On-site control system and method for double-ring network multi-stage ship lock
Through the combination of the double-ring network multi-stage lock on-site control system and the redundant PLC system, the complex problems of data acquisition, control and communication during the ship's lock pass are solved, and the dual guarantees of automated control and manual operator takeover are realized, which improves the safety and reliability of the system.
Patent Information
- Application Number
- CN202411893738.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-20
- Publication Date
- 2025-04-01
AI Technical Summary
The existing multi-stage lock control system is difficult to achieve real-time data acquisition, centralized control and communication control during ship lock passes, resulting in complex operations and heavy loads, and the problem that the operator station cannot take over control rights in the event of communication failure.
The double-ring network multi-level lock site control system is adopted, and the two I/O servers are hot backup for each other for data collection and instruction issuance, realizing multi-level uplink, downlink and water replenishment operations of the lock, and setting up a redundant PLC system and touch screen in the centralized control unit to ensure communication control with the gate site.
The automatic control of five-level uplink, downlink and water replenishment operations of the ship lock is realized, which reduces the load of the operator station, ensures the safety and reliability of the system, and allows the operator to manually take over the control rights in the event of communication failure.