the service life requirements. At the same time, the sandbag has a rounded corner structure, which is less hard than precast concrete blocks and is not destructive.
[0048] The polyester filament woven geotextile is a woven geotextile with excellent heat and light resistance. Even after short-term exposure to an environment of nearly 20°C, its performance remains almost unchanged. After testing and practical verification, it has been found that the polyester filament woven geotextile has long-term corrosion resistance to various natural soils, moisture, and microorganisms, and has the following characteristics:
[0049] First, it can play a permanent isolating role, which can isolate soil layers composed of different components and properties for a long time and prevent them from mixing. It also has frost resistance and the load-bearing requirements required for construction.
[0050] Secondly, it has good filtration and anti-corrosion properties. Water can penetrate in all directions without accumulating pressure, which can prevent soil loss and is beneficial to stability and anti-corrosion performance.
[0051] Thirdly, it has good protective properties. Due to its good puncture resistance, elongation and bulkiness, it can effectively protect the waterproof layer from potential mechanical damage.
[0052] Fourthly, its reinforcing properties, looseness, and high strength improve the overall stability of the project and enhance its strength.
[0053] The raw material for the short-fiber nonwoven geotextile is polyester fiber. It is manufactured into a fabric through processes such as opening, carding, web formation, and needle punching. It possesses good air and water permeability, facilitating water flow while effectively trapping sand and soil erosion. It also features high strength, corrosion resistance, and antimicrobial properties. Its relatively low porosity allows it to meet certain drainage and filtration requirements. Its characteristics include:
[0054] First, it boasts high strength and durability, exhibiting extremely high tensile and tear strength. It maintains sufficient strength and elongation in both dry and wet conditions, ensuring stable operation in various engineering environments.
[0055] Secondly, it has good permeability. Short-fiber nonwoven geotextile is made of polyester fiber with gaps between the fibers, which has good water permeability and is suitable for projects that require drainage and filtration.
[0056] Thirdly, corrosion resistance: short-fiber nonwoven geotextiles can withstand corrosion for a long time in soil and water with different acidity and alkalinity, making them suitable for various complex environmental conditions.
[0057] The woven geotextile is an item made of polypropylene and ethylene flat yarn. It has a compact structure, high strength, and provides planar isolation and protection.
[0058] Based on the characteristics of the above-mentioned polyester filament woven geotextile and short-filament nonwoven geotextile, the two are woven together and a woven fabric is used as the inner lining to ensure the sealing of the sandbag. This method is suitable for use at the bottom of reservoirs and can ensure that the sandbag does not corrode underwater all year round, with a service life that meets the design requirements.
[0059] Specifically, the actual size of the sandbag can be adjusted. After the sandbag is filled with 30 kg of medium and fine sand, a 5-10 cm gap is left above it for folding and sealing, and a non-elastic nylon rope is used for sealing.
[0060] In this embodiment, after the sandbag is filled with 30 kg of medium-fine sand, a 5-10 cm fold seal is left above it. The 5-10 cm fold seal distance ensures that the sandbag is effectively sealed. At the same time, a non-elastic nylon rope is used for sealing. The nylon rope has good impact resistance, wear resistance, corrosion resistance and high strength, which can ensure the sealing of the sandbag and meet the service life requirements.
[0061] In this embodiment, the size of the sandbag can be adjusted during the manufacturing process according to actual needs. When using sandbags to cover the geomembrane at the bottom of a pumped storage power station reservoir, it is generally necessary to cover an area of 6.25 square meters with a weight of 30 kilograms.
[0062] In this embodiment, the sandbags used are 60cm×60cm in size and are laid in a 2.5m×2.5m spot pattern on the bottom of the reservoir to meet the cladding requirements. In practice, sandbags of different sizes can be selected according to the size of the reservoir bottom area, and then different spot laying methods can be selected according to the requirements to meet the cladding requirements.
[0063] Example 2
[0064] In the construction of pumped storage power station reservoirs, before the geomembrane is installed at the bottom of the reservoir, it should be ensured that the underlying support layer is compacted and that the filter material contains no hard objects such as iron wires or steel bars that could easily scratch the geomembrane.
[0065] When laying the first geomembrane, the laying location needs to be measured. The geomembrane can only be laid after the measurements are confirmed to be accurate. During the laying process, to prevent the geomembrane from bending or curling due to strong winds or other factors, thus creating creases that could affect its seepage prevention performance, sandbags should be used to weigh down each section after laying. As a flexible seepage prevention material, geomembrane is easily affected by temperature changes, leading to expansion and contraction. Furthermore, finished geomembranes are generally rolled up. Therefore, after laying, sandbags should be used to weigh down the perimeter of the geomembrane. After allowing it to stand for one to two days to fully release the stress, sandbags should then be used to weigh down the center.
[0066] In this embodiment, sandbags are used to cover the geomembrane. Compared with the traditional method of covering with precast concrete blocks, the sandbags have an arc-shaped structure on all sides to avoid scratching the geomembrane and causing problems with the seepage prevention work at the bottom of the reservoir.
[0067] In this embodiment, sandbags can be made at a suitable location near the geomembrane laying site. Each sandbag is filled with 30kg of fine sand and must be weighed to ensure sufficient sand filling. A 5-10cm gap is left at the top for folding and sealing. Non-elastic nylon ropes are used to press the geomembrane at 2.5m*2.5m intervals on the large surface. At the bulges, the geomembrane is pressed tightly with sandbags, and three rows are laid densely on the sloping surface of the bulge. There is no need to use nylon ropes for connection here.
[0068] The construction of geomembrane and the process of covering the geomembrane with sandbags should follow the construction principle of proceeding from easy to difficult. First, lay and cover the entire large surface, then the bulging areas, and finally carry out the construction of the forebay area.
[0069] The method of covering the geomembrane with sandbags as described above includes the following steps:
[0070] S01: Geomembrane covering of the reservoir bottom;
[0071] S02: Geomembrane covering at the bulge;
[0072] S03: Geomembrane covering of the forebay.
[0073] In this embodiment, the above steps are adopted to meet the construction policy of proceeding from easy to difficult, which can ensure the efficiency and quality of construction.
[0074] Specifically, the reservoir bottom in step S01 consists of an excavation area and a backfill area. HDPE geomembrane is laid in the excavation area, and TPO geomembrane is laid in the backfill area.
[0075] In this embodiment, the reservoir bottom consists of an excavation area and a backfill area. The excavation area refers to the area where soil, rock, etc., are excavated during reservoir construction using mechanical or manual means. This process involves purposefully excavating soil according to engineering needs to expose building foundations, ditches, underground pipelines, etc. Construction in the excavation area typically involves a large amount of earthwork cutting, digging deep ponds, and opening new mines. The excavation area forms the foundation for construction and serves as the foundation for the reservoir bottom. Since its area is relatively large, HDPE geomembrane is used. HDPE geomembrane is a relatively rigid material, inexpensive, and has limited elasticity, thus its ability to cope with reservoir bottom settlement is limited. However, it can meet the requirements for reservoir bottom seepage prevention construction, making it a cost-effective option. Therefore, HDPE geomembrane is used in the excavation area.
[0076] The backfill area refers to the process of refilling the excavated soil back into the excavated area or other locations. Backfill soil can be used to fill entire areas of the ground or to fill voids under foundations or in pipe trenches. Backfill soil is generally compacted, and attention must be paid to loosening and drainage during earthwork to ensure optimal support and stability. The excavated soil in the backfill area is typically treated (e.g., sieving, cutting) to improve its physical properties and support capacity before backfilling. Therefore, surface seepage prevention measures are relatively important. TPO geomembrane is used; this material is relatively soft, slightly more expensive, has strong elasticity, and good resistance to reservoir bottom settlement, meeting the usage requirements of reservoir construction.
[0077] Therefore, using different types of geomembranes in different areas of the reservoir bottom can not only meet the actual needs of use, but also improve the economic benefits of the project.
[0078] Example 3
[0079] Specifically, the sandbags at the bottom of the silo are placed in the required position and leveled, and the air inside the sandbags is squeezed out. The large area of the silo bottom is covered by a point pressing method with sandbags spaced at 2.5m × 2.5m intervals.
[0080] In this embodiment, the sandbags are required to cover a large area of 2.5m × 2.5m at the bottom of the reservoir using a point-covering method, so that a large area of geomembrane at the bottom of the reservoir is effectively covered, ensuring that the seepage prevention construction of the bottom of the reservoir meets the requirements.
[0081] Example 4
[0082] Specifically, the bulges in step S02 are arranged to accommodate the tensile deformation of the geomembrane. They are distributed around the bottom of the reservoir and at the cut-fill boundary. At least three rows of external bulges are arranged by the cushion material so that the geomembrane presents a wavy line at the anchoring edge. The geomembrane at the bulge is densely pressed with sandbags, and three rows are densely laid on the sloping surface of the bulge without the need for nylon rope connection.
[0083] In this embodiment, the bulges in the reservoir construction process are arranged to accommodate the tensile deformation of the geomembrane. They are distributed around the bottom of the reservoir and at the cut-fill boundary. The arrangement of at least three rows of external bulges in the cushion material makes the geomembrane present a wavy line at the anchoring edge, which can effectively counteract the clamping effect, reduce the risk of tearing caused by excessive restraint of the geomembrane, and improve the seepage prevention performance.
[0084] Example 5
[0085] Specifically, the forebay in step S03 is the inlet and outlet of the reservoir, which is a three-sided sloping depression. A TPO geomembrane is laid on it. The geomembrane above the forebay is covered by sandbags in a horizontal and vertical stringing manner. Sandbags are horizontally and densely covered at intervals, and the sandbags are connected end to end with non-elastic nylon ropes.
[0086] Specifically, when the geomembrane is pressed over the forebay section, the anchoring method of the anchoring trench is adopted. A strip in the shape of an inverted trapezoid with a depth of 60 cm is dug down above the inlet and outlet of the forebay. 10 cm of reverse filter material is backfilled. Geotextile-geomembrane-geotextile is laid along the bottom edge using the sandwich method. Then, reverse filter material is backfilled parallel to the bottom surface of the reservoir and compacted. The geomembrane is laid on top and laid from the bottom surface of the reservoir.
[0087] In this embodiment, the forebay, as an important part of reservoir construction, mainly plays the following roles:
[0088] First, it evenly distributes water. The forebay can evenly distribute the incoming water from the water intake channel to each pressure water pipe, ensuring the stability and efficiency of the water flow. When the turbine's flow rate changes rapidly, the forebay can effectively supplement or accommodate additional water through its volume regulation function, maintaining the required flow rate of the pressure water pipe.
[0089] Secondly, it limits water hammer pressure. The free water surface of the forebay can reflect water hammer waves, limiting their propagation in the pressurized water pipes and preventing excessive water hammer pressure from damaging the system. When the flow rate in the pressurized water pipes changes, surge waves or drop waves will appear in the forebay accordingly. However, the side weirs located in the forebay can limit the rise of surge waves and reduce the impact of drop waves through water flow, thereby reducing the adverse effects of unsteady flow on the water diversion channel.
[0090] Thirdly, the forebay is responsible for cleaning the water intake. It can effectively remove dirt, silt, floating ice, etc. that enter the water intake channel, reduce wear on the water turbine and other potential impacts, and ensure the normal operation of the water intake system and the cleanliness of the water quality.
[0091] Fourthly, creating favorable hydraulic conditions is crucial. The purpose of constructing the forebay is to provide optimal hydraulic conditions for the pumps. The geometry and dimensions of the forebay should meet hydraulic requirements such as smooth water flow and uniform velocity distribution across the cross-section, preventing the main flow from detaching from the walls, deflecting, backflowing, and creating eddies. The forebay should include piers, sills, and columns to further optimize the flow, prevent siltation, and reduce vibration and noise during unit operation.
[0092] From the above description of the functions of the forebay, it can be seen that the forebay plays an important role in the construction of the reservoir. Therefore, the geomembrane covering method of the forebay is also particularly important. Anchoring technology, by installing anchor rods or anchor cables and applying prestress, improves the stability of the soil or rock mass and effectively prevents or mitigates geological disasters such as landslides and ground fissures. Choosing the anchoring method of anchoring grooves in the forebay can ensure effective covering and thus guarantee the quality of covering.
[0093] In this embodiment, the geomembrane is anchored using an anchoring groove above the inlet and outlet of the forebay, ensuring safe construction of the geomembrane on the slope from top to bottom, while also ensuring the firmness of the geomembrane welding under the impact of water flow at this location.
[0094] Example 6
[0095] Specifically, in step S03, the geomembrane of the inclined section of the forebay is welded to the geomembrane of the large surface of the reservoir bottom in step S01 using an anchoring groove.
[0096] Specifically, the treatment process for the welded joint between the geomembrane in the forebay section and the geomembrane at the bottom of the reservoir includes the following steps:
[0097] Step 1: Place a 1-meter-wide geomembrane on each of the left and right sides of the junction;
[0098] Step 2: Lay the three-dimensional composite drainage net normally on the subbase;
[0099] Step 3: Lay a geomembrane on top of the three-dimensional composite drainage net;
[0100] The welding process is as follows:
[0101] The upper layer of geotextile embedded in the filter material is hot-air welded to the three-dimensional composite drainage net on the left.
[0102] The geomembrane is then welded to the upper geomembrane layer using a single-track welding process.
[0103] The lower layer of geotextile embedded in the filter material is hot-air welded to the three-dimensional composite drainage net on the right.
[0104] On the right side of the single-rail weld, a suitable position is selected to connect the geomembrane of the forebay slope using double-rail welding.
[0105] In this embodiment, the above-mentioned welding method can ensure that the geomembrane on the slope is laid from top to bottom, which reduces construction costs, improves work efficiency, and is safe and controllable, ensuring safety during the construction process.
[0106] In general, the method of using sandbags to cover the geomembrane involves spacing and point pressing on the large surface of the reservoir bottom; on the slope section of the forebay, sandbags are connected horizontally and vertically, densely covering the geomembrane at intervals and connecting the ends with non-elastic nylon ropes; at the bulges, the geomembrane is densely pressed with sandbags, with three rows densely laid on the slope of the bulge, where no nylon rope connection is needed. Selecting different covering methods according to the construction method of different parts of the reservoir can effectively cover the geomembrane and save labor costs, ensuring that the geomembrane is effectively covered and guaranteeing the effective function of the seepage prevention project in the reservoir construction.
[0107] The preferred embodiments of the present invention have been described in detail above with reference to the accompanying drawings. However, the present invention is not limited to the above embodiments. Within the scope of knowledge possessed by those skilled in the art, various changes can be made without departing from the spirit of the present invention.
[0108] Many other changes and modifications can be made without departing from the concept and scope of this invention. It should be understood that this invention is not limited to the specific embodiments, and the scope of this invention is defined by the appended claims.
Claims
1. A method for pressing sandbags onto a geomembrane, characterized in that, Includes the following steps: S01: Geomembrane lining of the reservoir bottom. The reservoir bottom consists of an excavation area and a backfill area. HDPE geomembrane is laid in the excavation area and TPO geomembrane is laid in the backfill area. Sandbags at the reservoir bottom are placed in place and leveled as required, and the air in the sandbags is pressed out. The large area of the reservoir bottom is covered by point lining with sandbags spaced at 2.5m × 2.5m. S02: Bumped geomembrane covering. The bumps are arranged to accommodate the tensile deformation of the geomembrane. They are distributed around the bottom of the reservoir and at the cut-fill boundary. At least three rows of external bumps are arranged with cushion material so that the geomembrane presents a wavy line at the anchoring edge. The geomembrane of the bumps is tightly pressed with sandbags. Three rows are densely laid on the sloping surface of the bumps without the need for nylon rope connection. S03: Forebay geomembrane covering. The forebay is the inlet and outlet of the reservoir. It is a three-sided sloping depression. A TPO geomembrane is laid on it. The geomembrane covering above the forebay is done by connecting sandbags horizontally and vertically. Sandbags are densely covered horizontally at intervals and the sandbags are connected end to end with non-elastic nylon ropes. In step S03, the geomembrane on the slope of the forebay is welded to the geomembrane on the bottom surface of the reservoir in step S01 using an anchoring groove. The specific steps for treating the welded joint between the forebay geomembrane and the reservoir bottom geomembrane are as follows: Step 1: Place a 1-meter-wide geomembrane on each of the left and right sides of the junction; Step 2: Lay the three-dimensional composite drainage net normally on the subbase; Step 3: Lay a geomembrane on top of the three-dimensional composite drainage net; The welding process is as follows: The upper layer of geotextile embedded in the filter material is hot-air welded to the three-dimensional composite drainage net on the left. The geomembrane is then welded to the upper geomembrane layer using a single-track welding process. The lower layer of geotextile embedded in the filter material is hot-air welded to the three-dimensional composite drainage net on the right. On the right side of the single-rail weld, a suitable position is selected to connect the geomembrane of the forebay slope using double-rail welding. The sandbag is made of 250g polyester filament woven geotextile and 150g short filament nonwoven geotextile. The inner side of the sandbag is lined with woven fabric. The sandbag has an UV resistance retention rate of ≥90%, a longitudinal tensile strength of ≥65kN / m, and a transverse tensile strength of not less than 0.7 times the longitudinal tensile strength. The sandbag has a rounded corner structure.
2. The method for pressing sandbags onto a geomembrane according to claim 1, characterized in that, When the geomembrane is pressed over the forebay, the anchoring method of the anchoring trench is adopted. A strip in the shape of an inverted trapezoid with a depth of 60 cm is dug down above the inlet and outlet of the forebay. 10 cm of reverse filter material is backfilled. Geotextile-geomembrane-geotextile is laid along the bottom edge using the sandwich method. Then, reverse filter material is backfilled parallel to the bottom surface of the reservoir and compacted. The geomembrane is laid on top and laid from the bottom surface of the reservoir.
Citation Information
Patent Citations
Side slope surface anti-seepage design method
CN109629580A
Net type geomembrane pressing block structure
CN215715045U
Sandbag for civil engineering
JP2009108613A